Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMAND SYSTEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

FRMAC Assessment Manual Volume 1 - Assessment Division Operations

In the event of a major radiological incident or accident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities and/or capabilities for responding to such incidents (Ref. FRMAC10). The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. For less severe radiological incidents, elements of the Department of Energy (DOE) Consequence Management (CM) program, such as the CM Response Team (CMRT) or CM Home Team (CMHT) may be activated to provide similar support activities to regional or local response assets. This manual describes the roles and responsibilities of the Assessment Division of the FRMAC during a response to a radiological incident. Every effort will be made in this manual in accordance with the Implementation of the National Incident Management System (NIMS)/Incident Command System (ICS) in the Federal Radiological Monitoring and Assessment Center (FRMAC) – Emergency Phase (Ref. RSL07) to use terminology consistent with the National Incident Management System (NIMS) for Incident Command System (ICS) organizations, planning processes, and leadership positions (Ref. FEMA17). This manual also applies to smaller scale CM responses that may involve the CMRT or CMHT elements without the formation of a FRMAC. It details the concept of operations for the Assessment Division, including common tasks performed by the Division. This manual also describes the organizational structure of the Assessment Division and roles of the personnel within the Division.

61 RADIATION PROTECTION AND DOSIMETRY↗

Energy storage design considerations for an MVDC power system

The U.S. Navy is investing in the creation of new technologies that broaden warship capabilities and maintain U.S. naval superiority. Specifically, Naval Sea Systems Command (NAVSEA) is supporting the development of power systems technologies that enable the Navy to realise an all-electric warship. A concern to fielding an all-electric power system architecture includes minimising the size of energy storage systems (ESS) while maintaining the response times necessary to support potential pulsed loads. This work explores the trade-off between energy storage size requirements (i.e. mass) and performance (i.e. peak power, energy storage, and control bandwidth) in the context of a power system architecture that meets the needs of the U.S. Navy. In this work, the simulated time domain responses of a representative power system were evaluated under different loading conditions and control parameters, and the findings were considered in conjunction with sizing constraints of and estimated specific power and energy densities of various storage technologies. The simulation scenarios were based on representative operational vignettes, and a Ragone plot was used to illustrate the intersection of potential energy storage sizing with the energy and power density requirements of the system. Furthermore, the energy storage control bandwidth requirements were evaluated by simulation for different loading scenarios. Two approaches were taken to design an ESS: one based only on time domain power and energy requirements from simulation and another based on bandwidth (specific frequency) limitations of various technologies.

25 ENERGY STORAGE↗

Hierarchical Control of Utility-Scale Solar PV Plants for Mitigation of Generation Variability and Ancillary Service Provision

This paper presents a hierarchical control system to mitigate the variability of solar photovoltaic (PV) power plant and provide ancillary services to the electric grid without the need for additional non-solar resources. With coordinated management of each inverter in the system, the control system commands the power plant to proactively curtail a small fraction of its instantaneous maximum power potential, which gives the plant enough headroom to ramp up production from the overall power plant, for a service such as regulation reserve. This control system is practical for continuously changing cloud cover conditions in partially cloudy days. A case study from a site in Hawaii with one-second resolution solar irradiance data is used to verify the efficacy of the proposed control system. The proposed control algorithm is subsequently compared with the alternative control technology from the literature, the grouping control algorithm; the results show that the proposed hierarchical control system is over 10 times more effective in reducing generator mileage to support power fluctuations from solar PV power plants.

14 SOLAR ENERGY↗

Optimization of Fatigue Test Signal Compression Using the Wavelet Transform (Final Report)

This report summarizes Sandia National Laboratories (SNL) contribution to ATA Engineering, Inc's (ATA) project for the Naval Air Systems Command (NAVAIR), entitled "Optimization of Fatigue Test Signal Compression Using the Wavelet Transform." Sandia National Laboratories were a subcontractor to ATA. We were involved because this was a Small Business Technology Transfer (STTR) project that required ATA to partner with a national laboratory or academic institution. ATA selected SNL, and specifically the Environments Engineering Department (1557) because ATA has a long-standing working relationship with this department and the department staff have experience in environment definition, signal processing, fatigue testing protocols and traditional methods of generating inputs for accelerated fatigue testing.

42 ENGINEERING↗

FRMAC Laboratory Analysis Manual Volume 1, Revision 0

This manual is written for personnel who respond to a nuclear/radiological incident and will be called upon to provide support to ensure that samples receive appropriate laboratory analyses. Overall, this manual provides general guidance and some specific diagrams and forms. However, it is understood that site- and incident-specific operational decisions and procedures may need to be modified at the time of the incident. This manual is intended to provide guidance for laboratory analysis personnel without limiting FRMAC’s ability to integrate the work with other partners and stakeholders. Some of the titles of management positions with the FRMAC have been changed in order to comply with the structure of the Incident Command System (ICS) under the National Incident Management System (NIMS).

