Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

TH-AB-201-10: Portal Dosimetry with Elekta IViewDose:Performance of the Simplified Commissioning Approach Versus Full Commissioning

Purpose: Elekta recently developed a solution for in-vivo EPID dosimetry (iViewDose, Elekta AB, Stockholm, Sweden) in conjunction with the Netherlands Cancer Institute (NKI). This uses a simplified commissioning approach via Template Commissioning Models (TCMs), consisting of a subset of linac-independent pre-defined parameters. This work compares the performance of iViewDose using a TCM commissioning approach with that corresponding to full commissioning. Additionally, the dose reconstruction based on the simplified commissioning approach is validated via independent dose measurements. Methods: Measurements were performed at the NKI on a VersaHD™ (Elekta AB, Stockholm, Sweden). Treatment plans were generated with Pinnacle 9.8 (Philips Medical Systems, Eindhoven, The Netherlands). A farmer chamber dose measurement and two EPID images were used to create a linac-specific commissioning model based on a TCM. A complete set of commissioning measurements was collected and a full commissioning model was created.The performance of iViewDose based on the two commissioning approaches was compared via a series of set-to-work tests in a slab phantom. In these tests, iViewDose reconstructs and compares EPID to TPS dose for square fields, IMRT and VMAT plans via global gamma analysis and isocentre dose difference. A clinical VMAT plan was delivered to a homogeneous Octavius 4D phantom (PTW, Freiburg, Germany). Dose was measured with the Octavius 1500 array and VeriSoft software was used for 3D dose reconstruction. EPID images were acquired. TCM-based iViewDose and 3D Octavius dose distributions were compared against the TPS. Results: For both the TCM-based and the full commissioning approaches, the pass rate, mean γ and dose difference were >97%, <0.5 and <2.5%, respectively. Equivalent gamma analysis results were obtained for iViewDose (TCM approach) and Octavius for a VMAT plan. Conclusion: iViewDose produces similar results with the simplified and full commissioning approaches. Good agreement is obtained between iViewDose (simplified approach) and the independent measurement tool. This research is funded by Elekta Limited.

60 APPLIED LIFE SCIENCES↗

Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop

Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible trouble-shooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.

Piesciorovsky, Emilio↗

TU-C-BRE-05: Clinical Implications of AAA Commissioning Errors and Ability of Common Commissioning ' Credentialing Procedures to Detect Them

Purpose: To test the ability of the TG-119 commissioning process and RPC credentialing to detect errors in the commissioning process for a commercial Treatment Planning System (TPS). Methods: We introduced commissioning errors into the commissioning process for the Anisotropic Analytical Algorithm (AAA) within the Eclipse TPS. We included errors in Dosimetric Leaf Gap (DLG), electron contamination, flattening filter material, and beam profile measurement with an inappropriately large farmer chamber (simulated using sliding window smoothing of profiles). We then evaluated the clinical impact of these errors on clinical intensity modulated radiation therapy (IMRT) plans (head and neck, low and intermediate risk prostate, mesothelioma, and scalp) by looking at PTV D99, and mean and max OAR dose. Finally, for errors with substantial clinical impact we determined sensitivity of the RPC IMRT film analysis at the midpoint between PTV and OAR using a 4mm distance to agreement metric, and of a 7% TLD dose comparison. We also determined sensitivity of the 3 dose planes of the TG-119 C-shape IMRT phantom using gamma criteria of 3% 3mm. Results: The largest clinical impact came from large changes in the DLG with a change of 1mm resulting in up to a 5% change in the primary PTV D99. This resulted in a discrepancy in the RPC TLDs in the PTVs and OARs of 7.1% and 13.6% respectively, which would have resulted in detection. While use of incorrect flattening filter caused only subtle errors (<1%) in clinical plans, the effect was most pronounced for the RPC TLDs in the OARs (>6%). Conclusion: The AAA commissioning process within the Eclipse TPS is surprisingly robust to user error. When errors do occur, the RPC and TG-119 commissioning credentialing criteria are effective at detecting them; however OAR TLDs are the most sensitive despite the RPC currently excluding them from analysis.

60 APPLIED LIFE SCIENCES↗

Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future

This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commissioning and Testing of a new 4.5K Cold Box for JLab Cryogenic Test Facility

A new 4.5K cold box at Jefferson Lab (JLab) Cryogenic Test Facility (CTF) was recently installed and commissioned to upgrade the existing 4.5 K refrigeration system and work in parallel with the existing 4.5 K cold box. This new 4.5 K cold box is equipped with two turbo-expanders and, at its maximum capacity condition, it is expected to support at least 6.6 g/s of helium liquefaction or 650 W of refrigeration at 4.5 K. It can also handle up to 10 g/s 30 K return flow for 2 K refrigeration recovery that supports cryo-module and superconducting cavity testing. Performances of the cold box at its maximum capacity conditions as well as several other operating modes were tested for acceptance. Finally, we will briefly review the new 4.5 K cold box design features and discuss the commissioning and performance testing results.

