Search NASASearch

SEARCH · Search NASA

Results for “COOLANT LOOPS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Designing a Propylene-Glycol Coolant Servicer System for Gateway’s Internal Active Thermal Control System

A human spacecraft ATCS—especially one using single-phase coolant loops exposed to cabin atmospheric conditions—requires periodic degassing and refilling to support long-duration missions of 15 to 30 years. During initial fill operations, system maintenance, gas permeation, and quick-disconnect mating or de-mating, small amounts of gas can gradually enter the coolant system over time. This can lead to degraded heat transfer performance, pump cavitation, and potentially pump vapor lock if a significant gas volume accumulates over time. Additionally, system leaks and routine fluid sampling can gradually reduce accumulator volumes to unacceptable levels, requiring periodic refills. In more severe cases, catastrophic changes in fluid composition may necessitate emergency draining, refilling, and degassing to ensure continued system functionality. These risks were identified and mitigated on the ISS ITCS through the development of a dual-membrane degasser ORU and a Fluid Servicer System ORU for coolant refilling. These systems were developed for the fully water-based ISS ITCS Coolant[1]. The Gateway space station, the first permanent human habitat in lunar orbit, uses a propylene-glycol/water coolant mixture, which has significantly different fluid properties compared to pure water. Because microgravity degassing technologies are sensitive to fluid surface tension and viscosity, existing ISS hardware is not suitable for servicing a propylene-glycol-based TCS. Unlike the ISS, the Gateway will operate in a higher-radiation environment and must meet stricter mass constraints due to its location outside of low earth orbit. This Government Furnished Equipment (GFE) flight hardware project aims to develop a lightweight, radiation-resistant Coolant Servicer System (CSS) capable of degassing and refilling Gateway’s propylene-glycol water-based IATCS.

Propylene Glycol Water

Designing a Propylene-Glycol Coolant Servicer System for Gateway’s Internal Active Thermal Control System

A human spacecraft ATCS—especially one using single-phase coolant loops exposed to cabin atmospheric conditions—requires periodic degassing and refilling to support long-duration missions of 15 to 30 years. During initial fill operations, system maintenance, gas permeation, and quick-disconnect mating or de-mating, small amounts of gas can gradually enter the coolant system over time. This can lead to degraded heat transfer performance, pump cavitation, and potentially pump vapor lock if a significant gas volume accumulates over time. Additionally, system leaks and routine fluid sampling can gradually reduce accumulator volumes to unacceptable levels, requiring periodic refills. In more severe cases, catastrophic changes in fluid composition may necessitate emergency draining, refilling, and degassing to ensure continued system functionality. These risks were identified and mitigated on the ISS ITCS through the development of a dual-membrane degasser ORU and a Fluid Servicer System ORU for coolant refilling. These systems were developed for the fully water-based ISS ITCS Coolant[1]. The Gateway space station, the first permanent human habitat in lunar orbit, uses a propylene-glycol/water coolant mixture, which has significantly different fluid properties compared to pure water. Because microgravity degassing technologies are sensitive to fluid surface tension and viscosity, existing ISS hardware is not suitable for servicing a propylene-glycol-based TCS. Unlike the ISS, the Gateway will operate in a higher-radiation environment and must meet stricter mass constraints due to its location outside of low earth orbit. This Government Furnished Equipment (GFE) flight hardware project aims to develop a lightweight, radiation-resistant Coolant Servicer System (CSS) capable of degassing and refilling Gateway’s propylene-glycol water-based IATCS.

Propylene Glycol Water

Thermal-Fluid Analysis of a Liquid-Cooled Battery Module for Electrified Aircraft

The development of safe, energy-dense batteries is critical to advancing hybrid electric and fully electrified aircraft propulsion. Achieving this capability requires a thermal management system that can maintain battery performance and safety under demanding operational conditions. The objective of this project is to support the maturation of next-generation lithium-ion batteries for electrified aircraft by conducting performance testing on integrated battery modules, specifically a 2-cell series configuration module housed within an aluminum enclosure. Designed to operate at a nominal 7.2 V with discharge rates up to 2.5C, the module will eventually be used to power an electric motor and DC-DC converter, generating substantial thermal loads that must be effectively managed to increase the usable energy and power density of electrified aircraft. To address these thermal challenges, this study presents the development and thermal-fluid analysis of a liquid-cooled thermal management system. While the full aircraft architecture utilizes an eight-string configuration, the present work evaluates a representative single-string water coolant loop to characterize baseline performance. The active cooling loop circulates water through a reservoir, pump, the battery module, and a variable area flow meter. Key performance metrics including component-level temperatures, mass flow rates, and pressure drops are quantified across the loop. Across discharge rates ranging from 0.5C to 2.5C, the active thermal loop consistently and effectively removed heat from the module, validating the design approach and confirming readiness for further development. The validated thermal performance indicates a path toward scalable battery modules that could enable energy and power dense systems for hybrid electric aircraft.

