Search NASA⌕ Search

SEARCH · Search NASA

Results for “CANADA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Port Radium Canada's Original Radium/Uranium Mine, The Complete Story of Canada's Historic Radium/Uranium Mine, 1932 to 2012 - 13159

This paper provides the life story of Canada's original radium/uranium mine. In addition to the history of operations, it discusses the unique and successful approach used to identify the key issues and concerns associated with the former radium, uranium and silver mining property and the activities undertaken to define the remedial actions and subsequent remedial plan. The Port Radium Mine site, situated approximately 275 km north of Yellowknife on the east shore of Great Bear Lake, Northwest Territories, was discovered in 1930 and underground mining began in 1932. The mine operated almost continuously from 1932 to 1982, initially for recovery of radium, then uranium and finally, for recovery of silver. Tailings production totaled an estimated 900,000 tons and 800,000 tons from uranium and silver processing operations respectively. In the early days of mining, Port Radium miners were exposed to radon and associated decay product levels (in Working Level Months of exposure - WLM) hundreds of times greater than modern standards. The experience of the Port Radium miners provides important contribution to understanding the risks from radon. While the uranium mine was originally decommissioned in the early 1960's, to the standards of the day, the community of Deline (formerly Fort Franklin) had concerns about residual contamination at the mine site and the potential effects arising from use of traditional lands. The Deline people were also concerned about the possible risks to Deline Dene arising from their work as ore carriers. In the late 1990's, the community of Deline brought these concerns to national attention and consequently, the Government of Canada and the community of Deline agreed to move forward in a collaborative manner to address these concerns. The approach agreed to was to establish the Canada-Deline Uranium Table (CDUT) to provide a joint process by which the people of Deline could have their concerns expressed and addressed. A great deal of work was done through the CDUT, including efforts to assess site environment and safety issues in the context of modern reclamation standards. In addition to the environmental and remediation studies, an assessment of historic exposures of Deline ore carriers to radiation and a follow-up epidemiological feasibility study were performed. SENES Consultants Limited (SENES) carried out the dose reconstruction for the Port Radium miners in the 1990's, was the environmental consultant to the CDUT from 2000 to 2005, developed the Remedial Action Plan (RAP), engineering plans and specifications for decommissioning the Port Radium mine and vicinity sites in 2005/6, supervised the remedial works in 2007 and carried out the long term post closure monitoring from 2008 to 2012. Our firsthand experience from working cooperatively with the CDUT provides insights into effective decommissioning of historic contaminated sites. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Panel Session 3: Featured Country Canada: Management and Disposal of High and Low-Level Waste

This panel featured Senior Executives accountable for the safe management and disposal of most of Canada's radioactive waste liabilities and provided their perspectives on current plans and progress made to date. Topics addressed by the panelists included national policies and programs, the regulatory framework, and actions led by the waste generators and solution implementers to ensure Canada's waste legacy is responsibly managed. Presentations proposed include: 1 - Overview of Canadian Radioactive Waste Policy and Long-Term Waste Management Projects (Dave McCauley, Natural Resources Canada (Canada)); 2 - Featured Country: Canada - National Repository (Laurie Swami, Nuclear Waste Management Organization (Canada)); 3 - Management and Disposal of Ontario Power Generation's Low and Intermediate Level Waste (Lise Morton, Ontario Power Generation (Canada)); 4 - Featured Country: Canada - National Laboratories Liabilities (Richard Sexton, Atomic Energy of Canada Limited (Canada)); 5 - Management and Disposal of High and Low-Level Waste (Mark Lesinski, Canadian Nuclear Laboratories (Canada)); 6 - Disposal in Canada: The Regulatory Perspective (Ramzi Jammal, Canadian Nuclear Safety Commission (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inventory of Radioactive Waste in Canada - 19336

