Search NASA⌕ Search

SEARCH · Search NASA

Results for “Charging Load Profiles”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Heavy-Duty Electric Fleet Depot Charging Load Profiles & Substation Load Integration Assessment Results

This data set includes the 24-hour fleet depot charging load profiles (15-min. average demand) and substation load integration assessment results produced for the study, "Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems", published in 2021 (https://doi.org/10.1038/s41560-021-00855-0). The code developed to generate these load profiles is publicly available at https://github.com/NREL/hdev-depot-charging-2021. Please cite as: Borlaug, B., Muratori, M., Gilleran, M., Woody, D., Muston, W., Canada, T., Ingram, A., Gresham, H., and McQueen, C., (2021). "Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems". https://doi.org/10.1038/s41560-021-00855-0.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy consumption and charging load profiles from long-haul truck electrification in the United States

Abstract The urgent need to decarbonize the transportation sector combined with falling battery prices has spurred industry and policy interest in long-haul truck electrification. The charging behavior and resulting loads from electrified long-haul freight trucks are crucial for the smooth operation of the electric grid and have far-reaching environmental impacts (e.g., greenhouse gas and other air pollutant emissions). However, the aggregate energy impact of a fleetwide shift to electrified long-haul freight trucking has not been explored. This study combines electric truck design scenarios, bottom-up truck weight modeling, vehicle energy modeling, large-scale truck traffic data, and simulation of likely operation and charging behaviors to estimate end-use energy consumption and location-specific hourly charging loads for a national fleet of long-haul electric trucks. Relative to a fleet of future diesel trucks, electrification would reduce direct end-use energy consumption by 0.9 × 10 18 J (0.9 quadrillion BTU), but electrification might increase life cycle energy consumption depending on the electricity source. The electricity required to charge long-haul electric trucks is equivalent to five percent of annual electricity consumption in the United States (US). The simulated truck charging loads peak during the day across the US grid regions, but the charging peaks’ exact timing is sensitive to when trucks are dispatched for operation. The load shapes suggest that electric trucks’ charging loads can coincide with peaks in solar power generation, and planning could enable on- or off-site integration between truck charging stations and renewable electricity generation.

Tong, Fan (ORCID:0000000346613956)↗

Grid Impact Analysis of Heavy-Duty Electric Vehicle Charging Stations

This paper presents a grid impact analysis of heavy-duty electric vehicle (EV) charging stations. In this work, heavy-duty EVs have battery capacities high enough to provide a range of 250-500 miles on a single charge, such as long-haul trucks. Heavy-duty EVs will require extremely fast charging rates to reduce charging time and will induce very high charging loads (at the multiple-megawatt scale) if several vehicles charge at the same time. Therefore, analysis is needed to understand the impact of charging station loads on the electric power grid and set the baseline for developing mitigation plans and necessary system upgrades. We develop a systematic procedure to analyze the potential impact of the placement of charging stations on the grid. Charging load is modeled using a DC fast-charging station model. A voltage load sensitivity matrix approach is leveraged to investigate the challenges of placing charging stations on the feeder. Given the charging load profiles and suggested charging station locations, time-series simulations are performed on various connection points on the feeder to understand the impact. The analysis is performed on both the IEEE 34-bus system and a realistic feeder from California. Initial mitigation solutions are developed based on insights from this analysis.

47 OTHER INSTRUMENTATION↗

Analyzing School Bus Electrification in Richmond, Virginia

School buses are an essential component of the transportation infrastructure, serving as a lifeline for students across the globe. However, the widespread use of diesel school buses has raised concerns about the health impact on millions of students exposed to harmful emissions daily. Recognizing this issue, school districts worldwide are urgently seeking cleaner energy alternatives. Electric school buses emerge as an environmentally friendly and sustainable option, fostering a healthier environment for both students and communities. However, school bus electrification faces the challenges of high upfront cost, cumbersome charging management, and constraints from power grids. To help school bus operators address those challenges, this study presents a data-driven analysis for school bus electrification. This study considered a real-world school bus system in Richmond, VA, and developed a mathematical programming model to analyze the system design, charging strategies, and charging load profiles for the electrification scenario. The study evaluated different charging strategies based on model outcomes, aiming to optimize efficiency and effectiveness. Ultimately, this research generated electric school bus charging demand profiles under various scenarios, shedding light on the feasibility and implications of transitioning to electric-powered school buses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems

Major technological advancements and recent policy support are improving the outlook for heavy-duty truck electrification in the United States. In particular, short-haul operations (=200 miles (=322 km)) are prevalent and early candidates for plug-in electric vehicles (EVs) given their short, predictable routes and return-to-base applications, which allows vehicles to recharge when off shift at their depots. Although previous studies investigated the impacts of added electrical loads on distribution systems, which included light-duty EVs, the implications for heavy-duty EV charging are underexplored. Here we summarize the causes, costs and lead times of distribution system upgrades anticipated for depot charging. We also developed synthetic depot charging load profiles for heavy-duty trucks from real-world operating schedules, and found that charging requirements are met at common light-duty EV charging rates (=100 kW per vehicle). Finally, we applied depot charging load profiles to 36 distribution real-world substations, which showed that most can accommodate high levels of heavy-duty EV charging without upgrades.

