At least 19 records

Geospatial characterization of low-temperature heating and cooling demand in residential, commercial, manufacturing, agricultural, and data center sectors for potential geothermal applications in the United States

Thermal demand for heating and cooling has been predominantly supplied by fossil fuel combustion in the United States, although low-carbon alternatives are extensively available including geothermal, solar thermal, and waste heat. Here, this study analyzed end-use energy consumption, fuel expenditure, and data center commissioned power data to geospatially characterize the U.S. low-temperature heating and cooling demand at the county level in residential, commercial, manufacturing, agricultural, and data center sectors and understand potential opportunities for geothermal applications. In the analysis, the regional-scale energy consumption data was incorporated with system efficiencies to address actual demand and was then disaggregated with weighting factors to the county level. The results indicated that total low-temperature heating and cooling demand is 16.7 EJ, combining heating demand of 10.8 EJ and cooling demand of 5.9 EJ. Overall, 59.9 % (10 EJ) of the low-temperature heating and cooling demand occurred in the residential sector. The heating and cooling demand visualized in maps represented that the geospatial distribution of heating and cooling demand in the residential and commercial sectors is governed by the number of housing units and climate zone designations, while heating and cooling demand in the manufacturing, agricultural, and data center sectors is dependent on the number and location of facilities. The results also demonstrated that geothermal heat pumps are broadly used in the residential and commercial sectors for heating and cooling in the U.S. Midwest, South, and Northeast regions but are limited in the West, implying great decarbonization potential in the future.

15 GEOTHERMAL ENERGY↗

Data Centers and Digital Assurance Introduction to Supply Chain and Cybersecurity for Data Centers, Session 1

The first session of the TADA (Technical Assistance for Digital Assurance) Data Centers Cohort Workshop, held on October 30, 2025, introduced foundational concepts of Digital Assurance in the context of data center and grid integration. Sponsored by the U.S. Department of Energy, the workshop brought together utilities, data center operators, developers, and vendors to address cybersecurity and supply chain vulnerabilities. The session emphasized the growing criticality of data centers within the electric grid and the need for secure, real-time, bidirectional communication. Participants explored the principles of Digital Assurance, including cybersecurity, cyber-informed engineering (CIE), and lifecycle security, and applied a threat-vulnerability-consequence framework to identify and mitigate risks at the data center–grid interface. Discussions covered a range of threats such as spoofed dispatch signals and insider threats, architectural vulnerabilities like SCADA interfaces and insecure protocols, and potential consequences including cascading grid failures. The session also raised strategic questions about business value, vendor assurance, and defining cyber boundaries and responsibilities. This foundational workshop set the stage for deeper technical analysis and the development of actionable frameworks in subsequent sessions. Session 1 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Data Center Energy Opportunities: Cloud and Infrastructure CoP - Data Center Energy and Efficiency with AI Adoption

The NLR portion of the "Cloud & Infrastructure CoP - Data Center Energy and Efficiency with AI Adoption" web meeting will cover data center locations, energy use and load growth, best practices, performance metrics, transition to direct liquid cooled data center equipment, and NLR's approach to optimizing data center.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

3-center and 4-center 2-particle Gaussian AO integrals on modern accelerated processors

We report an implementation of the McMurchie–Davidson (MD) algorithm for 3-center and 4-center 2-particle integrals over Gaussian atomic orbitals (AOs) with low and high angular momenta l and varying degrees of contraction for graphical processing units (GPUs). This work builds upon our recent implementation of a matrix form of the MD algorithm that is efficient for GPU evaluation of 4-center 2-particle integrals over Gaussian AOs of high angular momenta (l ≥ 4) [A. Asadchev and E. F. Valeev, J. Phys. Chem. A 127, 10889–10895 (2023)]. The use of unconventional data layouts and three variants of the MD algorithm allow for the evaluation of integrals with double precision and sustained performance between 25% and 70% of the theoretical hardware peak. Performance assessment includes integrals over AOs with l ≤ 6 (a higher l is supported). Preliminary implementation of the Hartree–Fock exchange operator is presented and assessed for computations with up to a quadruple-zeta basis and more than 20 000 AOs. The corresponding C++ code is part of the experimental open-source LibintX library available at https://github.com/ValeevGroup/libintx.

