Search NASA⌕ Search

SEARCH · Search NASA

Results for “Building Permits”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Extract useful information from building permits data to profile a city’s building retrofit history

Building retrofit is one of the key strategies for cities to reduce energy use and GHG emissions. The historical information about changes to buildings is crucial to infer the buildings’ current energy system efficiency levels and to identify candidate buildings for retrofit. In general, a building permit is required before the start of any construction activity of a building, such as changing building structure, remodeling, or installing new equipment. Moreover, many large cities provide public datasets of building permits in history. Therefore, the permits are a potentially good resource for mining information on the city’s retrofit history. In this study, we use the permit dataset from the city of San Francisco as a case study. Location and time information from the dataset is also used to depict the retrofit timeline of each building and the whole building stock. The type of work of the permit is inferred from the descriptive text by a machine learning model. At last, the limitations of the current permit dataset and potential improvements on the permit data management are discussed to better utilize the information in the future.

Zhang, Wanni↗

Expedition UT-GOM2-2 Methods

Methods used during the University of Texas (UT) Deepwater Hydrate Coring Expedition (UT-GOM2-2) include work done onboard the Helix Q4000 in the offshore Gulf of America (Gulf of Mexico), herein “the Gulf”, “dockside” in Salt Lake City, Utah, and some shore-based work in individual laboratories. The goal of this report is two-fold: to provide enough detail on the methods so they can be repeated by others; and to provide a reference document for the team to enhance cross-disciplinary understanding and knowledge. Methods include drilling operations, depth references and depth modification, downhole tool deployment, coring tool performance assessment, core processing, lithostratigraphy, biostratigraphy, as well as physical properties, including core logging and imaging, rock magnetism, dissolved methane concentration, hydrate saturation, microbiology, and geochemistry. An extensive amount of operational work and planning was required before mobilization of the expedition to permit, build mobile labs, and test downhole tools for deepwater drilling.

03 NATURAL GAS↗

Using Open Data to Characterize Building Stock Trends for Energy and Equity Evaluation

This project provides a methodology for retrieving data from both existing public data and municipal open data sets to characterize changes in the building stock, socioeconomic, demographic, and climate indicators at a neighborhood scale. This methodology forms the basis for a geospatial dashboard to analyze and share the data. The developed methodology may be used to collect data for further energy equity analyses. Additional data sets, such as from other municipalities, may be incorporated in the future to expand the extents of the possible analysis.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building an EPA Class VI Permit Application

Summary To accelerate the commercialization of carbon capture and storage (CCS), the US Department of Energy (US DOE) is building on decades of characterization efforts and pilot-scale projects through their CarbonSAFE program. Administered through their National Energy Technology Laboratory, this program seeks to bring fully integrated projects to the sector that can store more than 50 million tonnes of CO2 over a 30-year period. The program, which was enacted before the enhancement of Internal Revenue Code Section 45Q, is in the capture assessment, characterization, and permitting phase. The objectives of this paper are to discuss (a) the injection permitting requirements of the CarbonSAFE projects; (b) information gathering in support of the permit; (c) the timelines of field development and permit-related activities; (d) the major technical components of the field development plan; and (e) early feedback from the regulators toward acceptance of the permit. In Mississippi, more than 30,000 acres have been characterized by six deep characterization wells, a deep groundwater well, and 92 line miles of 2D seismic as part of the CarbonSAFE Project ECO2S. During the acquisition of seismic data, all receiver lines were live, which resulted in the generation of a pseudo-3D seismic design. The incorporation of a 3D seismic survey was not included as part of this project due to logistical difficulties presented by the undulating, wooded surface terrain. A suite of openhole geophysical logs was taken from each well, allowing for a detailed interpretation of prospective storage reservoirs and confining intervals to complement the analysis carried out on the 290 ft of a whole core that was cut through the prospective confining zone and storage reservoir. The detailed geologic and reservoir data were assembled and entered into a 3D model to assess the injection capacity and the area of review (AoR). This information fed into the detailed corrective action, monitoring, testing, and postinjection site care (PISC) modeling. The results have been exceptional. The geologic assessment has revealed three primary storage targets, ranging in depth from 3,500 ft to 6,000 ft. These storage reservoirs net 1,300 ft of sandstone, with mean porosity and permeability of 29% and 3.6 darcies, respectively. Together, these reservoirs have storage capacities that may exceed 20 million tonnes per square mile, making this a gigatonne prospect. Forward modeling of the project resulted in an AoR of 16 sq miles, injecting about 8000 t/d, for 30 years, via two deep injection wells. The excellent confining characteristics of the caprock, relatively simple geologic structure, and lack of historical well drilling activity in this area provide excellent containment of the injected CO2. Based on this work, the project has proposed 20 years of PISC. To date, only two US CO2 injection permits have been granted. These projects relied on a singular capture point feeding a singular sequestration point (source to sink), and considerations have not been made to garner CO2 emissions from other industrial sources. The Kemper County Storage Complex is a first-of-its-kind storage hub concept that looks to develop an area capable of storing significant quantities of CO2 from the region. Also, this work will show how characterization efforts, geological and numerical modeling efforts, and plan development were constructed in support of permit and incentives acceptance.

