Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMERCIAL POWER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Fuel Cell Combined Heat and Power Commercial Demonstration

This is the annual report for the Market Transformation project as required by DOE EERE's Fuel Cell Technologies Office. We have been provided with a specific format. It describes the work that was done in developing evaluating the performance of 5 kW stationary combined heat and power fuel cell systems that have been deployed in Oregon and California. It also describes the business case that was developed to identify markets and address cost.

combined heat and power↗

Modeling receiver flux of commercial power tower concentrating solar power plants using ray tracing: a round-robin comparison of SolTrace, Solstice, and TieSOL

This study presents a multi-stage, cross-validation comparison of three software packages for Monte Carlo ray tracing (MCRT) applied to central tower concentrating solar power (CSP) systems. The three packages evaluated are: (1) SolTrace, an open-source tool developed by the National Renewable Energy Laboratory (NREL); (2) Solstice, an open-source program created by CNRS-PROMES and Meso-Star, with enhancements for CSP applications (called solsticepy) from the Australian National University; and (3) TieSOL, a commercial software developed by Tietronix. This investigation extends previous ray tracing comparisons by incorporating models of multi-facet heliostats within a commercial-scale solar field, taking into account zoned focal lengths and canting configurations. Receiver flux distributions were compared across the tools using a series of case studies, including single-heliostat scenarios, isolated blocking situations, and comprehensive full-field simulations. The case studies were designed to diagnose differences across the models at varying levels of complexity, and to identify and resolve discrepancies as additional parameters were introduced. Key factors examined in the analysis include sun positions, heliostat location, facet and canting focus, and aimpoint strategies. The comparison aims to improve the accuracy and reliability of these tools while providing benchmark cases for validating future optical modeling tools.

14 SOLAR ENERGY↗

Application of Sapphire-Fiber-Bragg-Grating-Based Multi-Point Temperature Sensor in Boilers at a Commercial Power Plant

Readily available temperature sensing in boilers is necessary to improve efficiencies, minimize downtime, and reduce toxic emissions for a power plant. The current techniques are typically deployed as a single-point measurement and are primarily used for detection and prevention of catastrophic events due to the harsh environment. In this work, a multi-point temperature sensor based on wavelength-multiplexed sapphire fiber Bragg gratings (SFBGs) were fabricated via the point-by-point method with a femtosecond laser. The sensor was packaged and calibrated in the lab, including thermally equilibrating at 1200 °C, followed by a 110-h, 1000 °C stability test. After laboratory testing, the sensor system was deployed in both a commercial coal-fired and a gas-fired boiler for 42 days and 48 days, respectively. The performance of the sensor was consistent during the entire test duration, over the course of which it measured temperatures up to 950 °C (with some excursions over 1000 °C), showing the survivability of the sensor in a field environment. The sensor has a demonstrated measurement range from room temperature to 1200 °C, but the maximum temperature limit is expected to be up to 1900 °C, based on previous work with other sapphire based temperature sensors.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Linkages from DOE’s Geothermal R&D to Commercial Power Generation

This study provides an evaluation of the Geothermal Technologies Program (GTP) of the U.S. Department of Energy (DOE). Specifically, for the period 1976 to 2008, it investigates the linkages between GTP's outputs and their downstream use by others to produce power from geothermal energy. The results are relevant for assessing DOE's past and future roles in the development and advancement of the nation's geothermal resources. In addition, the study investigates other applications of the GTP's outputs beyond power generation.

15 GEOTHERMAL ENERGY↗

Approach to Startup Inventory for Viable Commercial Power Plant

Summary • FPP realization within the next 10-15 years will require dedicated efforts to improve DIR, burn fraction, fueling efficiency, and/or processing times. • Modest improvements from either the fuel cycle side or plasma physics side should be possible with considered allocation of R&D funding. • Current gaps in particular include blanket extraction at scale, improved efficiency in isotope separation and detritiation, and maximizing DIR efficiency. • Total costs for FPP construction and commissioning depend heavily on site regulation, so decreases in required SI and OI can lead to large decreases in capital outlay. • Some subsystems in the fuel cycle are required from a environmental management perspective but are both energetically expensive and time consuming, particularly water detritiation. • Low inventories but high capital and operational costs mean a centralized water detritiation plant could greatly improve likelihood of deployment of multiple FPPs on the same time scale.

