Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEI”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Comprehensive Environmental Informatics System (CEIS) Integrating Crew and Vehicle Environmental Health

Integrated Vehicle Health Management (IVHM) systems have been pursued as highly integrated systems that include smart sensors, diagnostic and prognostics software for assessments of real-time and life-cycle vehicle health information. Inclusive to such a system is the requirement to monitor the environmental health within the vehicle and the occupants of the vehicle. In this regard an enterprise approach to informatics is used to develop a methodology entitled, Comprehensive Environmental Informatics System (CEIS). The hardware and software technologies integrated into this system will be embedded in the vehicle subsystems, and maintenance operations, to provide both real-time and life-cycle health information of the environment within the vehicle cabin and of its occupants. This comprehensive information database will enable informed decision making and logistics management. One key element of the CEIS is interoperability for data acquisition and archive between environment and human system monitoring. With comprehensive components the data acquired in this system will use model based reasoning systems for subsystem and system level managers, advanced on-board and ground-based mission and maintenance planners to assess system functionality. Knowledge databases of the vehicle health state will be continuously updated and reported for critical failure modes, and routinely updated and reported for life cycle condition trending. Sufficient intelligence, including evidence-based engineering practices which are analogous to evidencebased medicine practices, will be included in the CEIS to result in more rapid recognition of off-nominal operation to enable quicker corrective actions. This will result from better information (rather than just data) for improved crew/operator situational awareness, which will produce significant vehicle and crew safety improvements, as well as increasing the chance for mission success, future mission planning as well as training. Other benefits include improved reliability, increase safety in operations and cost of operations. The cost benefits stem from significantly reduced processing and operations manpower, predictive maintenance for systems and subjects. The improvements in vehicle functionality and cost will result from increased prognostic and diagnostic capability due to the detailed total human exploration system health knowledge from CEIS. A collateral benefit is that there will be closer observations of the vehicle occupants as wrist watch sized devices are worn for continuous health monitoring. Additional database acquisition will stem from activities in countermeasure practices to ensure peak performance capability by occupants of the vehicle. The CEIS will provide data from advanced sensing technologies and informatics modeling which will be useful in problem troubleshooting, and improving NASA s awareness of systems during operation.

Nall, Mark E.↗

SMS crew station (C and D panels and forward structures). CEI part 1: Detail specification, type 1 data

Established are the requirements for performance, design, test and qualification of one type of equipment identified as SMS C&D panels and forward structures. This CEI is used to provide all hardware and wiring necessary for the C&D panels to be properly interfaced with the computer complex/signal conversion equipment (SCE), crew station, and software requirements as defined in other CEI specifications.

Source record↗

SMS power and grounding. CEI part 1: Detail specification, type 1 data

This specification establishes the requirements for performance, design, test, and qualification of the SMS total power and grounding system. This is defined as designing a new PDU to be useable for SMS adding FBCS and modifying and adding to the OAS power systems, the emergency off system and the overheat warning system. The above design considers all S.O.W. requirements.

Source record↗

Payload specialist station study. Part 2: CEI specifications (part 1)

The performance, design, and verification specifications are established for the multifunction display system (MFDS) to be located at the payload station in the shuttle orbiter aft flight deck. The system provides the display units (with video, alphanumerics, and graphics capabilities), associated with electronic units and the keyboards in support of the payload dedicated controls and the displays concept.

Source record↗

Space Station Furnace Facility. Volume 2: Appendix 1: Contract End Item specification (CEI), part 1

This specification establishes the performance, design, development, and verification requirements for the Space Station Furnace Facility (SSFF) Core. The definition of the SSFF Core and its interfaces, specifies requirements for the SSFF Core performance, specifies requirements for the SSFF Core design, and construction are presented, and the verification requirements are established.

Seabrook, Craig↗

Galileo Earth approach navigation using connected-element interferometer phase-delay tracking

The application of a Connected-Element Interferometer (CEI) to the navigation of the Galileo spacecraft during its encounter with Earth in December 1990 is investigated. A CEI tracking demonstration is planned for the week of November 11 through 18, 1990, from 27 days to 20 days prior to Earth encounter on December 8. During this period, the spacecraft will be tracked daily with Deep Space Network Stations 13 and 15 at Goldstone. The purpose of this work is twofold: first, to establish and define the navigation performance expected during the tracking demonstration and, second, to study, in a more general sense, the sensitivity of orbit demonstration results obtained with CEI to the data density within CEI tracking passes and to important system parameters, such as baseline orientation errors and the phase-delay measurement accuracy. Computer simulation results indicate that the use of CEI data, coupled with conventional range and Doppler data, may reduce the uncertainty in the declination of the spacecraft's incoming trajectory by 15 to 66 percent compared with the operational solution using range and Doppler data only. The level of improvement depends upon the quantity and quality of the CEI data.

