Search NASA⌕ Search

SEARCH · Search NASA

Results for “Battery energy storage system (BESS)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

West Africa Battery Energy Storage Systems (BESS) Capacity Building - Discussion of BESS Tariffs: Payment Structures and Case Studies [Slides]

Battery Energy Storage Systems (BESS) are emerging as critical assets for enhancing grid reliability, integrating renewable energy, and enabling system flexibility. Yet, the regulatory and financial frameworks that determine how BESS projects are compensated vary widely across jurisdictions. This presentation explores international case studies - from Honduras, Costa Rica, Chile, South Africa, Mexico, and Brazil - to illustrate how tariff design and payment structures are evolving to support large-scale BESS deployment. The cases highlight a range of ownership and revenue models, including cost-of-service mechanisms, energy and capacity payments, and market-based arbitrage, as well as hybrid approaches under development. The discussion will examine key challenges such as defining remuneration for ancillary services, addressing double charging, and accounting for efficiency losses and degradation over time. By comparing experiences across markets, the presentation identifies emerging best practices for valuing BESS and designing tariffs that align technical performance with economic incentives, providing insights for regulators, utilities, and policymakers pursuing storage integration.

25 ENERGY STORAGE↗

Africa Battery Energy Storage Systems (BESS) Capacity Building Li-Ion Battery Degradation and Performance [Slides]

This presentation is intended for power system engineers, operators, and planners who work on isolated power systems that have (or may soon have) high levels of power generation coming from wind turbines, solar farms, and battery energy storage, which are collectively referred to as inverter-based resources. It describes the basics of lithium-ion battery energy storage systems and lithium-ion battery degradation. Battery degradation at the cell-level is explained, and then the structure and degradation of battery energy storage systems is also explained. This is intended to help power system engineers, operators, and planners to understand and effectively utilize battery energy storage systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Africa Battery Energy Storage Systems (BESS) Capacity Building Utility-Scale Storage: BESS Valuation, Tariffs, and Remuneration [Slides]

Utility-scale Battery Energy Storage Systems (BESS) are key to enhancing grid reliability, integrating renewable energy, and providing operational flexibility. Designing effective valuation, remuneration, and tariff frameworks is essential to ensure both system benefits and financial viability for developers. This presentation outlines a structured methodology for evaluating BESS projects, covering policy and legal considerations, cost and revenue analysis, benchmarking, financial sensitivity, and risk assessment, while ensuring alignment with public interest. It also explores valuation of multiple storage services - bulk energy, ancillary services, and infrastructure support - and monetization strategies through capacity payments, energy tariffs, tolling, arbitrage, and non-wires alternative payments. Technical factors, including round-trip efficiency, degradation, and storage duration, are integrated into financial and operational modeling to quantify both system-wide and project-level benefits. Through case studies and simulation-based approaches, this framework provides regulators, utilities, and developers with practical guidance for tariff design, payment structures, and investment decisions, maximizing the economic and societal value of BESS deployment.

25 ENERGY STORAGE↗

Battery Energy Storage System (BESS) Licensing and Permitting [Slides]

This presentation provides an overview of the licensing, permitting, and regulatory frameworks governing Battery Energy Storage Systems (BESS) across multiple international contexts. It outlines foundational permitting considerations - including safety standards, siting requirements, regulatory and environmental obligations, and interconnection processes - alongside typical pathways for installation, approval, and inspection. The presentation summarizes key technical standards such as NFPA 855 and IEEE guidelines, and emphasizes best practices for safe and effective deployment. A series of detailed case studies from South Africa, Chile, Mexico, Brazil, Costa Rica, Honduras, and the Dominican Republic illustrates how different countries structure approval authority, evaluate environmental impacts, and integrate BESS into national grid systems. The deck concludes with insights on emerging challenges, including evolving regulatory frameworks, financial viability, and the need for pricing mechanisms that accurately value storage services.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Battery Energy Storage System (BESS) End-of-Performance and Decommissioning Considerations [Slides]

This presentation provides a comprehensive overview of end-of-performance and decommissioning considerations for large-scale Battery Energy Storage Systems (BESS). It outlines expected system lifespans, midterm assessment needs, and pathways for extending operational life through augmentation or repowering. The presentation details regulatory requirements that govern decommissioning plans, cost estimates, financial assurance mechanisms, and performance obligations across multiple jurisdictions. It further examines end-of-life equipment management, including recycling, waste handling, transportation, and environmental compliance. Designed to support Malawi's electricity-sector institutions, the presentation highlights how planning for decommissioning and environmental stewardship can be integrated early in project development to ensure safe, financially accountable, and environmentally responsible BESS system retirement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Key Considerations for Adoption of Technical Codes and Standards for Battery Energy Storage Systems in Thailand