MALONE, COLLIN↗

Approach to startup inventory for viable commercial fusion power plant

With the increasing efforts to commercialize fusion power, private and government organizations are investing heavily in the development of technology to support a viable fusion power plant. Deuterium-Tritium (DT) fueled reactors are more prevalent than other proposed designs, requiring tritium processing and handling technology for safe operations and self-sufficiency. Further, each fusion power plant will need a specific-to-design startup inventory of tritium to begin operations. This startup inventory is required prior to breeding and is the minimum tritium inventory required to fill each processing component in the fuel cycle, to offset radioactive decay losses, and to avoid a zero-fuel situation for continuous operation. We present an approach to calculate the startup tritium inventory for a 500 MW th reactor, with considerations for reserve inventory for maintenance and commissioning. A baseline startup inventory was calculated to be approximately 327 gs. This value was obtained using modest assumptions about the technology and operating parameters of a fusion power plant. The required operating reserve inventory or the inventory necessary to keep a fusion power plant operational using only direct internal recycling for 24 h for the same plant design is approximately 642 gs. The approach and findings of this paper will enable fusion energy stakeholders to better utilize the existing scarce global tritium supply.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Sensitivity of Infrastructure Sectors to the Disruption of Commercial Electric Power

Electric power is crucial to the function of other infrastructures, as well as to the stability of the economy and the social order. Disruption of commercial electric power service, even for brief periods of time, can create significant consequences to the function of other sectors, and make living in some environments untenable. This analysis, conducted in 2017 for the United States Department of Energy (DOE) as part of the Grid Modernization Laboratory Consortium (GMLC) Initiative, focuses on describing the function of each of the other infrastructure sectors and subsectors, with an eye towards those elements of these sectors that depend on primary electric power service through the commercial electric power grid. It leverages the experience of Sandia analysts in analyzing historical disruptive events, and from the development of capabilities designed to identify the physical, logical, and geographic connectivity between infrastructures. The analysis goes on to identify alternatives for the provision of primary electric power service, and the redundancy of said alternatives, to provide a picture of the sector’s ability to withstand an extended disruption.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of recent developments on the status of commercial nuclear power and reactor decommissioning in the United States

This paper examines the impact of three recent developments on the commercial nuclear power in the United States. These developments include: Yucca Mountain closure and issues related to SNF; actions in response to Fukushima Diaiichi accident, and; energy economics. All of these have had a significant impact on the commercial nuclear power, its future, as well as the reactor decommissioning scene in the US. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TidGen Power System Commercialization Project

ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.

16 TIDAL AND WAVE POWER↗

Tritium Breeding Blanket for a Commercial Fusion Power Plant - A System Engineering Assessment

The goal of developing a new source of electric power based on fusion has been pursued for decades. If successful, future fusion power plants will help meet growing world-wide demand for electric power. A key feature and selling point for fusion is that its fuel supply is widely distributed globally and virtually inexhaustible. Current world-wide research on fusion energy is focused on the deuterium-tritium (DT for short) fusion reaction since it will be the easiest to achieve in terms of the conditions (e.g., temperature, density and confinement time of the DT fuel) required to produce net energy. Over the past decades countless studies have examined various concepts for TBBs for both magnetic fusion energy (MFE) and inertial fusion energy (IFE). At this time, the key organizations involved are government sponsored research organizations world-wide. The near-term focus of the MFE community is on the development of TBB mock-ups to be tested on the ITER tokamak currently under construction in Caderache France. TBB concepts for IFE tend to be different from MFE primarily due to significantly different operating conditions and constraints. This report focuses on longer-term commercial power plants where the key stakeholders include: electric utilities, plant owner and operator, manufacturer, regulators, utility customers, and in-plant subsystems including the heat transfer and conversion systems, fuel processing system, plant safety systems, and the monitoring control systems.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Deep Well #4 Backup Power Systems Project Closeout Report

The project scope was to install a diesel generated power source to deep well 4 in addition to the existing commercial power source. The diesel power source and its fuel supply system shall be seismically qualified to withstand a Performance Category 4 (PC-4) seismic event. This diesel power source will permit the deep well to operate during a loss of commercial power. System design will incorporate the ability to select and transfer power between the new diesel power source and commercial power sources for the the deep well motor and TRA-672 building loads.