Chemistry↗

Scalable Data Center Capacity for DOE's AI Prototype: A Rapidly Available Gigawatt Data Center for DOE

The multilaboratory Gigawatt Data Center working group was commissioned to identify approaches to rapidly establish federal data centers with scalable capacities up to 1,000 MW. These state-of-the-art facilities will serve as hubs for interdisciplinary collaboration, industry partnerships, and transformative applications of artificial intelligence. The proposed strategic shift includes facilitating multilaboratory collaboration, prioritizing operational efficiency, expanding public–private partnerships, optimizing investments, ensuring long-term contractual flexibility, supporting open science and secure data enclaves, and exploiting high-speed national networks. Owing to their extensive experience and best practices, the US Department of Energy national laboratories are uniquely positioned to lead this initiative. We recommend conducting a feasibility analysis to rapidly identify the optimal sites for this initiative, and the effort will likely involve private industry for design, construction, financing, and operational integration. We also propose establishing multiple geographically diverse sites to ensure energy resilience, high operational reliability, and a diverse user base, thereby effectively addressing the nation’s critical needs.

42 ENGINEERING↗

A Chemist’s Guide to Solid-State Qubits: Diamond Color Centers as Embedded Vacancy-Centered Molecules

Diamond point defects or color centers are at the crux of solid-state quantum technology applications, from computing to sensing. Modeling molecular qubits has advanced by leaps and bounds mainly due to the advanced quantum mechanical (QM) tools in the arsenal of quantum chemists for modeling (isolated) molecular systems, which should be easily translatable for analogous systems in the solid state. Here, we simulate a series of diamond defects: a carbon vacancy (V C ) and second row substitutions that are adjacent to a V C or D C V C , with D = B, N, and O, to evaluate their magnetic and optical properties. We applied molecular orbital principles, an embedded cluster method, and a multiconfigurational QM theory to computationally characterize the above-mentioned defects for a multitude of spin, charge, and excited states. Our computational approach delivered high-quality QM insights that compare well with experiments. Furthermore, with this framework, we confirm the spin-triplets B C V C – and O C V C 0 to be analogous to N C V C – , with calculated bright transitions that respectively correspond to UV (3.80 eV) and blue (2.65 eV) light absorption and emission lifetimes (τ) of 2.3 and 5.6 ns, which are higher in energy and more short-lived (and thus brighter) than that for N C V C – : green (2.26 eV), τ = 9.5 ns.

Martirez, John Mark P. [Princeton Plasma Physics L↗

Collaborative Research: Louis Stokes Regional Center of Excellence: Louis Stokes Midwest Regional Center of Excellence (LSMRCE) for Broadening Participation in STEM

The Louis Stokes Midwest Regional Center of Excellence (LSMRCE) for Broadening Participation in STEM, a partnership of Chicago State University (CSU), aimed to increase the number of underrepresented minority (URM) students graduating with science, technology, engineering, and math (STEM) degrees and matriculating into graduate STEM programs. As a member institution of the LSMRCE, Fermi Research Alliance, LLC, (Fermilab) looked to support its continued mission of increasing URM student participation in its Summer Internship in Science and Technology (SIST) internship program. The program provided URMs with access to research skills development, mentoring and professionalization activities via paid, summer research internships at Fermilab. Students received instruction and mentoring while gaining exposure to a global laboratory workforce and community with diverse academic and professional expertise. In addition, students established professional relationships and networked with senior researchers, early career scientists, technical professionals, post-docs and other undergraduate interns to help forge collaboration, innovation and mentoring opportunities at Fermilab and LSMRCE partner institutions

