Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEMAC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Analysis of Supply Chains and Advanced Manufacturing of Small Hydropower Systems

Clean energy manufacturing is a sector of increasing importance both in the United States and worldwide. In the United States, it has been presented as an engine for job creation in a sector of the U.S. economy that was hit hard by the 2008-2009 recession. The Clean Energy Manufacturing Analysis Center (CEMAC), sponsored by the U.S. Department of Energy (DOE), conducts credible, objective, industry-relevant, recurring, and consistent analyses of clean energy technologies. In this project, the National Renewable Energy Laboratory (NREL) and the Oak Ridge National Laboratory (ORNL) collaborated in a hydropower manufacturing and supply chain analysis primarily for U.S. small hydropower (SHP) market to provide insights on supply chain constraints, manufacturing cost, location factors, and opportunities for hydropower using advanced manufacturing technologies. The goal of the project is to improve understanding of the manufacturing opportunities in the U.S. hydropower supply chain, specific competitive advantages, and factors for manufacturing location decisions for SHP. These insights could be used to inform investment and research strategies, policy, and other decisions that could promote economic growth and strengthen U.S. manufacturing capabilities. The project scope included a design for manufacturing and assembly (DFMA) costs analysis and a levelized cost of electricity (LCOE) sensitivity analysis of modular, representative SHP turbines. A representative SHP system was chosen to be made up of two 5 megawatt (MW) turbines, as these Kaplan style turbines could be useable for many non-powered dams (NPDs) across the U.S. The sensitivity analysis used the Integrated Design and Assessment (IDEA) tool, which has helped highlight the impact of the turbine equipment cost on the potential capital expenditure (CAPEX) and LCOE of the installed, representative system. In addition, the project team analyzed international tradeflows (e.g., export and import of hydropower turbines and the parts used in hydropower systems). As part of this project, hydropower stakeholder interviews were undertaken to help identify insights related to hydropower manufacturing opportunities for U.S. players in SHP, the country-specific manufacturing advantages in the United States and threats, and key factors behind manufacturing location decisions made by the SHP industry. Key opportunities for the US SHP market and industry include: Foreign export markets such as Chile, China, Columbia, India and Japan, have an estimated 71,795 MW of technical potential that could be serviced with SHP installations. Utilization of existing manufacturing capacity and expertise, along with economies of scale benefits, could result in increased global competitiveness through lower investment requirements and component costs, which could lead to increased U.S. strength in the export of SHP systems and components. Technology advances such as modular turbine designs, standardized units for conduit systems, precast systems, and improved powertrain technologies could help reduce costs, particularly for manufacturing a small number of units. The DOE is also exploring modular hydropower designs, which would integrate standard independently-produced components, validated to meet multiple specifications. Using modules in product design simplifies manufacturing activities such as inspection, testing, assembly, and purchasing, may increase economies of scale to lower total system cost. There are significant opportunities for the use of composites and Additive Manufacturing (AM) for hydropower components, when design changes are made to hydropower systems. By taking advantage of the corrosion resistance, light-weighting and structural benefits, composites and AM could help significantly alter hydropower structures and installations.

13 HYDRO ENERGY↗

Refrigerants: Market Trends and Supply Chain Assessment

The National Renewable Energy Laboratory (NREL), in partnership with ORNL, under the Clean Energy Manufacturing Analysis Center (CEMAC www.manufacturingcleanenergy.org) umbrella, assessed the current state of existing and low-GWP refrigerants for major end-use applications, including HVAC and those outside of the HVAC industry. The project incorporated a market overview, and supply chain assessment to determine the production, distribution, consumption, costs, and potential operating efficiency impacts of new and alternative refrigerants entering the market. Market trends and ongoing research are also documented. This work supplements other DOE efforts to support research activities on refrigerants and their applications including a refrigerant R&D roadmap and outlook into global air conditioning markets (Goetzler et al. 2014, 2016).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Benchmarks of Global Clean Energy Manufacturing, 2014-2016

The Clean Energy Manufacturing Analysis Center (CEMAC), sponsored by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE), provides objective analysis and up-to-date data on global supply chains and manufacturing of clean energy technologies. This updated version of the Benchmarks of Global Clean Energy Manufacturing sheds light on several fundamental questions about the global clean technology manufacturing enterprise: How does clean energy technology manufacturing impact national economies? What are the economic opportunities across the manufacturing supply chain? What are the global dynamics of clean energy technology manufacturing?

