Search NASA⌕ Search

SEARCH · Search NASA

Results for “Charging Strategy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A novel method for co-optimizing battery sizing and charging strategy of battery electric bus fleets: An application to the city of Paris

Battery-electric buses (BEBs) are a promising technology for replacing diesel buses and reducing their environmental burden. However, their charging process can take several hours, depending on the charging technique and strategy, making them susceptible to schedule disruptions. Furthermore, the selection of the charging strategy and battery size can increase the total capital investment and operational expenses of a BEB fleet, which is a major obstacle to its adoption. Therefore, to minimize the total cost of ownership (TCO) and prevent schedule disruptions, it is essential to establish a well-defined approach to determine an appropriate battery size and charging strategy for BEB fleets. This paper presents a method for reducing the TCO of BEB by determining the optimal battery size and charging strategy for each bus while satisfying operating constraints. The method involves a two-step optimization algorithm that uses Dynamic Programming and Genetic Algorithm. Further, the study applies this approach to the bus fleet serving line 21 in Paris and generates the optimal battery sizing, charging strategy, and required charging infrastructure. The results indicate that 100 kWh batteries offer the best trade-off between capital and operational expenditure for the fleet deployment if used with 65–85 kW chargers at bus terminals.

33 ADVANCED PROPULSION SYSTEMS↗

Optimizing workplace charging facility deployment and smart charging strategies

This study introduces a workplace charging (WPC) optimization model that maximizes the total satisfied electric miles of employees’ plug-in electric vehicles, subject to a given annual budget. The model optimizes both planning decisions of charger number and power levels and operation decisions of charging spot assignment and charging schedule for the given temporal distribution of charging demands and varied electricity prices. Results of experiments based on national average travel data indicate that the actual WPC strategy varies by budget level. Through optimization, the strategy could reduce impacts of the varied electricity price by shifting charging schedules to periods when electricity prices are low. Also, the model is expanded to study the trade-off between providing WPC and addressing consequence of degraded charging service by including the per-mile shadow cost of unsatisfied charging demand. Finally, we observe that their relative competitiveness mainly depends on the actual shadow cost of WPC.

33 ADVANCED PROPULSION SYSTEMS↗

Synergies between repositioning and charging strategies for shared autonomous electric vehicle fleets

The emergence of on-demand shared autonomous electric vehicle (SAEV) service requires careful charging station planning and a joint charging and repositioning strategy to mitigate empty travel. This study couples charging and repositioning events as a means of improving service quality (rider wait times), reducing empty travel due to repositioning or charging, and improving fleet utilization (average daily trips per vehicle and charging queues). This synergy is explored for the Austin, Texas region using POLARIS, an agent-based model. On average, wait times were 39% lower, and average daily trips served per SAEV increased up to 6.4 (or 28%) compared to SAEV repositioning with heuristic charging. Coupling repositioning with charging decreased the fleet's percent empty travel on average by 1.6%, relative to the scenario treating them as independent events (which varies by charging station design). Sparser charging stations reduce investment costs, and operators can leverage this framework to keep traveler wait times low.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design Considerations of a Coordinative Demand Charge Mitigation Strategy

This paper presents a coordinative demand charge mitigation (DCM) strategy for reducing electricity consumption during system peak periods. Available DCM resources include batteries, diesel generators, controllable loads, and conservation voltage reduction. All resources are directly controlled by load serving entities. A mixed integer linear programming based energy management algorithm is developed to optimally coordinate of DCM resources considering the load payback effect. To better capture system peak periods, two different kinds of load forecast are used: the day-ahead load forecast and the peak-hour probability forecast. Five DCM strategies are compared for reconciling the discrepancy between the two forecasting results. The DCM strategies are tested using actual utility data. Simulation results show that the proposed algorithm can effectively mitigate the demand charge while preventing the system peak from being shifted to the payback hours. We also identify the diminishing return effect, which can help load serving entities optimize the size of their DCM resources.