61 RADIATION PROTECTION AND DOSIMETRY↗

FRMAC Laboratory Analysis Manual Volume 1, Revision 0

The Federal Radiological Monitoring and Assessment Center (FRMAC) is an operational center, available on request by the Department of Homeland Security (DHS) to respond to nuclear and radiological incidents as described in the National Response Framework (NRF). Under the Federal Interagency Operational Plan for Response and Recovery’s Nuclear/Radiological Annex, the U.S. Department of Energy (DOE) has the responsibility to maintain the operational readiness of the FRMAC during the emergency phase of an event. FRMAC is initially established and managed by the Nuclear Emergency Support Team (NEST) and serves as an interagency operations center with representatives from various federal, state, and local radiological response organizations. The purpose of the FRMAC is to assist state, local, tribal, and territorial governments (SLTT) in their mission to protect the health and well-being of their citizens with: • Verified radiation measurements. • Interpretations of radiation distributions based on Environmental Protection Agency (EPA), Food and Drug Administration (FDA), or local Protective Action Guidelines (PAGs). • Characterization of overall radiological conditions. Once a declaration to respond to a radiological emergency has been made, the National Nuclear Security Administration (NNSA) Headquarters will coordinate the response in consultation with the cognizant NNSA Regional Coordinating Office (RCO). Each of the eight RCOs maintain a 24-hour response capability for radiological emergencies that may occur in states served by its region. When a FRMAC is established, it operates under the parameters of the Incident Command System (ICS), as defined in the National Incident Management Systems (NIMS) construct. The Consequence Management Home Team (CMHT) will be activated immediately during normal business hours (Pacific Time Zone), and within two hours otherwise. The Consequence Management Response Team (CMRT) is prepared for deployment within six hours after activation. Along with the assets, FRMAC provides an operational framework for coordinating of all federal off-site radiological monitoring and assessment activities during a response to a radiological emergency to support the coordinating agency and SLTT governments. Potential radiological emergencies that fall within FRMAC vary widely in terms of the area affected, the nature of the contamination, and the scope of the government’s response. Detonation of a nuclear device, accidental release of radiation from a nuclear power plant, and a terrorist threat are just a few of the many possible scenarios FRMAC must be prepared to address. Through all this, supporting the state, local, and tribal organizations in the protection of the public remains the primary goal of the federal response.

54 ENVIRONMENTAL SCIENCES↗

Cyber Halo Innovation Research Program (CHIRP) Handbook: CHIRP Program Document 2026

The Cyber Halo Innovation Research Program (CHIRP) handbook outlines a comprehensive framework designed to advance space cybersecurity education, workforce development, recruitment efforts for United States Space Force (USSF) Space Systems Command (SSC) and the Department of the Airforce, and foster students’ professional growth. It provides an overview of CHIRP's objectives and strategic focus, establishing the foundation for participant engagement through a network of collaborations with academic institutions, contracted industry partners, training and certification organizations, federal agencies, and community organizations. It states a clear participation strategy for SSC and Pacific Northwest National Laboratory (PNNL) for program execution and successful support for student transition to a career in space cybersecurity.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Cyber Halo Innovation Research Program (CHIRP) Student Research Report: Program Analysis

The Cybersecurity and Space Systems Research Program (CHIRP) conducted multi-year, mission-focused research addressing emerging cybersecurity challenges affecting space and ground systems. Students from California State University San Bernardino (CSUSB), University of Texas El Paso (UTEP), and California State University Dominguez Hills (CSUDH) conducted structured research, developed proof-of-concept demonstrations, participated in applied cybersecurity training, and collaborated with Space Systems Command (SSC), academic, and industry partners. This report documents the research questions, methodologies, findings, demonstrations, and student contributions associated with each cohort. It also summarizes the program’s workforce-development outcomes, including applied cybersecurity training, professional certifications, technical credentials, and partnerships with organizations such as CT Cubed, Inc. and ISC2. Collectively, CHIRP strengthened the space-cybersecurity workforce pipeline and produced research and prototype efforts that may inform future cybersecurity assessments, test and evaluation activities, cyber-range development, acquisition planning, operational training, and mission-assurance initiatives.

McKenzie, Penny L.↗

Systems and methods for control system security

A component security device may be disposed at an interface between a component and a cyber-physical system. The disclosed component security device may be physically and/or electrically coupled between the component and infrastructure of the cyber-physical system, such as a backplane, bus, and/or the like. The component security device may be configured to monitor the component, and selectively isolate the component from the cyber-physical system. Since the component security device is interposed at the interface of the component, the component security device may be capable of isolating the component regardless of whether the component has been compromised (e.g., regardless of whether the component is capable of complying with system commands).

