Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEBAF ACCELERATOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Reduction of waveguide vacuum trips in CEBAF accelerating cavities with a combination ion pump and non-evaporable getter pump

Pressure spikes in the fundamental power coupler waveguide are a significant source of trips during the operation of both original and refurbished superconducting radio-frequency cavities installed in the CEBAF accelerator. In its original configuration, two waveguides from a cavity-pair are connected to a single 32 l/s ion pump. In 2017 a new cavity-pair was installed in a refurbished cryomodule in which a NEXTorr® D200-5 combination ion pump and non-evaporable getter pump was installed for each waveguide. It is shown that hydrogen is the dominant residual gas in the waveguide and simulations with Molflow+ indicated that the new pumping scheme allows reducing the pressure at the end of the waveguide by a factor of ~5 , compared to the original configuration. In conclusion, the new cavity-pair has been operating in CEBAF for a total of 431 days and it only had a total of 3 trips due to vacuum spikes in the waveguide.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

CEBAF Accelerator Tunnel Robot Project

Advancements in the field of robotics allow for the use of remotely controlled robots to perform tasks that have typically required human intervention. Jefferson Lab has explored the possibilities of robots placed in the accelerator tunnel to perform remote inspections that would otherwise require powering down equipment and completing lengthy radiological surveys that impact beam operations. A robotic solution ? driven by a human operator ? could not only reduce accelerator down time but also support the Lab's radiation exposure policy (known as "ALARA" - As Low As Reasonably Acceptable) by handling routine tunnel and beamline investigations in place of a human being. However, operating a remote device in a radioactive, high electronic-noise area is not a trivial task and drop-in solutions are rarely as simple as they seem. We will present the past prototypes that were tested as well follow-on technology developed from the project. We will also briefly survey current applications of robots at accelerator facilities with an eye toward future applications.

McGuckin, Theodore↗

The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

High precision 5 MeV Mott polarimeter

We report on the design and performance of a Mott polarimeter optimized for a nominal 5-MeV electron beam from the Continuous Electron Beam Accelerator Facility (CEBAF) injector. The rf time structure of this beam allows the use of time of flight in the scattered electron detection, making it possible to cleanly isolate those detected electrons that originate from the scattering foil, and resulting in measured scattering asymmetries which are exceptionally stable over a broad range of beam conditions, beam currents, and foil thicknesses. In two separate series of measurements from two different photocathode electron sources, we have measured the Mott scattering asymmetries produced by an approximately 86% transversely polarized electron beam incident on ten gold foils with nominal thicknesses between 50 and 1000 nm. The statistical uncertainty of the measured asymmetry from each foil is below 0.25%. Within this statistical precision, the measured asymmetry was unaffected by ±1-mm shifts in the beam position on the target foil, and by beam current changes and dead-time effects over a wide range of beam currents. The overall uncertainty of our beam polarization measurement, arising from the uncertainty in the value of the scattering asymmetry at zero foil thickness as determined from our fits to the measured asymmetries versus scattering foil thicknesses, the estimated systematic effects, and the (dominant) uncertainty from the calculation of the theoretical Sherman function, is 0.61%. A simulation of the polarimeter using geant4 has confirmed that double scattering in the target foil is the sole source of the dependence of the measured asymmetry on foil thickness, and gives a result for the asymmetry versus foil thickness in good agreement with both our measurements and a simple calculation. Future measurements at different beam energies and with target foils of different atomic numbers will seek to bound uncertainties from small effects such as radiative corrections to the calculation of the polarimeter analyzing power. A simultaneous high-precision measurement of the beam polarization with a different polarimeter, AESOP (Accurate Electron Spin Optical Polarimeter), under development at the University of Nebraska, clearly possible at the CEBAF accelerator, will allow a high-precision comparison of our measured asymmetries with theoretical calculations of the Mott analyzing power. Finally, the improved precision of the current Mott polarimeter along with similar improvements to other Jefferson Lab polarimeters warrants another precision comparison of all of these polarimeters when measuring a beam of the same polarization.