47 OTHER INSTRUMENTATION↗

Highly Resolved Projections of Passenger Electric Vehicle Charging Loads for the Contiguous United States: Results From and Methods Behind Bottom-Up Simulations of County-Specific Household Electric Vehicle Charging Load (Hourly 8760) Profiles Projected Through 2050 for Differentiated Household and Vehicle Types

This report documents enhancements made to the TEMPO (Transportation Energy & Mobility Pathway Options TM ) model to project spatially, demographically, and temporally resolved national-scale EV charging load profiles and describes three scenarios and corresponding datasets created for the NREL demand-side grid (dsgrid) project in support of bulk power systems modeling. In brief, TEMPO was enhanced to disaggregate national and annual energy demand projections into household and county-level projections of passenger electric vehicle (EV) hourly charging load profiles (8760 profiles), accounting for consumer, travel, and temperature variations that impact EV energy demand. In alignment with NREL's forward-looking grid modeling, three scenarios for EV adoption covering 2020-2050 were created-- Annual Energy Outlook (AEO) Reference Case, Electrification Futures Study (EFS) High Electrification, and All EV Sales by 2035 --and associated datasets have been included in the dsgrid platform for public use.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Airport Ground Support Equipment Analysis

Ground support equipment (GSE) plays a critical role in providing services to aircraft at arrival and departure gates, ensuring smooth and efficient airport operations. As the airline industry seeks to reduce costs and expand energy options, electric GSE (eGSE) is emerging as a promising solution. This project examines the integration of eGSE into airport operations, addressing key considerations such as vehicle deployment, charging infrastructure, and grid impacts. We developed a flexible, bottom-up modeling framework to evaluate energy demands and infrastructure requirements across more than 300 U.S. airports, providing actionable insights to support electrification planning and implementation. The study focuses on eight major types of GSE with commercially available electric counterparts: aircraft tractors, ground power units, baggage tractors, belt loaders, cargo loaders, catering trucks, lavatory trucks, and water trucks. Project results include annual charging load profiles, total energy consumption, and the charger and fleet requirements for each airport.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DC Fast Charging Infrastructure for Electrified Road Trips

To assess DC fast charging station network required for electrified road trips by 2030 in California, a new charging infrastructure simulation tool/model, EVI-Pro (Electric Vehicle Infrastructure Projection) RoadTrip, has been developed. In contrast to the existing EVI-Pro model that is primarily for short-distance travels, EVI-Pro RoadTrip is exclusively focused on road trips (long-distance travels, 100 or miles per day per vehicle). Also, the charging paradigm or strategy is different. EVI-Pro RoadTrip is built upon waypoint charging, in which vehicles are forced to stop to charge or replenish the on-board batteries, along the routes between origins and destinations. On the other hand, EVI-Pro is based on destination charging, in which charging is conducted when vehicles are parked in destinations (e.g., work, home). EVI-Pro RoadTrip takes coordinate-level origin and destination data for road trips (intra-state as well as domestic or international out-of-state) and estimates energy consumption and charging needs along the routes between origins and destinations on a minute-by-minute resolution. Based on charging demands for electrified road trips across the state, the optimal locations of charging stations are determined accounting for preferred land use types (e.g., commercial areas) and station service area (e.g., 5 or less miles). Based on station-by-station charging load profiles, the required number of plugs/connectors is estimated for each station and entire state. By comparing hosting capacity of the electric grid (circuit-level) and the charging load output from EVI-Pro RoadTrip, capacity deficit is also evaluated.

ADVANCED PROPULSION SYSTEMS,ENERGY STORAGE↗

Evi-Pro Lite API

This application programing interface provides output from NREL's EVI-Pro model and is used to power the EVI-Pro Lite tool at https://afdc.energy.gov/evi-pro-lite. These endpoints provide daily (24-hour) fleet-level charging load profiles for a variety of customizable scenarios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evi-Pro Lite API

This application programing interface provides output from NREL's EVI-Pro model and is used to power the EVI-Pro Lite tool at https://afdc.energy.gov/evi-pro-lite. These endpoints provide daily (24-hour) fleet-level charging load profiles for a variety of customizable scenarios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evi-Pro Lite API

