Search NASA⌕ Search

SEARCH · Search NASA

Results for “Carlsbad Field Office”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Oxidizer Testing on Alternative Absorbents for Los Alamos National Laboratory - 18656

In the summer of 2016, during glovebox operations in TA-55, cheesecloth, a cellulosic material, was used to clean up a small spill of 9.8 molar nitric acid (oxidizer). Because cellulosic materials and oxidizers are incompatible, this prompted a chemical compatibility evaluation of the waste in TA-55 to determine if this waste was Resource Conservation and Recovery Act (RCRA) ignitable waste (D001) or RCRA reactive waste (D003). After testing and consulting with the Carlsbad Field Office in Carlsbad (CBFO), Los Alamos National Laboratory (LANL) NPI-7 decided to look for alternative absorbents to use in the gloveboxes that would not create an incompatibility issue with an oxidizer. While small spills are infrequent, they do happen and LANL wanted to be proactive and search for a material that would be compatible with an oxidizer. In December 2016, LANL NPI-7 requested LANL-Carlsbad's (LANL-CO) Difficult Waste Team to perform compatibility testing on potential alternative wipes for disposal at the Waste Isolation Pilot Plant (WIPP). The purpose for testing was to meet the Operational Experience Level 3 (OE-3) requirements that states 'any proposed use of organic absorbents or engineered absorbents in combination with potentially oxidizing TRU waste, wet or dry, should be evaluated and approved by the National TRU Program, Carlsbad Field Office' [1]. LANL NPI-7 requested LANL-CO to perform these tests because they were the group that performed all of the oxidizer testing for CBFO for the Basis of Knowledge (BoK) [2]. LANL NPI-7 chose nine fabrics and KMI Zeolite to be tested. The testing in Carlsbad took approximately 2 months to prepare the procedures, test plans and for the procurement of items. The burn rate testing was done in accordance with the requirements discussed in the BoK and approved by the LANL-CO Difficult Waste Team. Each absorbent was tested for 1) capacity limiting tests, 2) verifying the non-oxidizer threshold concentration of the oxidizer and 3) establishing the non-oxidizer concentration based on the experimental results. The effect of rinsing cheesecloth samples that have absorbed an oxidizer was also tested [3]. The burn rate testing provided three potential alternative absorbents (Spilfyter Hazmat Sorbent SM Pads Premium, Kimtech Pure W4 Wipers and Polybenzimidazole (PBI) Staple fiber) that produced a non-oxidizer result as defined by the BoK. Two wipes Spilfyter Hazmat Sorbent SM Pads Premium and Kimtech Pure W4 Wipers were able to absorb the highest concentration of potassium nitrite and still produce a non-oxidizer. TA-55 has used Spilfyter Hazmat Sorbent SM Pads Premium for a number of years in several of the processes and has ordered Kimtech Pure W4 Wipers for use in the facility. PBI fabric passed at 25 wt. % solution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Programs at Los Alamos National Laboratory

Summary of this project is: (1) Teamwork, partnering to meet goals - (a) Building on cleanup successes, (b) Solving legacy waste problems, (c) Protecting the area's environment; (2) Strong performance over the past three years - (a) Credibility from four successful Recovery Act Projects, (b) Met all Consent Order milestones, (c) Successful ramp-up of TRU program; (3) Partnership between the National Nuclear Security Administration's Los Alamos Site Office, DOE Carlsbad Field Office, New Mexico Environment Department, and contractor staff enables unprecedented cleanup progress; (4) Continued focus on protecting water resources; and (5) All consent order commitments delivered on time or ahead of schedule.

54 ENVIRONMENTAL SCIENCES↗

Addressing the Highest Risk: Environmental Programs at Los Alamos National Laboratory

Report topics: Current status of cleanup; Shift in priorities to address highest risk; Removal of above-ground waste; and Continued focus on protecting water resources. Partnership between the National Nuclear Security Administration's Los Alamos Site Office, DOE Carlsbad Field Office, New Mexico Environment Department, and contractor staff has enabled unprecedented cleanup progress. Progress on TRU campaign is well ahead of plan. To date, have completed 130 shipments vs. 104 planned; shipped 483 cubic meters of above-ground waste (vs. 277 planned); and removed 11,249 PE Ci of material at risk (vs. 9,411 planned).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance (Rev. 3.1)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote-Handled Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states, "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "…each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Department of Energy Carlsbad Field Office or the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliances," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