Energy & Fuels↗

Illinois Storage Corridor, CarbonSAFE Phase III: UIC Class VI Permitting Plan

The Illinois Storage Corridor (ISC) project evaluated two distinct sites to determine the feasibility of commercial-scale CO₂ storage at each. The project leveraged the region's exceptional geological characteristics, particularly the well-characterized Cambro-Ordovician Storage Complex, to enable permanent geological storage of more than 50 million tonnes of CO₂ over 30 years. The two storage sites are located at One Earth Energy (OEE) facility in northcentral Illinois and Prairie State Generating Company (PSGC) in southcentral Illinois. Once operational, these facilities will combine to capture and store more than 6.5 million tonnes of CO₂ per year, positioning the ISC among the largest carbon storage regions globally. Preliminary homogeneous dynamic modeling based on regional and site-specific reservoir characteristics indicates promising injection capabilities at both locations. For the OEE site, modeling predicts a maximum allowable injection rate of 3.7 MTPA, with a baseline scenario of 1.7 MTPA over 30 years producing a CO₂ plume radius of 1.4 miles at end of injection. For the PSGC site, incorporating recent well data, modeling indicates a single-well maximum injection rate of 2.1 MTPA, with a plume radius of 4.2 miles at end of injection for the 60 MT over 30 years scenario. The primary objective of this CarbonSAFE Phase III project is to develop and submit Class VI Underground Injection Control (UIC) permit applications to the U.S. Environmental Protection Agency Region 5. The permitting plan outlines comprehensive site characterization, Area of Review delineation, monitoring programs, well construction designs, financial responsibility provisions, and post-injection site care procedures necessary to demonstrate safe, permanent CO₂ storage protective of underground sources of drinking water. Three UIC Class VI permit applications for the OEE site were submitted to EPA in October 2022 and are progressing through technical review, with final permit decision projected by June 2026. Through five rounds of Requests for Additional Information and responses, the applications have been refined to address computational modeling, area of review delineation, well integrity, monitoring protocols, and financial assurance requirements. For the PSGC site, finalized characterization and permitting documentation was delivered directly to the facility in July 2023 due to business constraints precluding formal federal regulatory submission. This comprehensive permitting effort builds upon extensive prior subsurface evaluations and demonstration projects that have confirmed the feasibility of widespread commercial-scale carbon storage in the region.

