Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

End-Use Savings Shapes Measure Documentation: Boiler Replacement with Air-Source Heat Pump Boiler and Natural Gas Boiler Backup

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock (™) and ComStock (™) models over the past three years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) measures. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility measure applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each timestep. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on a single end-use savings shape measure - boiler replacement with air-source heat pump boiler with natural gas boiler backup. This measure replaces natural gas boilers for HVAC application by air-source heat pump boilers when applicable and use natural gas boiler backup when the heat pump boiler could not operate due to outdoor air conditions which are below its cutoff temperature. This measure helps to quantify the decarbonization as well as the energy savings potential from the replacement. The measure resulted higher savings in natural gas consumption compared to the increase in electricity consumption, with a ratio of 3. The total natural gas energy consumption was reduced by 41%, whereas the total electricity consumption was increased by 5.3%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

End-Use Savings Shapes Measure Documentation: Boiler Replacement with Air-Source Heat Pump Boiler and Electric Boiler Backup

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock TM and ComStock TM models over the past three years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) measures. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility measure applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each timestep. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual sub hourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on a single end-use savings shape measure—boiler replacement by air-source heat pump boiler. This measure replaces space heating natural gas boilers by air-source heat pump boilers when applicable and helps quantify the decarbonization as well as the energy savings potential from the replacement. The measure resulted higher savings in natural gas consumption compared to the increase in electricity consumption, with a ratio of 2.9. The total natural gas energy consumption was reduced by 20%, whereas the total electricity consumption was increased by 2.5%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Emission factors of industrial boilers burning biomass-derived fuels

Boilers are combustion devices that provide process heat and are integral to many industrial facilities. Historically, outside of the pulp and paper industry, most boilers burned fossil fuels, although interest in decarbonization has been leading to an increased use of renewable fuels in boilers. These boilers, including those in the biorefineries, are often large sources of air pollutant emissions, and the characterization of these emissions is critical to obtaining air permits and ensuring protection of the surrounding air quality. Several industrial boilers and new biorefineries allow utilization of biomass-derived fuels (e.g. wastewater sludge, lignin, etc.) produced during their operation as a fuel for the boiler to meet process energy needs. However, there is limited empirical data on emission factors for the burning of unconventional fuels, such as solid-gas mixtures containing biomass residues. To fill this gap, we carry out a comprehensive data survey, collecting information on emission factors for boilers burning either a single or a mixture of solid and gaseous biomass-derived fuels. We review multiple hard-to-obtain and unconventional data sources, such as air permit applications, stack test data, and industry-sponsored data collection efforts, to compile emission factors for biomass-derived fuels. We then compare this data with wood residue emission factors from the U.S. Environmental Protection Agency’s AP-42 emission factor database. Our results indicate that the emission factors for boilers burning unconventional fuels vary widely depending on the fuel composition, boiler type, and fuel characteristics. Overall, we find that median emission factors of selected biomass-derived fuels are typically lower than those of wood residue boilers in AP-42. The information collected herein could be useful to permitting agencies and industries utilizing boilers who may want to reduce the carbon impact of their facilities by combusting biomass-derived wastes for process energy needs, for more accurate emission estimation for permitting.

09 BIOMASS FUELS↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

Full Scale 3D Computational Model of the Industrial -Scale Coal Fired Boiler Performance for Temperature Sensor Installation Guidance

Abstract Nearly 30% of the electricity is generated by using coal as the primary fuel in the US. One of the major concerns in coal-fired power plants is the failure of boiler tubes that leads to unscheduled maintenance and has a huge economical and societal impact. High temperature flue gas along with ash pass over the boiler tubes, which over time leads to tube failure. Therefore, developing temperature sensors for harsh environments and install them for temperature sensing and boiler tube lifetime prediction is an urgent need. On the side of sensor development, the location of the sensor installation is important for stable sensing performance and easy calibration. In this study, computational fluid dynamics and heat transfer modeling are adopted to establish a full-scale 3-dimensional model of a coal-fired boiler to investigate the flue gas temperature distribution within the boiler and identify the proper locations for sensor installation. We proposed three criteria to select the temperature sensor installation location: (1) select the boiler tube panel away from the sidewalls, (2) select the boiler tube section closer to the top wall of the boiler; and (3) select the boiler tube on the back of the boiler panel (not directly facing the flue gas flow). In these regions, the flue gas temperature is stable, providing an ideal environment for stable temperature sensing and calibration.

