Search NASASearch

SEARCH · Search NASA

Results for “Capacity expansion planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

PC4CAST: A tool for DSN load forecasting and capacity planning

Effectively planning the use and evolution of the Deep Space Network (DSN) is a complex problem involving many parameters. The tool that models many of these complexities, yet requires simple structured inputs and provides concise easy-to-understand metrics to aid in the planning process is discussed. The tool, PC4CAST, is used for both load forecasting (predicting how well planned that DSN resources meet expected demand) and as a decision support tool in the capacity-planning process (determining the relative benefits of capacity expansion options). It is now in use in the TDA Planning Office, has been used in numerous studies, and is also being used by the JPL Multimission Operations System Office (MOSO) as an integral part of Resource Allocation Team activities. Experience using the tool has helped to identify additional requirements that will further improve the planning process, which can be met by future PC4CAST versions.

Loyola, S. J.

An expansion plan for the 60 Hz power distribution system at KSC: LC-39 substations load allocation plan

The increasing load density in the LC-39 area of Kennedy Space Center (KSC) can be met by either modifying the existing substation and increasing its capacity or by planning an additional new substation. Evidence that the later approach is more economical, enhances the system reliability, and would produce more satisfactory performance indices is provided. Network theory is the basis for the optimal location determination of the proposed substation. A load reallocation plan which minimizes investment cost and power losses and meets other desirable system features is drafted. The report should be useful to the system designer and can be a useful guideline for future facility planners.

Kalu, Alex

Performance evaluation of NASA/KSC CAD/CAE graphics local area network

This study had as an objective the performance evaluation of the existing CAD/CAE graphics network at NASA/KSC. This evaluation will also aid in projecting planned expansions, such as the Space Station project on the existing CAD/CAE network. The objectives were achieved by collecting packet traffic on the various integrated sub-networks. This included items, such as total number of packets on the various subnetworks, source/destination of packets, percent utilization of network capacity, peak traffic rates, and packet size distribution. The NASA/KSC LAN was stressed to determine the useable bandwidth of the Ethernet network and an average design station workload was used to project the increased traffic on the existing network and the planned T1 link. This performance evaluation of the network will aid the NASA/KSC network managers in planning for the integration of future workload requirements into the existing network.

Zobrist, George

Runway configuration improvement programming model.

The basic objectives of the study were to subject a set of runway configurations to cost analysis and to develop a dynamic programming model which would enable an airport to economically match the ground capacity to its air traffic demand. Quantitative differences in the capacity of runway configurations result from the various aircraft/aircraft and aircraft/air-system interactions. A problem formulation and solution procedure is presented which is intended to be a meaningful technique for the long-range planning of runway expansion programs.

Yu, J. C.

Optimizing airport runway improvement program - A dynamic programming approach

In order to reduce the air traffic delay in the terminal area, an immediate remedy is to increase airport capacity by an expansion of the existing runway system. The runway expansion program is often limited by budgetary constraints; the expensive facilities for a long-term improvement cannot be built at once. When a runway improvement strategy is being considered for a longer planning horizon, the investiment decision depends upon the interrelations of its composite periods. The problem, therefore, is to determine how time factor and investment decisions interact to yield an optimal improvement scheme that meets demand at a minimum cost. With this objective in mind, a dynamic programming methodology is employed to determine the optimal planning scheme. Also, an example runway improvement problem is tested to illustrate how a dynamic programming model is practical in actual application.

Yu, J. C.

