Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Measure Guideline: Deep Energy Enclosure Retrofit for Interior Insulation of Masonry Walls and Flat Roofs

Measure Guideline: Deep Energy Enclosure Retrofit for Zero Energy Ready House Flat Roofs BSC TO5 Task 7.4 Deep Energy Enclosure Retrofit (DEER) for Interior Insulation of Masonry Walls Lawrence, MA 01840 This Measure Guideline describes a deep energy enclosure retrofit solution for insulating mass masonry buildings from the interior. It describes the retrofit assembly, technical details, and installation sequence for retrofitting masonry walls. Interior insulation of masonry retrofits might adversely affect the durability of the wall. This guideline includes a review of decision criteria pertinent to retrofitting masonry walls from the interior and the possible risk of freeze-thaw damage. This Measure Guideline is intended to support contractors who are implementing an interior insulation-based high-performance enclosure retrofit for masonry buildings and designers who are looking to design such retrofits. It may also be helpful to building owners who wish to learn more about strategies that are available for deep energy enclosure retrofit of masonry residential buildings on the interior. This Measure Guideline is important to the high-performance retrofit industry because the solution described here provides an opportunity to retrofit masonry buildings with ambitious energy performance goals by insulating them from the interior without disturbing their exterior appearance. BSC TO5 Task 7.4 Deep Energy Enclosure Retrofit (DEER) for Zero Energy Ready House (ZERH) Flat Roofs House Jamaica Plain, MA 02130 This Measure Guideline provides design and construction information for a deep energy enclosure retrofit solution of a flat roof assembly. It describes the strategies and procedures for an exterior retrofit of a flat wood-framed roof with brick masonry exterior walls using exterior and interior (framing cavity) insulation. The approach supported in this guide could also be adapted for use with flat wood-framed roofs with wood-framed exterior walls. Designers, contractors, and building code officials will benefit from the information contained in this Measure Guideline. The guide may also be helpful to building owners who wish to learn more about strategies for deep energy enclosure retrofit of flat roofs. This Measure Guideline is important to the high-performance retrofit industry because it demonstrates techniques for retrofitting flat roofs from the exterior, which is less disruptive to the living space and allows the structure to remain occupied during the project. It also illustrates a solution for preparing homes to become zero energy ready.

Array↗

Analysis of Joist Masonry Moisture Content Monitoring

BSC TO5 Task 7.2 Analysis of Joist Masonry Moisture Content Monitoring House - Lawrence, MA 01840 This work involved the field monitoring of embedded wood joist ends in a solid brick building in zone 5A that was retrofitted with interior insulation. Eleven joists throughout the building (which have a variety of orientations, exposures, and masonry wall types) were monitored for wood MCs at the embedded joist ends and for temperatures and RHs within the joist pocket. Indoor and outdoor conditions were also recorded. Results were collected for 28 months (December 2012-April 2015). One limitation was that the renovation was still ongoing; limited wintertime construction heating and no permanent occupancy were factors. Much of the building experienced cold interior temperatures (e.g., construction heating) during the winters. These were not typical interior heating set points. Because the building was essentially unoccupied, no significant interior moisture was generated. These boundary conditions are not normal service conditions. Overall, the RHs and MCs measured in joist pockets were higher than recommended for longterm durability. Many of the joist pockets had sustained conditions of 100% RH, and many wood MCs were in the 25%-35% range for extended periods. Typical guidance includes: (1) MCs lower than 20% are safe, and (2) decay fungi become active at MCs higher than 28%. ASHRAE xi 160 analysis showed that high RH levels coincided with temperatures that were high enough to support mold growth for most of the monitoring period (60%-70% of the hours) in most joists. However, no damage was seen at the joist ends when the instrumentation was installed or when a joist end sample was removed. This suggests that dense, old-growth framing might be able to survive these MCs without damage. Orientation has a significant effect on RH and MC levels: solar heating and drying kept all southfacing joist MCs well within the safe range. The east and west orientations had mixed results: some were in the safe range, but others exceeded the 20% MC level. The north side joists consistently had the highest MCs. Almost all the joists showed seasonal rises and falls; MC and RH conditions were higher during the summer and lower during the winter. This indicates the temperature gradient caused moisture to be driven inward during the summer. MC plots with driving rain showed no discernable correlations. In the parts of the building that had significant wintertime heating, many joists showed a drop in MC that coincided with the addition of heat, even after insulation and air sealing were installed. The joist ends showed a repeated pattern of MC measurements at their upper and lower ends. The lower joist end was consistently wetter than the upper joist end, which can be attributed to contact with the masonry pocket, gravity drainage of bulk water to the bottom of the pocket, greater drying at the top of the beam or deeper embedment at the bottom of the beam, and a larger air pocket at the top of the beam. The north-facing insulated and uninsulated joist ends were compared; a significant or consistent MC or RH difference was not seen between these cases. All three joist pockets essentially remained at a constant 100% RH.