Hu, Rongxing↗

Analyzing School Bus Electrification in Richmond, Virginia

School buses are an essential component of the transportation infrastructure, serving as a lifeline for students across the globe. However, the widespread use of diesel school buses has raised concerns about the health impact on millions of students exposed to harmful emissions daily. Recognizing this issue, school districts worldwide are urgently seeking cleaner energy alternatives. Electric school buses emerge as an environmentally friendly and sustainable option, fostering a healthier environment for both students and communities. However, school bus electrification faces the challenges of high upfront cost, cumbersome charging management, and constraints from power grids. To help school bus operators address those challenges, this study presents a data-driven analysis for school bus electrification. This study considered a real-world school bus system in Richmond, VA, and developed a mathematical programming model to analyze the system design, charging strategies, and charging load profiles for the electrification scenario. The study evaluated different charging strategies based on model outcomes, aiming to optimize efficiency and effectiveness. Ultimately, this research generated electric school bus charging demand profiles under various scenarios, shedding light on the feasibility and implications of transitioning to electric-powered school buses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Peer-to-peer communication control for resilient operations of networked cyberphysical systems

This report includes two main accomplishments of the peer-to-peer communication control for resilient operation of networked microgrids project in FY24, which include a scheme for cyberattack-aware coordination of networked microgrids for supporting voltages of bulk power systems and a scheme for price signal-based operations of EV-rich networked microgrids with mixed ownership. First, the cyberattack-aware scheme enables networked microgrids to distributedly determine the amount of reactive power injection to support the voltage of bulk power system (BPS) in a fair manner. In this scheme, a risk-informed algorithm is presented to generate the peer-to- peer (P2P) communication graph with minimal risk of attack on communication links. To deal with cyberattacks on MG controllers, the resilient consensus algorithm (CA) is utilized for MG controllers to robustly estimate the total reactive power headroom, from which the MGs can accurately provide the needed amount of reactive power injection for supporting the voltage of BPS. The CA implementation and performance within the P2P communication framework are demonstrated on the IEEE 39-bus system with 6 microgrids contained in the distribution feeder under different cyberattack scenarios. Second, the price-based scheme enables the usage of the real-time price signal for the operations of electric vehicle (EV)-rich networked-microgrids with mixed ownership, in which not all the microgrids can communicate with the distribution system operator (DSO). In this scheme, a max consensus is introduced to enable the real-time price signal to be propagated from the DSO to all the microgrids, from which each microgrid controller will manage the DERs to balance the load demand and the power injection from the EV charging stations within its microgrid. Numerical results over one day with 288 slots of 5-minute intervals on the modified 123-node test feeder including 3 microgrids with high penetration of EV are presented to evaluate how the price signal affects the operations of networked microgrids under different charging strategies of the EV charging stations. The result indicates that our proposed EVCS (dis)charging strategy, which leverages the flexibility of EVs to support the grid through discharging during peak demand, proves to be a cost-effective solution that reduces operational costs while improving the social welfare of EV charging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of an Extreme Fast Charging Battery

The objective of the project is to research, develop, design, fabricate, and demonstrate extreme fast charging (XFC) Li-ion cells capable of a 10 min charge to deliver 180Wh/kg at the beginning of life (BoL) and sustain >500 XFC cycles with less than 20% capacity loss. The PI developed an asymmetric temperature modulation (ATM) charging strategy that charges a Li-ion cell at an elevated temperature of ~60oC and discharges at the ambient temperature. The elevated charging temperature eliminates Li plating, while the limited exposure time to 60oC effectively controls materials degradation, thereby enabling XFC with remarkable battery life. We developed and demonstrated 209 and 271 Wh/kg cells, both of which exceed the afore-mentioned target of delivering 180Wh/kg at BoL and sustaining 500+ XFC cycles with less than 20% loss.

25 ENERGY STORAGE↗

NASA GRC and MSFC Space-Plasma Arc Testing Procedures

Tests of arcing and current collection in simulated space plasma conditions have been performed at the NASA Glenn Research Center (GRC) in Cleveland, Ohio, for over 30 years and at the Marshall Space Flight Center (MSFC) in Huntsville, Alabama, for almost as long. During this period, proper test conditions for accurate and meaningful space simulation have been worked out, comparisons with actual space performance in spaceflight tests and with real operational satellites have been made, and NASA has achieved our own internal standards for test protocols. It is the purpose of this paper to communicate the test conditions, test procedures, and types of analysis used at NASA GRC and MSFC to the space environmental testing community at large, to help with international space-plasma arcing-testing standardization. To be discussed are: 1.Neutral pressures, neutral gases, and vacuum chamber sizes. 2. Electron and ion densities, plasma uniformity, sample sizes, and Debuy lengths. 3. Biasing samples versus self-generated voltages. Floating samples versus grounded. 4. Power supplies and current limits. Isolation of samples from power supplies during arcs. 5. Arc circuits. Capacitance during biased arc-threshold tests. Capacitance during sustained arcing and damage tests. Arc detection. Prevention sustained discharges during testing. 6. Real array or structure samples versus idealized samples. 7. Validity of LEO tests for GEO samples. 8. Extracting arc threshold information from arc rate versus voltage tests. 9. Snapover and current collection at positive sample bias. Glows at positive bias. Kapon (R) pyrolisis. 10. Trigger arc thresholds. Sustained arc thresholds. Paschen discharge during sustained arcing. 11. Testing for Paschen discharge threshold. Testing for dielectric breakdown thresholds. Testing for tether arcing. 12. Testing in very dense plasmas (ie thruster plumes). 13. Arc mitigation strategies. Charging mitigation strategies. Models. 14. Analysis of test results. Finally, the necessity of testing will be emphasized, not to the exclusion of modeling, but as part of a complete strategy for determining when and if arcs will occur, and preventing them from occurring in space.