99 GENERAL AND MISCELLANEOUS↗

IM3 Open Source Data Center Atlas

IM3 Open Source Data Center Atlas Description This dataset contains locations of existing data center facilities in the United States. Data center locations were derived from OpenStreetMap (OSM), a crowd-sourced database. Data points from OSM are processed in various ways to determine additional variables provided in the data including: facility area (square feet), associated US county, and US state. This dataset can be used to identify areas of concentrated data center development and inform government and private sector planning strategies for future buildout of data centers and the infrastructure necessary to support it. Usage Notes Validation of OSM-derived data center locations is an ongoing development under the IM3 project, and the database will be updated as new information becomes available. In some instances, both the data center area (e.g., campus) and individual data center buildings are included as overlapping areas in the database. Both values are retained. Data center points, buildings, and campus areas are provided as separate layers in the downloadable data package. Note that data items are not necessarily complete across layers. That is, a specific data center may only be present as a single point geometry in the "point" layer while other data centers are represented in both the campus and building layers. In some cases, data center campuses and/or buildings straddle a county boundary line. Mappings to both counties are retained in the database as separate rows. These data rows will have the same data center id information, but each will have different county information. Crowd-sourced data, by nature, relies on individuals and communities to provide information. As a result, some data may be missing where it has not yet been reported. As we collect information on additional data center locations and as OSM receives additional contributions, the database will be updated to capture additional data points not yet shown. Data items will occasionally be removed from OSM if they are misidentified, if they no longer exist, if they are duplicates of another item, or similar. For that reason, updated versions of this database may not contain all data center locations included in previous versions. Technical Information Data is available for download under the following formats: GeoPackage (GPKG) CSV Geospatial data is provided in the WGS84 (EPSG:4326) coordinate reference system. The GeoPackage download contains the following layers. See usage notes for more information. "point" "building" "campus" The "point" layer includes all data from OSM that had POINT geometry type (i.e., individual coordinates). The "building" layer includes all OSM data that did not have POINT geometry and where the building tag in the OSM export was neither equal to "no" or null. Data that did not meet the "point" or "building" qualification was assumed to be a facility campus and included in the "campus" layer. The dataset contains the following parameters. Variables provided by OSM are labeled with (OSM-provided). id - unique identification number (OSM-provided with prefix of "node/", "relation/" and similar attributes removed) state - name of US state state_abb - two letter US state abbreviation state_id - state ID number county - name of US county county_id - county ID number ref - reference numbers or codes (OSM-provided) operator - the name of the company, corporation, or person in charge facility (OSM-provided) name - name of facility (OSM-provided) sqft - surface area of facility polygon, measured in square feet. Only available for "building" and "campus" layers lat - latitude of data centroid point lon - longitude of data centroid point type – represented spatial information. One of "point", "building", or "campus". geometry – POLYGON geometry of area footprint (in "campus" and "building" layers) or POINT geometry of locations (in "point" layer). This parameter is not included in the csv download. Attribution Data center locations were derived from OpenStreetMap, which is made available at openstreetmap.org under the Open Database License (ODbL). US state and county boundary information was collected from the US Census Bureau for the year 2024, which is made publicly available at https://www.census.gov/geographies/mapping-files.html Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License The IM3 Open Source Data Center Atlas is made available under the Open Database License: http://opendatacommons.org/licenses/odbl/1.0/. Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall [Pacific Northwest National Labor↗