Rieger, Craig G.↗

Integrated behavior-based infrastructure command validation

A cybersecurity infrastructure command validation system is provided herein for validating asset commands issued within an infrastructure network. The cybersecurity infrastructure command validation system can be integrated into an infrastructure network to monitor and validate infrastructure asset commands in real-time or while the infrastructure network is active. The cybersecurity infrastructure command validation system can receive or intercept commands issued by asset controllers. The cybersecurity infrastructure command validation system can validate the commands based on a command validation model. The command validation model can represent normal operating behavior of the infrastructure network. The cybersecurity infrastructure command validation system can provide valid commands to the intended infrastructure asset, or can reject invalid commands. The cybersecurity infrastructure command validation system can store validation results for use in updating the command validation model. The cybersecurity infrastructure command validation system can flag or otherwise warn the infrastructure network or administrators of invalid commands.

Akyol, Bora A.↗

Command and Control of Utilities Systems

The utilities systems that encompass the Y-12 National Security Complex are an integral part of the entire campus, and are essential to maintaining critical mission focus for the site. Although the utilities systems each differ in function, the central production and distribution model creates a common thread on which each system is run. Several incidents in FY 2018 and FY 2019 documented a lack of overall systems control and highlighted the need to create a better command system that could maintain system availability and decrease possible impacts to the surrounding environment. An initial system was started in September of 2019 to better control mechanical utility distribution systems. The measurement of the system can be modeled against a standard command and control related incident. The corresponding work hours from a typical control-related incident were used as key component to this system model. System effectiveness is modeled against utility’s incidents that demonstrate a loss of command and control. The increased simulations of the model also document control can only be effectively contained within the stated time (3-5 years) by yielding more engineers to complete alignments, or drastically reducing the amount of time for alignments. The total control points of the model document a clear correlation between alignments, control points, and the amount of man-hours per incident. Current data shows that actual incident man-hours (1.88 manhours/ incident since initial system implementation) are near expected incident man-hours (1.81 manhours/ incident) with command and control for October 2021, which documents a 33.3% reduction in man-hours/incident since initial system implementation. A conclusion can be drawn that focus on increasing the amount of controlled points in the system can reduce incidents and the decrease the amount of non-value added work to employee’s day-to-day lives, while also achieving a culture that enhances and sustains utilities reliability.

99 GENERAL AND MISCELLANEOUS↗

EVSE Characterization: V2G EVSE Comparison

As part of the U.S. Department of Energy EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization is conducted over a wide range of direct current (DC) current and DC voltage operation for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2024 study conducted on electric vehicle supply equipment (EVSE) characterization by the Idaho National Laboratory (INL) include two bi-directional vehicle-to-grid (V2G) capable EVSEs. These EVSE are referred to as V2G-EVSE9 and V2G-EVSE10. Laboratory testing is conducted at nominal test conditions to characterize the power transfer capabilities, efficiency, power factor, and other power quality metrics of the two DC EVSEs capable of V2G bi-directional power transfer. Results from testing show the performance is consistent for V2G-EVSE9 and V2G-EVSE10 when comparing charging to discharging performance, except for V2G-EVSE10 for power transfer when operating above 70% of the rated DC current. V2G-EVSE10 efficiency is >98% while charging and <91% while discharging at the same operating conditions, near maximum-rated current, at 300VDC. In contrast, V2G-EVSE9 results are consistent for charging and discharging. This EVSE is nearly 96% efficient while charging or discharging when operating over 50% of rated AC power. V2G EVSE performance is also characterized during off-nominal AC grid conditions involving AC voltage deviation (426 VAC to 518 VAC), AC frequency deviation of +2% (58.8 Hz to 61.2 Hz), and AC voltage harmonics injection. Many test conditions have little-to-no impact on performance characteristics of the two EVSEs; however, there are a few notable findings with significant power transfer capability impacts. AC voltage harmonics injection resulted in negative impacts on power quality attributes for both EVSEs, but with no impact on power transfer capability. Off-nominal AC voltage and frequency conditions resulted in unstable or lack of power transfer capability for both EVSEs. V2G-EVSE9 is unable to transfer power when AC voltage is >300V L-N. V2G-EVSE10 is unable to transfer power when AC frequency deviation exceeds +0.8%. V2G energy management system transient response and latency are quantified during laboratory testing. V2G-EVSE9 and V2G-EVSE10 utilize cloud-based V2G energy management systems that command the power transfer level between the EVSE and EV. The latency and response characteristics of the entire systems (web-based user interface, V2G energy management system, cellular communications, and EVSE response) are quantified through laboratory testing for V2G-EVSE9 and V2G-EVSE10. V2G-EVSE9 latency ranges from 0.8 to 1.8 seconds, whereas V2G-EVSE10 latency ranges from 3.4 to 8.8 seconds. The ramp rate to a change in power transfer request also differs between the two EVSEs. V2G-EVSE10 ramp rate ranges from 50% to -250% of rated AC power per second, whereas V2G-EVSE9 rate ranges from 95% to -95% of rated AC power per second. At the highest rate of change in power transfer, V2G-EVSE10 can change from full charge power to full discharge power in less than one second. The V2G EVSE characterization presented in this report provides valuable insights and results for use by numerous entities. This includes modeling and simulation organizations, decision makers, fleet planning, industry stakeholders, and many others involved with the development and deployment of electrified transportation technologies. Additional high-power DC chargers, bidirectional chargers, and inductive power transfer EVSE characterization results are anticipated from additional EVSE brands and models, which will be detailed in future publications in support of the U.S. Department of Energy EVs@Scale consortium Next-Gen Profiles project.