Electrified Aircraft

Development of a Thermal Radiator Optimization Tool with Alternate Coolants

The development of a modeling tool to optimize the design of a thermal radiator based on capacity, rejection temperature, geometry, type and coolant is presented. The radiator size is determined from the desired capacity, environmental conditions and rejection temperature. Flow through the radiator is derived from the overall heat load and prescribed inlet to outlet delta temperature for a given coolant. The tool considers radiator geometry (i.e., tube spacing and diameter, face-sheet thickness, overall size, etc.) and general type (i.e., parallel/manifold versus serpentine) in the optimization. Selection from a handful of potential coolants is also available in the tool which primarily affects necessary tube diameter to maintain turbulent flow and minimize pressure drop. An Equivalent System Mass (ESM) approach is utilized to include pump power in the optimization. Results from the tool and potential future enhancements are also discussed.

Coolant

Space Suit Material Compatibility with Space Vehicle Coolant PMS-1.5R

During a survey of 82P on February 11, 2023, a shiny substance was detected on the Progress vehicle. The suspected material was PMS-1.5R, a low volatility silicone oil coolant used in the vehicle. Crew exposure to the coolant was a concern as the low volatility would increase residence time, the time a material will stay on a surface after exposure to vacuum. A review of space suit materials revealed several materials with compatibility concerns that could impact Extravehicular Activity (EVA) operations and safety. To understand the risk, space suit materials were exposed to a simulant and tested. This testing provided the basis for rationale generated to continue with EVA operations for US EVA 86 on April 2, 2023. This testing also served as the basis to assess impacts to ISS EMU hardware due to potential contamination brought inside ISS on Russian space suits during RS EVA 61 on October 25, 2023, following an ISS Russian Multipurpose Lab Module (MLM) radiator leak of the same fluid on October 9, 2023. This paper will discuss the testing performed and analyze test results impacts to EVA operations. Additional work was conducted to determine coolant evaporation rates in space vacuum and demonstrate that no significant unreacted coolant from the MLM leak would remain on ISS surfaces long enough to contaminate the EMU or affect the ISS ECLSS water separator.

Space Suit Materials

Evaluation of AMSOIL® -ANT PGW Coolant Formula Change and Super Space AMSOIL Development

AMSOIL ® Propylene Glycol Water (PGW), is the baselined internal thermal control fluid for multiple manned spacecraft including Gateway (HALO, IHAB, and ALM modules) and Orion. The use of AMSOIL-ANT PGW was originally validated through extensive NASA/Collins materials-compatibility testing (circa 2008–2015). However, in late 2019, AMSOIL implemented an unannounced change in its PG inhibitor package. Because of this reformulation, concerns around materials compatibility arose. Therefore, NASA initiated corrosion rate and coolant stability testing in 2024. Results showed that the reformulated AMSOIL PG produced substantially elevated corrosion rates in aluminum alloys (about two times when compared to the original AMSOIL PG formula) accompanied by visible surface degradation. Coolant stability testing indicated accelerated propylene-glycol breakdown as well, with glycolate levels about nine times higher than the original formulation. Based on these findings, NASA Materials & Processes and Thermal Control Systems groups have baselined the use of the original PGW chemistry for all spacecraft use. In response, AMSOIL produced a reformulated variant, “Super Space AMSOIL” (ANT-SSA), compliant with MPCV 70156.This paper documents the reformulation testing completed, details on the formulation change, and the development of Super Space AMSOIL.

Woody Beringer

Evaluation of AMSOIL ® -ANT PGW Coolant Formula Change and Super Space AMSOIL ® Development

AMSOIL ® Propylene Glycol Water (PGW), is the baselined internal thermal control fluid for multiple manned spacecraft including Gateway (HALO, IHAB, and ALM modules) and Orion. The use of AMSOIL-ANT PGW was originally validated through extensive NASA/Collins materials-compatibility testing (circa 2008–2015). However, in late 2019, AMSOIL implemented an unannounced change in its PG inhibitor package. Because of this reformulation, concerns around materials compatibility arose. Therefore, NASA initiated corrosion rate and coolant stability testing in 2024. Results showed that the reformulated AMSOIL PG produced substantially elevated corrosion rates in aluminum alloys (about two times when compared to the original AMSOIL PG formula) accompanied by visible surface degradation. Coolant stability testing indicated accelerated propylene-glycol breakdown as well, with glycolate levels about nine times higher than the original formulation. Based on these findings, NASA Materials & Processes and Thermal Control Systems groups have baselined the use of the original PGW chemistry for all spacecraft use. In response, AMSOIL produced a reformulated variant, “Super Space AMSOIL” (ANT-SSA), compliant with MPCV 70156.This paper documents the reformulation testing completed, details on the formulation change, and the development of Super Space AMSOIL.

