Search NASA⌕ Search

SEARCH · Search NASA

Results for “Capacity expansion”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Impacts of Spatial Resolution in a High-Fidelity Capacity Expansion Model: An ERCOT Case Study

Capacity expansion models are important tools in examining the evolution of the electric power sector. Embedded in these tools are many modeling choices with consequential impacts on computational burden and associated analysis. In this study, we adjust the spatial resolution of the Regional Energy Deployment System (ReEDS) to understand the implications of higher-fidelity modeling on energy system projections and model solve times. The native ReEDS regions capture the contiguous United States in 134 balancing areas whereas the regions in the higher-resolution version are defined by over 3,000 U.S. counties. Using both resolutions, we conduct a case study of the Texas Interconnection (The Electric Reliability Council of Texas [ERCOT]) to explore differences in model projections and to inform appropriate applications of high spatial resolution in a large-scale, applied capacity expansion model.

county↗

Evaluating the Value of High Spatial Resolution in National Capacity Expansion Models using ReEDS

Power sector capacity expansion models (CEMs) have a broad range of spatial resolutions. This paper uses the Regional Energy Deployment System (ReEDS) model, a long-term national scale electric sector CEM, to evaluate the value of high spatial resolution for CEMs. ReEDS models the United States with 134 load balancing areas (BAs) and captures the variability in existing generation parameters, future technology costs, performance, and resource availability using very high spatial resolution data, especially for wind and solar modeled at 356 resource regions. In this paper we perform planning studies at three different spatial resolutions--native resolution (134 BAs), state-level, and NERC region level--and evaluate how results change under different levels of spatial aggregation in terms of renewable capacity deployment and location, associated transmission builds, and system costs. The results are used to ascertain the value of high geographically resolved models in terms of their impact on relative competitiveness among renewable energy resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

8760-Based Method for Representing Variable Generation Capacity Value in Capacity Expansion Models

Capacity expansion models (CEMs) are widely used to evaluate the least-cost portfolio of electricity generators, transmission, and storage needed to reliably serve load over many years or decades. CEMs can be computationally complex and are often forced to estimate key parameters using simplified methods to achieve acceptable solve times or for other reasons. In this paper, we discuss one of these parameters -- capacity value (CV). We first provide a high-level motivation for and overview of CV. We next describe existing modeling simplifications and an alternate approach for estimating CV that utilizes hourly '8760' data of load and VG resources. We then apply this 8760 method to an established CEM, the National Renewable Energy Laboratory's (NREL's) Regional Energy Deployment System (ReEDS) model (Eurek et al. 2016). While this alternative approach for CV is not itself novel, it contributes to the broader CEM community by (1) demonstrating how a simplified 8760 hourly method, which can be easily implemented in other power sector models when data is available, more accurately captures CV trends than a statistical method within the ReEDS CEM, and (2) providing a flexible modeling framework from which other 8760-based system elements (e.g., demand response, storage, and transmission) can be added to further capture important dynamic interactions, such as curtailment.

14 SOLAR ENERGY↗

Advanced Hydropower and PSH Capacity Expansion Modeling (Final Report on HydroWIRES D1 Improvements to Capacity Expansion Modeling)

Hydropower and pumped-storage hydropower (PSH) have played a key role in providing flexible, low-carbon electricity to the U.S. electricity system for over a century. As variable generation (VG) deployment increases the demand for flexible, dispatchable generation, it is important to use all available methods for understanding how hydropower and PSH interfaces with VG in a future low-carbon grid. Capacity expansion models (CEMs) of electricity systems are often used to study future electricity scenarios, but these tools often have difficulty representing site- and technology-details of hydropower and PSH due to limited spatial, temporal, or process resolution. This report demonstrates a set of model advancements to improve hydropower and PSH representations in CEMs and other models that consider hydropower and PSH's role in electricity systems. Model advancements include new data integration to define closed-loop PSH resource availability and cost, along with site-level parameterizations of existing PSH capacity and energy storage specifications. Shifting energy across seasons for both hydropower and PSH is explored to demonstrate the potential value of long-duration storage. New representations of hydropower upgrades offer opportunities to increase dispatchability, add pumps, or independently add capacity or energy depending on what is most valuable. New model structures and data are demonstrated individually and in combination to observe their impact on model results and provide initial insights into what is most important for analysts, electricity system planners, and hydropower decision-makers to consider when assessing future roles of hydropower. Improving flexibility of existing hydropower assets has the potential to reduce CO 2 emissions through complementing VG technologies and/or improve electricity system economics by reducing the need to deploy higher-cost systems. Large-scale energy storage is also shown to provide opportunities for balancing seasonal differences in VG, particularly solar photovoltaics (PV). Initial analysis with a new closed-loop PSH resource and cost dataset also demonstrate the potential for new PSH deployment to offer new grid flexibility opportunities. Future analysis and modeling of hydropower's role in the U.S. and other electricity systems could include methodological improvements based on those discussed here along with sensitivity analysis to better represent current and future potential hydropower and PSH flexibility. Improvements to geospatial and site-level data can further improve the understanding of how hydropower and PSH can be upgraded and operated in response to future electricity system needs. This work lays the groundwork to use advanced planning models to explore the range of roles hydropower and PSH can play in the grid of the future.