99 GENERAL AND MISCELLANEOUS↗

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preliminary Evaluation of the SNF Transportation Infrastructure at Operating Commercial Nuclear Power Plant Sites - 18466

The U.S. Department of Energy (DOE) has a goal to develop solutions for the long-term, sustainable management of the nation's spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The DOE Office of Nuclear Energy's (DOE-NE) Office of Integrated Waste Management (IWM) is applying integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. One aspect of an integrated nuclear waste management system architecture is transportation of spent nuclear fuel from the fleet of commercial nuclear reactors to interim storage and/or disposal facilities. This paper presents a preliminary evaluation of the SNF transportation infrastructure at existing commercial nuclear power plant sites. Reactor site surveys performed by DOE in the 1990's and early 2000's that described the transportation infrastructure at commercial reactor sites at that time served as the starting point for the evaluation. Geographical information systems (GIS) and available open-source information about the reactor sites were used to identify changes in the transportation infrastructure at operating commercial nuclear power plant sites. The data and schematics contained within the previous surveys were comparatively analyzed alongside the GIS tools Google Earth, Google Maps, and DOE's Stakeholder Tool for Assessing Radioactive Transportation (START) to determine potential transportation modes and to identify improvements to the transportation infrastructure that may be needed at each of the sites. The preliminary results obtained and the insight gained from this effort support both integrated waste management system architecture analyses and future planning efforts. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants: 2020 Update

This report documents the quantitative results of the current industry-average performance for components and initiating events (IEs) at U.S. commercial nuclear power plants (NPPs). It represents the third update of the original analysis in NUREG/CR-6928 with data through 2020. Continuous characterization and updating of current industry-average performance with the latest industry data available are important steps in maintaining up-to-date risk models. Typically, data from 1998–2002 were used in NUREG/CR-6928, data from 1998–2010 in the first update, data from 1998–2015 in the second update, and data from 2006–2020 in this update, although many IEs required longer periods for adequate characterization of frequencies in all these analyses. As with NUREG/CR-6928 and previous updates, four types of events are covered in this report: component unreliability (e.g., a pump that fails to start or fails to run), component or train unavailability resulting from test or maintenance outages, special event probabilities covering operational issues (e.g., pump restarts and injection valve re-openings during unplanned demands), and IE frequencies. Results (in the form of beta distributions for failure probabilities upon demand and gamma distributions for rates) are used as inputs to the U.S. Nuclear Regulatory Commission standardized plant analysis risk models covering U.S. commercial NPPs.

99 GENERAL AND MISCELLANEOUS↗

Ergonomic Safety and Health Activities to Support Commercial Nuclear Power Plant Control Room Modernization in the United States

Affordable, abundant, and reliable electricity generation is essential to fueling a nation’s robust and globally competitive economy. In the United States (U.S.), commercial nuclear power plants (NPPs) account for approximately 19% of reliable and cost-competitive baseload electricity generation. Other technologies that reduce reliance on fossil fuels and provide baseload electricity cost-competitively at a national scale are still under development. Thus, without suitable replacements for nuclear power, the generating capacity of nuclear energy in the U.S. must be continued through the safe and efficient operation of commercial NPPs. The U.S. De-partment of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) research and development (R&D) program provides the technical bases for the long-term, safe, and economical operation of NPPs. One area in the LWRS program is the Plant Modernization pathway, which includes human factors R&D, human factors engineering (HFE), and ergonomics to enable the modernization of the instrumentation and control (I&C) technologies in NPP main control rooms (MCRs). DOE researchers, including ergonomics specialists at Idaho National Laboratory (INL) have collaborated with nu-merous commercial NPP utilities over the last few years on control room modernization. This paper summarizes recent ergonomics safety and health R&D and HFE performed in collaboration with a U.S. commercial utility to modernize their NPP MCRs.

99 GENERAL AND MISCELLANEOUS↗