Since 1999, the Government of Canada has been conducting a regular exercise of gathering and compiling Canada's radioactive waste inventory and projection data from waste owners and making it available to the public in the form of a triennial Inventory Summary Report. The goal of this data collection exercise has been to support federal policy development, support the Canadian Nuclear Safety Commission's regulatory activities, provide consolidated radioactive waste information for the nuclear industry, promote transparency, and meet Canada's international commitments and growing demands internationally for radioactive waste data. The detailed national inventory report provides an overview of the production, accumulation and future projections of radioactive waste in Canada. Since the coming into force of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management in June 2001, the data collection and reporting cycle has been aligned to provide the waste inventory data required for Canada's triennial National Report for the Joint Convention. This paper presents Canada's radioactive waste inventory and projection data as of the end of December 2016, and summarizes key findings from the analysis of the data. For this reporting cycle, the waste data collected was expanded to include more detailed information on the decommissioning schedules and associated waste volume projections for nuclear power plants, and research and prototype reactors, as well as plans for transitioning waste inventories from storage to long-term management and disposal facilities, based on current schedules for establishing these facilities in Canada. With this additional information, the Government of Canada and Canadian stakeholders are better able to understand the waste disposal capacity and schedules required to accommodate all nuclear fuel waste and radioactive waste that will be produced by Canada's existing fleet of nuclear power plants and research reactors. The collection and analysis of projected waste volumes to be emplaced in long-term management facilities is in line with and will support the proposed methodology of presenting waste inventories in terms of management strategy and disposal routes by the Organization for Economic Cooperation and Development Nuclear Energy Agency Expert Group on Waste Inventorying and Reporting Methodology. The paper describes some of the uses that are made of the waste inventory information, as well as Canada's approach to national inventory data collection and its experience and lessons learned. Canada continues to modernize the format of the Inventory Summary Report with the goal of disseminating the technical information into an attractive and public-friendly report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 11: Featured Country Canada - Remediation of Contaminated Sites

Canada has several unique sites requiring environmental remediation of radiological contaminants. This panel was designed to outline the remediation of contaminated sites across Canada from several perspectives. Remote legacy uranium mining operations, small scale residential locations, and large impacted soil sites all pose different challenges, however there are some common solutions and keys to success. This panel addressed several of those challenges and provided lessons learned on how to successfully plan and execute large scale environmental remediation in both remote and residential locations. This panel focused on the cleaning up several contaminated sites in Canada and monitoring the long-term performance of sites that have already been remediated. Panelists addressed the technical and social challenges associated with various cleanup initiatives North of the 49. Parallel and the solutions that have been adopted to enable these projects to move forward. The panel offered the perspectives of owners, contractors and regulators on current projects and how they are leveraging past experience and learning from others to ensure future undertakings are successful. Presentations proposed include: 1 - Regulating Environmental Remediation in Canada (Michael Rinker, Canadian Nuclear Safety Commission (Canada)); 2 - Integration of Local Knowledge and Engagement/Capacity Building Legacy Uranium Mine Sites (Joe Muldoon, Saskatchewan Research Council (Canada)); 3 - The Path to Institutional Control - Safe, Secure and Stable (R. Liam Mooney, Cameco Corporation (Canada)); 4 - Port Hope Area Initiative: Project Challenges (Scott Parnell, Canadian Nuclear Laboratories (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Low-Level Radioactive Waste Management Office: Thirty Years of Experience in Canada - 13308