De-Inventory Plan for Transuranic Waste Stored at Area G

This report describes the strategy and detailed work plan developed by Los Alamos National Laboratory (LANL) to disposition transuranic (TRU) waste stored at its Area G radioactive waste storage site. The focus at this time is on disposition of 3,706 m 3 of TRU waste stored above grade by June 30, 2014, which is one of the commitments within the Framework Agreement: Realignment of Environmental Priorities between the Department of Energy (DOE) National Nuclear Security Administration (NNSA) and the State of New Mexico Environment Department (NMED), Reference 1. A detailed project management schedule has been developed to manage this work and better ensure that all required activities are aligned and integrated. The schedule was developed in conjunction with personnel from the NNSA Los Alamos Site Office (LASO), the DOE Carlsbad Field Office (CBFO), the Central Characterization Project (CCP), and Los Alamos National Security, LLC (LANS). A detailed project management schedule for the remainder of the above grade inventory and the below grade inventory will be developed and incorporated into the De-Inventory Plan by December 31, 2012. This schedule will also include all newly-generated TRU waste received at Area G in FYs 2012 and 2013, which must be removed by no later than December 31, 2014, under the Framework Agreement. The TRU waste stored above grade at Area G is considered to be one of the highest nuclear safety risks at LANL, and the Defense Nuclear Facility Safety Board has expressed concern for the radioactive material at risk (MAR) contained within the above grade TRU waste inventory and has formally requested that DOE reduce the MAR. A large wildfire called the Las Conchas Fire burned extensive areas west of LANL in late June and July 2011. Although there was minimal to no impact by the fire to LANL, the fire heightened public concern and news media attention on TRU waste storage at Area G. After the fire, New Mexico Governor Susana Martinez also requested that LANL accelerate disposition of TRU waste stored above grade at Area G. The 3,706 m 3 volume of TRU waste stored above grade consists of 4,495 containers that include all above grade non-cemented waste as well as above grade cemented waste that was ready for characterization on October 1, 2011. This volume includes all newly-generated TRU waste currently stored at Area G as of October 1, 2011. This volume does not include the Bolas Grandes spheres, mixed low level waste (MLLW) containers, empty containers, cemented waste that requires remediation, projected newly generated TRU waste from FY 2012 and later, or TRU waste stored below grade. The 3,706 m 3 volume represents about 86 per cent of the total volume of TRU waste stored above grade on October 1, 2011. The De-Inventory Plan supports the DOE Office of Environmental Management (EM) goal to disposition 90% of the Legacy TRU waste within the DOE complex by the end of 2015 as stated in its Roadmap for EM’s Journey to Excellence (Reference 2). The plan also addresses precursor actions for disposition of TRU waste that are necessary for compliance with the Compliance Order on Consent issued by the NMED in 2005 (Reference 3).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Annual Site Environmental Report for 2007

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2007 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data that (1) characterize site environmental management performance; (2) summarize environmental occurrences and responses reported during the calendar year; (3) confirm compliance with environmental standards and requirements; (4) highlight significant facility programs and efforts; and (5) describe how compliance and environmental improvement is accomplished through the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) (NM4890139088-TSDF [treatment, storage, and disposal facility]) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Annual Site Environmental Report for 2009

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) characterize site environmental management performance; (2) summarize environmental occurrences and responses reported during the calendar year; (3) Confirm compliance with environmental standards and requirements; and (4) highlight the WIPP Environmental Management System (EMS) and significant environmental programs and accomplishments, including progress toward the DOE Environmental Sustainability Goals. The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) Number NM4890139088-TSDF (treatment, storage, and disposal facility) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Future Transition of WIPP from EM to Another DOE Office - 19256