25 ENERGY STORAGE↗

A Cooperative Game Theory-based Secondary Frequency Regulation in Distribution Systems

Participation of distribution systems in frequency regulation has become an important factor for grid operation after the integration of distributed energy resources (DERs). While available reserves from a single distribution system may not be sufficient for frequency regulation, aggregated reserves from several distribution systems can provide frequency regulation at grid-scale. This paper proposes a cooperative game theory-based approach for secondary frequency regulation in distribution systems consisting of distributed energy resources (DERs). A two-stage strategy is proposed to effectively and precisely determine a change in active power set points of DERs following a command from system operators. In the first stage, the value or worth of each DER and their coalitions are determined using initial rates of change of frequency (ROCOF) for each DER/coalition. In the second stage, the Shapley value, one of the solution concepts of cooperative game theory, is used to determine changes in active power set points of DERs. The proposed method is implemented on several distribution systems including a modified IEEE 13-node system and modified 33-node distribution system.

Gautam, Mukesh↗

Large-Scale Thermoset Pick and Place Testing and Implementation

Oak Ridge National Laboratory is developing the first commercially available medium to large-scale thermoset additive manufacturing (AM) system with Magnum Venus Products (MVP). This 3D printer is capable of fabricating large-scale thermoset components at room temperature with a build volume of 16’ x 8’ x 42’’. The thermoset extrusion process uses irreversible exothermic chemical reactions to form a cross-linked polymer. Printing thermosets at such large scales with highly customizable materials at room temperature provides huge opportunities for complex and smart tooling applications. Integrating a pick and place actuator into this system will allow for the placement of heating/cooling channels as well as sensors to monitor tooling health and heat distribution. The pneumatically-driven pick and place actuator is integrated into the existing electrical and mechanical design and is controlled using custom M-code commands. The system is comprised mostly of commercially available components, providing easy adoptability by future thermoset systems.

Boulger, Alex↗

Real-Time Dispatch With Secondary Frequency Regulation: A Pathway to Consider Intra-Interval Fluctuations

Real-time dispatch balances the power demand with minimized operating costs. For the current dispatch model, the demand is assumed to be constant within a time interval, while the intra-interval power balance is left to frequency regulation. Based on practical experience and simulations, this behavior may lead to insufficient frequency regulation and uneconomic regulation costs considering the increase in intra-interval fluctuations caused by renewables. Here, a real-time dispatch method with secondary frequency regulation behaviors is proposed. Without changing the interval of the real-time dispatch command, the system regulation mileage and intra-interval generation adjustment are explicitly formulated in a mixed-integer optimization model. To reduce the computational burden, an efficient two-stage calculation method is proposed. With practical utility data, this article finds that the proposed method can effectively improve the system frequency performance with the subminute net load forecasting curve obtained by an off-the-shelf forecasting approach. Time-domain simulations in IEEE and practical utility systems validate the effectiveness of the proposed method in terms of the frequency performance and total operating costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space vehicle with customizable payload and docking station

A “black box” space vehicle solution may allow a payload developer to define the mission space and provide mission hardware within a predetermined volume and with predetermined connectivity. Components such as the power module, radios and boards, attitude determination and control system (ADCS), command and data handling (C&DH), etc. may all be provided as part of a “stock” (i.e., core) space vehicle. The payload provided by the payload developer may be plugged into the space vehicle payload section, tested, and launched without custom development of core space vehicle components by the payload developer. A docking station may facilitate convenient development and testing of the space vehicle while reducing handling thereof.

Judd, Stephen↗