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Supply Chain of Raw Materials Used in the Manufacturing of Light-Duty Vehicle Lithium-Ion Batteries

This report is a first attempt to integrate raw materials into the CEMAC benchmark framework. Benchmarking raw materials provides a broader view supply chain from mines to the manufacturer of clean energy technologies. This report provides insight into resource location and ownership, global production, demand, and trade, highlighting potential supply chain risks and opportunities. The report focuses on the lithium and cobalt supply chains. It serves as a foundation for incorporating the raw materials link for other clean energy technologies into future benchmark reports.

25 ENERGY STORAGE↗

Supply Chain of Raw Materials Used in the Manufacturing of Light-Duty Vehicle Li-Ion Batteries

This report is a first attempt to integrate raw materials into the CEMAC benchmark framework. Benchmarking raw materials provides a broader view supply chain from mines to the manufacturer of clean energy technologies. This report provides insight into resource location and ownership, global production, demand, and trade, highlighting potential supply chain risks and opportunities. The report focuses on the lithium and cobalt supply chains. It serves as a foundation for incorporating the raw materials link for other clean energy technologies into future benchmark reports.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

Currently, geothermal project developers customize the size of the power plant to fit the resource being developed. The turbine is designed and sized to optimize efficiency and resource utilization for electricity production; most often, other power plant components are then chosen to complement the turbine design. These custom turbine designs demand one-off manufacturing processes, which result in higher manufacturing setup costs, longer lead-times, and higher capital costs overall in comparison to larger-volume line manufacturing processes. In contrast, turbines produced in standard increments, manufactured in larger volumes, could result in lower costs per turbine. In this study, we developed a manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. Then we used discounted cash flow (DCF) analysis to calculate the minimum sustainable price (MSP). We analyzed three different cases 1) 1 MWe geothermal ORC turboexpander 2) 5 MWe ORC turboexpander and 3) 20 MWe geothermal steam turbine, and calculated the cost of manufacturing the major components, such as the impellers/blades, shaft/rotor, nozzles, inlet guide lanes, disks, and casings. The results showed that MSP could highly vary between 893 /kW and 30 /kW based on turbine size, standardization and volume of manufacturing. The analysis also showed that the economy of scale applies both to the size of the turbine and the number manufactured in a single run. As an example, the unit price of a 5 MW standard design turbine could be 150 /W cheaper than the custom design. Sensitivity analysis indicated that these savings come largely from reduced labor costs for design and engineering and manufacturing setup. In addition to manufacturing cost savings, there is a delivery time saving up to 10 months, which could have a positive effect to construction financing operation time. Another advantage of these standard turbines is their adaptability to different geothermal systems by operating at off-design conditions. We also modeled off-design turbine efficiencies within the commercially-favorable operating range of a standard ORC compared to custom-designed ORC equipment. Than we used these performance calculations and power output capacities in a discounted cash flow (DCF) analysis of plant operations and financing, thereby creating representative techno economic models of a total geothermal power plant. I this scope we used NREL's System Advisor model (SAM) and performed DCF analysis of standard and custom design turbines using results from IPSEpro over range of temperatures of interest. In this scope 63 different off-design cases were analyzed. This helped us to answer the question; 'Can today's capital cost savings compensate the future revenue losses due to lower electricity generation?' The results showed that, the net capital cost savings for the modeled 5 MW case study may reach up to plus 1,298,672. Also, the difference between NPV of standard design and custom design turbine could reach up to 733,940. To sum up, when all the things mentioned above are taken into consideration, it can be said that, the standard turbines are competitive over a wide range of temperatures and flow rates and the give positive NPV differences for certain cases near their design point.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost Modelling for Energy Efficient Window Replacements

This paper detailed data collection and cost-modeling efforts to understand the hardware and non-hardware (soft) cost of residential, energy efficient window replacements. NREL created a bottom-up cost model that details costs associated with window materials, installation labor, company overhead, and administrative costs. NREL did not find a single cost area for improvement but observed several non-cost barriers to increased window replacements. The non-cost barriers associated with window replacements are consumer education, lack of communication of the value of window replacement to consumers, and difficulty for consumers to identify quality products and installation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of Agricultural Equipment Manufacturing for a Bio-Based Economy

This report provides the analysis results of agricultural and preprocessing equipment and manufacturing requirements to support the mobilization of the Billion Ton projections utilizing the conventional supply chain logistics. This report discusses the number of required agricultural machinery and their market values, the drivers and barriers of the transition in agricultural equipment, the potential economic impacts to the US associated with expansion of these equipment manufacturing and the factors that impact the transition in agricultural machinery to support the growth of a large-scale biofuel and bio-products industry in short and long terms. Short and long terms refer to the early development and mature development phases of the cellulosic biofuels industry in the United States.