Grames, J. M. (ORCID:0000000193908752)↗

AN OVERVIEW OF PLASMA PROCESSING OF SRF CAVITIES AT JLAB

Plasma processing is a common technique where the free oxygen produced in a low-pressure RF plasma breaks down and removes hydrocarbons from surfaces. This increases the work function and reduces the secondary emission coefficient of the treated surfaces. Jefferson Lab has an ongoing R&D program in plasma processing. The experimental program investigated processing using argon/oxygen and helium/oxygen gas mixtures. The initial focus of the effort was processing C100 cavities by injecting RF power into the HOM coupler ports. We also developed the methods for establishing a plasma C75 cavities where the RF power is injected via the fundamental power-coupler. As part of the process development we processed, three C100 cryomodules in our off-line cryomodule test facility. In May 2023 we processed four C100 cryomodules in-situ in the CEBAF accelerator with the cryomodules returning to an operational status in Sept. 2023. The cumulative improvement in field emission free operation, as measured on a cavity by cavity basis, was 59 MeV or 24%. We recently started processing 7 cryomodules in the CEBAF accelerator in August 2024. Methods systems and results from processing cryomodules and individual cavities in the vertical test will be presented. Current status and future plans will also be presented.

Ganey, Tiffany↗

IN SITU PLASMA PROCESSING OF SUPERCONDUCTING CAVITIES AT JLAB, 2023 UPDATE

Jefferson Lab has an ongoing R&D program in plasma processing which just completed a round of production processing in the CEBAF accelerator. Plasma processing is a common technique for removing hydrocarbons from surfaces, which increases the work function and reduces the secondary emission coefficient. The initial focus of the effort was processing C100 cavities by injecting RF power into the higher order mode (HOM) coupler ports. Results from processing cryomodules in the CEBAF accelerator as well as vertical test results will be present-ed. The goal of in-situ processing is to improve the operational gradients and the energy margin of the linacs. This work will describe the systems and methods used at JLAB for processing cavities using an argon-oxygen gas mixture as well as a helium-oxygen gas mixture. Before and after plasma processing results will also be presented.

Powers, Thomas↗

Conceptual Design of the Interaction Region Magnets for Future Electron-Ion Collider at Jefferson Lab

The Jefferson Lab Electron Ion Collider (JLEIC) is a proposed new machine for nuclear physics research. As proposed, it will deliver between 15 and 65 GeV center of mass energy collisions between electrons and nuclei. It uses the existing CEBAF accelerator as a full energy injector to deliver 3 to 10 GeV electrons into a new electron collider ring. An all new ion accelerator and collider complex will deliver up to 100 GeV protons, or 40 GeV/nucleon ions. The machine will have luminosity goals of above 1033 cm-2 sec-1 in the whole energy range with a maximum of a few 1034 cm-2 sec-1. The two collider rings use a unique figure-of eight layout to deliver a high degree of polarization in both beams. The machine will include room for two interaction regions with only one initially installed. The crossing angle in the primary interaction region will be 50 mrad. The whole detector region including forward detection covers about 80 meters of the JLEIC complex. This paper will describe the requirements and preliminary designs for both the ion and electron beam magnets in the most complex 32 m long interaction region (IR) around the interaction point (IP). The interaction region has over thirty-seven superconducting magnets operating at 4.5K; these include dipoles, quadrupoles, skew-quadrupoles, solenoids, horizontal and vertical correctors and higher order multipole magnets. The paper will also discuss the electromagnetic interaction between these magnets.