Robotic tape library system level testing at NSA: Present and planned

In the present of declining Defense budgets, increased pressure has been placed on the DOD to utilize Commercial Off the Shelf (COTS) solutions to incrementally solve a wide variety of our computer processing requirements. With the rapid growth in processing power, significant expansion of high performance networking, and the increased complexity of applications data sets, the requirement for high performance, large capacity, reliable and secure, and most of all affordable robotic tape storage libraries has greatly increased. Additionally, the migration to a heterogeneous, distributed computing environment has further complicated the problem. With today's open system compute servers approaching yesterday's supercomputer capabilities, the need for affordable, reliable secure Mass Storage Systems (MSS) has taken on an ever increasing importance to our processing center's ability to satisfy operational mission requirements. To that end, NSA has established an in-house capability to acquire, test, and evaluate COTS products. Its goal is to qualify a set of COTS MSS libraries, thereby achieving a modicum of standardization for robotic tape libraries which can satisfy our low, medium, and high performance file and volume serving requirements. In addition, NSA has established relations with other Government Agencies to complete this in-house effort and to maximize our research, testing, and evaluation work. While the preponderance of the effort is focused at the high end of the storage ladder, considerable effort will be extended this year and next at the server class or mid range storage systems.

Shields, Michael F.

The Development of the Multi-Center Traffic Management Advisor (MCTMA): Traffic Flow Management Research in a Multi-Facility Environment

The Traffic Management Advisor (TMA) is a decision-support tool for traffic managers and air traffic controllers that provides traffic flow visualization and other flow management tools. TMA creates an efficiently sequenced and safely spaced schedule for arrival traffic that meets but does not exceed specified airspace system constraints. TMA is being deployed at selected facilities throughout the National Airspace System in the US as part of the FAA's Free Flight Phase 1 program. TMA development and testing, and its current deployment, focuses on managing the arrival capacity for single major airports within single terminal areas and single en route centers. The next phase of development for this technology is the expansion of the TMA capability to complex facilities in which a terminal area or airport is fed by multiple en route centers, thus creating a multicenter TMA functionality. The focus of the multi-center TMA (McTMA) development is on the busy facilities in the Northeast comdor of the US. This paper describes the planning and development of McTMA and the challenges associated with adapting a successful traffic flow management tool for a very complex airspace.

Lee, Katharine K.

NASA's Space Launch System: A Heavy-Lift Platform for Entirely New Missions

The National Aeronautics and Space Administration s (NASA's) Space Launch System (SLS) will contribute a new capability for human space flight and scientific missions beyond low-Earth orbit. The SLS Program, managed at NASA s Marshall Space Fight Center, will develop the heavy-lift vehicle that will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions. Orion will carry crews to space, provide emergency abort capability, sustain the crew during space travel, and provide safe reentry from deep-space return velocities. Supporting Orion s first autonomous flight to lunar orbit and back in 2017 and its first crewed flight in 2021, the SLS ultimately offers a flexible platform for both human and scientific exploration. The SLS plan leverages legacy infrastructure and hardware in NASA s inventory, as well as continues with advanced propulsion technologies now in development, to deliver an initial 70 metric ton (t) lift capability in 2017, evolving to a 130-t capability after 2021, using a block upgrade approach. This paper will give an overview of the SLS design and management approach against a backdrop of the missions it will support. It will detail the plan to deliver the initial SLS capability to the launch pad in the near term, as well as summarize the innovative approaches the SLS team is applying to deliver a safe, affordable, and sustainable long-range capability for entirely new missions opening a new realm of knowledge and a world of possibilities for multiple partners. Design reference missions that the SLS is being planned to support include asteroids, Lagrange Points, and Mars, among others. The Agency is developing its mission manifest in parallel with the development of a heavy-lift flagship that will dramatically increase total lift and volume capacity beyond current launch vehicle options, reduce trip times, and provide a robust platform for conducting new missions destined to rewrite textbooks with the information they deliver, while creating a framework for further collaboration among domestic and international partners, and potentially spurring economic expansion into new markets.

Creech, Stephen A.