David Brockett

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez

SERFE Ground Unit EVA Series After Three Year Spacesuit Stowage Period

NASA’s spacesuit government reference design for returning to the Moon is called the Exploration Extravehicular Mobility Unit (xEMU). The xEMU subassembly that provides life support, such as oxygen and thermal control, is the Portable Life Support System (PLSS). Inside the PLSS is a new technology that NASA wanted to test to provide cooling to the crew during EVAs (ExtraVehicular Activity). This technology is called the Spacesuit Water Membrane Evaporator (SWME). In order to test SWME in an improved thermal control loop (TCL) both on Earth and in Space, the Spacesuit Evaporation Rejection Flight Experiment (SERFE) was created. The Ground unit, or testbed at Johnson Space Center (JSC), tested the cooling technology in Earth’s gravity, while the Flight unit, or payload on the International Space Station (ISS), tested the cooling technology in micro-gravity. Since fluids flow differently in micro-gravity, testing in both environments would provide important data for improving cooling performance during EVAs. Both units completed 25 simulated EVAs with the same settings so SWME performance on the ground could be compared to the ISS. The Flight unit was completed first and performed EVAs on the ISS between 2020 and 2022. The Ground unit performed EVAs between 2021 and 2022. When the Flight unit came back from the ISS, it was taken apart for analysis. This analysis looked at how well SWME was able to maintain its heat rejection capability after various dwell times, such as a 90 day Airlock Coolant Loop Recovery (ALCLR) cycle, when the Extravehicular Mobility Unit (EMU) currently on the ISS would normally need maintenance. After a three year simulated spacesuit dwell, the Ground unit performed another EVA series in 2025 to test SWME’s shelf life. The results from this test series will inform mission planning as NASA plans to go back to the Moon and beyond.

Michael Lewandowski

SERFE Ground Unit EVA Series After Three Year Spacesuit Stowage Period

NASA’s spacesuit government reference design for returning to the Moon is called the Exploration Extravehicular Mobility Unit (xEMU). The xEMU subassembly that provides life support, such as oxygen and thermal control, is the Portable Life Support System (PLSS). Inside the PLSS is a new technology that NASA wanted to test to provide cooling to the crew during EVAs (ExtraVehicular Activity). This technology is called the Spacesuit Water Membrane Evaporator (SWME). In order to test SWME in an improved thermal control loop (TCL) both on Earth and in Space, the Spacesuit Evaporation Rejection Flight Experiment (SERFE) was created. The Ground unit, or testbed at Johnson Space Center (JSC), tested the cooling technology in Earth’s gravity, while the Flight unit, or payload on the International Space Station (ISS), tested the cooling technology in micro-gravity. Since fluids flow differently in micro-gravity, testing in both environments would provide important data for improving cooling performance during EVAs. Both units completed 25 simulated EVAs with the same settings so SWME performance on the ground could be compared to the ISS. The Flight unit was completed first and performed EVAs on the ISS between 2020 and 2022. The Ground unit performed EVAs between 2021 and 2022. When the Flight unit came back from the ISS, it was taken apart for analysis. This analysis looked at how well SWME was able to maintain its heat rejection capability after various dwell times, such as a 90 day Airlock Coolant Loop Recovery (ALCLR) cycle, when the Extravehicular Mobility Unit (EMU) currently on the ISS would normally need maintenance. After a three year simulated spacesuit dwell, the Ground unit performed another EVA series in 2025 to test SWME’s shelf life. The results from this test series will inform mission planning as NASA plans to go back to the Moon and beyond.

SWME

An analysis of digital phase-locked loops

This report focuses on second-order digital phase-locked loops (DPLLs) with uniformly sampled input, an amplitude-insenstive phase extractor and a conventional loop filter.

Thomas, J. B.

Mercury Corrosion Loop Testing Program

The Mercury Corrosion Loop Testing Program continued through the second quarter. Materials to be tested in the 10 forced-convection test loops were selected; the materials are: Haynes 25, 9 Cr-1Mo alloy clad with Type 316 stainless steel, AM 350 stainless steel, and columbium (niobium) clad with Type 316 stainless steel. The eight-test-cell facility was completed and all utilities were installed. Pneumatic and electronic instrumentation for all test cells was installed and calibrated. Fabrication was initiated on the first four Haynes 25 loops. The first loop was 85% assembled at the end of the quarter. A centrifugal pump made from Type 316 stainless steel was tested; bearing modifications were made to improve operation.