01 COAL, LIGNITE, AND PEAT↗

Data Driven Commercial Building Energy Code Compliance and Technology Inventory for New York City

Building Performance Standards (BPS) are gaining national traction. A BPS will require new processes in the design, construction, and operation of buildings that take the occupants into account and enable predictive analysis to ensure compliance with current and future GHG emissions caps. In New York City, most buildings over 25,000 square feet will be regulated by a BPS starting in 2024, regardless of whether it is new construction permitted under current energy codes or an existing building. This research is one of the first to begin the evaluation of a long-term series of building policies in the context of an open data ecosystem, in cooperation with city agencies. Existing building policies enacted in NYC have ranged from building energy benchmarking and labeling to energy audits to the regulation of GHG emission in buildings. Through the development of a dataset related to building technologies and energy consumption, this project can help to evaluate if meaningful conclusions can be drawn for the data that has been largely self-reported in compliance with city regulations. This project will also provide lessons learned from a deep dive into these types of datasets to provide best practices for municipalities or states seeking to embark on policies like those enacted in NYC. In addition, a Building Automation System (BAS) Stretch Standard of Care (SSOC) for owners, designers, and building operators will enable the measurement and predictive analysis of energy consumption and GHG emissions at the plant, system, or component level, in anticipation of regulated GHG limits on buildings based on energy use. The SSOC is expected to be suitable for use on a national level. The primary feature of an SSOC is a standardized format for a set of BAS points that can be used to control and to gather data from individual plants, systems, or components that are related to building energy consumption. This project examined how measurements compare to prescriptive or simulation-based energy code targets, finding little correlation between predictive 8760-hour energy modeling and actual energy consumption for a small sample (n=27) of buildings constructed after 2015. Other analysis found that, while large multifamily housing (MFH) buildings showed a general trend similar to predicted reductions in energy use from the implementation of model commercial energy codes, this trend was not evident in the office, K-12 school, and hotel use groups in NYC. No upward or downward trends in energy consumption were found when buildings were grouped by size. Energy audit data were analyzed and it appears that there is bias by audit company on measures recommended to clients. Further research should be performed to cross-analyze this with other attributes, such as building size, vintage, and number of stories. Analysis found that for 281 buildings that were permitted and completed after 2015 and had submitted benchmarking data in 2022, between 81% and 96% (by use group) were found to be in compliance with the 2024 to 2029 NYC BPS emission caps, and between 55% and 89% were in compliance with the 2030-2034 caps. This work is beneficial to the public in helping policymakers and building stakeholders better understand the wide-ranging implications of a BPS.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessment of the 3420 Building Filtered Exhaust Stack Sampling Probe Location: Stack Verification Following Fan and Air Blender Additions

The Pacific Northwest National Laboratory (PNNL) 3420 Building, which is part of the Physical Sciences Facility (PSF), houses radiological capabilities that results in the requirement that emissions monitoring must be conducted for potential radionuclides in the exhaust air discharge of this building. The air monitoring system is required to conform to Title 40 of the Code of Federal Regulations part 61 (40 CFR 61) Subpart H, which in turns requires a sampling probe in the exhaust stream to conform to the criteria of American National Standards Institute / Health Physics Society (ANSI/HPS) N13.1-2011, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. To support the air emissions permit for the 3420 Building on the PNNL campus, stack testing that used computational fluid dynamics (CFD) modeling as a surrogate stack and verification tests of velocity uniformity and flow angle on the retrofitted facility stack was performed. The ANSI/HPS N13.1-2011 criteria for the air monitoring probe location are that velocity uniformity, gaseous tracer uniformity, and particulate tracer uniformity must be less than or equal to 20%COV. Furthermore, no point in the sampling location may have a gaseous tracer concentration that varies from the mean concentration by more than 30%. Additionally, the flow angle at the sampling location must not be more than 20°. The CFD modeling of the stack, as reported by Recknagle et al. (2018) demonstrated that the stack meets the criteria at the probe location. The velocity uniformity and flow angle results from the 3420 stack verification tests, performed in October 2020, demonstrated that the CFD model results may be used to support the qualification of the stack sampling location. The measured velocity uniformity verification test result was 1.4%COV. This value is well within the uniformity criterion, which is that the velocity uniformity be =20%COV. Additionally, this value is well within the criterion that the actual stack measurement must be within 5% of the surrogate stack result of 2.1%COV when all four fans were operating. Additionally, the measured average flow angle at the 3420 stack monitor location was 15.5 degrees. Although this is higher than expected based on the CFD model, the result is =20 degrees, so the criterion is met. Based on these stack verification test results, the reconfigured 3420 Building filtered exhaust stack meets the qualification criteria given in the ANSI/HPS N13.1-2011 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the CFD report (Recknagle et al., 2018) may require additional tests and additional analysis to determine compliance with the standard.