Battery storage is “technology that enables power system operators and utilities to store energy for later use. A battery energy storage system (BESS) is an electrochemical device that charges (or collects energy) from the grid or a power plant and then discharges that energy at a later time to provide electricity or other grid services when needed”. As countries in Asia consider the inclusion of BESS in their power systems to meet policy objectives, renewable energy goals, increase resilience, and expand energy access, there is an opportunity to learn from the experiences of other regions and jurisdictions that have developed more advanced storage markets and deployment methodologies. This report presents global best practices of codes, standards, and interconnection procedures developed to support the safe and reliable deployment of BESS. Several relevant case studies highlight current efforts to ensure safe operation of BESS and showcase potential pathways for adoption of relevant codes and standards. Specifically, this report is intended to support the Thailand Office of Energy Regulatory Commission (OERC) and other stakeholders in their efforts to develop technical codes and standards to govern the installation and operation of BESS; it may also be utilized as a guide for other countries as interest in the deployment of BESS technologies continues to grow.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

Component Criticality in BESS for Cybersecurity

Battery energy storage systems (BESS), inverters, and associated digital equipment are integral pieces of interdependent energy delivery systems. When considering the supply chain security of such systems, there is often a misplaced focus on the origin of energy generation and storage materials like battery cells, overlooking the more significant cyber risks that stem from digital power electronics control systems. Part of this misplaced focus is due to the relative costs of these components, with more attention given to expensive raw materials rather than the impactful digital elements themselves. The Idaho National Laboratory (INL) is addressing this gap in supply chain security through a systems-of-systems approach that considers the impact various components in digital energy systems can have should misoperation occur. Therefore, INL assigns a cyber criticality score based on quantitative analysis, which enables informed prioritization of mitigations and allows operators to reduce risk in light of the prevalence of a BESS and associated systems foreign supply chain.

25 ENERGY STORAGE↗

IEEE PES GM Poster - Cyber-Informed Engineering Approach to Mitigating BESS Supply Chain Concerns

Battery energy storage systems (BESS) are increasingly important to meet the needs of grid resilience and reliability. BESS provide critical grid services, maintaining stability of the grid with increased variable conditions. However, there are significant geopolitical and security concerns regarding their operation in critical infrastructure, due to lack of a domestic supply chain and prevalence of foreign entity of concern (FEOC) components in BESS and associated inverter-based resources. The supply chain challenge is dually exacerbated by a lack of alternative suppliers who can meet the economic targets for energy delivery and a potentially adversarial supply chain. Solutions are needed to secure components, addressing mixed layers of risk and engineering controls. This paper presents a specific application of Cyber-Informed Engineering (CIE) principles for BESS and recommends an alternative strategy to blocking the supply chain, ensuring that grid modernization targets can be met despite lack of a validated or secure supply chain. This study focuses on the United State (U.S.) use case, but the process can be applied globally to address supply chain security challenges. CIE practices represent the next step in functional assurance and risk mitigation, ensuring optimal resource allocation and enhancing security measures to safeguard the future of energy in the U.S. and beyond.

25 - ENERGY STORAGE↗

Battery asset management with cycle life prognosis

We report Battery Asset Management problem determines the minimum cost replacement schedules for each individual asset in a group of battery assets that operate in parallel. Battery cycle life varies under different operating conditions including temperature, depth of discharge (DOD), charge rate, etc., and a battery deteriorates due to usage, which cannot be handled by current asset management models. This paper presents a new battery asset management methodology where battery cycle life prognosis is integrated with parallel asset management to reduce lifecycle cost of the Battery Energy Storage Systems (BESS). For the battery failure time prognosis, a nonlinear physics-based battery capacity fade model is developed and incorporated in parallel asset management model to update battery capacity over time. Experiment results have shown that the developed battery asset management methodology can be conveniently used to facilitate BESS asset management decision making thereby decreasing asset lifecycle costs.

25 ENERGY STORAGE↗

Small Hydro Power Plants with Integrated BESS for Enhance Resiliency

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a black start- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFM controlled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar PV and BESS Plant-Level Voltage Control and Interactions: Experiments and Analysis

In real world operation, low-frequency oscillations associated with plant-level voltage control of inverter-based resources (IBRs) have been a concern of grid operators. Here, this research aims to demonstrate and analyze the effect of plant-level voltage control on system stability and potential interactions among IBRs. The experiment results of a 13.2-kV system interconnected with two IBRs—a 1-MW battery energy storage system (BESS) and a 430-kW solar photovoltaic (PV) plant—are presented. Both 0.5-Hz and 3-Hz oscillations become visible at certain conditions. The phenomenon is further explained by use of a feedback system consisting of the plant-level droop control and the effect of reactive power or var injection on voltage. The main components of the block diagram are obtained via frequency scan measurements. The analysis offers an understanding of the main contributors and other influencing factors of the 3-Hz and 0.5-Hz modes. It also reveals the role of the volt-var droop gain, the low-pass filter time constant, and the system impedance in stability.