Ferguson, Dale C.↗

NASA GRC and MSFC Space-Plasma Arc Testing Procedures

Tests of arcing and current collection in simulated space plasma conditions have been performed at the NASA Glenn Research Center (GRC) in Cleveland, Ohio, for over 30 years and at the Marshall Space flight Center (MSFC) for almost as long. During this period, proper test conditions for accurate and meaningful space simulation have been worked out, comparisons with actual space performance in spaceflight tests and with real operational satellites have been made, and NASA has achieved our own internal standards for test protocols. It is the purpose of this paper to communicate the test conditions, test procedures, and types of analysis used at NASA GRC and MSFC to the space environmental testing community at large, to help with international space-plasma arcing testing standardization. To be discussed are: 1. Neutral pressures, neutral gases, and vacuum chamber sizes. 2. Electron and ion densities, plasma uniformity, sample sizes, and Debye lengths. 3. Biasing samples versus self-generated voltages. Floating samples versus grounded. 4. Power supplies and current limits. Isolation of samples from power supplies during arcs. Arc circuits. Capacitance during biased arc-threshold tests. Capacitance during sustained arcing and damage tests. Arc detection. Preventing sustained discharges during testing. 5. Real array or structure samples versus idealized samples. 6. Validity of LEO tests for GEO samples. 7. Extracting arc threshold information from arc rate versus voltage tests. 8 . Snapover and current collection at positive sample bias. Glows at positive bias. Kapton pyrolization. 9. Trigger arc thresholds. Sustained arc thresholds. Paschen discharge during sustained arcing. 10. Testing for Paschen discharge thresholds. Testing for dielectric breakdown thresholds. Testing for tether arcing. 11. Testing in very dense plasmas (ie thruster plumes). 12. Arc mitigation strategies. Charging mitigation strategies. Models. 13. Analysis of test results. Finally, the necessity of testing will be emphasized, not to the exclusion of modeling, but as part of a complete strategy for determining when and if arcs will occur, and preventing them from occurring in space.

Ferguson, Dale C.a↗

NASA GRC and MSFC Space-Plasma Arc Testing Procedures

Tests of arcing and current collection in simulated space plasma conditions have been performed at the NASA Glenn Research Center (GRC) in Cleveland, Ohio, for over 30 years and at the Marshall Space Flight Center (MSFC) in Huntsville, Alabama, for almost as long. During this period, proper test conditions for accurate and meaningful space simulation have been worked out, comparisons with actual space performance in spaceflight tests and with real operational satellites have been made, and NASA has achieved our own internal standards for test protocols. It is the purpose of this paper to communicate the test conditions, test procedures, and types of analysis used at NASA GRC and MSFC to the space environmental testing community at large, to help with international space-plasma arcing-testing standardization. Discussed herein are neutral gas conditions, plasma densities and uniformity, vacuum chamber sizes, sample sizes and Debye lengths, biasing samples versus self-generated voltages, floating samples versus grounded samples, test electrical conditions, arc detection, preventing sustained discharges during testing, real samples versus idealized samples, validity of LEO tests for GEO samples, extracting arc threshold information from arc rate versus voltage tests, snapover, current collection, and glows at positive sample bias, Kapton pyrolysis, thresholds for trigger arcs, sustained arcs, dielectric breakdown and Paschen discharge, tether arcing and testing in very dense plasmas (i.e. thruster plumes), arc mitigation strategies, charging mitigation strategies, models, and analysis of test results. Finally, the necessity of testing will be emphasized, not to the exclusion of modeling, but as part of a complete strategy for determining when and if arcs will occur, and preventing them from occurring in space.