Array↗

Field Testing Unvented Roofs with Asphalt Shingles in Cold and Hot-humid Climates

BSC TO5 Task 7.1 Field Testing Unvented Roofs with Asphalt Shingles in Cold Climates - Bolingbrook, IL 60440 BSC TO5 Task 7.1 Field Testing Unvented Roofs with Asphalt Shingles in Hot-Humid Climates - Friendswood, TX 77546 To understand the long-term moisture performance of unvented roof assemblies with fibrous insulation, the U.S. Department of Energy's Building America team Building Science Corporation built and monitored test roofs in two climates: a cold-climate test house in Bolingbrook, Illinois (Chicago area; zone 5A), and a hot-humid test house in Friendswood, Texas (Houston area, zone 2A). The Chicago-area test bed had seven parallel experimental rafter bays. The assemblies included a control vented compact (cathedral) roof, a dense-pack cellulose unvented roof, and an unvented roof with a "diffusion vent" (a strip of vapor-permeable gypsum sheathing at the ridge to allow drying). The interior finish was gypsum wallboard (GWB) with latex paint. The other four bays were top vent roof assemblies, which have a polypropylene breather mesh between the roof sheathing and the asphalt shingles to allow ventilation drying of the assembly from underneath the vapor-impermeable shingles. Two of the four "top vent" roofs were fiberglass batt and two were dense-pack cellulose roofs with either interior GWB or open to the interior. Wintertime moisture-related failure was accelerated by providing interior humidification (22.2 degree C [72 degree F]/50% relative humidity [RH]), which is known to be an extreme interior loading). Data were captured over 8 months, including a winter and the following spring and early summer.

Array↗

Field Testing of an Unvented Roof with Fibrous Insulation, Tiles, and Vapor Diffusion Venting

BSC TO5 Task 2.5 Field Testing of an Un-vented Roof with Fibrous Insulation and Tiles - Winter Park, FL 32789 Field test data available for wood moisture contents, temperature, and relative humidity. Un-vented roofs (aka cathedral-ized attics) are an established presence in Florida residential building markets. These roofs are built with a layer of spray polyurethane foam (SPF) on the underside of the roof deck. Such a roof configuration positions the heating, ventilating, and air-conditioning equipment and ductwork within the conditioned space and improves airtight-ness in practice (by shifting the air barrier from the ceiling to the roofline). However, SPF is more expensive than fibrous insulation. Some builders have also become wary of using SPF because of liability concerns about indoor air quality and off-gassing. Unfortunately, un-vented roofs that use only air-permeable fibrous insulation (cellulose or fiberglass) have been demonstrated to be at risk of moisture issues in climate zone 2A because condensation and moisture accumulation occur at the ridge. This report describes research about a test implementation of an un-vented tile roof assembly in a hot-humid climate (Orlando, Florida; climate zone 2A); the roof was insulated with air-permeable insulation (netted and blown fiberglass). Given the localized moisture accumulation and failures seen in previous work, the U.S. Department of Energy's Building America research team Building Science Corporation theorized that installation of diffusion vents might allow for the wintertime release of moisture to safe levels. Diffusion vents are open slots at the roof's highest points (the ridge and hips) that are covered with a water-resistant but vapor-open (500+ perm) air barrier membrane. The test home is a two-story slab-on-grade structure (3,600 ft2 ); the roof was insulated with a prototype insulation system (called boxed netting), which allows full depth insulation (i.e., it is not limited by the depth of the truss top chord). As a control comparison, one part of the roof was constructed as a typical un-vented roof (with a self-adhered membrane at the ridge). Ideally, failure would occur in the control roof and the experimental (diffusion vent) roofs would show sufficient drying to avoid failure. No intentional space conditioning was provided in the un-vented attic so worst-case humidity buildup conditions could be observed.