Wiseman, Mark (ORCID:0000000179110306)↗

Exploring Causes of Beam Loss at CEBAF

At Jefferson Lab, the Continuous Electron Beam Accelerator (CEBAF) features a unique design with two linear accelerators and two arc sections allowing for multiple turns of the electron beam, as well as four experimental end stations. This topology leads to increased beam losses, especially in the spreader and recombiner regions connecting the arcs to the linacs and in the extraction regions connecting the experimental end stations to the accelerator. These losses result in equipment activation and operational interruptions. Recent upgrades to the facility’s diagnostic systems, including the addition of xenon ion chambers, have provided higher-resolution data regarding these loss events. Building on this improved observational capability, we are developing a simulation framework using optics codes and the Geant4-based BDSIM to model beam extinction and halo formation in these regions. This work aims to correlate simulation results with experimental data to isolate the causes of beam loss and inform future machine tuning strategies. We present a summary of conclusions drawn from recent operational studies and outline a plan to model the beam loss and validate the simulations.

Matthews, C. [Old Dominion Univ., Norfolk, VA (Uni↗

Nb3Sn multicell cavity coating at JLAB

Following encouraging results with Nb3Sn-coated R&D cavities, the existing coating system was upgraded to allow for Nb3Sn coating of CEBAF accelerator cavities. The upgrade was designed to allow Nb3Sn coating of original CEBAF 5-cell cavities with the vapor diffusion technique. Several CEBAF cavities were coated in the upgraded system to investigate vapor diffusion coatings on extended structures. Witness samples coated along with the cavities were characterized with material science techniques, while coated cavities were measured at 4 and 2 K. The progress, lessons learned, and the pathforward are discussed.

Pudasaini, Uttar↗

An extraction scheme for future CEBAF FFA based energy upgrade

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

Accelerator Physics↗

Extraction scheme for future CEBAF FFA based energy upgrade

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

Kazimi, Reza↗

Commissioning of the Second JLAB C75 Cryomodule & Performance Evaluation of Installed C75 Cavities

JLAB has long been a hub of SRF technology with the CEBAF accelerator as one of its first large scale adopters. As SRF technology has advanced, the C50 and C100 programs have allowed for the extension of CEBAF's total energy to 6 GeV and nearly 12 GeV respectively. Along with the increase in energy reach, rates of accelerating gradient degradation have been extracted for these cryomodule designs. A plan to mitigate these losses & maintain robust gradient headroom to deliver the 12 GeV program - the CEBAF Performance Plan - established a multi-year effort of cryomodule refurbishments and replacements. Part of this plan included a cost optimization of the C50 program with more modern processing techniques and the replacement of existing cavities with larger grain boundary cavities produced from ingot Niobium (dubbed C75 for 75 MeV gain). Reports have been made on the prototype pair of C75 cavities installed in a C50 cryomodule and the first full C75 cryomodule installed in 2017 and 2021. This paper reports on the results from the qualification of the cavities for the second C75 module in both a vertical cryostat and the commissioning results of the cryomodule in the CEBAF tunnel. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177.

McCaughan, Michael↗

First Exclusive Measurement of Deeply Virtual Compton Scattering off He 4 : Toward the 3D Tomography of Nuclei

Here, we report on the first measurement of the beam-spin asymmetry in the exclusive process of coherent deeply virtual Compton scattering off a nucleus. The experiment used the 6 GeV electron beam from the CEBAF accelerator at Jefferson Lab incident on a pressurized $^4$He gaseous target placed in front of the CEBAF Large Acceptance Spectrometer (CLAS). The scattered electron was detected by CLAS and the photon by a dedicated electromagnetic calorimeter at forward angles. To ensure the exclusivity of the process, a specially designed radial time projection chamber was used to detect the recoiling $^4$He nuclei. We measured beam-spin asymmetries larger than those observed on the free proton in the same kinematic domain. From these, we were able to extract, in a model-independent way, the real and imaginary parts of the only $^4$He Compton form factor, $\cal H_A$. This first measurement of coherent deeply virtual Compton scattering on the $^4$He nucleus, with a fully exclusive final state via nuclear recoil tagging, leads the way toward 3D imaging of the partonic structure of nuclei.