This paper reviews thirty years of progress by the Low-Level Radioactive Waste Management Office (LLRWMO) in developing and implementing low-level radioactive waste (LLRW) remediation projects and environmentally safe co-existence strategies. It reports on the present status and the future of the national historic waste program in Canada. There are over two million cubic metres of historic LLRW in Canada. Historic LLRW is broadly defined as LLRW that was managed in the past in a manner that is no longer considered acceptable and for which the original owner cannot reasonably be held accountable. In many cases, the original owner can not be identified or no longer exists. The LLRWMO was established in 1982 as Canada's agent to carry out the responsibilities of the federal government for the management of historic LLRW. The LLRWMO is operated by Atomic Energy of Canada Limited (AECL) through a cost-recovery agreement with Natural Resources Canada (NRCan), the federal department that provides the funding and establishes national policy for radioactive waste management in Canada. The LLRWMO expertise includes project managers, environmental remediation specialists, radiation surveyors, communications staff and administrative support staff. The LLRWMO in providing all aspects of project oversight and implementation contracts additional resources supplementing core staff capacity as project/program demands require. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of SLOWPOKE-2 HEU Irradiated Fuel Transportation from Canada to USA - 19123(2)

The SLOWPOKE-2 (Safe Low-Power Kritical Experiment) was designed by AECL (Atomic Energy of Canada Limited) in the late 1960's. The core consists of HEU (highly enriched uranium) fuel with an enrichment of 93%. The fuel cage typically has approximately 300 fuel pins assembled in a triangular pitch between the two plates. The fuel pins are made from uranium-aluminum alloy cladded with aluminum. The SLOWPOKE-2 reactor is rated at a nominal 20 kW. with varying neutron flux, maximum being 1 E12 n/cm{sup 2}/s. The mass of the fuel cage is 5.06 kg. The life of the core can be extended by adding layers of beryllium reflector. The transportation flask for the irradiated fuel is a Type B(U)F. The shipment classification is UN3328 Class 7. To date, 4 SLOWPOKE-2 reactors have been decommissioned. The fuel from all these reactors was transported to the U.S. The CNSC (Canadian Nuclear Safety Commission) joint Canada-United States guide for approval of Type B(U) and fissile material transportation packages (RD-364) satisfies the requirements stipulated in International Atomic energy Agency (IAEA) TS-R-1 1996 edition (revised) and is acceptable to the DOT (Department of Transportation) and NRC (Nuclear Regulatory Commission) for complying with U.S. code of federal regulations 10 CFR Part 71. The export license is issued by the CNSC. The transportation licence is issued by CNSC after approval from TC (Transport Canada) and also by DOT after approval from NRC. The final home of the HEU SLOWPOKE-2 irradiated fuel is in Savannah River Site of DOE (Department of Energy). The transportation licence requires that the Type B(U)F flask is structurally sound in case of a crash. The US DOT provides a CAC (Competent Authority Certificate) which describes the irradiated fuel specifications that can be transported in the designated flask. The U.S. DOT also requires a leak test certification in accordance with ANSI N14.5-2014 to verify a leakage rate not to exceed 1 E-7 std-cm{sup 3}/s. As most SLOWPOKE-2 facilities are not located on the existing approved routes for nuclear fuel transportation, a route survey needs to be performed and submitted to the NRC. The route survey report is assessed by the NRC and issues a route approval for the transportation of the fissile material. This technical paper will discuss the detailed processes required to obtain approvals in order to transport the HEU SLOWPOKE-2 irradiated fuel from Canada to U.S. based upon recent experiences of decommissioning SLOWPOKE-2 reactors in Canada. It will provide details on the requirements of various regulators in Canada and the U.S. that govern and regulate this shipment including transportation, safety and security. It will also present lessons learned from previous experiences that can be utilized for best practice on other similar projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying equity principles leads to higher carbon removal obligations in Canada

Despite net-zero pledges, consensus on national responsibilities for carbon dioxide removal (CDR) strategies is lacking. Here, we use integrated assessment modeling to examine equity-informed estimates of Canada’s remaining carbon budgets, exploring CDR’s role at net-zero and beyond. Gigaton-scale CDR efforts post-2050 are needed to address Canada’s carbon debt under various burden-sharing principles. Cumulative negative emissions (2050-2100) could increase from 7.5 GtCO 2 in the Net-Zero scenario to 20.3 GtCO 2 in equity-informed scenarios. By 2100, a CDR portfolio, including bioenergy with carbon capture and storage, direct air capture, and enhanced weathering could contribute up to ~500 MtCO 2 /year of removals. The projected average CDR growth rates, 2.8%-16%/year, align with the historical adoption rates of ammonia synthesis and biomass consumption in Canada, underscoring the importance of drawing lessons from past successes. Socio-economic and technological sensitivity analysis highlights that, despite variations in the role of individual CDR technologies, CDR remains essential for Canada’s post-net-zero commitments.