Gupta, Tanuj↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Test and Validate Distributed Coaxial Cable Sensors for in situ Condition Monitoring of Coal-Fired Boiler Tubes

This project aims to test, validate, and advance the technology readiness level (from TRL5 to TRL7) of a novel low-cost distributed stainless-steel/ceramic coaxial cable sensing (SSC-CCS) technology for in situ monitoring of the boiler tube temperature in existing coal-fired power plants. The novel SSC-CCS sensing technology and associated condition-based monitoring (CBM) software to be demonstrated in this project will lead to an improved understanding of the boiler tube failure mechanisms and a prognostic system to improve the overall performance, reliability, and flexibility of the nation’s coal-fired power plant fleet. A boiler tube monitoring system with distributed coaxial cable temperature sensors and a sensor acquisition system was constructed. The high-temperature coaxial cable sensor with a length of 1.3m was made by using a quartz tube (1mm inner diameter (ID) and 6mm outer diameter (OD)) to concentrically separate a 304 stainless-steel (SS) rod (1mm OD) and SS tube (7.94mm OD and 6.16mm ID). The sensor acquisition system includes a vector network analyzer (VNA), a radio frequency (RF) power amplifier, multiple switches and a USB hub. The distributed stainless-steel quartz coaxial cable sensor (SSQ-CCS) had a linear response to temperature with a resolution uncertainty of σ = 0.77℃. To withstand the harsh conditions of 3,300 steam pressures and 800℃ high temperatures, the sensor was shielded by a protective tube made of the same material as the boiler tube. The protection tube had an OD of 1.5 inches and a thickness of 0.25 inches. In the laboratory tests, the sensor showed good sensitivity and fast response. The drift was bounded between +0.33% and -0.67% during a test at 600℃ for 350 hours, indicating good stability of the sensor. A field test was conducted where four sensors were welded on four superheat tubes (SH-Ts) at a coal-fired power station over 400 days. Conventional thermocouples were welded to the superheater tubes alongside the coaxial cable sensors for the purpose of comparison. Two sensors were capable of distributed sensing, with three multiplexed sensing sections. The other two sensors were single section. During the 400-day test period, the power plant experienced startups and shutdowns. At the steady state operations, the temperature of the boiler tube is about 600℃ (1112°F). The sensors recorded the entire coal-firing processes (start-up, steady state, and shut-down) and the glitch event. A GSM modem and a Watchdog were added to the system to ensure reliable data recording. The GSM modem sent daily messages to plant managers and Clemson team to inform the status of the sensor system. If the system was not normally working, the Watchdog would reboot the system automatically. The new coaxial cable based distributed sensing technology has been proven to be successful in both laboratory and field tests. A comprehensive four-stage multi-physics computational framework has been developed to assist the design, optimization, installation, and operation of SSQ-CCS. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. A conditional-based monitoring system is implemented as well. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

01 COAL, LIGNITE, AND PEAT↗

Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Coal and Biomass – Integration of Combustor Boiler and DCC

Utilities and grid operators worldwide are under significant pressure to incorporate intermittent renewable sources while strategizing on how to maintain the necessary stability and reliability of the grid. The development of a power plant which will be capable of flexible operation to meet the needs of the grid as more intermittent sources like wind and solar energy are incorporated is key to maintain the reliability of the grid. Through the use of innovative and cutting-edge technologies that improve efficiency and reduce carbon emissions, and being small compared to today's conventional utility-scale power plants, the modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. Specifically, the process offers: 1) a modular plant design that allows for better operational flexibility; 2) the utilization of fuel-staging and pressurized oxy-combustion, resulting in smaller plant size, improved plant efficiency, and reduced costs for pollutant and CO2 removal compared to traditional power plants with post-combustion capture technology; and 3) the use of small modular boilers and pollutant removal units that can be constructed off-site leading to reduced capital costs for the plant. WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustor-boiler system and the direct contact cooler. To demonstrate the boiler convective section and to obtain critical data for commercial-scale pressurized boiler design, a simulated convective heat transfer boiler test section was designed and integrated with the combustor (radiant section). A direct contact cooler (DCC) was integrated with the combustor-boiler to demonstrate the dynamic operation of the integrated system and the performance of the DCC, including the efficiency for simultaneous removal of NOx and SOx. This talk will present an update on the evaluation of the critical components for system integration, including heat transfer data from the simulated boiler, scrubbing efficiency for the DCC under different operating conditions, and CFD modeling and validation for burner and boiler development.