NASA's Space Launch System: A Heavy-Lift Platform for Entirely New Missions

The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) will contribute a new capability for human space flight and scientific missions beyond low-Earth orbit (LEO). The SLS Program, managed at NASA s Marshall Space Flight Center, will develop the heavy-lift vehicle that will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. Orion will carry crews to space, provide emergency abort capability, sustain the crew during space travel, and provide safe reentry from deep-space return velocities. Supporting Orion s first autonomous flight to lunar orbit and back in 2017 and its first crewed flight in 2021, the SLS ultimately offers a flexible platform for both human and scientific exploration. The SLS plan leverages legacy infrastructure and hardware in NASA s inventory, as well as continues with advanced technologies now in development, to deliver an initial 70 metric ton (t) lift capability in 2017, evolving to a 130-t capability, using a block upgrade approach. This paper will give an overview of the SLS design and management approach against a backdrop of the missions it will support. It will detail the plan to deliver the initial SLS capability to the launch pad in the near term, as well as summarize the innovative approaches the SLS team is applying to deliver a safe, affordable, and sustainable long-range capability for entirely new missions-opening a new realm of knowledge and a world of possibilities for multiple partners. Design reference missions that the SLS is being planned to support include Mars, Jupiter, Lagrange Points, and near-Earth asteroids (NEAs), among others. The Agency is developing its mission manifest in parallel with the development of a heavy-lift flagship that will dramatically increase total lift and volume capacity beyond current launch vehicle options, reduce trip times, and provide a robust platform for conducting new missions destined to rewrite textbooks with the information they deliver, while creating a framework for further collaboration among domestic and international partners, and potentially spurring economic expansion into new markets.

Creech, Stephen D.

Queuing theory models for computer networks

A set of simple queuing theory models which can model the average response of a network of computers to a given traffic load has been implemented using a spreadsheet. The impact of variations in traffic patterns and intensities, channel capacities, and message protocols can be assessed using them because of the lack of fine detail in the network traffic rates, traffic patterns, and the hardware used to implement the networks. A sample use of the models applied to a realistic problem is included in appendix A. Appendix B provides a glossary of terms used in this paper. This Ames Research Center computer communication network is an evolving network of local area networks (LANs) connected via gateways and high-speed backbone communication channels. Intelligent planning of expansion and improvement requires understanding the behavior of the individual LANs as well as the collection of networks as a whole.

Galant, David C.

Revisiting Training and Verification Process Implementation for Risk Reduction on New Missions at NASA Jet Propulsion Laboratory

In 2003 we proposed an effort to develop a core program of standardized training and verification practices and standards against which the implementation of these practices could be measured. The purpose was to provide another means of risk reduction for deep space missions to preclude the likelihood of a repeat of the tragedies of the 1998 Mars missions. We identified six areas where the application of standards and standardization would benefit the overall readiness process for flight projects at JPL. These are Individual Training, Team Training, Interface and Procedure Development, Personnel Certification, Interface and procedure Verification, and Operations Readiness Testing. In this paper we will discuss the progress that has been made in the tasks of developing the proposed infrastructure in each of these areas. Specifically we will address the Position Training and Certification Standards that are now available for each operational position found on our Flight Operations Teams (FOT). We will also discuss the MGSS Baseline Flight Operations Team Training Plan which can be tailored for each new flight project at JPL. As these tasks have been progressing, the climate and emphasis for Training and for V and V at JPL has changed, and we have learned about the expansion, growth, and limitations in the roles of traditional positions at JPL such as the Project's Training Engineer, V and V Engineer, and Operations Engineer. The need to keep a tight rein on budgets has led to a merging and/or reduction in these positions which pose challenges to individual capacities and capabilities. We examine the evolution of these processes and the roles involved while taking a look at the impact or potential impact of our proposed training related infrastructure tasks. As we conclude our examination of the changes taking place for new flight projects, we see that the importance of proceeding with our proposed tasks and adapting them to the changing climate remains an important element in reducing the risk in the challenging business of space exploration.

verifications

Recommendations for the NASA Avionics program for the 1980's

NASA is examining the merits of a significant expansion of its avionics, controls, and human factors technology program for the 1980's. The rationale for an expanded program is related to two factors. One factor is related to a utilization of recent and anticipated significant advances in microelectronics. The second factor is the need to develop new concepts in avionics and control systems for more efficient aircraft operation and better utilization of extremely limited airport capacity. Substantial benefits could be realized in three major categories, including improved aircraft efficiency, improved flight operations, and improved/extended operational capability. The NASA Avionics, Controls, and Human Factors Technology Plan is the report of a task force of agency personnel working in close cooperation with industry, DOD, and FAA. Attention is given to the NASA role, aircraft controls, crew station technology, flight management, integration and interfacing, commercial transports, general aviation, rotorcraft, V/STOL, and high performance aircraft.