IM3 Data Center Driven Grid Stress Dataset for the U.S. Western Interconnection

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from an open-source grid operations modeling framework - GO), for the Integrated Multisector, Multiscale Modeling (IM3) project, under varying levels of data center demand growth between 2025 and 2035 in the U.S. Western Interconnection. The scenarios and sensitivity experiments are combinations of different data center demand growth rates and energy, weather, population and economic pathways. Data center demand growth projections were sourced from the Electric Power Research Institute (EPRI). The data center demand growth projection names are: Low (3.71% annual data center demand growth) Moderate (5% annual data center demand growth) High (10% annual data center demand growth) Higher (15% annual data center demand growth) Energy, weather, population and economic pathways are informed by two Shared Socioeconomic Pathways (SSP3 and SSP5) and two Representative Concentration Pathways (RCP4.5 and RCP8.5) following the hotter general circulation model (GCM) forcing group from a set of perturbed thermodynamics simulations. The resulting pathway names are: rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 The main scenarios and sensitivity experiments are detailed below. Reference scenario: The projected grid stress and reliability results for the U.S. Western Interconnection from a previous study. This scenario does not consider data center demand growth explicitly. Data center scenario: Building on the reference scenario, this scenario considers various data center growth rates and how they impact the U.S. Western Interconnection. Data center loads are modeled as flat 8760-hr profiles. This scenario does not consider new generation and transmission capacities specifically designed to meet the new data center demands. The related folder is named "flat". Delayed generator retirements sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different levels of natural gas and nuclear generator retirement delays. The resulting scenario names are: (1) postponing 100% nuclear retirements; (2) postponing 100% nuclear and 25% natural gas retirements; (3) postponing only 50% natural gas retirements; (4) postponing 100% nuclear and 50% natural gas retirements; (5) postponing 100% nuclear and 75% natural gas retirements; and (6) postponing 100% nuclear and 100% natural gas retirements. The related folder names are: no_gen_retire_0_gas, no_gen_retire_25_gas, no_gen_retire_50_gas, no_gen_retire_50_gas_only, no_gen_retire_75_gas, and no_gen_retire_100_gas. Demand response through curtailment sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different participation and compensation levels of data center demand response. The resulting scenario names are: (1) 5% demand available for curtailment with 750 $/MWh compensation; (2) 5% demand available for curtailment with 500 $/MWh compensation; (3) 5% demand available for curtailment with 250 $/MWh compensation; (4) 15% demand available for curtailment with 750 $/MWh compensation; (5) 15% demand available for curtailment with 500 $/MWh compensation; and (6) 15% demand available for curtailment with 250 $/MWh compensation. The related folder names are: dr_cost_250_drup_0_drdown_5, dr_cost_250_drup_0_drdown_15, dr_cost_500_drup_0_drdown_5, dr_cost_500_drup_0_drdown_15, dr_cost_750_drup_0_drdown_5, and dr_cost_750_drup_0_drdown_15. Combination of delayed generator retirements and demand response through curtailment sensitivity experiment: The impact of combining postponing 100% nuclear and 25% natural gas retirements with 5% demand available for curtailment with 750 $/MWh compensation is simulated. The related folder is named "dr_cost_750_drup_0_drdown_5_nuc_100_gas_25". Please refer to the README file for a detailed description of the dataset including individual files and references.