Magalhaes, Duarte↗

Oxy-combustion process with modular boiler design

A modular boiler system for implementing fuel combustion is provided. The system includes a first boiler and a second boiler of a plurality of boilers, an oxygen input unit, a fuel input unit, a recycled flue gas input unit, and a flue gas separator. The first boiler receives oxygen from the oxygen input unit, fuel from the fuel input unit, and recycled flue gas from the recycled flue gas input unit. The first boiler outputs intra-system flue gas. The flue gas separator separates the intra-system flue gas into a first and second flue gas stream, transfers the first flue gas stream to the second boiler, and transfers the second flue gas stream to a gas cleaning system. The second boiler receives oxygen from the oxygen input unit, fuel from the fuel input unit, and the first flue gas stream from the flue gas separator.

Axelbaum, Richard L.↗

Creating an Advanced Sensor Network to calculate real-time, mass-weighted flue gas composition and air heater leakage of a coal-fired utility boiler under dynamic operating conditions

Utilization of renewable energy sources to minimize the environmental impact of energy production has changed the way utility boilers operate, requiring frequent load cycling between full load and partial loads as low as 30%. Dynamic operation of coal-fired utility boilers significantly reduces boiler efficiency when compared to steady state at full load. Data-driven plant optimization has shown success with coal-fired utility boilers under dynamic operating conditions. The purpose of this work was to create an Advanced Sensor Network (ASN) to provide more extensive real-time data to inform dynamic plant optimization of Net Unit Heat Rate (NUHR). The ASN consists of gas sampling grids in the convective pass of the boiler and downstream of the air heater. These sampling grids allow for quantification of spatial variation of flue gas within the boiler and calculation of mass-weighted composition of flue gas through the combination of composition, velocity, and temperature measurements. The comparison of O 2 between the inlet and outlet of the air heater is used to calculate air leakage in real time. Flue gas composition and air heater leakage are both important factors in boiler efficiency and NUHR. Further, the results of this work support the value of mass-weighted averages for determining flue gas composition accurately. The measurements from the ASN show increased composition stratification during dynamic operation, with an average standard deviation 38% higher than observed during steady-state operation. Air heater leakage was also observed to increase from 2.8% to 5.1% following a load change. Prior to the installation of the ASN, these data would not have been available for dynamic control. These real-time data will be leveraged to calculate and optimize for NUHR during dynamic operation in future work.

42 ENGINEERING↗

AI-Enabled Robots for Automated Nondestructive Evaluation and Repair of Power Plant Boilers. Final Report