Corrosion

Costas Loop Demodulation of Suppressed Carrier BPSK Signals in the Dsn Environment: Experimental Results Obtained at TDL

Suppressed carrier binary phase-shift keyed (BPSK) signalling is currently being considered as a design alternative for future DSN telemetry in the multimegabit range. Carrier tracking of such signals is usually achieved by a Costas loop, as opposed to the ordinary phase lock loop. A Costas loop capable of demodulating BPSK signals with data rates up to 1 Msps was designed and constructed and its Doppler tracking performance with respect to a Block 3 receiver was tested at the Telecommunications Development Laboratory (TDL). The compatibility of suppressed carrier signalling with the current radiometric system, specifically Doppler tracking and ranging, was investigated. The experimental results obtained to-date with respect to Doppler tracking are presented.

R Reasoner

Simulated Lunar Gravity Testing of VIPER Loop Heat Pipe

NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) mission consists of a rover designed to explore the lunar south pole. One of the main challenges faced by the rover during the lunar polar exploration is the adverse thermal environment. Temperatures can fluctuate more than a 100°C between day and night; potentially dropping to −246°C in permanent shadow regions. To maintain the rover components within temperature limits, VIPER’s Thermal Management System (TMS) relies heavily on Loop Heat Pipes (LHPs). To assist the design of the thermal management system, an Engineering Design Unit (EDU) LHP has been tested in several opportunities under thermal vacuum (TVAC) environment. Of particular interest was the LHP performance in lunar gravity. To that end, the EDU LHP was tested at the nominal orientation within the rover assembly, vertical, and inclined such that the gravitational component acting on the LHP evaporator and condenser was 1/6g (lunar gravity is 1/6 of Earth gravity) when compared to the vertical configuration. This paper will examine the LHP conductance as one the key parameters to assess the effect of the gravity on the LHP performance.

Loop Heat Pipe

A Simplified Model of VIPER Thermal Management System. Part I: Loop Heat Pipe

NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) uses a combination of loop heat pipes (LHPs) and heaters as the primary hardware to modulate the temperature of the electronic boxes and payloads instruments. LHPs have been designed and instrumented to be capable of passive and active shutdown. The goal of the passive shutdown, using a thermal control valve (TCV) to limit the flow of the working fluid, is to preserve thermal energy and avoid unnecessary heat leaks during lunar night. The goal of the active shutdown on the other hand, is to forcefully increase the vehicle internal temperature to bakeout the payload instruments. Several numerical modeling tools are available to analyze LHP performance under the complex set of operational requirements and environments levied on the VIPER Thermal Management System (TMS). Yet, while those numerical modeling tools are capable of detailed performance analysis, they tend to take large computational resources and long computational time. In this paper, a model of a single LHP developed based on control volume approach is presented. By using the control volume approach, the complex geometry of the LHP, and the components attached to it, are reduced to thermal lump capacitances, thus reducing the computation effort. This paper also describes the effort to correlate the proposed LHP model using thermal vacuum (TVAC) test data.

Loop Heat Pipe

A Simplified Model of VIPER Thermal Management System. Part I: Loop Heat Pipe

NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) uses a combination of loop heat pipes (LHPs) and heaters as the primary hardware to modulate the temperature of the electronic boxes and payloads instruments. LHPs have been designed and instrumented to be capable of passive and active shutdown. The goal of the passive shutdown, using a thermal control valve (TCV) to limit the flow of the working fluid, is to preserve thermal energy and avoid unnecessary heat leaks during lunar night. The goal of the active shutdown on the other hand, is to forcefully increase the vehicle internal temperature to bakeout the payload instruments. Several numerical modeling tools are available to analyze LHP performance under the complex set of operational requirements and environments levied on the VIPER Thermal Management System (TMS). Yet, while those numerical modeling tools are capable of detailed performance analysis, they tend to take large computational resources and long computational time. In this paper, a model of a single LHP developed based on control volume approach is presented. By using the control volume approach, the complex geometry of the LHP, and the components attached to it, are reduced to thermal lump capacitances, thus reducing the computation effort. This paper also describes the effort to correlate the proposed LHP model using thermal vacuum (TVAC) test data.

Loop Heat Pipe

Thermal Cycle and Capacitance Testing of Mezzo Industries Phase Change Material Heat Capacitor

A phase change material heat capacitor prototype, designed and built under a NASA Small Business Innovation Research grant by Mezzo Technologies, was tested through coolant thermal cycling within the expected flow rates and temperature range of the Orion spacecraft’s propylene glycol-water mixture coolant system. Testing was performed with the phase change material contained under sealed conditions after a degassing procedure and exposed to atmosphere without prior degassing. The useful heat storage capacitance was measured and compared to Orion spacecraft requirements and theoretical N-Pentadecane storage capacity.

Propylene Glycol Water