Search NASA⌕ Search

SEARCH · Search NASA

Results for “COE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Center of Excellence in Model-Based Human Performance

The Center of Excellence (COE) was created in 1984 to facilitate active collaboration between the scientists at Ames Research Center and the Stanford Psychology Department. As this document will review, over that period of time, the COE served its function well. Funds from the Center supported a large number of projects over the last ten years. Many of the people who were supported by the Center Have gone on to distinguished research careers in government, industry and university. In fact, several of the people currently working at NASA Ames were initially funded by the Center mechanism, which served as a useful vehicle for attracting top quality candidates and supporting their research efforts. We are grateful for NASA's support over the years. As we reviewed in the reports for each year, the COE budget generally provided a portion of the true costs of the individual research project. Hence, the funds from the COE were leveraged with funds from industry and other government agencies. In this way, we feel that all parties benefitted greatly from the collaborative spirit and interactive aspects of the COE. The portion of the support from NASA was particularly important in helping members of the COE to set aside the time to publish papers and communicate advances in our understanding of human performance in NASA-related missions.

Wandell, Brian A.↗

Center of Excellence in Model-Based Human Performance

The Center of Excellence (COE) was created in 1984 to facilitate active collaboration between the scientists at Ames Research Center and the Stanford Psychology Department. As this document will review, over that period of time, the COE served its function well. Funds from the Center supported a large number of projects over the last ten years. Many of the people who were supported by the Center have gone on to distinguished research careers in government, industry and university. In fact, several of the people currently working at NASA Ames were initially funded by the Center mechanism, which served as a useful vehicle for attracting top quality candidates and supporting their research efforts. We are grateful for NASA's support over the years. As we reviewed in the reports for each year, the COE budget generally provided a portion of the true costs of the individual research projects. Hence, the funds from the COE were leveraged with funds from industry and other government agencies. In this way, we feel that all parties benefitted greatly from the collaborative spirit and interactive aspects of the COE. The portion of the support from NASA was particularly important in helping members of the COE to set aside the time to publish papers and communicate advances in our understanding of human performance in NASA-related missions.

Wandell, Brian A.↗

Comparison of two methods of performing the Thellier experiment

Two methods for performing the Thellier experiment on paleointensity determinations are compared. The first method is essentially that of Coe (1967) and the second is a slight modification of it. Prepared samples containing different species of magnetic particles are used, and both methods are always performed on the same sample. The study is designed to accent procedural differences between the two methods. It is shown that only the Coe method yields linear PNRM-PTRM (Partial ThermoRemanent Magnetization) plots for single domain and pseudo-single domain particles, because it maintains the symmetry between high-temperature VRM (Viscous Remanent Magnetization) and spontaneous decay, whereas for the modified Coe method the spontaneous decay is enhanced. For multidomain remanence, even the Coe method yields a nonlinear concave-up PNRM-PTRM plot. Paleointensity determinations employing only the ratio NRM/TRM provide no means of evaluating the reliability of the results.

Levi, S.↗

Static calibration for measurement of loads in wind tunnel tests on Shuttle surface tiles

A description is given of the procedures used for the static calibrations of the Coe (1981) sensor array to determine normal force, pitching moment, and rolling moment from the ensemble of sensor outputs. The use of independent data to confirm the validity of the calibration is also described. Two methods are used in calibrating the Coe sensors. In the first, calibration loads and readings are arranged in matrix form and are assumed to be related in a linear fashion. In the second, each Coe sensor reading is regarded as a sum of contributions from each of the calibration loads. It is shown that the Coe load sensors, in conjunction with either of two data analysis methods, can be used to determine the forces and moments experienced by a Shuttle TPS tile.

Rummler, D. R.↗

Stanford/NASA-Ames Center of Excellence in model-based human performance

The human operator plays a critical role in many aeronautic and astronautic missions. The Stanford/NASA-Ames Center of Excellence in Model-Based Human Performance (COE) was initiated in 1985 to further our understanding of the performance capabilities and performance limits of the human component of aeronautic and astronautic projects. Support from the COE is devoted to those areas of experimental and theoretical work designed to summarize and explain human performance by developing computable performance models. The ultimate goal is to make these computable models available to other scientists for use in design and evaluation of aeronautic and astronautic instrumentation. Within vision science, two topics have received particular attention. First, researchers did extensive work analyzing the human ability to recognize object color relatively independent of the spectral power distribution of the ambient lighting (color constancy). The COE has supported a number of research papers in this area, as well as the development of a substantial data base of surface reflectance functions, ambient illumination functions, and an associated software package for rendering and analyzing image data with respect to these spectral functions. Second, the COE supported new empirical studies on the problem of selecting colors for visual display equipment to enhance human performance in discrimination and recognition tasks.

