Search NASA⌕ Search

SEARCH · Search NASA

Results for “CSG”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Improving the Effectiveness of Integral Property Calculation in a CSG Solid Modeling System by Exploiting Predictability

Integral property calculation is an important application for solid modeling systems. Algorithms for computing integral properties for various solid representation schemes are fairly well known. It is important to deigners and users of solid modeling systems to understand the behavior of such algorithms. Specifically the trade-off between execution time and accuracy is critical to effective use of integral property calculation. The average behavior of two algorithms for Constructive Solid Geometry (CSG) representations is investigated. Experimental results from the PADL-2 solid modeling system show that coarse decompositions can be used to predict execution time and error estimates for finer decompositions. Exploiting this predictability allow effective use of the algorithms in a solid modeling system.

Clark, A. L.↗

Octree based automatic meshing from CSG models

Finite element meshes derived automatically from solid models through recursive spatial subdivision schemes (octrees) can be made to inherit the hierarchical structure and the spatial addressability intrinsic to the underlying grid. These two properties, together with the geometric regularity that can also be built into the mesh, make octree based meshes ideally suited for efficient analysis and self-adaptive remeshing and reanalysis. The element decomposition of the octal cells that intersect the boundary of the domain is emphasized. The problem, central to octree based meshing, is solved by combining template mapping and element extraction into a procedure that utilizes both constructive solid geometry and boundary respresentation techniques. Boundary cells that are not intersected by the edge of the domain boundary are easily mapped to predefined element topology. Cells containing edges (and vertices) are first transformed into a planar polyhedron and then triangulated via element extractors. The modeling environments required for the derivation of planar polyhedra and for element extraction are analyzed.

Perucchio, Renato↗

Establishing Cleaning Methods for Cleanroom and Safety Suits at Remote Sites with Available Resources

"The James Webb Space Telescope (JWST) spent considerable time in multiple clean facilities during its launch campaign at the Centre Spatial Guyanais (CSG) in French Guiana. Throughout this time, it was imperative that personnel wear approved cleanroom or safety suits when working in proximity to the JWST observatory. This proved to be challenging for two reasons: 1) A large quantity of NASA cleanroom suits needed to be shipped to CSG to account for the heavy volume of NASA and ESA personnel requiring access to the clean facilities. It became evident that shipping clean suits from the US to CSG in a timely fashion during the launch campaign would be challenging. Consequently, a backup plan needed to be established to avoid running out. 2) For safety purposes, Self-Contained Atmospheric Protection Ensemble (SCAPE) and Splash suits were required for hazardous operations. Neither type of suit was cleanroom compatible; therefore, a viable cleaning process needed to be developed to ensure both types of suits met JWST’s approved cleanliness standards. The NASA Contamination Control (CC) team partnered with CSG’s S5E cleanroom and suit processing team. The teams were able to make modifications to the S5E facility to create a NASA approved makeshift clean environment where NASA cleanroom suits and CSG Splash suits were inspected, folded, and bagged for cleanroom use once they were washed and dried. Since SCAPE suits could not be cleaned using conventional methods, a procedure was developed to clean and inspect the suits by the CC team in a temporary clean environment prior to fueling. "

James Webb Space Telescope↗

Establishing Cleaning Methods For Cleanroom And Safety Suits At Remote Sites With Available Resources

The James Webb Space Telescope (JWST) spent considerable time in multiple clean facilities during its launch campaign at the Centre Spatial Guyanais (CSG) in French Guiana. Throughout this time, it was imperative that personnel wear approved cleanroom or safety suits when working in proximity to the JWST observatory. This proved to be challenging for two reasons: 1) A large quantity of NASA cleanroom suits needed to be shipped to CSG to account for the heavy volume of NASA and ESA personnel requiring access to the clean facilities. It became evident that shipping clean suits from the US to CSG in a timely fashion during the launch campaign would be challenging. Consequently, a backup plan needed to be established to avoid running out. 2) For safety purposes, Self-Contained Atmospheric Protection Ensemble (SCAPE) and Splash suits were required for hazardous operations. Neither type of suit was cleanroom compatible; therefore, a viable cleaning process needed to be developed to ensure both types of suits met JWST’s approved cleanliness standards. The NASA Contamination Control (CC) team partnered with CSG’s S5E cleanroom and suit processing team. The teams were able to make modifications to the S5E facility to create a NASA approved makeshift clean environment where NASA cleanroom suits and CSG Splash suits were inspected, folded, and bagged for cleanroom use once they were washed and dried. Since SCAPE suits could not be cleaned using conventional methods, a procedure was developed to clean and inspect the suits by the CC team in a temporary clean environment prior to fueling.

