Search NASA⌕ Search

SEARCH · Search NASA

Results for “Chariot rover”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

ISRU-Based Robotic Construction Technologies For Lunar And Martian Infrastructures

Economically viable and reliable building systems and tool sets are being sought, examined and tested for extraterrestrial infrastructure buildup. This project utilizes a unique architecture weaving the robotic building construction technology with designs for assisting rapid buildup of initial operational capability Lunar and Martian bases. The project intends to develop and test methodologies to construct certain crucial infrastructure elements in order to evaluate the merits, limitations and feasibility of adapting and using such technologies for extraterrestrial application. High priority infrastructure elements suggested by our NASA advisors to be considered include landing pads and aprons, roads, blast walls and shade walls, thermal and micrometeorite protection shields and dust-free platforms utilizing the well-known insitu resource utilization (ISRU) strategy. Current extraterrestrial settlement buildup philosophy holds that in order to minimize the materials needed to be flown in, at great transportation costs, strategies that maximize the use of locally available resources must be adopted. Tools and heavy equipment flown as cargo from Earth are proposed to build required infrastructure to support future missions and settlements on the Moon and Mars. Several unique systems including the Lunar Electric Rover, the unpressurized Chariot rover, the versatile light-weight crane and Tri-Athlete cargo transporter as well as the habitat module mockups and a new generation of spacesuits are undergoing coordinated tests at NASAs D-RATS. This project intends to draw up a detailed synergetic plan to utilize these maturing systems coupled with modern robotic fabrication technologies based primarily on 3D Printing, tailored for swift and reliable Lunar and Martian infrastructure development. This project also intends to increase astronaut safety, improve buildup performance, ameliorate dust interference and concerns, and reduce time-to-commission, all in an economic manner. The goal stated in our Phase I proposal was a high fidelity demonstration at D-RATS to be conducted at the conclusion of the Phase II study. In the course of the Phase I study, however, it became clear that such demonstration was neither possible (due to the maximum Phase II budget limitation and the cost of NASA assets and related overhead expenses to support such demonstrations), nor necessary (due to NASA's low TRL expectation of Phase II results). These important facts were revealed to us only after interacting with the NIAC administrators and meetings with potential future partners at JPL and KSC. Accordingly, it was decided by the team that in order to make best use of resources we should investigate novel directions in the adaptation of our fabrication technologies by using in-house laboratories and to produce truly useful technologies and data, and then proceed with high fidelity demonstration at a later opportunity when sufficient resources become available. Furthermore, we have recognized that in addition to our building scale 3D printing technology called Contour Crafting, variations of some of our other fabrication technologies under development are suitable for construction of infrastructure elements such as regolith based ceramic tiles and hence we have decided to include some related preliminary research in this Phase II proposal.

Extraterrestrial↗

Refined Gearbox Design for the Chariot Lunar Rover

In planning for NASA's return to the moon by the year 2020, the NASA Johnson Space Center (JSC) designed and built a lunar concept vehicle called Chariot. Slightly larger than a pickup truck, it was designed to demonstrate similar utilitarian functions, but with twelve wheels for redundancy, reliability, and reduced surface contact pressure. JSC designed a motor gearbox to drive each of Chariot s six wheel pods. The pods can be independently steered over 360 for maneuverability. This paper describes the design of a second generation, drop-in replacement gearbox. The new design has a lower parts count, and is lighter than the original, which represents a step toward flight hardware.

Bauman, Steve↗

Design of a Lunar Quick-Attach Mechanism to Hummer Vehicle Mounting Interface

This report presents my work experiences while I was an intern with NASA (National Aeronautic and Space Administration) in the Spring of2010 at the Kennedy Space Center (KSC) launch facility in Cape Canaveral, Florida as a member of the NASA USRP (Undergraduate Student Research Program) program. I worked in the Surface Systems (NE-S) group during the internship. Within NE-S, two ASRC (Arctic Slope Regional Corporation) contract engineers, A.J. Nick and Jason Schuler, had developed a "Quick-Attach" mechanism for the Chariot Rover, the next generation lunar rover. My project was to design, analyze, and possibly fabricate a mounting interface between their "Quick-Attach" and a Hummer vehicle. This interface was needed because it would increase their capabilities to test the Quick Attach and its various attachments, as they do not have access to a Chariot Rover at KSC. I utilized both Pro Engineer, a 3D CAD software package, and a Coordinate Measuring Machine (CMM) known as a FAROarm to collect data and create my design. I relied on hand calculations and the Mechanica analysis tool within Pro Engineer to perform stress analysis on the design. After finishing the design, I began working on creating professional level CAD drawings and issuing them into the KSC design database known as DDMS before the end of the internship.