The U. S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has a primary mission to assist federal government entities disposition transuranic (TRU) radioactive waste. The main resource for disposition is the deep geologic repository known as the Waste Isolation Pilot Plant (WIPP). Other resources include a complete transportation system and a program that assists in the certification and shipment of TRU waste to WIPP known as the National TRU Program (NTP). All of these resources are managed by CBFO, which currently is part of the DOE Environmental Management (EM) program. EM's primary mission for DOE is to clean up the legacy remaining from many years of nuclear weapons research and production. But, CBFO estimates the need for WIPP and NTP will continue beyond the mission of EM and will assist other entities such as the National Nuclear Security Administration (NNSA), the Office of Science (OS) and the Navy. As the inventory of legacy TRU waste is reduced, the inventory of new TRU waste will continue from ongoing missions. So, over the life span of WIPP the primary customers of CBFO will shift from legacy EM sites to newly-generated TRU waste sites. And, somewhere along the way CBFO estimates that it will transition, primarily from an EM support (legacy waste) entity to a primarily a NNSA support (newly-generated waste) entity to facilitate ongoing DOE missions. This paper will address the need for that change at a programmatic level and will include some ideas for conceptual planning for such a transition. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 3)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Cask Waste Shipping Package (hereinafter referred to as "72-B cask"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before 72-B cask loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the 72-B cask can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the 72-B cask: a spread axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the 72-B cask into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 4)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 5)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 6)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance (Rev. 3)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote Handled-Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brine Availability Test in Salt (BATS) (FY25 Final Closeout)

This fiscal year 2025 (FY25) closeout report summarizes the final experiments conducted and data collected in phase 2 of the Brine Availability Test in Salt (BATS 2). The design and interpretation of the test was previously funded by the US Department of Energy’s Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition Program, under the Disposal Research and Development (R&D) program of the Office of Spent Fuel & Waste Science and Technology (SFWST) but they are not funding it anymore (since May 2025). The experiment was located underground at the Waste Isolation Pilot Plant (WIPP), southeastern New Mexico, which is a DOE Office of Environmental Management (DOE-EM) site managed by the Carlsbad Field Office (CBFO). DOE-EM funds the WIPP Test Coordination Office (TCO), which provided critical implementation support for the continued execution of BATS. A high-level summary of processes expected in a salt repository are given in Kuhlman & Mills (2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Well Plugging and Abandonment and Reconfiguration Activities for Fiscal Year 2005 (Rev. 1)

The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy (DOE) facility disposing of transuranic and mixed waste under a permit issued by the New Mexico Environment Department (NMED). WIPP is located 26 miles east of Carlsbad, New Mexico, in eastern Eddy County (Figure 1). Disposal panels are mined in the Permian Salado Formation at a depth of about 2,150 feet below ground surface (bgs). Over the years a number of groundwater monitor wells have been installed for site characterization and to monitor temporal and spatial changes in groundwater elevation and chemistry at WIPP. Many of the wells in the fiscal year (FY) 2005 program were selected for plugging and abandonment (P&A) due to redundancy. In other words, the well pads have multiple wells that monitor the Culebra ("Culebra") Member of the Rustler Formation when only one is necessary. These multi-well locations are a relic of various aquifer testing programs associated with the site characterization of WIPP. Additionally, the multi-well locations had wells that were completed in both the Culebra and the Magenta ("Magenta") Members of the Rustler Formation for dual monitoring of these intervals. The intervals were separated by inflatable packers used as bridge plugs, and over the years these packers have aged and their integrity compromised. For these wells, the packers were removed and the wells were converted to Magenta-only monitor wells. The FY 2005 program was initiated on March 31, 2005, and concluded on July 16, 2005. The FY 2005 program initially included 25 wells requiring workover (P&A, Magenta reconfiguration, cleaning and keeping). During the process, the U.S. Bureau of Land Management (BLM) requested transfer of two wells (H-7c and H-8c) to their ownership for future livestock watering. These wells were transferred to the BLM through execution of Form wr-03, Declaration of Owner of Underground Water Rights, between the New Mexico Office of the State Engineer (NMOSE), the BLM, and the DOE Carlsbad Field Office (CBFO). One well (H-2b2) was cleaned and retained as a Culebra monitor well for continued use. One well (H-3d) was converted to a shallow well to monitor the formational contact between the Dewey Lake Redbeds Formation and the Santa Rosa Formation in support of the DP-831 discharge permit monitoring program. Nine dual-completion wells were reconfigured as Magenta-only monitor wells, and 12 wells were plugged and abandoned permanently. This report presents the summary in the same order that the wells were worked in the field.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Journey From Sandia To Los Alamos - 12465