14 SOLAR ENERGY↗

Integration of Storage in the DC Link of a Full Converter-Based Distributed Wind Turbine

Energy storage is known to support the dispatchability of variable renewable resources. In this paper, we model a battery energy storage system (BESS) integrated with the DC link of a Type IV full converter-based wind turbine and the necessary controls to achieve efficient dispatch. To support the validation of control methodologies, we build a detailed model of a Type IV research wind turbine at the National Renewable Energy Laboratory (NREL), the Controls Advanced Research Turbine (CART 3), and we integrated a lithium-ion BESS model in grid-following mode into the model. The simulation results illustrate the sizing and control of the DC link-integrated BESS for a given variable wind resource and varying dispatch strategies (i.e., under constant, uncertain, and ramping wind scenarios). The integrated storage can smooth variabilities in distributed wind output, hedge against uncertainties, provide the ramping capability, as well as support stability under voltage and frequency transients. All of these have been illustrated in MATLAB/Simulink.

DC-link voltage↗

Solid-State Transformer and Hybrid Transformer With Integrated Energy Storage in Active Distribution Grids: Technical and Economic Comparison, Dispatch, and Control

Solid-state transformer (SST) and hybrid transformer (HT) are promising alternatives to the line-frequency transformer (LFT) in smart grids. The SST features medium-frequency isolation, full controllability for voltage regulation, reactive power compensation, and the capability of battery energy storage system (BESS) integration with multiport configuration. The HT has a partially-rated converter for fractional controllability and can integrate a small BESS. Fast grid-edge voltage fluctuations from increased solar photovoltaic (PV) and electric vehicle (EV) penetration are difficult to manage for mechanical load tap changers. Hence, along with the trend towards more BESS in the grid, the controllability and the storage integration capability of the SST and HT are of strong interest. However, a review of literature shows existing SST and HT research is mostly at converter level, while system-level assessments are scarce. Assessing technical and economic impacts is critical to understanding the benefits and role of the SST and HT to guide future research, which is presented for the first time in this article. Experimental results from medium-voltage (MV) SST and MV HT prototypes are shown to confirm equipment-level feasibility, where the voltage controllability waveforms of a MV HT prototype are reported for the first time. Comparative simulations are performed on a modified IEEE 34-bus system. Here, a grid-model-less decentralized grid-edge voltage control method and a day-ahead BESS dispatch method are proposed for the SST and HT. The simulations show that the SST and HT with integrated storage can host more PV, achieve peak shaving, mitigate voltage fluctuation and reverse power flow, and support energy arbitrage for operational cost reduction, as compared to the LFT. Moreover, comprehensive analyses of net present value (NPV) and internal rate of return (IRR) are performed under different installed PV capacities, HT’s partial converter ratings, and BESS capacities. Sensitivities to future cost reductions of the PV and BESS are studied. Although the NPV and IRR are currently negative, 60% capital cost reduction or 150% revenue increase will make the SST and HT economically viable in the use case studied.

14 SOLAR ENERGY↗

ASEAN Technical Exchange Workshop for System Operators, Regulators, and Policymakers

This presentation provides an in-depth exploration of power system planning, cross-border electricity trading, and battery energy storage systems (BESS), offering actionable insights for system operators, regulators, and policymakers. The first section delves into power system planning and analysis, focusing on capacity expansion models and resource adequacy studies, including their role in optimizing system efficiency, managing emissions, and addressing system reliability risks. Key considerations, such as integration of transmission into generation planning and the forecasting versus optimization of customer distributed energy resources (DER) technologies, are explored. The session highlights critical trade-offs in spatial granularity and model runtimes, as well as the feasibility of aligning distribution investments with capacity expansion efforts. The second section examines cross-border electricity trading, with an emphasis on resource adequacy concepts such as reliability targets, loss of load expectation (LOLE), and planning reserve margins (PRM). Case studies on reserve market design and coordination across US regions provide insights into improving reserve deliverability and managing interregional power balance and congestion. This section also addresses market-to-market congestion management, including advanced strategies for high-voltage direct current (HVDC) optimization and ancillary service delivery. Finally, the presentation covers the rapid evolution of Battery Energy Storage Systems (BESS), highlighting their operational growth, regulatory frameworks, and use cases in grid flexibility, energy storage, and reliability. The discussion focuses on the benefits of BESS for system stability, resilience, and integration of renewable energy, offering insights into its role as a vital component in the transition toward a more sustainable and flexible grid. Key performance parameters, such as throughput, round-trip efficiency, and state of charge, are also examined.

25 ENERGY STORAGE↗