3420 Building↗

Radioisotope Analysis of Wastewater from Livermore Site Retention Tanks by Gel Laboratory Gross Alpha, Gross Beta and Tritium Sampling Method

Lawrence Livermore National Laboratory discharged approximately 4.4% of the City of Livermore’s total wastewater in 2022 (LLNL’s Annual Site Environmental Report, Chapter 5, 2022). This volume includes wastewater from Sandia National Laboratories (SNL) and some process wastewater from Site 300. Due to the high volume and constituents of the discharge, LLNL works alongside the City of Livermore under permit #1250, requiring wastewater generated to be monitored and sampled in accordance with permit limits. Process wastewater, from buildings with the highest risk to sewer, is collected by wastewater retention tanks throughout the Livermore Site and sampled prior to discharge. Domestic wastewater directly discharges to sanitary sewer. To maintain permit requirements and ensure proper wastewater discharge practices, an internal wastewater audit was conducted during the summer of 2023. Current wastewater practices, regulatory knowledge and risk management across various Livermore Site buildings were evaluated. Workspaces connected to a wastewater retention tank and sanitary sewer drains were major focus areas. Data collected from walk-throughs prompted further evaluation as many practices were reported to be done based on historical usage. A table of concerns was created to showcase reasons for auditing and proceeding action. An analysis of current and historical retention tank usage throughout LLNL Livermore Site buildings with radioisotope results over a 5-year period from 2019 to 2024, was done to assess building trends and any significant changes throughout the 5-year period. Analytes evaluated were Gross Alpha, Gross Beta and Tritium (GABT) of eleven buildings at the Livermore Site, posing the highest risk to sanitary sewer for radioisotopes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Small-Scale Engineered High Flexibility Gasifier

This project advances a small-scale gasification unit as the first step in syngas-based hydrogen, chemicals, and synthetic fuels production. This unit is associated with an enhanced flexibility to different carbonaceous feedstocks including different types of coals, biomass, and plastics. The purpose of the project was to demonstrate feasibility and efficiency of coal pyrolysis in an auger reactor (pyrolyzer); supplemental methane and pyrolysis gas conversion into syngas in a proprietary non-catalytic converter; combined performance of pyrolyzer and non-catalytic converter to convert coal into syngas The proposed technology is based on an application of an intermediate speed pyrolysis at the temperature range 400-600°C as the first stage of biomass processing. At an industrial scale, an incorporation of coal pyrolysis into a feeding machine – auger-reactor allows to decrease its capital cost. At a pilot scale, it permits to employ electricity to build a compact device for testing of downstream equipment. The auger-reactor (pyrolyzer) generates pyrolysis gas and char practically from any carbonaceous feedstocks but their compositions and quantities are determined by their types. Pyrolysis gas is converted into syngas (mix of H 2 and CO) in a novel, proprietary hydrogen flame assisted non-catalytic converter which employs O 2 instead of air as an oxidizer. This reactor (converter) allows an easy adjustment to different pyrolysis gas compositions and tolerates a presence of sulfur and nitrogen contaminants. Our technology assumes carbonaceous feedstocks gasification with oxygen to allow the products H 2 , CO or CO 2 to be not diluted in N 2 and ready for the following synthesis of chemicals and fuels. Due to the same reason, it permits a more efficient CO 2 capture for its transport and storage. An implementation of our small-scale gasification process may overcome economic constrains by a flexible acceptance of coal, biomass, and plastics as well as their unsorted mixtures to make syngas for the following production of pure hydrogen, chemical and/or synthetic fuels.