54 ENVIRONMENTAL SCIENCES↗

Panel Session 37: Featured Country Canada - Whiteshell Laboratories Decommissioning Successes and Challenges (4/5)

This panel focused on the decommissioning of the AECL Whiteshell Laboratories in Pinawa, Manitoba. The discussion presented successes as well as remaining challenges, including the proposed in-situ disposal of the organic-coated nuclear reactor shell. The panel included representatives from the Owner, the operator, the Canadian regulator, the local municipality and a representative of the indigenous community in the area. Presentations proposed include: 1 - Whiteshell Laboratories - Decommissioning Successes and Challenges (Craig Michaluk, Atomic Energy of Canada Limited (Canada)); 2 - Whiteshell Laboratories Decommissioning: Successes and Challenges (Kavita Murthy, Canadian Nuclear Safety Commission (Canada)); 3 - Successes and Challenges of the Whiteshell Laboratories Closure Project (Brian Wilcox, Canadian Nuclear Laboratories (Canada)); 4 - Whiteshell Laboratories Decommissioning Successes and Challenges - Community Point of View (Blair Skinner, Local Government District of Pinawa, Manitoba (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Canada-U.S. Power Sector Modeling with the Regional Energy Deployment System (ReEDS)

The electric power system in North America is linked between the United States and Canada. Canada has historically been a net exporter of electricity to the United States. The extent to which this remains true will depend on the future evolution of power markets, technology deployment, and policies. To evaluate these and related questions, we modify the Regional Energy Deployment System (ReEDS) model to include an explicit representation of the grid-connected power system in Canada to the continental United States. ReEDS is unique among long-term capacity expansion models for its high spatial resolution and statistical treatment of the impact of variable renewable generation on capacity planning and dispatch. These unique traits are extended to new Canadian regions. We present example scenario results using the fully integrated Canada-U.S. version of ReEDS to demonstrate model capabilities. The newly developed, integrated Canada-U.S. ReEDS model can be used to analyze the dynamics of electricity transfers and other grid services between the two countries under different scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Genomic Characterization and Wetland Occurrence of a Novel Campylobacter Isolate from Canada Geese

Populations of resident, non-migratory Canada geese are rapidly increasing. Canada geese are known to transmit viral and bacterial diseases, posing a possible threat to human health. The most prevalent pathogens vectored by geese are Campylobacter species, yet the current understanding of the identity and virulence of these pathogens is limited. In our previous study, we observed a high prevalence of Campylobacter spp. in the Banklick Creek wetland—a constructed treatment wetland (CTW) located in northern KY (USA) used to understand sources of fecal contamination originating from humans and waterfowl frequenting the area. To identify the types of Campylobacter spp. found contaminating the CTW, we performed genetic analyses of Campylobacter 16s ribosomal RNA amplified from CTW water samples and collected fecal material from birds frequenting those areas. Our results showed a high occurrence of a Campylobacter canadensis-like clade from the sampling sites. Whole-genome sequence analyses of an isolate from Canada goose fecal material, called MG1, were used to confirm the identity of the CTW isolates. Further, we examined the phylogenomic position, virulence gene content, and antimicrobial resistance gene profile of MG1. Lastly, we developed an MG1-specific real-time PCR assay and confirmed the presence of MG1 in Canada goose fecal samples surrounding the CTW. Our findings reveal that the Canada goose-vectored Campylobacter sp. MG1 is a novel isolate compared to C. canadensis that possesses possible zoonotic potential, which may be of human health concern.