This application programing interface provides output from NLR's EVI-Pro model and is used to power the EVI-Pro Lite tool at https://afdc.energy.gov/evi-pro-lite. These endpoints provide daily (24-hour) fleet-level charging load profiles for a variety of customizable scenarios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance and Implementation Requirements for Residential EV Smart Charge Management Strategies

As the electrification of transportation expands, electric vehicle (EV) charging as residential loads will continue to grow. Residential EV charging has the potential to increase feeder peak loads and decrease voltage quality. As a result of this growing energy demand driven by EV, utilities may employ the use of smart charge management (SCM) controls to modify charging load profiles and mitigate these grid impacts. It is important that utilities understand both the potential benefits-as well as possible implementation challenges-before considering this technology as a solution to managing growing EV loads. In order for an SCM strategy to be an effective solution, the potential benefits must outweigh the implementation challenges. This study establishes and tests a novel framework to assess the implementation requirements of different SCM controls. It identifies a range of requirements specific to various SCM controls and implementation approaches to compare the relative challenges associated with the deployment of each. When paired with analysis on the effectiveness of the ability of each control to mitigate grid impacts from EV charging, this assessment is critical in comparing the value potential of different SCM controls.

ADVANCED PROPULSION SYSTEMS↗

Medium and Heavy-Duty Electric Vehicle Infrastructure - Load Operations and Deployment (HEVI-LOAD) v1.0

In order to support the California state goals to reduce the carbon and pollution emissions (AB2127), The goal of this project (HEVI-Pro) is to project the charging infrastructure needs by future medium- and heavy- duty electric vehicles, and assess optimal deployment the infrastructure in California and provide grid impacts analysis. The MHDV projections will also consider transportation system and electric system interaction with light duty vehicles. The project consists of 2 approaches in general: top-down approach that takes aggregated MHDV adoptions as the inputs and provide the county-level projections of charging load profile and infrastructure need, and the bottom-up approach that that incorporates more granular (temporal, spatial and duty-cycle-specific) behaviors of a variety of MHDVs into activity simulations/optimizations for further analysis.

Wang, Bin↗

EV Stock and Load Forecasting for HECO [Slides]

This presentation covers the work completed for the HECO Forecasting Department for the Electric Vehicle Stock and Load Forecast for Integrated Grid Planning project. This project uses a suite of detailed analytical tools developed by the National Laboratory of the Rockies, including TEMPO and EVI-Pro, to develop future scenarios to 2050 of county-level electric vehicle adoption and associated annual hourly charging load profiles for the state of Hawaii.

33 ADVANCED PROPULSION SYSTEMS↗

A Stochastic Framework for Estimating Load Profiles at EV Fast Charging Stations

This paper formulates a methodology for estimating the average daily load profiles of EV fast charging stations over a planning horizon of five to ten years. The developed methodology uses historic vehicle registration data, state-level EV adoption targets, seasonal driving patterns, local demographics, competition, and traffic volume information to predict average station usage. Through Monte Carlo simulations, an average daily load profile is obtained for each month in the planning horizon, and prediction uncertainty is quantified. The proposed framework will facilitate the accurate estimation of energy and demand costs incurred by the charging station over the planning period, thereby informing return-on-investment calculations.

Biswas, Shuchismita↗

GSE Yearly Load Profiles for Each Airport Under Six Charging Scenarios

This dataset contains GSE yearly load profiles for each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6). ![image](gse_load_profile_sample_day.png) GSE load profile of a sample day across different airport categories under charging scenario 1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Load Profiles Data for the EVI-RoadTrip Web Tool

The dataset contains EVI-RoadTrip outputs, minute-by-minute load profiles in kW for each station in the simulation based on assumed utilization and network density. The load profiles are aggregated to lower spatial resolution (e.g., state-level, corridor-level) by summation of all station loads associated with the respective geography. This results in a load profile for each scenario that summarizes the corridor's, state's, or county's load profile in minute-level resolution.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commercial and Residential Hourly Load Profiles for All Typical Meteorological Year 3 (TMY3) Locations in the United States

One way to achieve grid flexibility is to shed or shift demand to align with changing grid needs. To facilitate this, it is critical to understand how and when energy is used. High-quality end-use load profiles (EULPs) provide this information and can help cities, states, and utilities understand the time-sensitive value of energy efficiency, demand response, and distributed energy resources. Publicly available EULPs have traditionally had limited application because of age and incomplete geographic representation. To help fill this gap, the U.S. Department of Energy funded a 3-year project, End-Use Load Profiles for the U.S. Building Stock, that culminated in this publicly available dataset of calibrated and validated 15-minute-resolution load profiles for all major residential and commercial building types and end uses across all climate regions in the United States. These EULPs were created by calibrating the ResStock and ComStock physics-based building stock models using many different measured datasets, as described in the "Technical Report Documenting Methodology" linked in the submission.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