42 ENGINEERING↗

Solar Photovoltaic (PV) Manufacturing Expansions in the United States, 2017-2019: Motives, Challenges, Opportunities, and Policy Context

This report analyzes U.S. PV manufacturing announcements from 2017 through July-2019 and explores the potential impact of tariffs on the competitiveness of U.S. PV module manufacturing. First, the fraction of announcements that resulted in established facilities in the time frame specified is analyzed, as well as firm nationality and the existence of any other U.S. facilities for the firm. The prevalence of different PV product types among the announcements was also analyzed, as well as the type of facilities selected for development (greenfield, existing PV factories, or repurposed buildings). The cost to build these facilities was also analyzed in the context of their capacity, the value of incentives received by state and local governments, and the number of jobs created. Case studies of Auxin Solar, First Solar, Hanwha Q Cells, JinkoSolar, LG, Silfab, Solaria, and SunPower were conducted and highlight five factors influencing firms’ decisions to expand their U.S. PV production capacity. These included: 1) proximity to demand, including supply contracts and demand for domestic content 2) tariffs and other incentives. The Section 201 tariffs on PV module imports were often described helpful but tariffs on cell imports (Section 201) or materials (Section 301, Section 232) were often described as counterproductive since U.S. supply chains do not exist for many necessary goods. The corporate tax decrease and local incentives were often mentioned as helpful. 3) the ability to move quickly in order to maximize the benefit of the Section 201 tariffs. This affected decisions to select localities with faster permitting or moving into existing buildings. 4) competition with scale, where competing with Asian PV imports or avoiding imports of material from China was challenging due to the larger scale of Asian manufacturers. Additionally, smaller firms expressed concerns that larger firms may not need their U.S. facilities to profitable. 5) access to capital, which was a particular challenge for smaller firms. Several U.S. tariffs affect the economics of PV cells, modules, and balance-of-module (BOM) materials, some of which are applicable to a long list of countries and others applicable only to China or Taiwan. We analyze how the tariffs interact to affect the prices of c-Si modules sourced under various assumptions about domestic and imported components and assembly. We estimate module prices under a range of baseline scenarios featuring U.S.-assembled modules with Southeast Asian cells (not from China or Taiwan). When all BOM components are sourced from the United States, baseline module prices are $0.37/W (below the 2.5-GW Section 201 cell cap) to $0.42/W (above the 2.5-GW cell cap). If all BOM components are sourced from China, the module price in this baseline U.S.-assembly scenario can reach up to $0.60/W. Imported module prices are lower than or within the range of the U.S.-assembled baseline prices under some conditions. Importing bifacial modules from Southeast Asia is the lowest-priced alternative, at $0.35/W, because bifacial modules are excluded from the Section 201 tariffs. Importing Southeast Asia modules that contain U.S. cells results in a price of $0.38/W, also owing to a Section 201 exclusion. Importing Southeast Asian modules that have Southeast Asian cells yields a price of $0.44/W, and importing Chinese modules that have U.S. cells yields a price of $0.58/W. These results suggest that U.S. tariff policy in 2019 may encourage U.S. assembly of mono-facial c-Si modules if the 2.5-GW cell import cap is not reached and Chinese BOM imports are negligible. However, some imported module options may offer the lowest prices if the 2.5-GW cell import cap is reached and/or U.S. module manufacturers must rely on significant Chinese BOM content. The analysis shows the 2.5-GW cell cap may be exceeded in 2019 and following years. It is also likely that U.S. module manufacturers will need to use at least some Chinese BOM content, since U.S. module manufacturers have stated that U.S. supply chains do not exist (or do not exist at a sufficient scale) for most BOM components, which makes them at least partially reliant on Chinese BOM and thus subject to Section 301 tariffs.