air leakage↗

Comfort in High-Performance Homes in a Hot-Humid Climate

TO5 2.3.2: Large-Scale Temperature Study Although space-conditioning systems are required to meet standards such as those in the Air Conditioning Contractors of America (ACCA) Manual RS (Rutkowski 1997) and the ASHRAE Standard 55 (ASHRAE 2013) comfort criteria, little is known about how space-conditioning systems are actually operating in the field and if these systems are meeting those standards. Unconventional space-conditioning systems may be necessary for low-load homes in the future. It is important to know how current systems are functioning in existing homes and to what temperatures occupants typically set the thermostats in their homes. The U.S. Department of Energy's Building America research team IBACOS set out to find some answers. By using low-cost data loggers and occupant surveys to monitor 37 single-family homes that have standard heating, ventilating, and air-conditioning (HVAC) equipment, the team gained insight into how sensitive occupants are to comfort in their homes relative to the ACCA and ASHRAE standards. This study focused on one climate zone (hot-humid); however, future studies may find differences among occupants- ideas of thermal comfort in other climate zones. Data were collected from installed sensors during a 2-month period from late August 2014 through late October 2014. The final aspect of this project was to review the business metrics associated with builders involved in a comfort and performance guarantee program. The results of this study-taken as an aggregate-show that the homes provided room-to-room temperature differences less than 6 degrees F 95% of the time. Temperature differences were less than 4 degrees F 80% of the time. Some homes showed better or worse performance. On average, two-story homes had a 3.3 degrees F temperature difference between rooms; single-story homes had an average of a 2.2 degrees F temperature difference between rooms. Occupants who did not use programmable thermostats had an average set point of 75 degrees F. Homes in which the thermostats were programmed with a setback schedule showed a median baseline temperature value of 74 degrees F and had a median afternoon setback of 75 degrees F. System runtime was analyzed and showed that the room-to-room temperature uniformity in some homes worsened during an on cycle, whereas the uniformity improved in other homes. That is, when the system was running, some rooms were receiving too much or too little air relative to the rest of the house, and the temperatures in those rooms were moving away from the temperatures of the other rooms in the house. Finally, analysis of the thermostat data shows a wide degree of variability among homes in the study. Interpretation of the measured data suggests that 21 occupants made no regular adjustments to the thermostats in their homes, seven had regular setbacks, seven showed varying setbacks, and 10 appeared to follow no pattern (with random adjustments). Ultimately, the data show that current systems are maintaining expected levels of comfort. As expected, it is more challenging to maintain a uniform temperature in all rooms of two-story homes, and future systems should address this issue. Furthermore, the data show that the majority of homes maintained relative humidity levels below 60% without any supplemental dehumidification

ACCA Manual RS↗

Monitoring of Double-Stud Wall Moisture Conditions in the Northeast

BSC TO5 Task 2.2 Monitoring of Double Stud Wall Moisture Conditions in the Northeast Field test data available for wood moisture contents, temperature, and relative humidity. STRUCTURE - House - Devens, MA 01432 Three double-stud assemblies were compared: 12-in. ocSPF, 12-in. cellulose, and 5.5-in. ocSPF at the exterior of a double-stud wall (to approximate conventional 2 x 6 wall construction and insulation levels, acting as a control wall). These assemblies were repeated on the north and south orientations, for a total of six assemblies. Data were collected from December 2011 through July 2014, capturing three winters of operation in various states. Winter 2011-2012 was very mild (warm) and the house had very low interior relative humidity (RH) because it was unoccupied. Winter 2012-2013 was colder and the house had very high (40%-50%) interior RH until the ventilation system was put into operation (mid-February 2013). Winter 2013-2014 was very cold, but the ventilation system was operated, resulting in moderate interior RHs. Under "normal" interior conditions (functioning ventilation system, wintertime RH 10%-30%), ocSPF walls (both 12 in. and 5.5 in.) with latex paint as interior vapor control (nominally Class III, but possibly more vapor open) showed low risk; all sheathing moisture contents (MCs) remained lower than 20%. However, the 12-in. cellulose wall had MCs higher than 20% on the north side. In addition, the cellulose wall sheathing-insulation interface had high RH conditions. Under high interior humidity loading (nonfunctional ventilation system, 40%-50% interior RH), all test walls showed MCs and sheathing-insulation interface RHs well into the high risk range. The cellulose walls showed particularly high MCs (sheathing in excess of 30%), while the ocSPF walls showed MCs in the 18%-25% range. In addition, the monitoring showed evidence of liquid water condensation (which can result in quick degradation) in all walls; the condensation was substantial in the cellulose walls. These condensation issues occurred on the north and south sides. But in all walls, during each summer after a winter of wetting, moisture levels fell well into the safe range. Based on the difference between the winters, it is clear that interior RH can have a tremendous effect on the performance of enclosure systems, in terms of interstitial condensation risks, when using more vapor-open interior finishes such as latex paint. The ocSPF walls showed consistently lower MCs and interface RH levels than the cellulose walls. Although air leakage cannot be eliminated as a possibility, it is likely that at the thicknesses applied, the ocSPF provided reasonable vapor control (1.5-3.5 perms when combined with Class III latex paint) under normal loading conditions. The collected data were analyzed in terms of ASHRAE Standard 160 criteria (tabulating hours with RH and temperatures that support mold growth), using the calculated surface RH at the sheathing-insulation interface. All north-facing walls failed through all three winters; in particular, there were large numbers of failure hours during the high humidity winter (2012-2013). Sheathing-insulation interface temperatures and RHs during the high humidity winter showed many hours with mold risk conditions (high humidity and sufficient temperature for mold growth).