Spitzer, C. R.

NASA’s Space Launch System: Enabling a New Generation of Lunar Exploration

Following two decades of operational experience in low-Earth orbit (LEO), NASA has turned its focus once again to deep space exploration. The Agency is building the Space Launch System (SLS) to take astronauts and cargo to the Moon and send robotic spacecraft deep into the solar system. Offering unmatched performance, departure energy and payload capacity, SLS is designed to evolve into progressively more powerful configurations, enabling a new generation of human exploration of the Moon in preparation for future missions to Mars. The first build of the Block 1 vehicle is nearly complete for Exploration Mission-1 (EM-1), the first integrated flight of SLS and the Orion crew vehicle. EM-1 will send an uncrewed Orion to a distant retrograde lunar orbit in order to test and verify new systems, and along the way will deploy 13 6U-class CubeSats in deep space along the upper stage disposal trajectory after separation from Orion. The Agency’s current plans call for the first three missions on the SLS manifest to utilize the Block 1 vehicle in crew and cargo configurations. A more powerful evolved vehicle, Block 1B, will provide additional mass and volume performance using a new Exploration Upper Stage (EUS). Block 1B will lift 34 to 40 metric tons (t) to trans-lunar injection (TLI), depending on crew or cargo configuration. The Block 1B crew configuration will offer as much payload volume as industry-standard 5 m-diameter fairings to co-manifested payloads in a Universal Stage Adapter (USA). The Block 1B cargo variant will accommodate 8.4 meter-diameter fairings in 62.7-foot (19.1 meter) or 90-foot (27.4 meter) lengths. Adding smallsat secondary payloads to ride along with primary and co-manifested payloads on future flights may be possible, depending on mass margins. Leveraging a flight-proven, well-understood propulsion system, SLS’s flexible architecture, unmatched performance and expansive payload accommodations will open exciting new mission possibilities in deep space. Launches of habitat modules for NASA’s new Gateway lunar outpost, the next generation of robotic spacecraft to the far reaches of the solar system, large-aperture deep space telescopes, probes to interstellar space and the return of astronauts to the Moon are all possible with SLS.

Creech, Stephen D.

Investigating Low-Altitude Constellations of Ad-Hoc Lunar PNT System for Distributed Spacecraft Autonomy