13 HYDRO ENERGY↗

Improving Power System Modeling. A Tool to Link Capacity Expansion and Production Cost Models

Capacity expansion models (CEM) provide a high-level long-term view at the prospects of the evolving power system. In simulating the possibilities of long-term capacity expansion, it is important to maintain the viability of power system operation in the short-term (daily, hourly and sub-hourly) scales. Production-cost models (PCM) simulate routine power system operation on these shorter time scales using detailed load, transmission and generation fleet data by minimizing production costs and following reliability requirements. When based on CEM 'predictions' about generating unit retirements and buildup, PCM provide more detailed simulation for the short-term system operation and, consequently, may confirm the validity of capacity expansion predictions. Further, production cost model simulations of a system that is based on capacity expansion model solution are 'evolutionary' sound: the generator mix is the result of logical sequence of unit retirement and buildup resulting from policy and incentives. The above has motivated us to bridge CEM with PCM by building a capacity expansion - to - production cost model Linking Tool (CEPCoLT). The Linking Tool is built to onset capacity expansion model prescriptions onto production cost model inputs. NREL's ReEDS and Energy Examplar's PLEXOS are the capacity expansion and the production cost models, respectively. Via the Linking Tool, PLEXOS provides details of operation for the regionally-defined ReEDS scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

8760-Based Method for Representing Variable Generation Capacity Value in Capacity Expansion Models: Preprint

Capacity expansion models (CEMs) are widely used to evaluate the least-cost portfolio of electricity generators, transmission, and storage needed to reliably serve demand over the evolution of many years or decades. Various CEM formulations are used to evaluate systems ranging in scale from states or utility service territories to national or multi-national systems. CEMs can be computationally complex, and to achieve acceptable solve times, key parameters are often estimated using simplified methods. In this paper, we focus on two of these key parameters associated with the integration of variable generation (VG) resources: capacity value and curtailment. We first discuss common modeling simplifications used in CEMs to estimate capacity value and curtailment, many of which are based on a representative subset of hours that can miss important tail events or which require assumptions about the load and resource distributions that may not match actual distributions. We then present an alternate approach that captures key elements of chronological operation over all hours of the year without the computationally intensive economic dispatch optimization typically employed within more detailed operational models. The updated methodology characterizes the (1) contribution of VG to system capacity during high load and net load hours, (2) the curtailment level of VG, and (3) the potential reductions in curtailments enabled through deployment of storage and more flexible operation of select thermal generators. We apply this alternate methodology to an existing CEM, the Regional Energy Deployment System (ReEDS). Results demonstrate that this alternate approach provides more accurate estimates of capacity value and curtailments by explicitly capturing system interactions across all hours of the year. This approach could be applied more broadly to CEMs at many different scales where hourly resource and load data is available, greatly improving the representation of challenges associate with integration of variable generation resources.

14 SOLAR ENERGY↗

Transmission Interface Limits for High-Spatial Resolution Capacity Expansion Modeling

Large-scale capacity expansion models typically rely on estimates of the power transfer limits between modeled zones. Accurate estimation of these interface transfer limits (ITLs) requires modeling the underlying transmission network. Here we expand on a maximum flow optimization method that uses linearized power flow to estimate transfer limits. We apply this method to a data set of the U.S. transmission network to estimate ITLs between U.S. counties. By calculating ITLs using different subsets of the network, we evaluate how the size of the network used in the estimation affects the results. The results show diminishing returns to ITL accuracy after six hops, suggesting that a network subset can reasonably be used to approximate ITLs. The county-level estimates produced in this study will support more spatially resolved capacity expansion modeling and will help inform policy making at local and national levels.

capacity planning↗

Transmission Interface Limits for High-Spatial Resolution Capacity Expansion Modeling

Large-scale capacity expansion models typically rely on estimates of the power transfer limits between modeled zones. Accurate estimation of these interface transfer limits (ITLs) requires modeling the underlying transmission network. Here we expand on a maximum flow optimization method that uses linearized power flow to estimate transfer limits. We apply this method to a data set of the U.S. transmission network to estimate ITLs between U.S. counties. By calculating ITLs using different subsets of the network, we evaluate how the size of the network used in the estimation affects the results. The results show diminishing returns to ITL accuracy after six hops, suggesting that a network subset can reasonably be used to approximate ITLs. The county-level estimates produced in this study will support more spatially resolved capacity expansion modeling and will help inform policy making at local and national levels.