Array↗

Field Testing of Compartmentalization Methods for Multifamily Construction - Washington DC

BSC TO5 Task 2.1 Field Testing of Compartmentalization Methods for Multifamily Construction - Capitol Heights, MD 20743 A building comprising five vertical townhome units was built in the Washington, D.C., area; the townhomes were three-story slab-on-grade units (1700-2000 ft2) with a rear-facing "tuck under" garage. The three-story townhome design results in 3 ACH50 being equivalent to a stringent surface-area based target (0.16-0.17 CFM50/ft2 building enclosure). The party walls between units were area separation walls, with a 2-hour fire resistance rating (Underwriters Laboratories U347 assembly; equivalent to U373 and U336). This assembly has a 1-in. vertical air cavity on each side of a 2-in. vertical gypsum panel in the middle of the assembly, resulting in an airflow network that is connected over multiple floors (despite nominal draft stopping), and has potential connections to exterior conditions. The test townhomes were built with several experimental airtightness details, including taping of exterior sheathing as an air barrier closure detail (in particular, at area separation walls). Various measures were applied to the units for this experiment, including a "control" conventional construction unit and some units with "improved" detailing (without taped sheathing).

air leakage↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders - Chicago, IL and Devens, MA

TO4 Task 3.1 - K Hovnanian Chicago, IL DOE Challenge Home Program Certified Home Constructed and Verified Specifications DOE Challenge Home Building envelope Ceiling R-49 blown fiberglass, Grade I Walls 2x4 framing @ 16 o.c. with R-13 fiberglass batts, Grade I and 1"" R-5 extruded polystyrene (XPS) insulating sheathing Frame Floors R-38 blown fiberglass, Grade I Basement Walls R-19 fiberglass batts draped full height, Grade I Basement Slab uninsulated Windows Above Grade: ENERGY STAR certified, U=0.29, SHGC=0.28 Basement: Non ENERGY STAR certified, U=0.29, SHGC=0.24 Infiltration 2 ACH 50 Mechanical systems Heat 95% AFUE sealed combustion natural gas furnace in conditioned space Goodman GMH950703BXAF Cooling 13 SEER split system Goodman GSX130301BC DHW AO Smith Vertex 100 0.96 EF natural gas tank water heater in 2nd floor utility closet Hot Water Distribution Redesigned trunk and branch Compliant with EPA WaterSense Efficient Distribution Requirements Ducts Located 100% in conditioned space via floor joists leak free to outside (5% or less) Ventilation Central Fan Integrated Supply (CFIS) ventilation with 6"" insulated outside air duct Fan Controller: Air Cycler FRV, with 6"" motorized damper 50 CFM outside air flow, 33% duty cycle (10 minutes on, 20 minutes off); ASHRAE 62.2-2010 compliance via an exhaust fan - Panasonic FV-08VQ5 WhisperCeiling Rerturn Pathways Active Return at Master Bedroom Transfer Grilles in Secondary Bedrooms Appliances, Lighting, MELs Lights 80% ENERGY STAR certified CFL Appliances ENERGY STAR certified refrigerator, dishwasher, and clothes washer; Natural gas range/oven and clothes dryer" STRUCTURE - Test House Lot 145 - 2013 DOE Challenge Test House Task 3.1 Bolingbrook, IL 60490 House is constructed and is DOE Challenge Verified by Don Nelson, a local rater. The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. To that end, Building Science Corporation (BSC) consulted on the construction of five test houses by three cold climate production builders in three separate U.S. cities. (1) K. Hovnanian Homes, Chicago, Illinois (2) David Weekley Homes, Denver, Colorado (3) Transformations, Inc., Devens, Massachusetts. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations about the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: (1) Adding services to the scope of work for various trades, such as HERS Rater and heating, ventilation, and air conditioning contractor. (2) Increased material costs related to the checklists, especially the U.S. Environmental Protection Agency Indoor airPLUS and WaterSense Efficient Hot Water Distribution requirement. Ceiling - 18" cellulose Walls - 12" open cell spray foam in double stud walls Foundation - R-10 under slab, 3 1/2" closed-cell spray foam at walls Windows - Harvey U=0.20, SHGC=0.22 Infiltration - 1.0 sq in per 100 sq ft Heating - Mini split heat pump, 10.6 HSPF, 23 SEER Cooling - Mini split heat pump, 10.6 HSPF, 23 SEER DHW - 0.97 EF instantaneous propane water heater Ventilation - bathroom exhaust fans as basic option, HRV upgrade option Adams Circle Devens MA 01434 Cavite Street Devens, MA 01434