In this study, we examine a low-altitude Lunar Position, Navigation, and Timing (LPNT) constellations and the localization performance of Centralized Extended Kalman Filter (CEKF) and Decentralized Extended Kalman Filter (DEKF) algorithms. The primary investigation involves a 100-node swarm operating at a 100 km altitude, in contrast to previous studies that examined a 21-node asset in a frozen-orbit at 5,500 km. The autonomous operation of large-scale swarm is based on two-way Inter-Satellite Link (ISL) measurements, which involve pseudoranges and relative velocities among swarm nodes. We perform a numerical assessment of the two filtering approaches, utilizing ‘fully sampled’ measurements from all available assets as well as ‘two ISL’ measurements where each spacecraft is restricted to only two antennas. This research includes an analysis of CEKF under 2-ISL constraints and evaluates the performance of DEKF in a 100-node swarm, which has not been explored in previous studies. In addition, we examine the impact of increasing the sampling frequency for DEKF, showing that the update cycle can be shortened from a 10-minute interval. A novel approach for ‘2-ISL limited’ DEKF will also be introduced, using a matching formulation that exhaustively enumerates all potential matches. This study provides valuable insights into large-scale distributed swarm operations, considering various filter configurations, sampling frequencies, matching strategies, and scalability of CEKF and DEKF for low-altitude LPNT applications. The Lunar PNT technology plays a key role in providing reliable and robust navigation services on the Moon's surface and the South pole, where the primary Lunar missions are planned. To support upcoming Lunar missions, including small satellites from NASA's Commercial Lunar Payload Services program, the Lunar PNT system must be adaptable to smaller platforms like CubeSats. Driven by the growing involvement of public and private exploration partnerships, the traditional low Earth orbit missions are shifting to beyond geosynchronous orbit [1]. These upcoming missions aim to foster a sustainable and innovative exploration program, in collaboration with commercial and international partners, to facilitate human expansion throughout the solar system and return new knowledge and opportunities to Earth [2]. As part of this trend, there are increasing efforts to utilize science missions in Lunar orbit to develop a non-dedicated and ad-hoc PNT network system. Two traditional approaches, the Deep Space Network (DSN) and the weak signal Global Positioning System (GPS), are established deep-space navigation technologies for missions beyond the geosynchronous orbit. Beginning in 1958, the DSN was developed to communicate with the Explorer 1 spacecraft based on the use of radiometric tracking in spacecraft navigation [3]. The DSN is capable of providing nearly unfettered coverage to spacecraft beyond low-Earth orbit (LEO), however, increased space mission volume has created concerns about future expectations of DSN usage for spacecraft navigation [4]. For cislunar mission applications, the position accuracy using DSN achieves 100 m (3σ) with at least three geometrically diverse ground stations when using radiometric tracking alone [5]. The DSN's dependence on Earth-based ground stations restricts its operational capabilities to periods of Earth visibility. This limitation, coupled with its poor localization performance, renders the DSN unsuitable for future lunar missions that demand continuous tracking and precise positioning. To satisfy the increasing requirements of DSN in Lunar applications, spacecrafts are also required to improve their onboard antenna power and efficiency of the transmission. However, there is an important aggregate cost trade between adding capabilities to every spacecraft and adding to a capacity on the ground that serves multiple spacecraft [6]. A weak GPS system can provide PNT service while the user spacecraft is bound to the Moon, leveraging a single, steerable high gain antenna with the relatively narrow beam which includes all the sources in its field of view [7]. However, the higher the altitude the receiver is above the GPS constellations, the poorer and the weaker are the relative geometry and the received signal powers, respectively, leading to a significant navigation accuracy reduction [8]. The transmitted power becomes weaker with increasing distance from the Earth as well as signals tracked from one of the side lobes of the GPS antenna pattern. As a results, the number of visible satellites and relative geometric condition of the GPS satellites at very high altitude drops dramatically and reduces the navigation solution accuracy. Therefore, the weak GPS system is also not an ideal way to provide PNT service to upcoming Lunar missions when considering its limited geometric condition and the recued navigation accuracy. Another navigation approach on the Moon is being developed, similar to the Global Navigation Satellite System (GNSS) on Earth, aiming to offer navigation service with continuous 24/7 coverage across the entire Lunar surface. For example, lunar communications relay and navigation systems (LCRNS) by NASA and Lunar navigation satellite systems (LNSS) by JAXA are designed to serve as dedicated Position, Navigation, and Timing (PNT) systems for the Moon. However, designing a dedicated LNSS and PNT service involves additional challenges, which are unique to the lunar environment, including limited payload capacity for the CubeSat platform, i.e., the size, weight, and power (SWaP) of the onboard clock, limited lunar ground monitoring stations, and limited financial investment as compared to the legacy Earth-GPS [9]. NASA’s focus on utilizing CubeSat platforms on the Moon leads to an alternative Lunar navigation platform that leverages the existing Lunar science and exploration assets. The small satellites used in Lunar missions can be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions [10]. As upcoming Lunar missions will often operate at low-altitude about 30 km to 100 km for scientific observations and mapping purposes, the low-altitude orbital constellations could be employed to create an ad-hoc Lunar PNT