09 BIOMASS FUELS↗

Critical Material Supply Chain Analysis: Magnetocalorics

Understanding manufacturing cost and supply chain implications of technologies is critical to aid adoption of next-generation energy solutions, such as advanced heating ventilation and air conditioning (HVAC) equipment for building energy efficiency. This report provides insights into the market, regulatory, technology, and cost drivers most impacting the adoption of magnetocaloric refrigeration (MCR) systems in the U.S., with a focus on the rare earth materials requirements, manufacturing costs of key components, and detail on the supply chain of critical materials.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2018 Research Highlight in Manufacturing Analysis: Analysis of Supply Chains and Advanced Manufacturing of Small Hydropower Systems

Hydropower in the United States has been a reliable and critical renewable energy generation resource over the last 100 years, and as of 2016, approximately 101 GW of hydropower and pumped hydropower capacity were installed (DOE 2016). As such, strong manufacturing supply chains have been essential. The U.S. hydropower supply chain is distributed across the country with denser concentrations near manufacturing centers, such as the West Coast, Midwest, Great Lakes, and Northeast (Uria-Martinez, O'Connor, and Johnson 2015). The hydropower manufacturing hubs (such as the Northeast and the Great Lakes vicinity), which produce components for all sizes of hydropower generating equipment, can be seen in Figure 1. The major components for hydropower are the gates, valves, generators, penstocks, transformers, and turbines.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2018 Research Highlight in Manufacturing: Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

Currently, geothermal project developers customize the size of the power plant to fit the resource being developed. The turbine is designed and sized to optimize efficiency and resource utilization for electricity production; most often, other power plant components are then chosen to complement the turbine design. These custom turbine designs demand one-off manufacturing processes, which result in higher manufacturing setup costs, longer lead-times, and higher capital costs overall in comparison to larger-volume line manufacturing processes. In contrast, turbines produced in standard increments, manufactured in larger volumes, could result in lower costs per turbine. In this study, we developed a manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. Then we used discounted cash flow (DCF) analysis to calculate the minimum sustainable price (MSP). We analyzed three different cases 1) 1 MWe geothermal ORC turboexpander 2) 5 MWe ORC turboexpander and 3) 20 MWe geothermal steam turbine, and calculated the cost of manufacturing the major components, such as the impellers/blades, shaft/rotor, nozzles, inlet guide lanes, disks, and casings. The results showed that MSP could highly vary between 893 $/kW and 30 $/kW based on turbine size, standardization and volume of manufacturing. The analysis also showed that the economy of scale applies both to the size of the turbine and the number manufactured in a single run. As an example, the unit price of a 5 MW standard design turbine could be 150 $/W cheaper than the custom design. Sensitivity analysis indicated that these savings come largely from reduced labor costs for design and engineering and manufacturing setup. In addition to manufacturing cost savings, there is a delivery time saving up to 10 months, which could have a positive effect to construction financing operation time. Another advantage of these standard turbines is their adaptability to different geothermal systems by operating at off-design conditions. We also modeled off-design turbine efficiencies within the commercially-favorable operating range of a standard ORC compared to custom-designed ORC equipment. Than we used these performance calculations and power output capacities in a discounted cash flow (DCF) analysis of plant operations and financing, thereby creating representative techno economic models of a total geothermal power plant. I this scope we used NREL's System Advisor model (SAM) and performed DCF analysis of standard and custom design turbines using results from IPSEpro over range of temperatures of interest. In this scope 63 different off-design cases were analyzed. This helped us to answer the question; 'Can today`s capital cost savings compensate the future revenue losses due to lower electricity generation?' The results showed that, the net capital cost savings for the modeled 5 MW case study may reach up to +$1,298,672. Also, the difference between NPV of standard design and custom design turbine could reach up to +$733,940. To sum up, when all the things mentioned above are taken into consideration, it can be said that, the standard turbines are competitive over a wide range of temperatures and flow rates and the give positive NPV differences for certain cases near their design point.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

TRANSFORM: Catalyzing the Transition to a 21st Century Energy Economy - JISEA 2019 Annual Report

The Joint Institute for Strategic Energy Analysis (JISEA) provides leading-edge, objective, high impact research and analysis to guide transformative global energy investment and policy decisions. Through strategic insights and worldwide dialogue, JISEA explores the intersections of the environmental, social, financial, technological, and political elements of energy systems on the path to a clean energy economy. JISEA's work informs innovative solutions that advance the goals of sustainability, economic prosperity, and resilience. JISEA research and analysis provided decision-making support to industry, the financial sector, and government with a focus on the following strategic areas: Energy Systems Integration and Transformation, Energy in the Global Water-Food Nexus, and Circular Energy Economy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