James Webb Space Telescope↗

High density bit transition requirements versus the effects on BCH error correcting code

The design to achieve the required bit transition density for the Space Shuttle high rate multiplexes (HRM) data stream of the Space Laboratory Vehicle is reviewed. It contained a recommended circuit approach, specified the pseudo random (PN) sequence to be used and detailed the properties of the sequence. Calculations showing the probability of failing to meet the required transition density were included. A computer simulation of the data stream and PN cover sequence was provided. All worst case situations were simulated and the bit transition density exceeded that required. The Preliminary Design Review and the critical Design Review are documented. The Cover Sequence Generator (CSG) Encoder/Decoder design was constructed and demonstrated. The demonstrations were successful. All HRM and HRDM units incorporate the CSG encoder or CSG decoder as appropriate.

Ingels, F. M.↗

Boundary to Constructive Solid Geometry Mappings: a Focus on 2-D Issues

The problem of converting boundary representation (B-rep) to constructive solid geometry representation (CSG-rep) (and vice versa) is discussed in two phases. The first phase entails finding a CSG-rep that defines the region bounded by a polygonal profile curve. The second phase utilizes the results of the first phase to find a CSG-rep for many non-polygonal profile curves. A mathematically concise representation of a region bounded by a polygonal is presented. Namely, any polygonal region bounded by an n sided polygon may be represented by a binary tree which has at most n planar halfspaces as leaves. A structure for this representation and an algorithm for calculating is discussed.

Peterson, D. P.↗

AIAA Aerospace America Magazine - Year in Review Article, 2010

NASA Stennis Space Center has implemented a pilot operational Integrated System Health Management (ISHM) capability. The implementation was done for the E-2 Rocket Engine Test Stand and a Chemical Steam Generator (CSG) test article; and validated during operational testing. The CSG test program is a risk mitigation activity to support building of the new A-3 Test Stand, which will be a highly complex facility for testing of engines in high altitude conditions. The foundation of the ISHM capability are knowledge-based integrated domain models for the test stand and CSG, with physical and model-based elements represented by objects the domain models enable modular and evolutionary ISHM functionality.

Figueroa, Fernando↗

Gate Drive Technology Evaluation and Development to Maximize Switching Speed of SiC Discrete Devices and Power Modules in Hard Switching Applications

To understand the limitation of maximizing the switching speed of SiC low current discrete devices and high current power modules in hard switching applications, double pulse tests are conducted and the testing results are analyzed. For power modules, the switching speed is generally limited by the parasitics rather than the gate drive capability. For the discrete SiC device, the conventional voltage source gate drive (VSG) is not sufficient to maximize the switching speed even if the external gate resistance is minimized. The limitation of existing current source gate drives (CSG) are analyzed, and a CSG dedicated for SiC discrete devices is proposed, which can provide constant current during the switching transient regardless of the high Miller voltage and large internal gate resistance. Compared with the conventional VSG, the proposed CSG achieves 67% faster turnon time and 50% turn-off time, and 68% reduction in switching loss at full load condition.

Handong Gui↗

Applying the Cognitive Space Gateway to Swarm Topologies

NASA’s future vision for interplanetary networking includes a lunar network, Cube Satellite (CubeSat) constellations, and deep space robotic missions, comprising what could be viewed as a network of networks. Delay-tolerant networking (DTN) architecture and protocols provide a standard network layer among these varying scenarios and mitigate many challenges of the space environment, such as long delays, unplanned service interruptions, and asymmetric links. The Cognitive Space Gateway (CSG) is a routing method in a DTN architecture that uses spiking neural networks as the learning element to optimize outing decisions in a complex environment. This work aims to further develop cognitive networking technologies in several critical areas, including DTN, the CSG algorithm, SmallSat swarm topologies, and cloud services. The CSG algorithm is tested in a realistic scenario in which the emulated network topology is based on a SmallSat swarm. The emulation environment will be built upon a commercial cloud service, such as Amazon Web Services (AWS) Elastic Compute Cloud. This work investigates the ability of such a platform to enable a flexible, lower maintenance approach to creating a multihop network outside of a physical laboratory. The cloud platform will provide a secure environment allowing for collaboration among government and academic entities.

