W.A. Parish Post-Combustion CO{sub 2} Capture and Sequestration Project Phase 1 Definition

For a secure and sustainable energy future, the United States (U.S.) must reduce its dependence on imported oil and reduce its emissions of carbon dioxide (CO{sub 2}) and other greenhouse gases (GHGs). To meet these strategic challenges, the U.S. wiU have to create fundamentally new technologies with performance levels far beyond what is now possible. Developing advanced post-combustion clean coal technologies for capturing CO{sub 2} from existing coal-fired power plants can play a major role in the country's transition to a sustainable energy future, especially when coupled with CO{sub 2}-enhanced oil recovery (CO{sub 2}-EOR). Pursuant to these goals, NRG Energy, Inc. (NRG) submitted an application and entered into a cost-shared collaboration with the U.S. Department of Energy (DOE) under Round 3 of the Clean Coal Power Initiative (CCPI) to advance low-emission coal technologies. The objective of the NRG W A Parish Post-Combustion CO{sub 2} Capture and Sequestration Demonstration Project is to establish the technical feasibility and economic viability of post-combustion CO{sub 2} capture using flue gas from an existing pulverized coal-fired boiler integrated with geologic sequestration via an enhanced oil recovery (EOR) process. To achieve these objectives, the project will be executed in three phases. Each phase represents a distinct aspect of the project execution. The project phases are: • Phase I. Project Definition/Front-End Engineering Design (FEED) • Phase ll. Detailed Engineering, Procurement & Construction • Phase III. Demonstration and Monitoring The purpose of Phase I is to develop the project in sufficient detail to facilitate the decision-making process in progressing to the next stage of project delivery. Phase n. This report provides a complete summary of the FEED study effort, including pertinent project background information, the scope of facilities covered, decisions, challenges, and considerations made regarding configuration and performance of the facility, along with the conceptual design and estimate results. The findings of this report should be considered conceptual in nature and are conditioned on the statements contained herein. The cost of preparing this report (including the FEED study described herein) was funded in part by a $167-million grant provided by the U.S. DOE.

20 FOSSIL-FUELED POWER PLANTS↗

W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

Texas Clean Energy Project: Decision Point Application, Section 2: Topical Report - Phase 1, February 2010-October 2013

Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the Project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) power plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) that will be cleaned and further treated so that at least 90 percent of the overall carbon entering the IGCC facility will be captured. The clean syngas will then be divided into two highhydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the Project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the Project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In August 2013, STCE executed fixed-price turnkey EPC contracts and previously, in December 2011 a long-term O&M agreement, with industry-leading contractors. Other work completed during Phase 1 includes execution of all commercial input and offtake agreements required for project financing. STCE negotiated long-term agreements for power, CO 2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as necessary agreements (supplementing the tariff) with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. STCE executed firm agreements for natural gas transportation with ONEOK for long-term water supply with a private landowner. In addition, STCE secured options for critical easements and rights-of-way, completed and updated a transmission study, executed an interconnection agreement and has agreed a target October 31, 2013 financial closing date with debt and conventional and tax equity.

Mattes, Karl↗

Mass transfer effects in a gasification riser

In the development of multiphase reacting computational fluid dynamics (CFD) codes, a number of simplifications were incorporated into the codes and models. One of these simplifications was the use of a simplistic mass transfer correlation for the faster reactions and omission of mass transfer effects completely on the moderate speed and slow speed reactions such as those in a fluidized bed gasifier. Another problem that has propagated is that the mass transfer correlation used in the codes is not universal and is being used far from its developed bubbling fluidized bed regime when applied to circulating fluidized bed (CFB) riser reactors. These problems are true for the major CFD codes. To alleviate this problem, a mechanistic based mass transfer coefficient algorithm has been developed based upon an earlier work by Breault et al. This fundamental approach uses the local hydrodynamics to predict a local, time varying mass transfer coefficient. The predicted mass transfer coefficients and the corresponding Sherwood numbers agree well with literature data and are typically about an order of magnitude lower than the correlation noted above. The incorporation of the new mass transfer model gives the expected behavior for all the gasification reactions evaluated in the paper. At the expected and typical design values for the solid flow rate in a CFB riser gasifier an ANOVA analysis has shown the predictions from the new code to be significantly different from the original code predictions. The new algorithm should be used such that the conversions are not over predicted. Additionally, its behaviors with changes in solid flow rate are consistent with the changes in the hydrodynamics.

20 FOSSIL-FUELED POWER PLANTS↗

Hydrogen Energy California (Final Scientific and Technical Report)

Hydrogen Energy California ("HECA") is an Integrated Gasification Combined-Cycle (IGCC) “polygeneration” project. The Project gasifies a 75 percent coal and 25 percent petroleum coke (petcoke) fuel blend to produce synthesis gas (syngas). Syngas produced via gasification is purified to hydrogen-rich fuel, which is used to generate low-carbon baseload electricity in a Combined Cycle Power Block, low-carbon nitrogen-based products in an integrated manufacturing Complex, and carbon dioxide (CO 2 ) for use in enhanced oil recovery (EOR). The power and products produced by HECA have a lower carbon footprint compared to power and products produced from more traditional fossil fuel facilities. This low-carbon footprint is achieved by capturing more than 90 percent of the CO 2 in the production of the hydrogen fuel and transporting it for use in EOR, which results in simultaneous sequestration (storage) of the CO 2 in a secure geologic formation in the adjacent Elk Hills Oil Field (EHOF), a hydrocarbon producing area. Highlights of HECA as conceived during the execution of FEED are as follows: The Project is designed to operate on a fuel blend consisting of 75 percent western subbituminous coal and 25 percent California petcoke based on thermal input to the gasifier on a higher heating value (HHV) basis; The feedstocks are gasified to produce syngas that is further processed and cleaned to produce hydrogen-rich fuel; More than 90 percent of the carbon in the raw syngas is captured in a high-purity CO 2 stream during steady-state operation; High purity CO 2 is compressed and transported by pipeline to the EHOF for injection into deep underground hydrocarbon reservoirs for CO 2 EOR; The Combined Cycle Power Block produces over 420 megawatts (MW) of gross power, which yields during periods of maximum power production over 270 MW of low-carbon baseload electricity to the grid; An integrated Manufacturing Complex produces approximately 1 million tons per year of low-carbon nitrogen-based products, including urea, urea ammonium nitrate (UAN), and anhydrous ammonia, to be used in agricultural, transportation, and industrial applications.

01 COAL, LIGNITE, AND PEAT↗