Array↗

Evaluation of Crawlspace Retrofits in Multifamily Buildings

In 2011 and early 2012, Building Science Corporation (BSC) collaborated with Innova Services Corporation on a multifamily community un-vented crawlspace retrofit project at Oakwood Gardens in Lansdale, Pennsylvania. BSC provided design consulting services and pre- and post-retrofit evaluation, testing, and data monitoring.The existing condition was a vented crawlspace with an un-insulated floor between the crawlspace and the dwelling units above. The crawlspace was therefore a critically weak link in the building enclosure and was ripe for improvement. Saving energy was the primary interest and goal, but the greatest challenge in this un-vented crawlspace retrofit project was working through a crawlspace bulk water intrusion problem caused by inadequate site drainage, window well drainage, foundation wall drainage, and a rising water table during rainy periods.While the un-vented crawlspace retrofit was effective in reducing heat loss, and the majority of the bulk water drainage problems had been resolved, the important finding was that some of the wood joists embedded in masonry pockets behind the brick veneer were showing signs of moisture damage.

affordable housing↗

Air Leakage and Air Transfer Between Garage and Living Space

This research project focused on evaluation of air transfer between the garage and living space in a single-family detached home constructed by a production homebuilder in compliance with the 2009 International Residential Code and the 2009 International Energy Conservation Code. The project gathered important information about the performance of whole-building ventilation systems and garage ventilation systems as they relate to minimizing flow of contaminated air from garage to living space. Important gaps and barriers addressed by this research were: (1) Developing recommendations for effective methods for precluding the flow of contaminated air from garages to living space. (2) Creating a resource for guiding home builders and retrofitters to achieve garage isolation by use of mechanical ventilation equipment. (3) Providing field measurement support for revision of the EPA Indoor airPLUS program requirements, which are part of the DOE Challenge Home program. Field test data provided in the form of technical report showing blower door test results for air leakage measurements and tracer gas testing results. Waldorf, MD 20602

Array↗

Spray Foam Exterior Insulation with Stand-Off Furring - New York

IBACOS and Green Homes America 1 (GHA) collaborated with the New York State Energy Research and Development Authority (NYSERDA) Advanced Buildings Program to research a variation of a commercial curtain wall assembly for residential construction as part of a comprehensive whole-house deep energy retrofit (DER) package. The advantages of this strategy include minimizing the physical connections to each individual existing wall stud, using closedcell spray foam to encapsulate existing siding materials including lead paint, and creating a vented rain screen assembly to promote drying. As Moore (2011) states, "Closed-cell foam acts as air-sealing, insulation, and secondary drainage plane..." Field installations on a limited number of houses indicate that the incremental cost when installed as part of a typical siding and window replacement job adds approximately $10/ft2 of wall area. 2 x 4 framing members were attached to the wall at band joists and top plates using "L" clips, and spray foam was used to insulate the wall after the framing was installed. Windows were installed as the framing was put up, including extension jambs. Key lessons learned include the following: (1) The installed cost of the spray foam system was comparable to the installed cost of the rigid foam and furring strips. (2) Spray foam should be applied in such a way that it locks the framing members in place before the remaining foam is installed in the field of the wall. The spray foam has a tendency to move the new wall framing as it expands. Best practice is to "picture frame" the wall framing with spray foam and then apply the spray foam in the field of each bay. (3) Variations in the existing siding conditions must be accounted for when attaching the ledger boards and wall framing. A best practice is to uniformly shim the ledger boards off the walls so the new framing is a uniform distance from the ledger boards and the inside surface of the interior framing. This is important primarily for window and door installation and the associated extension jambs and trim. (4) From a sequencing perspective, it is advantageous to replace the windows at the same time as the exterior walls are being built. This requires a crew that can perform a number of different tasks (e.g., framing, flashing, window install, trim carpentry) and does not lend itself to subcontracting this approach piecemeal (e.g., framing subcontractor, window installer, drainage plane installer, trim carpenter). (5) Application of the brackets and associated fastener screws was more time consuming than anticipated. (6) It is important for the spray foam contractor to perform all preparatory work, which in this case included placing plastic over the windows and exposed foundation to minimize or eliminate the possibility of damage due to overspray.