Thurman, S. W.↗

Comparison of earth-based radio metric data strategies for deep space navigation

Spacecraft angular coordinates can be determined with a variety of radio tracking measurements, such as Doppler, range, and Very Long Baseline Interferometry (VLBI)-derived data types. A relatively new interferometric tracking technique under development is Connected Element Interferometry (CEI), which uses a single frequency standard, distributed to two antennas spaced 10 to 100 km apart, to make highly accurate measurements of the phase-delay of incoming radio signals. The angular navigation accuracies attainable with Doppler, range, CEI, and VLBI data strategies are compared, using simple analytic models for these data types. The measurement accuracies assumed for Doppler, range, and VLBI data represent the performance expected from these systems in the Magellan and Galileo missions, while the assumed CEI data accuracy represents the anticipated performance of an experimental connected element system being constructed at the Deep Space Network's Goldstone, California complex. The results indicate that the Galileo VLBI system can deliver 20- to 25-nrad accuracy throughout the ecliptic plane. A hypothetical CEI dual-baseline sysem at Goldstone yielded accuracies in the 35- to 50-nrad range, while another hypothetical Goldstone-based system, consisting of a single CEI baseline and an X-band (8.4 GHz) Doppler system, produced accuracies of 25 to 100 nrad. Angular accuracies obtained from Doppler and range were found to be highly dependent upon the sensitivity of earth-spacecraft differential acceleration to small changes in geocentric spacecraft position.

Thurman, Sam W.↗

Ballistics/mass properties

The propulsion performance and reconstructed mass properties data from Morton Thiokol's RSRM-4 motors, which were assigned to the STS-30R launch, are presented. The composite type solid propellant burn rates were close to predicted. The performance of the pair of motors were compared to some CEI Specification CPW1-3600 for compliance. Some aspects of the CEI Specification could not be compared because of low sampling of data. The performance of the motors were well within the CEI specification requirements. Post flight reconstructured RSRM mass properties are within expected values for the RSRM quarterweight and halfweight configurations.

Drendel, Albert S.↗

Using connected-element interferometer phase-delay data for Magellan navigation in Venus orbit

The pointing accuracy needed to support Magellan's Synthetic Aperture Radar mapping of Venus places stringent requirements on navigation accuracy. This need is met with a combination of two-way Doppler and narrowband delta Very Long Baseline Interferometer (delta VLBI) data, which are capable of determining the spacecraft's orbit to the required level, typically about one-kilometer position uncertainty. Differenced Doppler (two-way Doppler minus three-way Doppler) is also capable of meeting mission navigation requirements, and serves as a backup to narrowband delta VLBI. The Magellan Project specifies that the turn-around time for processing narrowband delta VLBI data must be 12 hours or less, a very difficult requirement to meet operationally. The use of phase-delay data, taken from a Connected-Element Interferometer (CEI) with a 21-km baseline, for Magellan orbit determination was investigated to determine if navigation performance comparable with narrowband delta VLBI and differenced Doppler could be achieved. CEI possesses an operational advantage over delta VLBI data in that the observables are constructed in near-real time, thus greatly reducing the turn-around time needed to process the data, relative to the off-line system used to generate delta VLBI observables. Unfortunately, the results indicate that CEI data are much less powerful than narrowband delta VLBI and differenced Doppler for orbiter navigation, although there was some marginal improvement over the navigation performance obtained when only two-way Doppler data were used.

Thurman, S. W.↗

Information content of a single pass of phase-delay data from a short baseline connected element interferometer

An analytic development of the information array obtained with a single tracking pass of phase-delay measurements made from a short baseline interferometer is presented. Phase-delay observations can be made with great precision from two antennas using a single, common distributed frequency standard, hence the name connected element. With the information array, closed-form expressions are developed for the error covariance in declination and right ascension. These equations serve as useful tools for analyzing the relative merits of candidate station locations for connected element interferometry (CEI). The navigation performance of a short baseline interferometer located at the Deep Space Network's (DSN's) Goldstone intracomplex is compared with that which is presently achievable using Very Long Baseline Interferometry (VLBI) over intercontinental baselines. The performance of an intracomplex pair of short baselines formed by three stations is also investigated, along with the use of a single baseline in conjunction with conventional two-way Doppler data. The phase-delay measurement accuracy and data rate used in the analysis are based on the expected performance of an experimental connected element system presently under construction at Goldstone. The results indicate that the VLBI system that will be used during the Galileo mission can determine the declination and right ascension of a distant spacecraft to an accuracy of 20 to 25 nrad, while the CEI triad system and the combination of CEI-Doppler system are both capable of 30 to 70 nrad performance.