59 BASIC BIOLOGICAL SCIENCES↗

Update on site selection for Canada's national repository for used nuclear fuel - 15481

In 2007, the Government of Canada selected Adaptive Phased Management as Canada's plan that provides for long-term management of Canada's used nuclear fuel in a deep geological repository, located in an informed and willing host. The Nuclear Waste Management Organization is tasked through federal legislation to select the site and develop and manage all aspects of Canada's plan. In May 2010 the Nuclear Waste Management Organization published and initiated the site selection process that serves as a road map for decision-making on the location for the deep geological repository. The Nuclear Waste Management Organization continues to lead the site selection process for a deep geological repository for the long term management of Canada's used nuclear fuel and centre of expertise. The screening down process is advancing and, from an initial starting point of 22 communities expressing interest in learning about the project, as of November 2014 14 communities are now the focus of more detailed studies. Preliminary assessments are underway with these communities, which is the third step in the 9 step site selection process. Preliminary assessments involve preliminary technical and social desktop and field assessments, engagement activities within and beyond the interested community and seeking involvement of Indigenous peoples and nearby municipalities in the planning and conduct of the work. The paper provides an update on the advancement of the site selection process. It describes the nature of the technical and social studies being conducted at this phase of work, including the progressively more detailed field studies which are the focus of technical work at this stage, approach to engagement and collaboration with communities to direct these studies, and the work underway to ensure the framework used for this assessment and engagement includes the range of priorities and perspectives of First Nations and Metis peoples and communities in the broader area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Small Modular Reactors in Canada: Planning for Waste from the Outset - 19254

Canada is exploring the potential for on- and off-grid applications for small modular reactors (SMRs). SMRs are at an early stage of development and a road-mapping process was launched in Canada in February 2018 to better understand the views on priorities and challenges related to the possible development and deployment of SMRs. In addition to engaging partners, stakeholders and Indigenous representatives through workshops, a number of working groups were formed to advise the Road-map Secretariat on topics such as understanding the value proposition of different SMR technologies, matters associated with regulatory readiness, and issues related to waste management and transportation. The Waste Working Group (Waste WG) brought together experts from current nuclear waste generators, the organization responsible for managing Canada's nuclear fuel waste, government, and the regulator to identify waste disposal and storage considerations for Canadian SMR applications, including an analysis of waste streams, waste transportation, short and long-term disposal and storage requirements, and decommissioning considerations. Radioactive waste has been safely managed within a regulatory framework in Canada for decades. Technologies for waste storage and transport exist and also have been in use for decades, and therefore provide a technical basis to explore any specific differences that would apply to waste streams resulting from the construction, operation and decommissioning of SMRs. The Waste WG concluded that a disposal path for SMR used fuel exists through the Nuclear Waste Management Organisation's (NWMO) Adaptive Phased Management (APM) approach, but that R and D work is needed to demonstrate that SMR waste can meet the acceptance criteria. The Waste WG noted that although projects are progressing to realize disposal facilities for the two largest producers of low and intermediate level waste, small producers including potential SMR operators currently have no defined path to disposal for low and intermediate level waste. The Waste WG also highlighted that there could be potential logistical challenges with the transportation of irradiated reactor cores, in particular for remote locations, which will need to be explored. The Waste WG recognized that some uncertainties remain, and early and open communication and coordination between the SMR developers and the NWMO, and potential waste receivers will be key to ensuring a robust framework for SMR waste management from the outset in Canada. This paper explores the results of the analysis and the key findings, high-level recommendations and actions of the Waste WG. It presents the results of the Waste WG's analysis of waste categories against Canadian SMR technologies that best align to end-user requirements; identification of key gaps in research and development for waste categories; and identification of potential work that could address the key gaps. The Waste WG undertook its work between February and August 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 12: Featured Country Canada - Engaging the Public and Indigenous Groups in Canadian Waste and D and D Projects

