Search NASA⌕ Search

SEARCH · Search NASA

Results for “CLOSED CIRCUIT TELEVISION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Closed-circuit television welding- electrode guidance system

Closed-circuit TV camera is mounted parallel to electrode and moves along with it. Camera is scanned along seam so seam is viewed parallel with scan lines on TV monitor. Two fiber optics illuminators are attached to guidance system; they illuminate seam for TV camera.

Smith, H. E.↗

Design considerations for the Shuttle/Orbiter closed-circuit television subsystem

The Shuttle/Orbiter Program requirements relative to operational and performance parameters of the CCTV (closed circuit television) subsystem and their influence upon design considerations are presented. The anticipated use of the CCTV for rendezvous, docking, manipulator arm operation, satellite inspection and general orbiter operations is outlined to establish the performance requirements of each subsystem element. Typical physical characteristics, interface parameters, and remote-control design philosophy are briefly described.

Perry, W. E.↗

DTO-675: Voice Control of the Closed Circuit Television System

This report presents the results of the Detail Test Object (DTO)-675 "Voice Control of the Closed Circuit Television (CCTV)" system. The DTO is a follow-on flight of the Voice Command System (VCS) that flew as a secondary payload on STS-41. Several design changes were made to the VCS for the STS-78 mission. This report discusses those design changes, the data collected during the mission, recognition problems encountered, and findings.

Salazar, George↗

An exploratory flight investigation of helicopter sling-load placements using a closed-circuit television as a pilot aid

Helicopter sling load operations have been limited during pick up and delivery of external cargo by the lack of precision achieved by the combination of pilot, helicopter, and sling load. Use of a closed circuit television as a pilot aid during sling load delivery and placement was documented along with additional cases representing procedures currently employed by military and commercial operators. Although an increase in pilot workload was noted when the television system was used, the results indicated a comparable level of performance for each test case.

Dicarlo, D. J.↗

The use of PLAID in the Space Station Freedom viewing analysis

The focus early in the Space Station Freedom Program was on identifying viewing requirements for both direct viewing (windows) and indirect viewing (closed-circuit television). Currently, an analysis is being conducted to address the feasibility of viewing for Space Station Freedom. The goal of this analysis is to determine the optimum location for the windows and closed-circuit television cameras in order to meet the established requirements. Additionally all viewing provisions must adequately support Space Station assembly and on-board operations once the Station is operable. PLAID, a three-dimensional graphics system developed at NASA/Johnson Space Center, was selected for use as the primary tool in this analysis. PLAID provides the capability to simulate the assembly of the Space Station Freedom, as well as to examine operations on the Station as it evolves. In addition, it is used as a tool to analyze general out-the-window viewing conditions for all Space Station components, and provides the ability to integrate an anthropometric scale-modeled person (representing a crewmember) with the Station's interior architecture.

Mount, Frances E.↗

Annual Radioactive Waste Tank Inspection Program - 2018

The Department of Energy (DOE) requires that Savannah River Remediation LLC (SRR), the Liquid Waste contractor, maintain a robust and timely Structural Integrity Program for waste tanks that are leak-tight and for waste tanks that have leaked or are suspect. These requirements are promulgated in DOE Manual 435.1-1, Section II.Q.(2). A key aspect of SRR's implementation of these requirements is its annual tank inspection program. In 2018, the SRR Visual and In-Service Inspection Program used two visual imagery techniques to ascertain the integrity of the Savannah River Site (SRS) waste tanks: high resolution digital photography and closed-circuit television. The primary inspection method made use of direct photograph techniques, e.g., making a series of photographs providing detailed views of the tank and wide-angle photography for obtaining overviews of large areas. Closed-circuit television was then typically used to further investigate conditions found during the initial inspection. During 2018, a total of 4,853 photographs were taken and 47 video inspections were performed as part of this inspection program. Of the 51 waste tank systems at SRS that were designed, constructed, and placed into active service storing radioactive liquid waste, 43 remain in active service. Eight tanks have been cleaned, stabilized by filling with engineered grout, and removed from service (also known as operationally closed) -Tanks 5, 6, and 12 (Type I tanks); Tank 16 (Type II tank); and Tanks 17, 18, 19, and 20 (Type IV tanks). For the 43 waste tanks, inspections were successfully conducted in 2018 through all accessible annulus risers and inspection ports for nine Type I tanks, three Type II tanks, and 27 Type III/IIIA tanks; at least one inspection was made in the interior of four Type IV tanks (i.e., the tanks without annular spaces) above the liquid level in the tank. Rainwater continues periodically to be observed migrating into the annuli of some tanks. Evidence of this infiltration was primarily noted by observation of surface stains, and occasionally by calciferous deposits, changed configuration of salt deposits in the associated annulus, and mild surface corrosion. The conditions of the 43 tanks remained essentially unchanged from the conditions reported in 2017. The one key exception was the identification of eight new cracks in the Tank 15 primary tank wall. These newly identified cracks are located at 65, 67, 70, 76, 150, 152, 176 inches and 200 inches above the tank bottom. The identified cracks in Tank 15 do not constitute an impact on the structural integrity of the tank, as evaluated and confirmed in the referenced report, SRNS-STI-2008-00028, A Structural Impact Assessment of Flaws Detected During Ultrasonic Examination of Tank 15, and calculation, T-CLC-H-00890, Calculation of Critical Crack Lengths in HLW Tank 15. The 2018 inspection program confirmed the structural integrity and waste confinement capability of all 43 waste tanks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation and flight studies of an approach profile indicator for VTOL aircraft

Simulation and flight investigations were conducted by using a method of providing supplementary information to the pilot in conjunction with a closed-circuit-television display during a VTOL instrument final approach including deceleration and hover. The supplementary information included range, cross range, ground speed, altitude, and rate-of-climb error and was displayed on an instrument called an approach profile indicator. The display was arranged to provide both quasi-command and situation information. Pilot comments indicated that the approach-profile-indicator display concept in conjunction with the closed-circuit television resulted in a decreased pilot workload and an increase in pilot confidence. Also, the results indicated that the approach profile repeatability was significantly improved because of the ground-speed and altitude information provided on the approach profile indicator.

Moen, G. C.↗