Grismore, David A.↗

Desert Research and Technology Studies (DRATS) Traverse Planning

Slide 1] The Desert Research and Technology Studies (DRATS) include large scale field tests of manned lunar surface exploration systems; these tests are sponsored by the Director s Office of Integration (DOI) [sic, Directorate Integration Office (DIO)] within the Constellation Program and they include geological exploration objectives along well designed traverses. These traverses are designed by the Traverse Team, an ad hoc group of some 10 geologists form NASA and academia, as well as experts in mission operation who define the operational constraints applicable to specific simulation scenarios. [Slide 2] These DRATS/DOI tests focus on 1) the performance of major surface systems, such as rovers, mobile habitats, communication architecture, navigation tools, earth-moving equipment, unmanned reconnaissance robots etc. under realistic field conditions and 2) the development of operational concepts that integrate all of these systems into a single, optimized operation. The participation of science is currently concentrating on geological sciences, with the objective of developing suitable tools and documentation protocols to sample representative rocks for Earth return, and to generate some conceptual understanding of the ground support structure that will be needed for the real time science-support of a lunar surface crew. [Slide 3] Major surface systems exercised in the June 2008 analog tests at the Moses Lake site, WA. [Upper left] The Chariot Rover (developed at Johnson Space Center) is an unpressurized vehicle driven by fully suited crews. [Upper right] Mobile Habitat provided by the Jet Propulsion Laboratory. Chariot is the more nimble and mobile vehicle and the idea is to drive the habitat remotely to some rendezvous place where Chariot would catch up - after a lengthy traverse - at the end of the day. [Lower left] The K-10 remotely operated robot (provided by NASA Ames Research Center) conducting scientific/geologic reconnaissance of the prospective traverse region, locating specific sites for more detailed exploration by Chariot and its crew. [Lower right] This earth-moving equipment (provided by NASA KSC) can be attached to Chariot and is envisioned to, for example, level an outpost site or to mine lunar soi

Horz, Friedrich↗

RAPID: Collaboration Results from Three NASA Centers in Commanding/Monitoring Lunar Assets

Three NASA centers are working together to address the challenge of operating robotic assets in support of human exploration of the Moon. This paper describes the combined work to date of the Ames Research Center (ARC), Jet Propulsion Laboratory (JPL) and Johnson Space Center (JSC) on a common support framework to control and monitor lunar robotic assets. We discuss how we have addressed specific challenges including time-delayed operations, and geographically distributed collaborative monitoring and control, to build an effective architecture for integrating a heterogeneous collection of robotic assets into a common work. We describe the design of the Robot Application Programming Interface Delegate (RAPID) architecture that effectively addresses the problem of interfacing a family of robots including the JSC Chariot, ARC K-10 and JPL ATHLETE rovers. We report on lessons learned from the June 2008 field test in which RAPID was used to monitor and control all of these assets. We conclude by discussing some future directions to extend the RAPID architecture to add further support for NASA's lunar exploration program.

Torres, R. Jay↗

Lunar Lander Offloading Operations Using a Heavy-Lift Lunar Surface Manipulator System

This study investigates the feasibility of using a heavy-lift variant of the Lunar Surface Manipulator System (LSMS-H) to lift and handle a 12 metric ton payload. Design challenges and requirements particular to handling heavy cargo were examined. Differences between the previously developed first-generation LSMS and the heavy-lift version are highlighted. An in-depth evaluation of the tip-over risk during LSMS-H operations has been conducted using the Synergistic Engineering Environment and potential methods to mitigate that risk are identified. The study investigated three specific offloading scenarios pertinent to current Lunar Campaign studies. The first involved offloading a large element, such as a habitat or logistics module, onto a mobility chassis with a lander-mounted LSMS-H and offloading that payload from the chassis onto the lunar surface with a surface-mounted LSMS-H. The second scenario involved offloading small pressurized rovers with a lander-mounted LSMS-H. The third scenario involved offloading cargo from a third-party lander, such as the proposed ESA cargo lander, with a chassis-mounted LSMS-H. In all cases, the analyses show that the LSMS-H can perform the required operations safely. However, Chariot-mounted operations require the addition of stabilizing outriggers, and when operating from the Lunar surface, LSMS-H functionality is enhanced by adding a simple ground anchoring system.

Jefferies, Sharon A.↗