Wandell, Brian A.↗

A summary of the ECAS performance and cost results for MHD systems

The potential is examined of various advanced power plant concepts using coal and coal-derived fuel. The results indicate that open cycle coal fired direct preheat MHD systems have potentially one of the highest coal-pile-to-bus-bar efficiencies and also one of the lowest costs of electricity (COE) of the systems studied. Closed cycle MHD systems may have the potential to approach the efficiency and COE of open cycle MHD. The 1200-1500 F liquid metal MHD systems studied do not appear to have the potential of exceeding the efficiency or competing with the COE of advanced steam plants.

Seikel, G. R.↗

A summary of the ECAS performance and cost results for MHD system

The interagency-funded, NASA-coordinated Energy Conversion Alternatives Study (ECAS) has studied the potential of various advanced power plant concepts using coal and coal-derived fuel. Principle studies were conducted through prime contracts with the General Electric Company and the Westinghouse Electric Corporation. The results indicate that open-cycle coal-fired direct-preheat MHD systems have potentially one of the highest coal-pile-to-bus-bar efficiencies and also one of the lowest costs of electricity (COE) of the systems studied. Closed-cycle MHD systems may have the potential to approach the efficiency and COE of open-cycle MHD. The 1200-1500 F liquid-metal MHD systems studied do not appear to have the potential of exceeding the efficiency or competing with the COE of advanced steam plants.

Seikel, G. R.↗

A summary of the ECAS MHD power plant results

The performance and the cost of electricity (COE) for MHD systems utilizing coal or coal derived fuels are summarized along with a conceptual open cycle MHD plant design. The results show that open cycle coal fired recuperatively preheated MHD systems have potentially one of the highest coal-pile-to-bus bar efficiencies (48.3%) and also one of the lowest COE of the systems studied. Closed cycle, inert gas systems do not appear to have the potential of exceeding the efficiency of or competing with the COE of advanced steam plants.

Seikel, G. R.↗

ECAS Phase I fuel cell results

This paper summarizes and discusses the fuel cell system results of Phase I of the Energy Conversion Alternatives Study (ECAS). Ten advanced electric powerplant systems for central-station baseload generation using coal were studied by NASA in ECAS. Three types of low-temperature fuel cells (solid polymer electrolyte, SPE, aqueous alkaline, and phosphoric acid) and two types of high-temperature fuel cells (molten carbonate, MC, and zirconia solid electrolyte, SE) were studied. The results indicate that (1) overall efficiency increases with fuel cell temperature, and (2) scale-up in powerplant size can produce a significant reduction in cost of electricity (COE) only when it is accompanied by utilization of waste fuel cell heat through a steam bottoming cycle and/or integration with a gasifier. For low-temperature fuel cell systems, the use of hydrogen results in the highest efficiency and lowest COE. In spite of higher efficiencies, because of higher fuel cell replacement costs integrated SE systems have higher projected COEs than do integrated MC systems. Present data indicate that life can be projected to over 30,000 hr for MC fuel cells, but data are not yet sufficient for similarly projecting SE fuel cell life expectancy.

Warshay, M.↗

Wind turbines for electric utilities: Development status and economics

The technology and economics of the large, horizontal-axis wind turbines currently in the Federal Wind Energy Program are presented. Wind turbine technology advancements made in the last several years are discussed. It is shown that, based on current projections of the costs of these machines when produced in quantity, they should be attractive for utility application. The cost of electricity (COE) produced at the busbar is shown to be a strong function of the mean wind speed at the installation site. The breakeven COE as a fuel saver is discussed and the COE range that would be generally attractive to utilities is indicated.

Ramler, J. R.↗

Wind turbines for electric utilities - Development status and economics

The technology and economics of the large, horizontal-axis wind turbines currently in the Federal Wind Energy Program are presented. Wind turbine technology advancements made in the last several years are discussed. It is shown that, based on current projections of the costs of these machines when produced in quantity, they should be attractive for utility application. The cost of electricity (COE) produced at the busbar is shown to be a strong function of the mean wind speed at the installation site. The breakeven COE as a 'fuel saver' is discussed and the COE range that would be generally attractive to utilities is indicated.