system. However, several issues must be addressed, such as the instability of these orbits, which often require maintenance or are only suitable for short-duration missions, operating for fewer than 90 days. Additionally, at an altitude of 100 km, the satellites have a limited period during which they are above the horizon and capable of providing PNT service to users. The implementation of a non-dedicated, ad-hoc Lunar navigation constellation facilitates on-demand PNT services. A preliminary study of ad-hoc Lunar PNT system was conducted using 21 spacecraft in 5,5000 km altitude frozen orbits to test its feasibility and a basic performance of orbital asset localization among ad-hoc Lunar constellations in small satellites format [10]. These swarm assets are designed for autonomous localization with minimal Earth interaction, reducing dependency on bandwidth and ground resources. The design in [10] demonstrated the feasibility of a decentralized PNT approach, specifically employing a DEKF approach for state estimation, which helps minimize onboard operating costs. The DEKF method distributes computation across individual satellites, which lightens the computational load while maintaining accuracy in orbit ephemeris and clock offsets, similar to centralized systems [11]. In a follow-on study [12], each spacecraft was limited to 2 communications antennae, forcing the selection of measurements and scheduling spacecraft activities to perform the measurements. A matching algorithm is implemented to select the best measurements and schedule position estimation updates. The decentralized localization performance is also investigated with increasing levels of network degradation for swarm assets considering the impact of intermittent and permanent communication failure, to demonstrate the robustness and fidelity of the decentralized Lunar PNT service [13]. This study confirmed that the ad-hoc PNT constellations in frozen orbit are highly robust and resilient to communication failures. However, unlike frozen orbit swarm assets, the low-altitude satellites have a limited ground view at an altitude of 100 km, where the ad-hoc Lunar constellation consists of 98 low-altitude satellites, evenly distributed across seven circular polar orbital planes, alongside two satellites in a frozen orbit at an altitude of 5,500 km (Figure 1). Therefore, the number of satellites visible to ground users is significantly limited in low-altitude orbit constellations. As each visibility of a spacecraft remains intact for only a few ticks before it moves out of the field of view, the ground user encounters challenges in maintaining continuous navigation service, resulting in sparse availability and provision of Lunar PNT system. Consequently, service availability is primarily restricted to the Lunar South Pole region (Figure 2). Given these limitations and concerns, the localization performance of low-altitude swarm assets will be assessed in this study. We focus on the investigation of the localization performance of low-altitude swarm assets and ground users near the Lunar South Pole. The overall flow of the Lunar PNT simulation incorporates the DEKF approach of asset localization and the weighted least-squares approach in user localization (Figure 3). The autonomous Lunar PNT simulation is primarily implemented in MATLAB, where the DEKF based on the matching scheduler is implemented with Google’s OR-tools as a model builder and Gurobi optimization tool as a backend solver. The General Mission Analysis Tool (GMAT) is utilized to generate ephemeris data for swarm assets, and accounts for satellite orbital details, mass, and perturbations like solar radiation pressure and drag coefficients. Each ephemeris dataset is produced in the Moon International Celestial Reference Frame (ICRF) inertial coordinate system. For state estimation, the distributed swarm assets rely on two-way Inter-Satellite Link (ISL) measurements, which involve tracking pseudoranges and relative velocities between visible satellites and anchor nodes during each observation. Numerical evaluations of the decentralized localization process are conducted to demonstrate the feasibility of the low-altitude PNT system in providing reliable navigation services. The main approach involves using DEKF and CEKF to localize 100 satellites in low-altitude constellations, where the CEKF is implemented to serve as a baseline for comparing the performance of distributed algorithms. In both cases, we evaluate ‘fully sampled’ measurements from all available assets, and ‘two ISL’ measurements when spacecraft are constrained to have only two antennas. We test four estimation techniques: CEKF fully sampled, CEKF two ISL, DEKF fully sampled, and DEKF two ISL filters. As the DEKF update cycle is comprised of network setup, communication, and computations, a global broadcast network and 2-way ISL network setup will take from 4 to 6 minutes as maximum [12]. In this simulation, the DEKF update cycle is set to 10 minutes, including a 4-minute latency for obtaining and computing the actual measurement updates. We experiment an increased update cycle to demonstrate the feasibility and evaluate the impact on localization performance using various tuning values for measurement noise covariances (Figures 4 and 5). By comparing centralized and decentralized approaches using a matching algorithm, we analyze the influence of cross-correlation factors in the covariance matrix, assuming 100% reliability of all assets and measurements. The increased frequency and the adjustments of tuning parameters reveal distinct error patterns between the two scenarios. The localization accuracy of the swarm assets and ground users is assessed by taking the median error across 100 assets and one ground user (84.9°S, 137.5°E) over 7-day simulation period (Table 1). Since the user localization accuracy is significantly affected by the performance of the swarm assets, it is crucial to maintain high localization accuracy within the swarm. This study will continue to explore decentralized filtering for autonomous LPNT operations, with further investigation of an 'iterative' matching approach which enumerates every valid matching pair, planned for the following month.