42 ENGINEERING↗

Commissioning of a two-target DC cylindrical magnetron sputter coater for depositing Nb 3 Sn film on Nb superconducting radiofrequency cavities

A DC cylindrical magnetron sputter coater was commissioned and used to coat Nb 2.6 GHz superconducting radiofrequency (SRF) cavity with Nb 3 Sn. The sputter coater has two identical cylindrical magnetrons that can move, with a controlled speed, along the axis of the SRF cavity to coat the inside surface of the cavity. The design of the sputter coater is discussed, along with its performance. Initially, a sample holder that allows coating on flat substrates at positions similar to the equator and beam tubes of a 2.6 GHz SRF cavity was used to test conditions for fabricating Nb 3 Sn layers. Multilayers of Nb and Sn were sequentially sputtered on flat Nb and sapphire substrates mounted on the equivalent positions of the cavity's beam tubes and the equator using the two identical cylindrical magnetrons. Then, the Nb/Sn multilayers were annealed at 950 °C for 3 h. Here, the ~1.2 μm thick Nb 3 Sn film did not show any other Nb–Sn compounds and had a superconducting transition temperature of 17.61–17.76 K. The 2.6 GHz SRF cavity was coated using similar conditions as flat samples. Cryogenic RF testing of the Nb 3 Sn-coated cavity demonstrated a quality factor of 3.2 × 10 8 at an accelerating gradient of 5 MV/m at 4.4 K.

43 PARTICLE ACCELERATORS↗

The NOνA experiment, the first 12 months of commissioning, operations and physics data

The NOνA experiment is a long baseline neutrino experiment designed to make precision measurements of the oscillation probabilities for ν{sub µ} → ν{sub e} and ν{sub µ} → ν{sub µ} for both neutrinos and anti-neutrinos. These measurements will provide new information on the neutrino mass hierarchy, improve our knowledge of whether θ{sub 23} is non-maximal and possibility provide information on the CP violating phase δ{sub CP} of the PMNS neutrino mixing matrix. We present the observations of the first neutrino event in the NOνA far and near detectors along with data obtained during the first year of detector commissioning and operations. We use the data to demonstrate the detector’s ability to identify electron and muon neutrino events and to reject cosmic ray induced backgrounds at a level of 4 × 10{sup 7}:1. New estimates for the signal and background sensitivities of the NOνA experiment during the first year of full detector running are presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

APS upgrade: Commissioning the world’s first light source based on swap-out injection

The Advanced Photon Source (APS) has recently completed a major upgrade, replacing its 25-year-old storage ring with a cutting-edge hybrid seven-bend achromat lattice enhanced by six additional reverse bends. The new design achieves a natural emittance of 42 pm-rad, enabling the production of X-rays up to 500 times brighter than those generated by the original APS. A key innovation of the upgrade is the implementation of a swap-out injection scheme, which replaces entire depleted bunches instead of performing traditional top-up injection. This approach enables on-axis injection to accommodate for the reduced dynamic aperture resulting from strong focusing. This paper outlines the commissioning process, shares initial operating experience with swap-out injection, and presents performance data for new systems such as the bunch-lengthening cavity.

Sajaev, Vadim [Argonne, PHY]↗

The commissioning of the CUORE experiment: the mini-tower run

CUORE is a ton-scale experiment approaching the data taking phase in Gran Sasso National Laboratory. Its primary goal is to search for the neutrinoless double-beta decay in Te-130 using 988 crystals of tellurim dioxide. The crystals are operated as bolometers at about 10 mK taking advantage of one of the largest dilution cryostat ever built. Concluded in March 2016, the cryostat commissioning consisted in a sequence of cool down runs each one integrating new parts of the apparatus. The last run was performed with the fully configured cryostat and the thermal load at 4 K reached the impressive mass of about 14 tons. During that run the base temperature of 6.3 mK was reached and maintained for more than 70 days. An array of 8 crystals, called mini-tower, was used to check bolometers operation, readout electronics and DAQ. Results will be presented in terms of cooling power, electronic noise, energy resolution and preliminary background measurements.

Copello, Simone↗

Installation and commissioning of the new Fermi National Accelerator Laboratory H- Magnetron

The Fermi National Accelerator Laboratory (FNAL) 40 year old Cockcroft-Walton 750 keV injectors with slit aperture magnetron ion sources have been replaced with a circular aperture magnetron, Low Energy Beam Transport, Radio Frequency Quadrupole Accelerator, and Medium Energy Beam Transport, as part of the FNAL Proton Improvement Plan. The injector design is based on a similar system at Brookhaven National Laboratory. The installation, commissioning efforts, and source operations to date will be covered in this paper along with plans for additional changes to the original design to improve reliability by reducing extractor spark rates and arc current duty factor.