Artificial Intelligence↗

IM3 Open Source Data Center Atlas

IM3 Open Source Data Center Atlas Description This dataset contains locations of existing data center facilities in the United States. Data center locations were derived from OpenStreetMap (OSM), a crowd-sourced database. Data points from OSM are processed in various ways to determine additional variables provided in the data including: facility area (square feet), associated US county, and US state. This dataset can be used to identify areas of concentrated data center development and inform government and private sector planning strategies for future buildout of data centers and the infrastructure necessary to support it. Usage Notes Validation of OSM-derived data center locations is an ongoing development under the IM3 project, and the database will be updated as new information becomes available. In some instances, both the data center area (e.g., campus) and individual data center buildings are included as overlapping areas in the database. Both values are retained. Data center points, buildings, and campus areas are provided as separate layers in the downloadable data package. Note that data items are not necessarily complete across layers. That is, a specific data center may only be present as a single point geometry in the "point" layer while other data centers are represented in both the campus and building layers. In some cases, data center campuses and/or buildings straddle a county boundary line. Mappings to both counties are retained in the database as separate rows. These data rows will have the same data center id information, but each will have different county information. Crowd-sourced data, by nature, relies on individuals and communities to provide information. As a result, some data may be missing where it has not yet been reported. As we collect information on additional data center locations and as OSM receives additional contributions, the database will be updated to capture additional data points not yet shown. Technical Information Data is available for download under the following formats: GeoPackage (GPKG) CSV Geospatial data is provided in the WGS84 (EPSG:4326) coordinate reference system. The GeoPackage download contains the following layers. See usage notes for more information. "point" "building" "campus" The "point" layer includes all data from OSM that had POINT geometry type (i.e., individual coordinates). The "building" layer includes all OSM data that did not have POINT geometry and where the building tag in the OSM export was neither equal to "no" or null. Data that did not meet the "point" or "building" qualification was assumed to be a facility campus and included in the "campus" layer. The dataset contains the following parameters. Variables provided by OSM are labeled with (OSM-provided). id - unique identification number (OSM-provided with prefix of "node/", "relation/" and similar attributes removed) state - name of US state state_abb - two letter US state abbreviation state_id - state ID number county - name of US county county_id - county ID number ref - reference numbers or codes (OSM-provided) operator - the name of the company, corporation, or person in charge facility (OSM-provided) name - name of facility (OSM-provided) sqft - surface area of facility polygon, measured in square feet. Only available for "building" and "campus" layers lat - latitude of data centroid point lon - longitude of data centroid point type – represented spatial information. One of "point", "building", or "campus". geometry – POLYGON geometry of area footprint (in "campus" and "building" layers) or POINT geometry of locations (in "point" layer). This parameter is not included in the csv download. Attribution Data center locations were derived from OpenStreetMap, which is made available at openstreetmap.org under the Open Database License (ODbL). US state and county boundary information was collected from the US Census Bureau for the year 2024, which is made publicly available at https://www.census.gov/geographies/mapping-files.html Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License The IM3 Open Source Data Center Atlas is made available under the Open Database License: http://opendatacommons.org/licenses/odbl/1.0/. Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall [Pacific Northwest National Labor↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

IM3 + EPRI Data Center Load Projections

This dataset contains scenarios of hourly total electricity demand with and without projected loads from data centers over the period 2022-2040. The root projections without data center demands are identical to those documented in Burleyson et al. 2024. In short, those projections encompass hourly electricity demands for 54 Balancing Authorities (BAs) in the United States across a range of eight of weather and socioeconomic scenarios. Refer to the root dataset and accompanying publication, Burleyson et al. 2025, for information about how those projections were generated. For this derivative dataset we used the base loads from the following scenarios: rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 The root load projections did not reflect the drastic expansion of data centers that has occurred in the last several years to support artificial intelligence and cloud computing. To reflect growth in data center demand, a second set of load projections were created in which we layered in additional data center load projections based on the data center load growth scenarios described in a 2024 report by the Electric Power Research Institute (EPRI): "Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption". The EPRI projections from the report are included in this dataset (EPRI_2024_Projections.xlsx). That report contained annual state-level data center load projections for four year-over-year growth rates for data center demands: Low (3.71% annual growth) Moderate (5% annual growth) High (10% annual growth) Higher (15% annual growth) To homogenize the load projections with and without data centers we had to get them to a common scale. The first step was to take the EPRI annual state-level data center energy consumption values and convert them to 8760-hr loads for each year. We did that by assuming a flat (e.g., not weather- or time-sensitive) load profile and distributing the data center loads in each state evenly across all hours in a year. From there the loads were downscaled from the state-level to the county-level using 2019 county-level populations as weights. Finally, the county-level hourly data center loads were summed to the BA-level using the county-to-BA mapping underpinning the root load projections. The net result is 16 (4 weather and socioeconomic scenarios crossed with 4 data center load growth scenarios) unique load projections for the period 2022-2040. The file format follows that of the root dataset with a single additional column "Scaled_TELL_BA_Load_with_DC_MWh" that contains the hourly loads with the added data center loads for a given BA-year-scenario combination. Please refer to the readme file in the root dataset for more information on the file format.