Ferguson, Dale C.↗

Performance and Implementation Requirements for Residential EV Smart Charge Management Strategies

As the electrification of transportation expands, electric vehicle (EV) charging as residential loads will continue to grow. Residential EV charging has the potential to increase feeder peak loads and decrease voltage quality. As a result of this growing energy demand driven by EV, utilities may employ the use of smart charge management (SCM) controls to modify charging load profiles and mitigate these grid impacts. It is important that utilities understand both the potential benefits-as well as possible implementation challenges-before considering this technology as a solution to managing growing EV loads. In order for an SCM strategy to be an effective solution, the potential benefits must outweigh the implementation challenges. This study establishes and tests a novel framework to assess the implementation requirements of different SCM controls. It identifies a range of requirements specific to various SCM controls and implementation approaches to compare the relative challenges associated with the deployment of each. When paired with analysis on the effectiveness of the ability of each control to mitigate grid impacts from EV charging, this assessment is critical in comparing the value potential of different SCM controls.

ADVANCED PROPULSION SYSTEMS↗

The power reliability event simulator tool (PRESTO): A novel approach to distribution system reliability analysis and applications

The growing interest in onsite solar photovoltaic and energy storage systems is partially motivated by customer concerns regarding grid reliability. However, accurately assessing the effectiveness of PVESS in mitigating these interruptions requires a comprehensive understanding of location-specific outage patterns and the ability to simulate realistic scenarios. To address the gap, we introduce the Power Reliability Event Simulation TOol (PRESTO), the first publicly available tool that simulates location-specific power interruptions at the county level. PRESTO allows for a more realistic assessment of system reliability by considering the unpredictability and location-specific patterns of power interruptions. We applied PRESTO in a case study of a single-family home across three U.S. counties, examining the performance of a solar photovoltaic system with 10kWh of battery storage during short-duration power interruptions. Our findings show that this system reliably met 93% of energy demand for essential non-heating and cooling loads, fully serving these loads in 84% of events, despite the constraints of daily time-of-use bill management which limits the battery's state-of-charge reserve. However, when heating and cooling loads were included, system performance decreased significantly, with only 70% of demand met and full service in 43% of events. These results highlight the challenges of using solar photovoltaic and energy storage systems for short-duration outages, emphasizing the need to consider factors like battery size and grid charging strategies to improve reliability. Our study demonstrates the practical applications of PRESTO, providing valuable insights into potential mitigation strategies including grid charging and optimizing battery size.

14 SOLAR ENERGY↗

Daily operational impacts on battery degradation in heavy-duty electric drayage trucks

Battery aging is a critical factor influencing the performance, longevity, and cost of ownership of battery electric trucks (BETs). This paper presents a comprehensive evaluation of battery aging for two Li-ion battery chemistries, Nickel-Manganese-Cobalt (NMC) and Lithium-Iron-Phosphate (LFP), accounting for both cycling and calendar aging. In contrast to traditional methods that rely on simplified linear degradation models based on manufacturer-provided data, this study employs semi-empirical aging models calibrated to experimentally collected data. The models are integrated into a detailed vehicle simulation environment, enabling a comprehensive assessment of battery degradation under realistic operating conditions. A case study focusing on heavy-duty electric drayage truck operations in the Port of Savannah, GA, is presented to illustrate the impact on battery pack lifespan of: seasonal variations, daily operational activities, charging strategies, and battery storage conditions. The results illuminate the significance of the battery pack’s state of charge during stationary periods, such as overnight storage or weekend parking, on battery degradation and its potential implications for long-term vehicle viability. Additionally, the study explores how different operational and environmental factors affect battery degradation, offering critical insights into best battery charging and storage practices. Our results demonstrate that LFP outperforms NMC in terms of years of useful life; however, by utilizing charging strategies that minimize the amount of time the battery spends resting at high levels of state-of-charge, the lifespan of the battery pack that uses NMC can nonetheless be increased by more than a factor of two.