Ricardo Lent↗

Evaluating the performance of portable air filter walls for the James Webb Space Telescope launch campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Evaluating the Performance of Portable Air Filter Walls for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Predicting contamination accumulation in facilities with limited data

In preparation for the James Webb Space Telescope (JWST) launch at Centre Spatial Guyanias (CSG) in French Guiana, particulate contamination accumulation predictions were necessary for each facility in which the hardware would be exposed because the Telescope would be uncovered in each of the facilities and had strict particulate requirements. These included facilities for final integration and testing, fueling, transportation and encapsulation. Minimal heritage data existed from CSG and previous launch campaigns to use as a basis for contamination predictions. Data from the Automatic Transfer Vehicle and Herschel & Planck launch campaigns were used in conjunction with facility monitoring data provided by ESA and data collected during JWST working group visits to CSG. These campaigns were conducted at varying cleanliness levels that were typically less stringent than JWST requirements. Each facility was evaluated using the data provided and likely performance improvement with the addition of High Efficiency Particulate Air filter (HEPA) banks operating when possible. Once the launch campaign was completed, the predicted fallout was compared with actual data collected throughout the campaign. Based on the actual measurements, JWST’s primary and secondary mirrors turned out to be much cleaner than what was predicted.

James Webb Space Telescope, contamination, cleanro↗

Predicting contamination accumulation in facilities with limited data

"In preparation for the James Webb Space Telescope (JWST) launch at Centre Spatial Guyanias (CSG) in French Guiana, particulate contamination accumulation predictions were necessary for each facility in which the hardware would be exposed because the Telescope would be uncovered in each of the facilities and had strict particulate requirements. These included facilities for final integration and testing, fueling, transportation and encapsulation. Minimal heritage data existed from CSG and previous launch campaigns to use as a basis for contamination predictions. Data from the Automatic Transfer Vehicle and Herschel & Planck launch campaigns were used in conjunction with facility monitoring data provided by ESA and data collected during JWST working group visits to CSG. These campaigns were conducted at varying cleanliness levels that were typically less stringent than JWST requirements. Each facility was evaluated using the data provided and likely performance improvement with the addition of High Efficiency Particulate Air filter (HEPA) banks operating when possible. Once the launch campaign was completed, the predicted fallout was compared with actual data collected throughout the campaign. Based on the actual measurements, JWST’s primary and secondary mirrors are likely much cleaner than was expected with the predicted fallout in each facility. "

James Webb Space Telescope, contamination, cleanro↗

Applying the Cognitive Space Gateway to Swarm Topologies

NASA's future vision for interplanetary networking includes a lunar network, Cube Satellite (CubeSat) constellations, and deep space robotic missions, comprising what could be viewed as a network of networks. Delay-tolerant networking (DTN) architecture and protocols provide a standard network layer among these varying scenarios and mitigate many challenges of the space environment, such as long delays, unplanned service interruptions, and asymmetric links. The Cognitive Space Gateway (CSG) is a routing method in a DTN architecture that uses spiking neural networks as the learning element to optimize routing decisions in a complex environment. This work aims to further develop cognitive networking technologies in several critical areas, including DTN, the CSG algorithm, CubeSat swarm topologies, and cloud services. To test the algorithm in a realistic scenario, the emulated network topology is based on a CubeSat swarm. The swarm may function as a mesh of nodes or as a hub-and-spoke network. An emulation environment will be built upon a commercial cloud service, such as Amazon Web Services (AWS) Elastic Compute Cloud. The cloud environment may enable a flexible, lower maintenance approach versus a multi-hop network based in a physical laboratory. The cloud platform will provide a secure environment allowing for collaboration among government and academic entities.

Ricardo Lent↗

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope, launch, contamination,↗

Ariane 5 Fairing Preparations for James JWST Space Telescope

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The Ariane 5 payload faring (PLF), as shown in Figure 1, interior and Vehicle Equipment Bay membranes received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. Investigation of PLF cleanliness began early in the JWST program to test the Fairing Acoustic Protection (FAP) panels. Initial PLF cleaning was performed at RUAG in Switzerland prior to shipment to the launch site in collaboration with NASA and ESA. The cleaning procedure used at RUAG premises was based on heritage of the PLF cleaning procedure for ESA/Herschel-Planck and NASA/Mars2020 missions on an Atlas V launcher. The Ariane 5 fairing was packaged in a clean manner and inspected and cleaned upon arrival to CSG. Silicon wafers and particle fall out (PFO) plates were used to monitor the internal fairing cleanliness prior to encapsulation. Just after encapsulation, PFO plates and calcium fluoride (CaF2) crystals were placed inside the fairing on a specific tool door for monitoring the cleanliness inside the fairing during the ventilation phase. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. Fairing cleanliness was achieved and mitigated contamination distribution upon launch.

James Webb Space Telescope↗