This panel will share insights from those directly involved in the dialogue among members of the Canadian public, elected officials of host communities, indigenous groups, project proponents, and the Canadian regulator. History has shown time and again that the early and meaningful engagement of stakeholders must go hand-in-hand with technical solutions in order to assure the successful start and finish of waste management and decommissioning projects. In this panel discussion, the requirements for consultation and communication, the tools and strategies used, the results of efforts to date, and plans will be addressed by those at the center of some of Canada's biggest and most controversial radioactive waste projects. Presentations proposed include: 1 - Engaging the Public and Indigenous Groups in Canadian Waste and D and D Projects (Candida Cianci, Canadian Nuclear Safety Commission (Canada)); 2 - Indigenous Engagement (Bob Watts, Nuclear Waste Management Organization (Canada)); 3 - Engaging the Public and Indigenous Groups Related to Canadian Waste and D and D Projects (Patrick Quinn, Canadian Nuclear Laboratories (Canada)); 4 - Engaging the Public and Indigenous Groups in Canadian Waste and D and D Projects Canadian Association of Nuclear Host Communities Point of View (Blair Skinner, Local Government District of Pinawa, Manitoba (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drought–induced increase in tree mortality and corresponding decrease in the carbon sink capacity of Canada's boreal forests from 1970 to 2020

Canada's boreal forests, which occupy approximately 30% of boreal forests world wide, play an important role in the global carbon budget. However, there is lit tle quantitative information available regarding the spatiotemporal changes in the drought-induced tree mortality of Canada's boreal forests overall and their associ ated impacts on biomass carbon dynamics. Here, we develop spatiotemporally ex plicit estimates of drought-induced tree mortality and corresponding biomass carbon sink capacity changes in Canada's boreal forests from 1970 to 2020. We show that the average annual tree mortality rate is approximately 2.7%. Approximately 43% of Canada's boreal forests have experienced significantly increasing tree mortality trends (71% of which are located in the western region of the country), and these trends have accelerated since 2002. This increase in tree mortality has resulted in sig nificant biomass carbon losses at an approximate rate of 1.51±0.29 MgC ha -1 year -1 (95% confidence interval) with an approximate total loss of 0.46±0.09 PgC year -1 (95% confidence interval). Under the drought condition increases predicted for this century, the capacity of Canada's boreal forests to act as a carbon sink will be further reduced, potentially leading to a significant positive climate feedback effect

59 BASIC BIOLOGICAL SCIENCES↗

Overview of the Government of Canada Nuclear Legacy Liabilities Program - 13551

Nuclear legacy liabilities have resulted from more than 60 years of nuclear research and development carried out on behalf of Canada. The liabilities are located at Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories in Ontario and Whiteshell Laboratories in Manitoba, as well as three shutdown prototype reactors in Ontario and Quebec that are being maintained in a safe storage state. Estimated at about $7.4 billion (current day dollars), these liabilities consist of disused nuclear facilities and associated infrastructure, a wide variety of buried and stored waste, and contaminated lands. In 2006, the Government of Canada adopted a long-term strategy to deal with the nuclear legacy liabilities and initiated a five-year, $520 million start-up phase, thereby creating the Nuclear Legacy Liabilities Program (NLLP). The Government of Canada renewed the NLLP in 2011 with a $439-million three-year second phase that ends March 31, 2014. The projects and activities carried out under the Program focus on infrastructure decommissioning, environmental restoration, improving the management of legacy radioactive waste, and advancing the long-term strategy. The NLLP is being implemented through a Memorandum of Understanding between Natural Resources Canada (NRCan) and AECL whereby NRCan is responsible for policy direction and oversight, including control of funding, and AECL is responsible for implementing the program of work and holding and administering all licences, facilities and lands. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