DOE OSTI2026
SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.
24 POWER TRANSMISSION AND DISTRIBUTION↗