14 SOLAR ENERGY↗

Hierarchical Model-Free Transactive Control of Building Loads to Support Grid Services

Residential buildings consume 4.4 quads of electricity annually, approximately 37% of the total electricity consumption in the United States. This represents a vast resource that can be used for demand management and other ancillary services. This project aims to develop a robust, scalable hierarchical transactional control mechanism incorporating elements of model-free control (MFC) and game theory to harness buildings to provide ancillary services to the grid. This approach is being taken to address the challenges of incorporating traditional transactional control schemes into existing buildings. The challenges include small individual building sizes requiring aggregation of many buildings, unpredictable energy usage that makes model identification difficult, and satisfying the sensitive occupant comfort constraints. In the proposed approach, by separating the control mechanism into two layers above and below the load aggregator, MFC can be used below the aggregator to modulate flexible building loads in response to pricing signals with guaranteed performance. This allows the burden of identifying an accurate model of the system to be shifted to the above-aggregator layer, where fluctuations in individual building usage have less impact on predicted building system behavior. Game theory concepts can then be used to determine pricing curves and control signals among regional aggregators. Managing this control in a game-theoretic approach will allow us to build in financial incentives that increase customer engagement. Additionally, the usage of MFC necessitates less burdensome computational and communication requirements, thus, it is easily deployable on small, embedded devices. In a broader sense, developing a strategy capable of effectively incorporating residential and small commercial buildings will allow greater throughput of existing and emerging grid services in addition to future transactive energy grid management methods. Using MFC within a hierarchical control architecture will allow the shifting of existing forecasting challenges to an aggregate level, where dynamics are slower and more predictable. This will enable a smooth interface between the grid services requests of utilities and the reliable control required by participating buildings. MFC, which supports distributed control architecture, permits a scalable solution that can be deployed to neighborhood-size systems as well as individual buildings. This project focuses on three objectives: (1) developing the mathematical framework, algorithm toolkit, and software toolset of the two-layer transactive control testbed; (2) developing a scalable solution for application over many residential and small-size commercial buildings with sparse distributed communication; and (3) field testing and implementation on hardware of the control strategies developed in the previous two objectives. The research and development activities are focused and designed to be impactful within the relevant 2025 targets timeframe. An open-source control framework for exploiting variability and dispatchability of building loads will be delivered as the outcome of the project. This capability enables greater participation of loads in electricity markets and ancillary services that are both useful for the utility and financially beneficial for building owners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

City-Wide Distributed Roof-Top Photovoltaic System Adoption Forecast, Grid Impact Simulation, & Neighborhood Microgrid Contribution Assessment

The adoption of distributed photovoltaic (PV) systems grew significantly in recent years. Market projections anticipate future growth for both residential and commercial installations. To understand grid impacts associated with distributed PV, useful hosting capacity studies require accurate representations of the spatial distribution of PV adoptions. Prediction of PV locations and numbers depends on median income data, building use zoning maps, and permit records to understand existing trends and predict future adoption rates and locations throughout an entire city. Using the PV adoption data, advanced and realistic simulations were performed to capture the distributed PV impacts on the grid. Also, using graph theory community detection hundreds of neighborhood microgrids can be discovered for the entire city by identifying densely connected loads that are sparsely connected to other communities. Then, based on the PV adoption predictions, this work identified the contribution of PV within each of the newly discovered graph theory defined microgrid communities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Innovative Advanced Hydrogen Mobile Fueler (Final Technical Report)