43 PARTICLE ACCELERATORS↗

The Jefferson Lab 12 GeV Program

The Jefferson Lab facilities have undergone a substantial upgrade, both of accelerator, CEBAF, and of the experimental installations. We will discuss the progress to completion of these facilities, the status of accelerator commissioning, and the recent first operations for physics. We will then flesh out the anticipated exciting physics program of the next several years.

Montgomery, Hugh↗

35 years of CEBAF - Historic Review

Jefferson Lab, the youngest of the DOE Science laboratories, is now more than thirty years old, time to look back and understand how the lab has become a pillar of nuclear physics research in the world. Initially, a 2GeV conventional linac and stretcher ring was foreseen, but as soon as Hermann Grunder was nominated as Lab Director, he changed the design to a superconducting, recirculating linac. It is this accelerator, CEBAF, which has become the workhorse at Jefferson Lab, first at 4 GeV, then 6 GeV, and then an upgrade to 12GeV. The talk will follow this evolution of the accelerator complex.

Hutton, Andrew↗

In Situ Plasma processing of SRF cuperconducting cavities at JLAB, 2024 Update

Jefferson Lab has an ongoing R&D program in plasma processing. The experimental program investi-gated processing using argon/oxygen and heli-um/oxygen gas mixtures. Plasma processing is a com-mon technique where the free oxygen produced by the plasma breaks down and removes hydrocarbons from surfaces. This increases the work function and reduces the secondary emission coefficient. The initial focus of the effort was processing C100 cavities by injecting RF power into the high order mode (HOM) coupler ports. We also developed the methods for establishing a plasma in C75 cryomodules where the RF power is injected via the fundamental power-coupler. Four C100 cryomodules were in situ processed in the CE-BAF accelerator in May 2023 with the cryomodules returning to an operational status in Sept. 2023. The overall operational energy gain for the four cryomod-ules was 49 MeV. Methods, systems and results from processing cryomodules in the CEBAF accelerator and vertical test results are presented. Current status and future plans are discussed.

Powers, T.↗

Electron-ion collider: The next QCD frontier: Understanding the glue that binds us all

This White Paper presents the science case of an Electron-Ion Collider (EIC), focused on the structure and interactions of gluon-dominated matter, with the intent to articulate it to the broader nuclear science community. It was commissioned by the managements of Brookhaven National Laboratory (BNL) and Thomas Jefferson National Accelerator Facility (JLab) with the objective of presenting a summary of scientific opportunities and goals of the EIC as a follow-up to the 2007 NSAC Long Range plan. This document is a culmination of a community-wide effort in nuclear science following a series of workshops on EIC physics over the past decades and, in particular, the focused ten-week program on “Gluons and quark sea at high energies” at the Institute for Nuclear Theory in Fall 2010. It contains a brief description of a few golden physics measurements along with accelerator and detector concepts required to achieve them. It has been benefited profoundly from inputs by the users’ communities of BNL and JLab. Furthermore, this White Paper offers the promise to propel the QCD science program in the US, established with the CEBAF accelerator at JLab and the RHIC collider at BNL, to the next QCD frontier.

43 PARTICLE ACCELERATORS↗

Review of requirements and challenges

The development of an electron ion collider (EIC) as the next frontier in nuclear physics has been proposed by the National Academy of Sciences. A collider capable of meeting unprecedented energy and luminosity requirements imposes formidable technical challenges in many accelerator physics disciplines. Two EIC concepts have been proposed, one by Jefferson Lab based on a ring-ring collider design with strong ion cooling based on a magnetized beam. The high-energy polarized electron beam would be generated by the present 12 GeV CEBAF accelerator. The other concept proposed by Brookhaven National Laboratory is based on utilizing the existing RHIC ring and a polarized electron beam injected into an additional storage ring. Multiple cooler schemes are being explored for future luminosity upgrades. This talk summarizes the requirements and challenges on the electron source for the various cooler concepts being proposed.

Hernandez-Garcia, Carlos↗