Array↗

Moisture Risk in Unvented Attics Due to Air Leakage Paths - Minneapolis Minnesota

IBACOS completed an initial analysis of moisture damage potential in an unvented attic insulated with closed-cell spray polyurethane foam. To complete this analysis, the research team collected field data, used computational fluid dynamics to quantify the airflow rates through individual airflow (crack) paths, simulated hourly flow rates through the leakage paths with CONTAM software, correlated the CONTAM flow rates with indoor humidity ratios from Building Energy Optimization software, and used "Warme und Feuchte instationar Pro two-dimensional modeling" to determine the moisture content of the building materials surrounding the cracks. Given the number of simplifying assumptions and numerical models associated with this analysis, the results indicate that localized damage due to high moisture content of the roof sheathing is possible under very low airflow rates. Reducing the number of assumptions and approximations through field studies and laboratory experiments would be valuable to understand the real-world moisture damage potential in unvented attics.

Array↗

Evaluation of the Performance of Houses With and Without Supplemental Dehumidification in a Hot-Humid Climate

Understanding indoor humidity conditions in low energy homes in hot-humid climates is critical to promoting long term occupant comfort, indoor air quality and building durability. The results of this study were expected to inform the residential building community on whether supplemental dehumidification is a needed and effective investment to promote these long term standards. Data logging equipment was installed at eight test homes in July, 2012 and later at two more test homes in January, 2013. Interior conditions and various end-use loads were monitored until November 7th, 2013. The mechanical systems at each of the 10 homes were commissioned by BSC to ensure consistent operation between each of the homes and to fully comply with the intended mechanical design. PHA-1 to 8 - Energy Savings: 21.8-18.9%, Company: Project Home Again (PHA); Address New Orleans, LA 70112, House Count: 8 BDC-1 - Energy Savings: 28.8%, Company: Broadmoor Development Corporation (BDC); Address New Orleans, LA 70112, House Count: 2

Array↗

Measured Performance of a Varied Airflow Small-Diameter Duct System

In this study, researchers with the U.S. Department of Energy's Building America team IBACOS built on research previously done in two new-construction unoccupied test houses-one in Pittsburgh, Pennsylvania (Poerschke and Stecher 2014) and one in Fresno, California (Stecher and Poerschke 2013). Specific traditional central air distribution systems were installed in each of these low-load homes. For this study, the cold-climate new-construction unoccupied test house in Pittsburgh, Pennsylvania, was modified to test the performance of a heating, ventilating, and air-conditioning (HVAC) system with varied airflow and small-diameter ducts. The main goal of the small-diameter duct system is to simplify the task of bringing ductwork inside conditioned space, particularly on the single-story slab-on-grade type of home that is prevalent in the South and Southeast. Guidance is provided here to homebuilders and HVAC contractors on cost and performance tradeoffs between the conventional duct system and the small-diameter duct system. Comparisons were made between variable-capacity heat pump operation modes with three constant airflow rates to determine the ideal tradeoff between maximizing thermal comfort and minimizing fan energy consumption. ASHRAE Standard 55 (ASHRAE 2010a) was used to set limit metrics for temporal temperature variation; Air Conditioning Contractors of America (ACCA) Manual RS (Rutkowski 1997) was used to set a limit on spatial temperature uniformity (room-to-thermostat uniformity). The small diameter duct system was able to meet the temporal temperature variation limits much better than the spatial temperature uniformity limits. TO4 2.1.2: High Velocity Space Cond. Systems

ACCA Manual RS↗

Evaluation of Early Performance Results for Massachusetts Homes in the National Grid Pilot Deep Energy Retrofit Program