The US Department of Energy (DOE) funded a project to design, develop, deploy and analyze the economic viability of an innovative Advanced Hydrogen Mobile Fueler (AHMF). As part of the design activity the project team defined specifications based upon vehicle requirements and compliance with specific fueling performance criteria. The AHMF was originally designed to fuel 10-20 fuel cell vehicles (FCV) per day, consistent with the requirements of the H70 fueling category. The AHMF is able to operate without remote power connections, is modular for easy transport and deployment, and can provide expanded daily capacity and multi-day operations using delivered gaseous hydrogen. Toward the end of the project, due to request from the hydrogen industry and some necessary modifications of the AHMF, the system is now modified to fuel heavy duty vehicles. The project was conducted over two primary phases, each including several key tasks, subtasks, and project milestones. Phase 1 involved the design, development, and construction of the AHMF, moving from a conceptual design through to completion of assembly and testing. In addition to reviewing several different approaches, the team chose to take a conventional station design and modify it for mobile fueling. There were several innovative components included in the design. The high pressure storage was the first to achieve a US Department of Energy (DOE) Special Permit (SP 20391) to transport high pressure hydrogen (95 MPa) in a composite cylinder. The second novel system was a liquid nitrogen (LIN) cooling system with a compact heat exchanger. Without this change, the cooling system would not be able to fit into the AHMF. Phase 2 demonstrated the AHMF by fueling fuel cell buses at a fleet in Pomona, CA. The site was chosen because a temporary fueling solution was required while a fixed station was being installed. The existing permits for the fixed station and non-public access also was a determining factor. Over two months, the buses were fueled 320 times with over 5000 kg of hydrogen from tube trailers. Existing shore power was used, and the average electrical efficiency was 0.13 kWh/kg. The average liquid nitrogen (LIN) consumption was 90.68 scf/kg. The fueling and consumption data was provided to the National Renewable Energy Laboratory (NREL) for analysis. An economic analysis was performed and will be provided in a separate report. The project was successful, but not without challenges and lessons learned. The DOT special permit led the way for the use of high pressure, composite cylinders and is being by multiple other systems and applications. The pandemic along with time for the DOT special permit approval delayed the project for years. The team also believes that hydrogen mobile fueling has a use for the industry, especially during this upcoming phase of expansion. However, it does have its limitations due to high cost to build and operate, and the same permitting challenges as a fixed station. A fully capable system at the speeds and pressures of the AHMF may not be necessary for most applications and would help reduce the cost and increase storage capacity. The on-board generator can be easily replaced with shore power or the wide range of power generation solutions in the marketplace. One of the major results of the project was the development of new code language in National Fire Protection Agency (NFPA) 2 and the International Fire Code (IFC) for on-demand mobile fueling. This will provide guidance for Authorities Having Jurisdiction (AHJ) and user on how to permit temporary fueling sites across the nation.

08 HYDROGEN↗

Final Technical Report

Statement of the problem or situation that is being addressed in your application. The DOE and its national laboratories developed the Home Energy Score™ (HES) to encourage homeowners to improve their energy performance, lower costs and to share energy information through the MLS listing, appraisal, and financing channels. While the HES is an instrumental tool, it is currently underutilized and consists of technical, structural and sector barriers which need to be addressed in order to scale and many energy efficiency contractors are understandably overwhelmed by the added time and effort and lack of incentive to sell and deliver deep retrofit projects while simultaneously meeting the DOE HES program requirements; consequently, contractors may decide to forgo participation. Home Energy Rating System (HERS) Raters have the opportunity to play the critical Assessor role in producing a Home Energy Score (HES); this role has immense potential but currently is unfulfilled. Lastly, while utilities are interested in their customer base achieving greater energy efficiency, especially to help offset growing residential loads in states like California that are accelerating electrification, utilities do not have access to the market actors who are on the front line of influence to homeowners or review and approve their permits: HERS Raters, assessors, contractors and building departments. General statement of how this problem is being addressed: ConSol will integrate the Home Energy Score™ (HES) to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California (CHEERS+HES). The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the utilities in supporting existing homes in their jurisdictions with HES and develop measures to improve energy efficiency and reduce emissions. How is this problem being addressed? What is the overall project approach? In effort to expand the Home Energy Score™ (HES) by increasing the use of aggregable home energy asset data, ConSol proposes to integrate the DOE HES via Application Programming Interface (API) to its State of California approved home energy rating services platform (CHEERS). Once the CHEERS platform and HES are integrated (CHEERS+HES), this enhanced platform will be instantly available and actively deployed via Phase 1 pilot to HERS Raters, assessors and contractors in California to market-test the solution, understand the rate of adoption and identify opportunities for improvement prior to scaling nationally. The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the building industry and homeowners with an easy-to-use assessment if energy and carbon impacts of existing homes, and assist the utilities in supporting existing homes in their jurisdictions with HES to improve energy efficiency and reduce emissions. What is to be done in Phase I? During Phase I of this proposed project, ConSol will (1) design software architecture that links CHEERS to the Home Energy ScoreTM via API, (2) solicit partnership from one or more California utilities for a regional pilot, (3) test the new software with its HERS Raters and contractor network in the partnership utility jurisdiction, (4) launch a pilot version of the newly developed software with HERS Raters and contractors in the utility territory, and (5) explore California’s GoGreen energy efficiency homeowner lending program in parallel with the pilot. Commercial Applications and Other Benefits. Summarize the future applications or public benefits if the project is carried over into Phase II or Phase III and beyond. The CHEERS+HES commercialized product will be ready for national market scale following a successful Phase 1 performance. The CHEERS+HES adoption is estimated to reach a 5% adoption growth rate versus the 110,000 baseline, starting in Year 1 after Phase I completion, and continuing each year. As a direct benefit to the DOE, CHEERS will set a goal of 100,000 Home Energy Score assessments for existing home alterations within the first 10 years following Phase 1 performance. The technical benefits of this proposed project include the harmonized, automated, and seamless integration of the DOE HES into the widely used and market leading California energy registry, CHEERS. The social benefits include the aggregate energy, cost and GHG savings by allowing the broader public streamlined access to the CHEERS+HES measurement and the energy efficiency recommended measures that may result. Key Words: Home Energy ScoreTM (HES); Application Programming Interface (API); Home Energy Rating Services (HERS); HERS Raters; contractors; assessors; existing homes, energy asset data; cost, energy, and emissions saving measures; energy code (Title 24) compliance; document repository; utilities; pilot; newly developed software; energy efficiency; homeowner. Summary for Members of Congress: The DOE Home Energy Score™ (HES) is a tool to encourage homeowners to improve their energy performance, lower costs and share energy information but is underutilized and consists of barriers which need to be addressed in order to scale. In effort to expand the HES, CHEERS, Inc. will integrate the HES to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California.