capacity planning↗

USAID Haiti Training Session #3: Capacity Expansion [Slides]

Welcome to Engage! Engage is a capacity expansion modeling tool supported by the National Renewable Energy Laboratory and based on the Calliope open-source capacity expansion model developed by the ETH Zurich University, maintained at the TU Delft University. Engage is an accessible (free, open-access, web-hosted) and flexible web-based energy system planning application for rapid multiple-energy-form energy system scenario exploration. Its cloud-based, collaborator-sharable data model, intuitive interface and visualization capabilities facilitate collaboration and communication among teams, with experts, and among diverse stakeholder groups exploring energy system implications from district to national-scale models. This training series was developed under USAID to empower Haitian stakeholders to explore modeling scenarios in Engage to develop a Haiti Energy Master Plan. This training series includes a general overview of how Engage works along with tailored exercises that target Haiti's specific energy needs, such as modeling the capacity expansion of the bulk power system, fuel scarcity challenges, the development of microgrids, and the economic viability of transmission strategies. See NREL/PR-7A40-89365 for the French translation of this document.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Discrete versus continuous: Enhancing battery optimization in capacity expansion models

This study compares two battery modeling approaches for capacity expansion models: discrete-duration and continuous-duration formulations. In the discrete approach, battery duration is fixed, and power capacity is optimized. In the continuous approach, both power and energy capacities are decision variables, allowing storage duration to be optimized endogenously. Although both discrete-duration and continuous-duration battery formulations are used in long-term power system planning models, the literature has provided limited direct, systematic comparisons of their implications within a common modeling framework. To address this gap, this study implements both approaches in the Regional Energy Deployment System (ReEDS TM ) capacity expansion model using two resource adequacy methods, across a range of future system conditions, and with varying battery cost projections. Results show continuous-duration and high-resolution discrete approaches produce similar capacity expansion outcomes. The continuous formulation achieves faster runtimes compared to discrete-duration runs with many discrete-duration options. However, the discrete-duration approach allows users to choose to have limited fidelity for storage duration options, which in some cases can outperform the continuous formulation. The continuous formulation has the lowest overall system costs, indicating its ability to fine-tune storage duration to better meet specific system needs. This study's findings provide a side-by-side evaluation of discrete and continuous battery modeling approaches and offer guidance for improving the representation of real-world systems, flexibility, and computational efficiency for representing energy storage in long-term power system planning models.

25 ENERGY STORAGE↗

GRIDCERF - Geospatial Raster Input Data for Capacity Expansion Regional Feasibility

The Geospatial Raster Input Data for Capacity Expansion Regional Feasibility (GRIDCERF) data package is a high-resolution product to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. GRIDCERF offers hundreds of individual suitability layers for use with both renewable and non-renewable power plant technology configurations in a harmonized format that can be easily ingested by geospatially-enabled modeling software. It also provides pre-compiled technology-specific suitability layers and allows for user customization to robustly address science objectives when evaluating varying future conditions. GRIDCERF data can be directly used with the CERF (Capacity Expansion Regional Feasibility) model to site power plants at a 1km resolution. GRIDCERF includes composite technology siting suitability raster layers for the following utility scale technology configurations. Note that, in addition to technology sub-types shown below, various cooling types are also included (recirculating, pond, once-through, recirculating-seawater, dry-hybrid, or dry) for various technologies. Biomass Conventional (with or without CCS) IGCC (with or without CCS) Coal Conventional (with or without CCS) IGCC (with or without CCS) Natural Gas Combined-cycle (CC) (with or without CCS) Turbine Geothermal Enhanced Geothermal Systems (EGS) - Class 1 through Class 5 resource potential Nuclear Gen 2 Light Water Reactor (LWR) Gen 3 Small Modular Reactor (SMR) Gen 3 AP1000 Refined Liquids Combined-cycle (CC) (with or without CCS) Turbine Solar Photovoltaic (PV) - for capacity factors in the range of 6-18% Utility-scale Concentrating Solar Power (CSP) - for capacity factors in the range of 24-46% Tower Wind (Onshore) - for capacity factors in the range of 5-50% 80m hub height 100m hub height 120m hub height 140m hub height Wind (Offshore) - for capacity factors in the range of 25-60% 100m hub height 140m hub height 160m hub height

capacity expansion↗

GRIDCERF - Geospatial Raster Input Data for Capacity Expansion Regional Feasibility

