Optimizing dynamic wireless charging for electric buses: A data-driven approach to infrastructure planning

The network configuration significantly impacts the performance of dynamic wireless charging (DWC) technology for electric buses. Here, this study presents a novel approach to planning charging infrastructure for public transit using data-driven nonconvex mixed-integer optimization. Integrating DWC and charging station technologies reveals a trade-off between enroute and stationary charging times. Our framework optimizes bus frequency settings and transmitter coil arrangements to minimize operational and infrastructure costs. A case study in Chattanooga, Tennessee, demonstrates the method's effectiveness in mitigating range anxiety and reducing charging expenses. This research implies that integrating DWC technology into public transit systems can enhance the feasibility and cost-effectiveness of electric bus operations, promoting sustainable urban mobility.

33 ADVANCED PROPULSION SYSTEMS↗

Safe Deep Reinforcement Learning for Robust Frequency and Voltage-Constrained Networked Microgrid Restoration

Here, this paper proposes a safe soft actor-critic reinforcement learning (RL) algorithm–based controller for networked microgrid restoration. It formulates the post black-start start as a finite-horizon constrained Markov decision process. The RL agent co-optimizes real and reactive power set-points for both grid-forming and grid-following inverters under explicit voltage and frequency constraints, while enforcing proper power sharing via the Mean Active Power Sharing Index (MPSI) and Mean Reactive Power Sharing Index (MQSI). Numerical results obtained on the IEEE 123-bus distribution system show that the proposed method achieves a mean voltage build-up time of 0.01 s without breaching the 5% sharing-violation budget under various load scenarios, considering MPSI and MQSI indices. These findings demonstrate that the proposed method yields fast and safe black-start schedules without resorting to heuristic penalties.

Selim, Alaa [Dartmouth College, Hanover, NH (Unite↗

Omega-Limit Sets and Input-To-State Stability in Power Grids with Switching Equilibria

This paper studies a power transmission system with both conventional generators (CGs) and distributed energy assets (DEAs) providing frequency control. We consider an operating condition with demand aggregating two dynamic components: one that switches between different values on a finite set, and one that varies smoothly over time. Such dynamic operating conditions may result from protection scheme activations, external cyber-attacks, or due to the integration of dynamic loads, such as data centers. Mathematically, the dynamics of the resulting system are captured by a system that switches between a finite number of vector fields - or modes -, with each mode having a distinct equilibrium point induced by the demand aggregation. To analyze the stability properties of the resulting switching system, we leverage tools from hybrid dynamic inclusions and the concept of ..omega.. -limit sets from sets. Specifically, we characterize a compact set that is semi-globally practically asymptotically stable under the assumption that the switching frequency and load variation rate are sufficiently slow. For arbitrarily fast variations of the load, we use a level-set argument with multiple Lyapunov functions to establish input-to-state stability of a larger set and with respect to the rate of change of the loads. The theoretical results are illustrated via numerical simulations on the IEEE 39-bus test system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

On the Impact of High-Order Harmonic Generation in Electrical Distribution Systems

The modern power grid has seen a rise in the integration of non-linear loads, presenting a significant concern for operators. These loads introduce unwanted harmonics, leading to potential issues such as overheating and improper functioning of circuit breakers. In pursuing a more sustainable grid, the adoption of electric vehicles (EVs) and photovoltaic (PV) systems in residential networks has increased. Understanding and examining the effects of high-order harmonic frequencies beyond $1.5$ kHz is crucial to understanding their impact on the operation and planning of electrical distribution systems under varying nonlinear loading conditions. This study investigates a diverse set of critical power electronic loads within a household modeled using PSCAD/EMTdc, analyzing their unique harmonic spectra. This information is utilized to run the time-series harmonic analysis program in OpenDSS on a modified IEEE 34 bus test system model. The impact of high-order harmonics is quantified using metrics that evaluate total harmonic distortion (THD), transformer harmonic-driven eddy current loss component, and propagation of harmonics from the source to the substation transformer.

Peerzada, Aaqib A. [BATTELLE (PACIFIC NW LAB)]↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