Thurman, S. W.↗

Flight motor set 360L006 (STS-34). Volume 1: System overview

Flight motor set 360L006 was launched at approximately 11:54 a.m. Central Daylight Time (CDT) on 18 October 1989 as part of NASA space shuttle mission STS-34. As with all previous redesigned solid rocket motor launches, overall motor performance was excellent. All ballistic contract end item (CEI) specification parameters were verified with the exceptions of ignition interval and rise rates. Ignition interval and rise rates could not be verified due to the elimination of developmental flight instrumentation from fourth flight and subsequent, but the low sample rate data that were available showed nominal propulsion performance. All ballistic and mass property parameters closely matched the predicted values and were well within the required CEI specification levels that could be assessed, with the exception of the RH-motor vacuum-delivered specific impulse. It exceeds the upper-limit CEI specification due to a bias imposed on the raw data by the OPT/Taber gage measurement differences. Evaluation of the ground environment instrumentation measurements again verified thermal model analysis data and showed agreement with predicted environmental effects. No launch commit criteria thermal violations occurred. Postflight inspection again verified superior performance of the insulation, phenolics, metal parts, and seals. Postflight evaluation indicated both nozzles performed as expected during flight, although splashdown loads tore the left-hand, 45-deg actuator bracket from the nozzle. All combustion gas was contained by insulation in the field and nozzle-to-case joints. Recommendations were made concerning improved thermal modeling and measurements. The rationale for these recommendations, the disposition of all anomalies, and complete result details are contained.

Garecht, Diane M.↗

Planetary approach orbit determination using earth-based short and long baseline radio interferometry

This paper describes an investigation and comparison of the approach-phase orbit determination performance of delta-Very Long Baseline Interferometry (delta VLBI) and Connected Element Interferometry (CEI) data types when used in conjunction with conventional two-way Doppler data. Simulated data sets containing Doppler plus delta VLBI data and Doppler plus CEI data are used to calculate approximate orbit determination accuracy statistics for representative approach trajectories drawn from future robotic missions to Mars and Jupiter. The results illustrate the theoretical performance of CEI data acquired from short (20 km) baselines relative to that obtained with delta VLBI using the intercontinental baselines currently available within the NASA/JPL Deep Space Network.

Thurman, Sam W.↗

RSRM-3 (360L003) Ballistics/Mass Properties Report

The propulsion performance and reconstructed mass properties data from Morton Thiokol's RSRM-3 motors which were assigned to the STS-29 launch are presented. The composite type solid propellant burn rates were close to predicted. The performance of the pair of motors were compared to some CEI Specifications. The performance from each motor as well as matched pair performance values were well within the CEI specification requirements. The nominal thrust time curve and impulse gate information is included. Post flight reconstructed Redesigned Solid Rocket Motor (RSRM) mass properties are within expected values for the lightweight configuration.

Laubacher, B. A.↗

Goldstone intracomplex connected element interferometry

Interferometric observations of the radio source pair 3C 84 and OE 400 were made on the 21 km baseline between Deep Space Station (DSS) 13 and DSS 15 to explore the angular navigation potential of intracomplex connected element interferometry (CEI). The differential phase-delay observable formed from pairs of 3 minute scans exhibited a precision of 1 psec, while the actual scatter of the phase-delay residuals for eleven scans over the 90 minute observing session was about 10 psec, consistent with the expected few millimeter fluctuations in the wet tropospheric path delay. Fitting for the position of OE 400 relative to 3C 84 yielded an error ellipse with a semi-minor axis of 60 nrad. Given the short data arc in this experiment, the orthogonal direction in the plane of the sky is not well determined; however, a second baseline or a data arc spanning a larger fraction of the source mutual visibility window could provide simultaneous determination of both right ascension and declination. Examination of the phase-delay residuals supports the accuracy of the cycle ambiguity resolution. However, reliable phase ambiguity resolution will pose the most significant challenge to routine use of CEI for spacecraft tracking, particularly when the a priori spacecraft source position is not well known. Several approaches for ambiguity resolution are briefly outlined.

Edwards, C. D.↗

Development of realtime connected element interferometry at the Goldstone Deep Space Communications Complex

Connected-element interferometry (CEI) has the potential to provide high-accuracy angular spacecraft tracking on short baselines by making use of the very precise phase delay observable. Within the Goldstone Deep Space Communications Complex (DSCC), one of three tracking complexes in the NASA Deep Space Network, baselines of up to 21 km in length are available. Analysis of data from a series of short-baseline phase-delay interferometry experiments are presented to demonstrate the potential tracking accuracy on these baselines. Repeated differential observations of pairs of angularly close extragalactic radio sources were made to simulate differential spacecraft-quasar measurements. Fiber-optic data links and a correlation processor are currently being developed and installed at Goldstone for a demonstration of real-time CEI in 1990.

Edwards, C. D.↗