Boiler failure could cause loss of life and safety issues, cost hundreds of thousands of dollars in equipment repairs, property damage and production losses, and drive up the cost of electric power. Boiler maintenance is challenging and risky for inspectors working on scaffolding in confined hazardous spaces inside of a boiler and sometimes the space is hard to access. The operation is also time-consuming due to the large area of vertical structures for inspection and the tremendous effort needed for scaffolding. Recently, the use of robotics (e.g., drones and crawlers) in power plants for maintenance is growing rapidly. However, the existing robotics solutions show two notable technological gaps: no live repair capability, and no Artificial Intelligence (AI) for smart autonomy. The objective of this project is to develop an integrated autonomous robotic platform that is equipped with compact non-destructive evaluation (NDE) sensors to perform live inspection, operates onboard repair devices to perform live repair, and uses AI for intelligent data fusion and predictive analysis for automated and smart spatiotemporal inspection, analysis and repair of the furnace walls in coal-fired boilers. The approach to achieve the objective includes developing NDE sensors with signal processing techniques, designing and evaluating repair devices for robots based on fusion and solid-state technologies, and an autonomous robotic platform that can attach to and navigate on boiler furnace walls using magnetic drive tracks. The robot is also powered by AI to automate data gathering (e.g., 3D mapping and damage localization) and predictive analysis. This project has advanced the state-of-the-art by providing technological breakthroughs including compact NDE and repair tools for robots, AI capabilities for smart autonomy, and a robotic platform for automated boiler maintenance. This project has great potential to result in significant benefits including limiting or eliminating the need to send operators to assess difficult-to-access or hazardous areas, enabling automated live inspection and repair, avoiding time consuming scaffolding (especially for partial maintenance during unplanned outage), collecting comprehensive and well-organized data smartly, and avoiding or limiting the need for onsite or remote piloting technicians. The impacts can be tremendous in terms of the time and cost savings, reducing the risk for human operators, and increasing boiler reliability, usability, and efficiency. In addition, by developing the new technologies on the autonomous inspection and repair robot, by involving multiple undergraduate and graduate students working together with the faculty members on this project, and by generating knowledge and building up collaborations with industrial partners, this effort will significantly update the education capabilities, support long-term fundamental research, and maintain the leadership of Colorado School of Mines and Michigan State University in energy fields.

20 FOSSIL-FUELED POWER PLANTS↗

Electrification potential of U.S. industrial boilers and assessment of the GHG emissions impact

Electrification is a key strategy for decarbonizing the industrial sector. Industrial process heating, which still relies heavily on fossil fuel combustion and accounts for the majority of sector wide GHG emissions, is a particularly attractive electrification target. Electrifying industrial boilers represents a cross-cutting opportunity for GHG emissions reductions, given their widespread use in most manufacturing industries. Yet, there are gaps in the understanding of the current population of conventional industrial boilers in the United States that preclude a characterization of boiler electrification's technical potential to reduce fuel consumption and GHG emissions. In this study, we develop an up-to-date dataset of the industrial boiler population in the U.S. and quantify the county-level electricity requirements and net changes in fuel use and GHG emissions under the current electric grid and theoretical future grid scenarios. Our results show an increase of 105 MMmtCO 2 e and 73 MMmtCO 2 e in GHG emissions from boiler electrification, with and without the replacement of byproduct fuels, respectively, under the current electric grid, and a reduction of 19 MMmtCO2e and 7 MMmtCO2e in GHG emissions under a future high renewables electric grid. GHG emissions savings are currently possible only in certain regions of the U.S. unless future grids are decarbonized. We also provide discussion that could be useful for policy makers and manufacturing facilities for advancing the electrification of industrial boilers in locations and industries toward fuel savings and GHG emissions reductions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electrification of industrial boilers in the USA: potentials, challenges, and policy implications

Decarbonization of the industrial heat demand through electrification could contribute significantly to climate change mitigation efforts. In the US industry, thermal processes accounted for 75% of the total final energy demand in 2018, of which 17% is consumed by conventional industrial boilers (excluding cogeneration) for steam generation. Electric boilers have a small share in the US industrial steam generation due to several techno-economic reasons. Here, this study employs a bottom-up approach to investigate the sector-level and state-level techno-enviro-economic potentials of deploying electric boilers in the US industry in different timeframes. The results show that the technical potential energy and CO 2 savings by electrifying industrial boilers are 595 PJ and 200 MtCO 2 per year in 2050, respectively; however, these incur additional costs in each sector. Although there may be individual cost-effective opportunities for electrifying boilers in specific industrial sites, the overall costs are high in all industrial sectors and states due to the large disparity between electricity and combustion fuel prices. To overcome the highlighted techno-economic barriers, a comprehensive action plan for different stakeholders is also formulated. This study provides novel insights that should inform policymakers’ and executives’ decisions about the electrification of the current and future US industrial boiler systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Four-Stage Multi-Physics Simulations to Assist Temperature Sensor Design for Industrial-Scale Coal-Fired Boiler