In 2009, National Grid started a DER pilot program that offered technical support and financial incentives to qualified Massachusetts homeowners who planned and successfully completed a retrofit that incorporated the performance requirements and goals of the National Grid DER measures package. This DER measures package, developed through collaboration with Building Science Corporation (BSC), includes specific thermal and airtightness goals for the enclosure components as well as health, safety, durability, and indoor air quality requirements. By providing measures that can be included with common renovation activities such as roof replacement, window replacement, re-siding, basement remediation, and remodeling, this DER measures package is expected to have widespread application for existing homes in the New England area. The post-retrofit performance and cost ranges provided by this research project can provide concrete input for homeowners who are considering a DER. Field test data available for air tightness measured using blower door test. House 1 - Address Belchertown, MA 01007, Notes: Energy Savings: 75%, Company: Clark House 2-1 and 2 - Address (1) Brownsberger, MA 02478 and (2) Belmont, MA 02478, Notes Energy Savings: 73%, Company: Brownsberger House 3 - Address Millbury, MA 01527, Notes Energy Savings: 31%, Company: Tweedly House 4 - Address Milton, MA 02186 Notes Energy Savings: 42%, Company: Koh House 5 - Address Quincy, MA 02169, Notes Energy Savings: 57%, Company: Hall House 6-1 and 2 - Address Arlington, MA 02476, Notes Energy Savings: 55%, Company: Venable-Hwang House 7 - Address Newton, MA 02459, Notes Energy Savings: 42%, Company: Lavine House 8-1, 2, and 3 - Address Jamaica Plain, MA 02130, Notes Energy Savings: 43%, Company: Buhs House 9 - Address Northampton, MA 01060, Notes Energy Savings: 49%, Company: Wick House 10 - Address Lancaster, MA 01523, Notes Energy Savings: 40%, Company: Habitat for Humanity of North Central Massachusetts House 11 - Address Brookline, MA 02445, Notes Energy Savings: 27%, Company: Aquiline House 12 - Address Westford, MA 01886, Notes Energy Savings: 30%, Company: Atkins House 13 - Address Gloucester, MA 01930, Notes Energy Savings: 35%, Company: Cunningham

airtightness↗

Performance and Costs of Ductless Heat Pumps in Marine-Climate High-Performance Homes Habitat for Humanity The Woods

The Washington State University (WSU) Energy Program's Building America (BA) team conducted a case study of a high-performance affordable housing community: The Woods (Figure 1). This BA effort is part of a larger-scale study of 30 homes funded from 2013-2016 by Tacoma Public Utilities (TPU) and the Bonneville Power Administration. The Woods is a Habitat for Humanity (HFH) community of homes certified by ENERGY STAR Homes Northwest (ESHNW); the community is in the marine climate of Tacoma/Pierce County, Washington. This research report builds on an earlier preliminary draft 2014 BA report and includes significant billing analysis and cost-effectiveness research from a collaborative and ongoing DHP research effort for TPU and the Bonneville Power Administration. This final BA report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing. The research goal of the U.S. Department of Energy's BA research team Building America Partnership for Improved Residential Construction was to compare a ductless heat pump (DHP) hybrid system (DHP in common area/electric resistance [ER] in bedrooms) to an all-electric zonal ER system in high-performance single-family affordable housing. This effort included assessing the costs and benefits of a DHP/ER hybrid system located in the main living area to offset the primary heating demand of zonal ER heaters in the bedroom zones and comparing these findings to data from of new affordable single-family housing in Washington State. This report includes: (1) Measured indoor and outdoor temperatures and relative humidity (RH) in the homes. (2) Field testing results of heating, ventilating, and air-conditioning equipment; ventilation system airflows; building envelope tightness; lighting, appliance, and other input data required for preliminary Building Energy Optimization (BEopt) modeling; and ENERGY STAR field verification (3) BEopt modeling results compared to measured energy use. (4) A comparison of the space heat energy consumption of a DHP/ER hybrid heating system and a traditional zonal ER heating system installed in the same home. This comparison is made by implementing a series of weekly "flip-flop tests" (referred to here as "switchback" tests per TPU) to compare space heating, temperature, and RH in zonal ER heating mode with a DHP/ER mode as discussed in the Building America Test Plan (Lubliner 2010a). (5) Cost data from HFH and other sources related to building efficiency measures focusing on the DHP/ER hybrid heating system. (6) An evaluation of the thermal performance and cost benefit of DHP/ER hybrid heating systems in these high-performance homes employing life cycle cost analysis for energy code policy and monthly cash flow analysis of HFH homeowners. (7) Post-monitoring occupant survey results. The report also provides the following stakeholder findings and recommendations: (1) DHP single-head systems at The Woods are cost-effective to new homebuyers of these high-performance all-electric homes. (2) Stakeholder education is needed on design, inspection, and commissioning; documentation is needed for heat recovery ventilation (HRV) and from ENERGY STAR builders, verifiers, and inspectors to help ensure that the houses meet the goal of "build tight, ventilate right." (3) A code gap in inspection and enforcement was identified that should be addressed by: (3a) Improving the fire marshal's approach to sprinkler attic piping freeze protection; (3b) Improving the maintenance of ceiling insulation continuity; and (3c) Educating the local building inspector on attic insulation inspection concerns that allow for maximizing design improveme...

