DOE OSTI2024
The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful
3D seismic GPS positioning↗