Yeji Kim

Tours of High-containment and Pristine Facilities in Support of Mars Sample Return (MSR) Sample Receiving Facility (SRF) Definition Studies

During 2019 and 2020, the NASA Tiger Team RAMA (acronym of the authors) toured several high-containment biosafety laboratories and pristine space-mission facilities worldwide to better understand their practices, capabilities, and lessons-learned to aid in planning a Sample Receiving Facility (SRF) in support of Mars Sample Return (MSR). The team also included tours of a manufacturer of mobile and modular high-containment facilities as well as manufacturers of isolators and gloveboxes. In addition, the team visited the European Space Agency (ESA)ultraclean and sterile ISO 3 / airborne molecular contamination -9 (AMC-9) isolator line to clean and assemble the most critical hardware for ESA’s ExoMars Mars Lander System, and researchers developing a novel double-walled isolator (DWI) and robotic handling techniques in support of an MSR SRF. The RAMA team visits covered several construction modalities for an MSR SRF: (1) a new traditional fixed facility; (2) use of an existing fixed Biosafety Level 4(BSL-4) facility; (3) a novel modular BSL-4 approach; and (4) a hybrid combination of fixed, modular, and existing facilities. A new fixed facility approach can be tailored to MSR’s needs and is the approach used by all U.S. BSL-4 laboratories constructed to date. However, this approach could be the most expensive modality, take the longest to implement (8-12 years), and have significant programmatic risk of delay. The utilization of an existing BSL-4 facility may be possible depending on the final contamination control and science requirements for the MSR SRF. Due to the internal dimensions of the labs visited and facility structural requirements, it is unlikely that any modification can be made to the facility to meet cleanliness requirements. Furthermore, due to possible construction delays, possible capacity issues, and potential cross contamination vectors from in-house select agents, there may also be significant programmatic risks for sharing an existing facility. Another approach is building a contemporary modular facility. This is a novel approach that has recently been used for a BSL-3/3Ag facilities. The modular elements would be installed in a traditional building or shell structure. A modular facility has many advantages over a traditional fixed facility with lower costs, shorter design/construction/ commissioning schedule, and flexibility for easier retrofits and future expansion. Lastly, a hybrid approach of combining the use of either: (1) a modular facility inside a new fixed facility or (2) a modular and/or fixed BSL-4 annex in conjunction with an existing BSL-4 space should be considered. The advantage of a hybrid approach is that the facility could leverage the strengths of other approaches. Beyond facility construction approaches, the RAMA team investigated technologies and techniques for isolating and handling Martian samples in pristine environments. For example, ESA has been studying and developing a DWI breadboard along with other sample-handling technologies. The research and development investment for clean, remote manipulation and robotics at the start of the facility design phase would be beneficial to the SRF. Additionally, under-standing the lessons learned from Thales Alenia Space during the construction and operation of the most advanced state-of-the-art precision cleaning, sterilization, and assembly glovebox isolators ever developed for spacecraft hardware are also critical for the SRF. The RAMA team lays out a summary of the 18 facilities toured, and includes 43 observations,18 findings, and 22 areas of possible follow-up that the RAMA team and others could pursue to enable further findings. The observations and findings illustrate that constructing an MSR SRF would combine the complexity of both high-containment and pristine facilities, and merging these technologies would be challenging, but achievable.

Mars Sample Return