The U.S. Department of Energy (DOE) relies on laboratory experiments and computer-based models to verify the reliability of the nation's nuclear stockpile. Sandia National Laboratories/New Mexico (SNL/NM) tests various materials in extreme environments designed to mimic those of nuclear explosions using the Z machine. The Z machine is a key tool in the National Nuclear Security Administration's (NNSA) stockpile stewardship mission and is used to study the dynamic properties of nuclear weapon materials. In 2006, SNL/NM and Los Alamos National Laboratory (LANL) signed a Memorandum of Understanding (MOU) defining experiments to be conducted in the Z machine involving plutonium (Pu) provided by LANL. Five Pu experiments have been completed with as many as 20 more planned through 2016. The experimental containment vessel used for the experiment and containing the Pu residues, becomes transuranic (TRU) waste after the experiment and termination of safeguards and is considered a LANL waste stream. Each containment vessel is placed in a 55-gallon Type A drum or standard waste box (SWB) for shipment back to LANL for final certification and eventual disposal at the Waste Isolation Pilot Plant (WIPP). The experimental containment vessels are greater than 99% metallic materials (ferrous and non-ferrous metals). In addition to the Pu targets, detonators with high explosives (HE) are used in the experiments to isolate the containment vessel from the Z machine as energy is delivered to the Pu samples. The characterization requirements, transportation issues, required documentation, and the approvals needed before shipments were challenging and required close coordination between SNL/NM, Sandia Site Office, LANL, Los Alamos Site Office, Washington TRU Solutions, Inc., the Central Characterization Project, and the Carlsbad Field Office. Between 2006 and 2010, representatives from SNL/NM and LANL worked to develop an approved path forward to meet the requirements of all stakeholders. This project clearly demonstrates successful cooperation between LANL and SNL/NM, and support from the LASO, SSO, CBFO, WTS, and CCP. Key elements were communication and documented plans with responsible parties and due dates. Now that the first successful shipment has been accomplished, it is believed that future shipments will become a more routine activity. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plutonium Oxidation State Distribution in the Presence of WIPP-Relevant Organics and Iron Corrosion Products

The oxidation state and solubility of plutonium (Pu) in high ionic strength synthetic WIPP (Waste Isolation Pilot Plant) brines as a function of pC H+ in the presence and absence of WIPP-relevant organic ligands (EDTA [Ethylenediaminetetraacetic acid], oxalate, citrate, acetate) and iron corrosion products (magnetite and metallic iron) at 𝑇 = 23 ± 2 ∘C was thoroughly studied by long-term batch solubility experiments (between approximately 800-1,100 days) from an undersaturation approach. The oxidation state of Pu in the WIPP environment has been a topic of interest since the initial Compliance Certification Application (CCA). This study aims to investigate the solubility of Pu under the expected WIPP conditions and to determine the oxidation state of the solid phase that will control the solubility. One of the most important results of this study is that the Pu oxidation state was analyzed both from the surface area of the corrosion products and in the precipitated solid. The analysis of the Pu oxidation state on the surface of the iron mineral from the ongoing undersaturated experiments is more relevant to the performance assessment of nuclear waste disposal than short term batch (plutonium-iron phase) experiments. The X-ray Absorption Near-Edge Spectroscopy (XANES) analysis showed that Pu oxidation state is different on the metal surface and in the precipitated solid. Pu(III) is the dominant oxidation state in the metallic iron (Fe 0 ) system in the presence and absence of organics. Pu(IV) is the dominant oxidation state in the magnetite system in the presence and absence of organics. Also, organics stabilize Pu(IV) in the magnetite system. Analysis of Pu in the precipitated solid by Extended X-ray Absorption Fine Structure (EXAFS) analysis showed that Pu formed an inner-sphere complex with iron with minor amounts of PuO 2 present. X-ray diffraction (XRD) results indicate that metallic iron and magnetite did not oxidize in three years in the alkaline and high ionic strength system. Under these conditions (8 < pC H+ < 10 at T = (22 ± 2) °C under nitrogen atmosphere, the solubility of Pu changes by up to three orders of magnitude (10 -5 and 10 -8 M). The spread in solubility is highest at pC H+ = 9. Pu(III) and Pu(IV) showed different solubility behavior in the synthetic WIPP brine. A summary of the data collected in this report will be submitted to Sandia National Laboratories as part of a parameter update report which will outline the changes to the OXSTAT parameter for the 2026 Compliance Recertification Application (CRA-2026). The experiments performed were done according to the U.S. Department of Energy (DOE) approved Test Plan entitled “Effects of Radiolysis, Organic Complexation, and Redox Conditions on the Speciation and Oxidation State Distribution of Pu(III/IV)” (LCO-ACP-25). All data reported were obtained under the Los Alamos National Laboratory-Carlsbad Office (LANL-CO) Quality Assurance Program, which is compliant with the DOE Carlsbad Field Office, Quality Assurance Program Document (CBFO/QAPD).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