The Geospatial Raster Input Data for Capacity Expansion Regional Feasibility (GRIDCERF) data package is a high-resolution product to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. GRIDCERF offers hundreds of individual suitability layers for use with both renewable and non-renewable power plant technology configurations in a harmonized format that can be easily ingested by geospatially-enabled modeling software. It also provides pre-compiled technology-specific suitability layers and allows for user customization to robustly address science objectives when evaluating varying future conditions. GRIDCERF data can be directly used with the CERF (Capacity Expansion Regional Feasibility) model to site power plants at a 1km resolution. GRIDCERF includes composite technology siting suitability raster layers for the following utility scale technology configurations. Note that, in addition to technology sub-types shown below, various cooling types are also included (recirculating, pond, once-through, recirculating-seawater, dry-hybrid, or dry) for various technologies. Biomass Conventional (with or without CCS) IGCC (with or without CCS) Coal Conventional (with or without CCS) IGCC (with or without CCS) Natural Gas Combined-cycle (CC) (with or without CCS) Turbine Geothermal Enhanced Geothermal Systems (EGS) - Class 1 through Class 5 resource potential Nuclear Gen 2 Light Water Reactor (LWR) Gen 3 Small Modular Reactor (SMR) Gen 3 AP1000 Refined Liquids Combined-cycle (CC) (with or without CCS) Turbine Solar Photovoltaic (PV) - for capacity factors in the range of 6-18% Utility-scale Concentrating Solar Power (CSP) - for capacity factors in the range of 24-46% Tower Wind (Onshore) - for capacity factors in the range of 5-50% 80m hub height 100m hub height 120m hub height 140m hub height Wind (Offshore) - for capacity factors in the range of 25-60% 100m hub height 140m hub height 160m hub height

capacity expansion↗

Endogenizing Probabilistic Resource Adequacy Risks in Deterministic Capacity Expansion Models

In this work, we demonstrate how power system capacity expansion models can understate the stochastic effects of thermal outages when considering resource availabilities on an hourly expected value basis, yielding system designs with multiple orders of magnitude more shortfall risk than stated adequacy targets. We develop a novel approximation approach to efficiently endogenize awareness of this risk in a deterministic, linear capacity expansion framework. We compare this approach to exogenous tuning of an energy reserve margin, the leading alternative method to compensate for unmodeled probabilistic shortfall risk. Empirical results from a test system show that the new endogenous method cost-effectively meets all regional reliability targets with a single optimization solve, and produces a near-identical system design as the incumbent method without the need for repeated re-optimizations to find an appropriate reserve level. The endogenous method may also use iterative re-optimizations to further improve solution quality, although these incremental benefits were modest in the system studied.

capacity expansion modeling↗

Representative Period Selection for Robust Capacity Expansion Planning in Low-carbon Grids

With the increasing urgency to decarbonize power systems, while mitigating extreme events, capacity expansion models can play a vital role in reliably planning the expansion of power systems and facilitating the integration of renewable energy sources. Optimizing capacity expansion generally involves selecting surrogate representative days from forecasts of load and the generation profiles of variable renewable energy resources. To properly select those representative days, we propose a novel input-based approach in combination with the k-means clustering algorithm that utilize three unique operational inputs: load shedding, renewable curtailment, and transmission congestion. The proposed method allows for more robust and cost-effective capacity planning. The method is validated using a capacity expansion model and a production cost model based on California Independent System Operator (CAISO)'s decarbonization goals, and results in reduced costs and drastically lower load shedding.

Anderson, Osten P.↗

Preliminary Findings of the South Africa Power System Capacity Expansion and Operational Modelling Study: Preprint

Wind and solar power contract prices have recently become cheaper than many conventional new-build alternatives in South Africa and trends suggest a continued increase in the share of variable renewable energy (vRE) on South Africa's power system with coal technology seeing the greatest reduction in capacity, see 'Figure 6: Percentage share by Installed Capacity (MW)' in [1]. Hence it is essential to perform a state-of-the-art grid integration study examining the effects of these high penetrations of vRE on South Africa's power system. Under the 21st Century Power Partnership (21CPP), funded by the U.S. Department of Energy, the National Renewable Energy Laboratory (NREL) has significantly augmented existing models of the South African power system to investigate future vRE scenarios. NREL, in collaboration with Eskom's Planning Department, further developed, tested and ran a combined capacity expansion and operational model of the South African power system including spatially disaggregated detail and geographical representation of system resources. New software to visualize and interpret modelling outputs has been developed, and scenario analysis of stepwise vRE build targets reveals new insight into associated planning and operational impacts and costs. The model, built using PLEXOS, is split into two components, firstly a capacity expansion model and secondly a unit commitment and economic dispatch model. The capacity expansion model optimizes new generation decisions to achieve the lowest cost, with a full understanding of capital cost and an approximated understanding of operational costs. The operational model has a greater set of detailed operational constraints and is run at daily resolutions. Both are run from 2017 through 2050. This investigation suggests that running both models in tandem may be the most effective means to plan the least cost South African power system as build plans seen to be more expensive than optimal by the capacity expansion model can produce greater operational cost savings seen only in the operational model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