The growth of renewable energy sources presents a pressing challenge to the operation and maintenance of existing fossil fuel power plants, given that fossil fuel remains the predominant fuel source, responsible for over 60% of electricity generation in the United States. One of the main concerns within these fossil fuel power plants is the unpredictable failure of boiler tubes, resulting in emergency maintenance with significant economic and societal consequences. A reliable high-temperature sensor is necessary for in situ monitoring of boiler tubes and the safety of fossil fuel power plants. In this study, a comprehensive four-stage multi-physics computational framework is developed to assist the design, optimization installation, and operation of the high-temperature stainless-steel and quartz coaxial cable sensor (SSQ-CCS) for coal-fired boiler applications. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. With the simulation-guided sensor installation plan, the newly designed SSQ-CCSs have been employed for field testing for more than 430 days. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

42 ENGINEERING↗

Characterization of Temperature Heterogeneity in Utility-Scale Power Plant Boilers by Spatially Distributed Ultrasonic Measurements

In extreme environments, even hardened insertion sensors fail quickly. For such environments, we have developed an ultrasonic (US) method for measuring the spatial distribution of temperatures in solid materials and, specifically, across containments of extreme processes. By deploying US sensors in multiple locations, spatial heterogeneity in temperatures inside harsh environments may be characterized. In this note, we update our progress on testing the developed approach in an industrial setting and its performance in describing the temperature distribution inside a 500 MW (electrical) coalfired utility boiler of an electrical power generation plant. We use waveguides (WG) structured to contain echogenic features that produce a train of echoes in response to an excitation pulse. The time of flight between echoes encodes the information on the temperature distribution in the corresponding segment of the WG, which we reconstruct using its parametrization. Five waveguides were welded to the boiler’s heat exchange surface (waterwall) and different locations at the same boiler elevation and produced reliable US waveforms 18 months after the installation. For several weeks during the latest trial, we performed US measurements in five locations spanning half of the boiler’s 14-meter width. The measurements were acquired during regular operation, including load cycling to adjust for demand and intermittent contributions of renewable power sources, and during boiler shutdown for emergency maintenance and the subsequent restart. The interpretation of US waveforms by signal processing resulted in an accurate estimation of temperature distribution along the waveguides. We captured daily cyclical variations in demand-following load. Measurements performed in multiple locations revealed unexpected temperature variations across the boiler. We conclude that an array of developed sensors can provide responsive and spatial temperature measurements while maintaining functionality despite prolonged exposure to an extreme environment.

Walton, Kenneth↗

AOI [1] Advanced Manufacturing of Ceramic Anchors with Embedded Sensors for Process and Health Monitoring of Coal Boilers

Researchers at West Virginia University (WVU) developed methods to fabricate and test ceramic anchors with an embedded sensor technology for monitoring the health and processing conditions within pulverized coal (PC) and fluidized-bed combustion (FBC) boiler systems. The technology included the development of advanced manufacturing processes for 2D/3D printing electroceramic (conductive ceramic) sensor designs within the ceramic anchor microstructure during the manufacturing process. This advanced manufacturing process would allow for the precise control of local microstructure and composition in order to engineer layer-by-layer any protective and electrically active materials within the refractory anchor. This 3D printing technology would permit the rapid and controlled design of the refractory microstructure and embedded sensor design throughout the volume of the ceramic anchor. The work also included a method to interconnect the sensors to boiler shell through the anchor clamp, where the sensor signals will be processed by low-power electronics and transmitted wirelessly to a central processing hub. The end-goal of the program was to produce a ceramic anchor sensor system which would be ready for implementation within a coal boiler, and/or other similar refractory liner systems (such as that in the glass and metal manufacturing areas). The project objectives were to: 1) Define the chemical and microstructural stability, in addition to the electrical properties, of oxide and non-oxide ceramic composites to be embedded within the ceramic anchor compositions that may operate up to 1400ºC; 2) Develop and implement the 2D/3D printing technology to pattern and control the microstructure of the ceramic anchor and embedded sensor circuits; 3) Develop an interconnect technology which will permit easy installation of the ceramic anchors and signal collection at the boiler shell; 4) Develop low power analog electronics and wireless communication hardware to efficiently collect the sensor signal at each processing unit and transmit data to a central hub for data analysis; 5) Demonstrate the smart ceramic anchor system for temperature and liner fracture within a high-temperature processing unit, such as a boiler furnace or glass melting furnace floor/wall liner.

20 FOSSIL-FUELED POWER PLANTS↗