25 ENERGY STORAGE↗

Optimal Sizing of PV and Energy Storage in an Electric Vehicle Extreme Fast Charging Station

This paper proposes an optimization model for the optimal sizing of photovoltaic (PV) and energy storage in an electric vehicle extreme fast charging station considering the coordinated charging strategy of the electric vehicles. The proposed model minimizes the annualized cost of the extreme fast charging station, including investment and maintenance cost of PV and energy storage, cost of purchasing energy from utility and demand charge. The decision variables are capacity of invested PV and the power and energy ratings of invested energy storage. To further reduce the annualized cost of the extreme fast charging station, the charging strategy of electric vehicles are integrated into the optimization model and coordinated with the power output of PV and charging/discharging of energy storage. Results of numerical simulations indicate that investment of PV and energy storage could help reduce the annualized cost of the extreme fast charging station significantly. Meanwhile, the impacts of various parameters on the optimal solution are investigated by sensitivity analysis.

Liu, Guodong↗

Evaluating the Impact of Managed EV Charging for Reliable Operation of Bulk Power Systems with High Non-Dispatchable Generation

The growth of electric vehicles (EVs) and variable-generation (VG) sources introduces new challenges for power-system operations. This study introduces a modeling framework and evaluates five EV charging strategies under projected 2040 grid conditions in the Evergy service territory with high non-dispatchable generation. Using realistic EV behavior and generation models, their impacts on system peak demand, ramp rate, and reserve capacity are evaluated. Results show that only the peak-avoidance strategy effectively reduces system peak demand, while decentralized strategies-particularly cost based dynamic charging-can exacerbate peaks due to synchronized user behavior. However, ramp-rate minimization strategy significantly reduce the stress on dispatchable generation achieving the lowest maximum absolute ramp rate (MARR) (56.81 MW) and lowest reserve requirement (2.39 GW). In contrast, unmanaged and TOU random strategies increase the stress on dispatchable generation sources with increased MARR and reserve requirements. These findings highlight the importance of coordinated, system-aware managed charging strategies to ensure reliable and affordable grid operation in the presence of EVs and VG sources.

14 - SOLAR ENERGY↗

Quantifying the Financial Impacts of Electric Vehicles on Utility Ratepayers and Shareholders [Slides]

Widespread electric vehicle (EV) adoption is critical for meeting economy-wide decarbonization goals and, as a result, states are considering enabling policies and rate designs to accelerate EV deployment. EVs can provide possible financial upside to electric utilities and ratepayers in several ways. For example, from the utility perspective, EVs could drive increased electricity sales and new earnings opportunities through increased capital investments. From the ratepayer perspective, increased electric loads from EVs could reduce average all-in retail rates. The degree to which there are net benefits or costs to shareholders and/or ratepayers depends on how EVs are integrated and managed through enabling grid investments and charging strategies. Using Berkeley Lab’s Financial Impacts of Distributed Energy Resources (FINDER) model that mimics the electric utility investment planning and ratemaking processes, we estimate the utility earnings and customer rate impacts of EVs using a bookend approach of “managed” (i.e., best case) and “mismanaged” (i.e., worst case) charging strategies for a generic summer-peaking, investor-owned, and vertically integrated utility. The analysis also examines the sensitivity of results to different assumptions of EV deployment characteristics, EV impacts on retail electricity sales, incremental distribution system costs, EV charging location, and utility EV enablement costs (i.e., utility costs to invest in EV charging, controls, and communication to deliver and administer EV programs). The results are intended to inform EV policies and deployment strategies that maximize utility system benefits and minimize ratepayer costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Drive Cycles, Battery Pack Scaling, and Usage Considerations for Long-Haul and Regional-Haul Electric Trucks

Electrifying Class-8 heavy-duty trucks presents a promising opportunity to enhance energy efficiency and reduce freight transport costs. Battery electric trucks (BETs), once considered niche, are gaining traction due to advancements in battery technology and cost reductions. However, accurately predicting battery lifespan under realistic usage conditions remains a key challenge. Understanding battery failure mechanisms and their links to design, operation, and management is essential for developers and fleet operators. This study introduces a method to develop simplified, lab-testable dynamic stress test (DST) cycles for regional and long-haul Class-8 BETs, derived from real-world diesel truck usage. These DSTs enable benchmarking of battery technologies, identification of aging stressors, and optimization of battery design, life, and cost. The approach supports evaluation of key metrics such as levelized cost of driving and total cost of ownership, aiding fair comparisons and adoption decisions. We also propose feasible battery pack sizes that meet current driving demands with strategic charging, and a method to scale pack-level DSTs to cell-level cycles for lab-based testing. These tools facilitate tradeoff analysis across battery chemistries, pack sizing, and charging strategies, while offering means to get insights into battery aging under realistic conditions-ultimately supporting informed BET deployment decisions.

25 ENERGY STORAGE↗