Application Programming Interface (API)↗

The potential of carbon markets to accelerate green infrastructure based water quality trading

Green infrastructure solutions can improve in-stream water quality in lieu of building electricity-consuming gray infrastructure. Permitted under the United States Clean Water Act, these programs allow regulated utilities to trade point-source water quality obligations with non-point source mitigation efforts in the watershed. Carbon financing can provide an incentive for water quality trading. Here we combine data on impaired waters, treatment technologies, and life cycle greenhouse gas emissions in the Contiguous United States, and compare traditional treatment technologies to alternative green infrastructure. We find green infrastructure could save $\$15.6$ billion dollars, 21.2 terawatt-hours of electricity, and 29.8 million tonnes of carbon dioxide equivalent emissions per year while sequestering over 4.2 million tonnes CO2e per year over a 40 year time horizon. Green infrastructure solutions may have the potential to generate $\$679$ million annually in carbon credit revenue (at $\$20$ per credit), which represents a unique opportunity to help accelerate water quality trading.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Deer Isle and Stonington Energy Reliability Opportunities

The towns of Deer Isle and Stonington, located on the island of Deer Isle in Maine, partnered with the U.S. Department of Energy's Energy Technology Innovation Partnership Project (ETIPP) to examine options to enhance energy resilience, reduce dependence on imported fuels, and mitigate high energy costs. With technical support from the National Laboratory of the Rockies (NLR), Lawrence Berkeley National Laboratory (LBNL), and regional partner the Island Institute, the project focused on evaluation of the local electricity distribution infrastructure, examination of ongoing activities to reduce the frequency of outages, review of the applicable policy and regulatory environment, and identification of potential on-site energy solutions. Key findings revealed the island's reliance on a single distribution line, and limited hosting capacity for additional distributed energy resources. Solar photovoltaics (PV) technology, with and without battery storage, was found to be the most viable technology given economic, technical, and social considerations. While also technically feasible, wind energy faces more difficult siting and less public acceptance compared to PV. Marine energy technologies were determined to be infeasible due to technology immaturity and lengthy permitting timelines. Modeling of potential building-scale PV plus storage systems resulted in successful grant applications for installations at two local facilities. Analysis of community scale energy generation and storage options resulted the local utility, Versant, submitting a grant application for a proposed community-scale battery storage system to increase grid resilience and hosting capacity. This initiative has strengthened the communities' energy planning capabilities and laid the groundwork for future clean energy development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