affordable housing↗

Thermostatic Radiator Valve Evaluation and Demonstration

A large stock of multifamily buildings in the Northeast and Midwest uses hot water or steam for space heating. Typically, residents do not pay for heat directly (i.e., heating fuel serves a central plant and use is not submetered). Losses from these systems are typically high, and a significant number of apartments are overheated much of the time. This is often evidenced by open windows on winter days. Controls and distribution are often faulty, and improving them can be more cost effective than replacing boilers. Thermostatic radiator valves (TRVs), which have been in use for many decades, are one potential strategy to combat this problem. They are commonly used in Europe and in other markets such as commercial buildings, but have not been widely accepted by the residential retrofit market in the northeastern United States. Anecdotal evidence suggests that heating systems engineers and contractors have a variety of opinions about their effectiveness, illustrating a lack of consensus on this potentially important energy efficiency measure. A review of the limited available literature revealed that, in one study, heating fuel savings as high as 15% was achieved through TRV retrofits. In this project, the U.S. Department of Energy Building America team, Advanced Residential Integrated Energy Solutions, sought to better understand the current usage of TRVs by key market players in steam and hot water heating and to conduct limited experiments on the effectiveness of new and old TRVs as a means of controlling space temperatures and reducing heating fuel consumption. The project included a survey of industry professionals, a field experiment comparing old and new TRVs, and cost-benefit modeling analysis using BEopt (Building Energy Optimization software). Radiator and apartment space temperature data were collected and analyzed for two similar apartment units in a building that underwent a one-pipe steam TRV retrofit. Space temperature comparisons were made across the pre- and post-TRV installation heating periods and between rooms equipped with old or new TRVs in an attempt to show the comparative effectiveness of each vintage of TRV. Analyses of the heating fuel utility bills before and after the building-wide TRV installation were conducted to quantify potential savings. The results of the field experiment and utility bill analysis did not show energy savings at either the unit or the building-wide level. The results provided inconclusive answers to the original study questions but provided valuable insight into common steam system imbalance and resident behavior issues that are critical to address in conjunction with TRV retrofits. Specific issues identified included steam distribution imbalance, possible TRV sensor location issues, a persistent window-opening habit, and a failure to optimize the boiler control set points as part of the TRV retrofit. The lack of heating fuel savings underscored the need to include whole steam system commissioning alongside or as a prerequisite to TRVs. Failed air vents and uneven steam main venting are critical to address either in conjunction with or before a TRV installation. Monitoring existing space temperatures before a retrofit strategy is chosen would allow the consultant and building owner to better assess the potential benefits of a whole-building TRV retrofit, selective installation of TRVs in some units, or simply balancing the steam distribution venting. Further gaps in the understanding of underlying processes that allow TRVs to function effectively were also identified and are presented as opportunities for future research.

Array↗

Solar Row Zero Energy Townhomes - Boulder, CO

Wonderland Development has constructed a new "near zero energy" row home design in North Boulder consisting of 9 units: one 5-plex and two duplexes. NREL has performed short-term tests and installed long-term monitoring equipment in three of these units. Two of these units used a solar thermal combi system with a boiler for radiant space heating and water heating and mini-split system for space conditioning. The third unit used a high efficiency tank water heater for space heating. In addition to studying the overall performance of the homes, one unit was used for a detailed study on hot water draws at each fixture. Several reports and presentations were produced on this project, however, due to shifting funding and staffing priorities, a comprehensive final report for this project was never completed. This dataset contains a wealth of raw and analyzed data and several unpublished reports.

Array↗