Ramler, J. R.↗

Parametric study of prospective early commercial MHD power plants (PSPEC). General Electric Company, task 1: Parametric analysis

The performance and cost of moderate technology coal-fired open cycle MHD/steam power plant designs which can be expected to require a shorter development time and have a lower development cost than previously considered mature OCMHD/steam plants were determined. Three base cases were considered: an indirectly-fired high temperature air heater (HTAH) subsystem delivering air at 2700 F, fired by a state of the art atmospheric pressure gasifier, and the HTAH subsystem was deleted and oxygen enrichment was used to obtain requisite MHD combustion temperature. Coal pile to bus bar efficiencies in ease case 1 ranged from 41.4% to 42.9%, and cost of electricity (COE) was highest of the three base cases. For base case 2 the efficiency range was 42.0% to 45.6%, and COE was lowest. For base case 3 the efficiency range was 42.9% to 44.4%, and COE was intermediate. The best parametric cases in bases cases 2 and 3 are recommended for conceptual design. Eventual choice between these approaches is dependent on further evaluation of the tradeoffs among HTAH development risk, O2 plant integration, and further refinements of comparative costs.

Marston, C. H.↗

Implementation Plan for the NASA Center of Excellence for Structures and Materials

This report presents the implementation plans of the Center of Excellence (COE) for Structures and Materials. The plan documented herein is the result of an Agencywide planning activity led by the Office of the Center of Excellence for Structures and Materials at Langley Research Center (LaRC). The COE Leadership Team, with a representative from each NASA Field Center, was established to assist LaRC in fulfilling the responsibilities of the COE. The Leadership Team developed the plan presented in this report.

Harris, Charles E.↗

Potentialities of TEC topping: A simplified view of parametric effects

An examination of the benefits of thermionic-energy-conversion (TEC)-topped power plants and methods of increasing conversion efficiency are discussed. Reductions in the cost of TEC modules yield direct decreases in the cost of electricity (COE) from TEC-topped central station power plants. Simplified COE, overall-efficiency charts presented illustrate this trend. Additional capital-cost diminution results from designing more compact furnaces with considerably increased heat transfer rates allowable and desirable for high temperature TEC and heat pipes. Such improvements can evolve of the protection from hot corrosion and slag as well as the thermal expansion compatibilities offered by silicon-carbide clads on TEC-heating surfaces. Greater efficiencies and far fewer modules are possible with high-temperature, high-power-density TEC: This decreases capital and fuel costs much more and substantially increases electric power outputs for fixed fuel inputs. In addition to more electricity, less pollution, and lower costs, TEC topping used directly in coal-combustion products contributes balance-of-payment gains.

Morris, J. F.↗

A program-management plan with critical-path definition for Combustion Augmentation with Thermionic Energy Conversion (CATEC)

Thermionic energy conversion (TEC) is discussed. In recent TEC-topping analyses, overall plant efficiency (OPE) and cost of electricity (COE) improved slightly with current capabilities and substantially with fully matured technologies. Enhanced credibility derives from proven hot-corrosion protection for TEC by silicon-carbide clads in fossil fuel combustion products. Combustion augmentation with TEC (CATEC) affords minimal cost and plant perturbation, but with smaller OPE and COE improvements than more conventional topping applications. Risk minimization as well as comparative simplicity and convenience, favor CATEC for early market penetration. A program-management plan is proposed. Inputs, characteristics, outputs and capabilities are discussed.

Morris, J. F.↗

Conceptual design of the 6 MW Mod-5A wind turbine generator

The General Electric Company, Advanced Energy Programs Department, is designing under DOE/NASA sponsorship the MOD-5A wind turbine system which must generate electricity for 3.75 cent/KWH (1980) or less. During the Conceptual Design Phase, completed in March, 1981, the MOD-5A WTG system size and features were established as a result of tradeoff and optimization studies driven by minimizing the system cost of energy (COE). This led to a 400' rotor diameter size. The MOD-5A system which resulted is defined in this paper along with the operational and environmental factors that drive various portions of the design. Development of weight and cost estimating relationships (WCER's) and their use in optimizing the MOD-5A are discussed. The results of major tradeoff studies are also presented. Subsystem COE contributions for the 100th unit are shown along with the method of computation. Detailed descriptions of the major subsystems are given, in order that the results of the various trade and optimization studies can be more readily visualized.

Barton, R. S.↗

Conceptual design of the 7 megawatt Mod-5B wind turbine generator

Similar to MOD-2, the MOD-5B wind turbine generator system is designed for the sole purpose of providing electrical power for distribution by a major utility network. The objectives of the MOD-2 and MOD-5B programs are essentially identical with one important exception; the cost-of-electricity (COE) target is reduced from 4 cent/Kwhr on MOD-2 to 3 cent/Kwhr on MOD-5B, based on mid 1977 dollars and large quantity production. The MOD-5B concept studies and eventual concept selection confirmed that the program COE targets could not only be achieved but substantially bettered. Starting from the established MOD-2 technology as a base, this achievement resulted from a combination of concept changes, size changes, and design refinements. The result of this effort is a wind turbine system that can compete with conventional power generation over significant geographical areas, increasing commercial market potential by an order of magnitude.

Douglas, R. R.↗