Burleyson, Casey [Pacific Northwest National Labor↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

Potential of Data Center Controls in Grid Services

The rapid proliferation of large data centers brings both challenges and opportunities for grid reliability. The data center resources and their potential flexibility have the potential to contribute resources to grid operations. Through capabilities like energy shifting and resource coordination, data centers can help reduce their net demand on the transmission network, as well as provide additional grid services to support reliable operation on the grid. While transient and long-term grid planning and operations are the scenarios that draw most attention, the quasi-steady state timeseries (QSTS) operation of data centers and grid bring interesting scenarios that can help evaluate the data center controls to aid grid services. This work is focused on modeling data centers for QSTS applications – incorporating the AI data center load profiles and building on the PNNL digital twin model for the thermal management loads to enable simulation studies to reveal the impact of data center controls on grid performance. This includes the integration of a QSTS battery and natural gas generator model to incorporate local resource impacts to the system. The simulation study is performed with a modified IEEE 24-Bus transmission system. Scenarios are focused on evaluating the data center load impacts on the transmission system and leveraging both data center and local generation controls to mitigate those impacts and provide additional grid services. The data center controls revealed the ability to contribute to two main kinds of grid services: preventing congestion on a weak grid by coordinating the data center resources with the collocated BESS and onsite generation; and the ability to help the grid operations during stressed times of operation like during a contingency. Leveraging these and other capabilities has the potential to help data centers become grid responsive assets, aiding in both their integration into the power system and grid reliability.

power grid simulation↗

Photophysics of O-band and transition metal color centers in monolithic silicon for quantum communications

Color centers in the O-band (1260–1360 nm) are crucial for realizing long-coherence quantum network nodes in memory-assisted quantum communications. However, only a limited number of O-band color centers have been thoroughly explored in silicon hosts as spin-photon interfaces. This study explores and compares two promising O-band color centers in silicon for high-fidelity spin-photon interfaces: T and *Cu (transition metal) centers. During T center generation process, we observed the formation and dissolution of other color centers, including the copper-silver related centers with a doublet line around 1312 nm (*Cu$^0_n$), near the optical fiber zero dispersion wavelength (around 1310 nm). We then investigated the photophysics of both T and *Cu centers, focusing on their emission spectra and spin properties. The *Cu$^0_0$ line under a 0.5 T magnetic field demonstrated a 25% broadening, potentially due to spin degeneracy, suggesting that this center can be a promising alternative to T centers.

42 ENGINEERING↗

Where to cool off: a geospatial framework for placement of cooling centers

Indoor cooling is essential to reduce heat stress and increase passive survivability during heatwaves. Although air conditioning (AC) is recommended for maintaining indoor thermal comfort, low- and medium-income households in the U.S. often do not own an AC and/or limit AC usage to reduce energy consumption and associated costs, thereby risking their health and safety. With the frequency and intensity of heatwaves increasing, cooling centers are considered an appropriate alternative to indoor cooling and a possible mitigation strategy to prevent adverse health impacts of heat exposure. However, these centers are limited in numbers and not always accessible. This requires (i) developing a geospatial framework using physical and social factors for optimal siting of cooling centers to meet future needs and (ii) ranking of existing and potential cooling centers (schools, libraries, religious institutions) based on their accessibility among vulnerable populations and proximity to healthcare facilities. We developed and deployed a geospatial framework based on the Multi-criteria Decision Analysis approach in five U.S. cities (Los Angeles (LA), Phoenix, Austin, Atlanta, Miami) to evaluate the effectiveness of the framework in ranking cooling centers based on accessibility and population coverage. The results revealed that (i) access to cooling centers varies across cities and 32.2–50.7% of centers are within walking distance of the most vulnerable populations, (ii) vulnerable populations exposed to Urban Heat Island (UHI) effects are more likely to experience energy burden, and (iii) about 21.2–49.4% of population with high energy burden have access to these centers. Considering that more cooling centers are needed to assist energy burdened households alleviate heat exposure impacts, the framework developed herein could be adapted to incorporate other factors (e.g. health impacts, policies) to assess site suitability of existing shelters, identify potential sites for new cooling centers, and geo-target communities where energy efficient emerging technologies could be deployed to reduce heat stress.

58 GEOSCIENCES↗