43 PARTICLE ACCELERATORS↗

Commissioning and First Results of the Fermilab Muon Campus

In the following years the Fermilab Muon Campus will deliver highly polarized muon beams to the storage ring of the Muon g-2 Experiment. The Muon Campus contains a target section wherein secondaries are produced, the Delivery Ring which separates the muons from the rest of the beam and a straight section that transports them to the storage ring. Here, we report the first experimental results and experience gained from commissioning the Muon Campus, including the interaction of the proton beam with the target, the transport of secondary beam over long sections, the monitoring of muons from the available diagnostics and the development of techniques for measuring the beam optics. We present detailed comparisons between experimental data and simulation and discuss the similarities and differences observed.

43 PARTICLE ACCELERATORS↗

Review of Literature and Utility Commission Proceedings Relevant to Integrated System Planning: Annotated Bibliography Prepared to Support the Washington Utilities and Transportation Commission

In 2024 the Washington State Legislature passed the Decarbonization Act for Large Combination Utilities (Engrossed Substitute House Bill 1589 – the Act). The Act requires a large combination electric and gas utility to conduct integrated system planning supporting electrification and gas system decarbonization, including a reduction in the gas rate base. The utility is required to submit the first integrated system plan (ISP) by January 1, 2027. The requirements are to be developed and adopted by the Washington Utilities and Transportation Commission (UTC) by July 1, 2025. In October 2024 Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) began providing technical assistance to the UTC to support the ISP rulemaking. PNNL and LBNL have prepared this annotated bibliography of research and reports, and state examples of coordinated gas and electric planning, future of gas, and future of heat proceedings in other U.S. States and one Canadian Province. The items described here have been selected by the authors for their potential relevance to the UTC’s integrated system planning rule discussions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Commissioning of Photon Beams of a Flattening Filter-Free Linear Accelerator and the Accuracy of Beam Modeling Using an Anisotropic Analytical Algorithm;TrueBeam; Flattening filter free; Commissioning; Anisotropic analytical algorithm

Purpose: To investigate dosimetric characteristics of a new linear accelerator designed to deliver flattened, as well as flattening filter-free (FFF), beams. To evaluate the accuracy of beam modeling under physical conditions using an anisotropic analytical algorithm. Methods and Materials: Dosimetric data including depth dose curves, profiles, surface dose, penumbra, out-of-field dose, output, total and scatter factors were examined for four beams (X6, X6FFF, X10, and X10FFF) of Varian's TrueBeam machine. Beams modeled by anisotropic analytical algorithm were compared with measured dataset. Results: FFF beams have lower mean energy (tissue-phantom ratio at the depths of 20 and 10 cm (TPR 20/10): X6, 0.667; X6FFF, 0.631; X10, 0.738; X10FFF, 0.692); maximum dose is located closer to the surface; and surface dose increases by 10%. FFF profiles have sharper but faster diverging penumbra. For small fields and shallow depths, dose outside a field is lower for FFF beams; however, the advantage fades with increasing phantom scatter. Output increases 2.26 times for X6FFF and 4.03 times for X10FFF and is less variable with field size; collimator exchange effect is reduced. A good agreement between modeled and measured data is observed. Criteria of 2% depth-dose and 2-mm distance-to-agreement are always met. Conclusion: Reference dosimetric characteristics of TrueBeam photon bundles were obtained, and successful modeling of the beams was achieved.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Installation and commissioning of the ion source systems for the new spallation neutron source 2.5 MeV injector

The U.S. Spallation Neutron Source (SNS) is a state-of-the-art neutron scattering facility delivering the world’s most intense pulsed neutron beams to a wide array of instruments, which are used to conduct investigations in many fields of engineering, physics, chemistry, material science, and biology. Neutrons are produced by spallation of liquid Hg by the bombardment of short (∼1 µs), intense (∼35 A) pulses of protons delivered at 60 Hz by an accumulator ring which is fed by a high-intensity, 1 GeV, H− LINAC (linear accelerator). This facility has operated nearly continuously since 2006 but has recently undergone a 4-month maintenance period, which featured a complete replacement of the 2.5 MeV injector feeding the LINAC. The new injector was developed at ORNL in an off-line beam test facility and consists of an ion source, low energy beam transport, and a Radio Frequency Quadrupole (RFQ). This report first describes the installed configuration of the new injector detailing the ion source system. The first beam current, RFQ transmission, emittance, and energy measurements from the injector installed on the SNS are reported. These data not only show a significant performance improvement for our existing facility but will also make accessible the higher beam current requirements for future SNS upgrade projects: the proton power upgrade and second target station.

Welton, R. F.↗

Pre-commissioning of the wide-dynamic range halo monitor to be installed in the Fermilab MI-8 line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, initial testing of equipment, and ray tracing simulations for the Offner optics and the targets used in the monitor.

Babacan, Betiay [IIT, Chicago; Fermilab]↗