Search NASA⌕ Search

SEARCH · Search NASA

Results for “Coding Guidelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Modeling Guidelines for Code Generation in the Railway Signaling Context

Modeling guidelines constitute one of the fundamental cornerstones for Model Based Development. Their relevance is essential when dealing with code generation in the safety-critical domain. This article presents the experience of a railway signaling systems manufacturer on this issue. Introduction of Model-Based Development (MBD) and code generation in the industrial safety-critical sector created a crucial paradigm shift in the development process of dependable systems. While traditional software development focuses on the code, with MBD practices the focus shifts to model abstractions. The change has fundamental implications for safety-critical systems, which still need to guarantee a high degree of confidence also at code level. Usage of the Simulink/Stateflow platform for modeling, which is a de facto standard in control software development, does not ensure by itself production of high-quality dependable code. This issue has been addressed by companies through the definition of modeling rules imposing restrictions on the usage of design tools components, in order to enable production of qualified code. The MAAB Control Algorithm Modeling Guidelines (MathWorks Automotive Advisory Board)[3] is a well established set of publicly available rules for modeling with Simulink/Stateflow. This set of recommendations has been developed by a group of OEMs and suppliers of the automotive sector with the objective of enforcing and easing the usage of the MathWorks tools within the automotive industry. The guidelines have been published in 2001 and afterwords revisited in 2007 in order to integrate some additional rules developed by the Japanese division of MAAB [5]. The scope of the current edition of the guidelines ranges from model maintainability and readability to code generation issues. The rules are conceived as a reference baseline and therefore they need to be tailored to comply with the characteristics of each industrial context. Customization of these recommendations has been performed for the automotive control systems domain in order to enforce code generation [7]. The MAAB guidelines have been found profitable also in the aerospace/avionics sector [1] and they have been adopted by the MathWorks Aerospace Leadership Council (MALC). General Electric Transportation Systems (GETS) is a well known railway signaling systems manufacturer leading in Automatic Train Protection (ATP) systems technology. Inside an effort of adopting formal methods within its own development process, GETS decided to introduce system modeling by means of the MathWorks tools [2], and in 2008 chose to move to code generation. This article reports the experience performed by GETS in developing its own modeling standard through customizing the MAAB rules for the railway signaling domain and shows the result of this experience with a successful product development story.

Ferrari, Alessio↗

Ground Operations Aerospace Language (GOAL). Volume 4: Interpretive code translator

This specification identifies and describes the principal functions and elements of the Interpretive Code Translator which has been developed for use with the GOAL Compiler. This translator enables the user to convert a compliled GOAL program to a highly general binary format which is designed to enable interpretive execution. The translator program provides user controls which are designed to enable the selection of various output types and formats. These controls provide a means for accommodating many of the implementation options which are discussed in the Interpretive Code Guideline document. The technical design approach is given. The relationship between the translator and the GOAL compiler is explained and the principal functions performed by the Translator are described. Specific constraints regarding the use of the Translator are discussed. The control options are described. These options enable the user to select outputs to be generated by the translator and to control vrious aspects of the translation processing.

Source record↗

A procedure for verifying the structural integrity of an existing pressurized wind tunnel

The present work describes the approach employed in verifying the structural integrity at maximum operating pressure of a low turbulence pressurized wind tunnel built in 1939-1940. The approach utilized existing ASME Code guidelines and fracture mechanics techniques in combination with the latest nondestructive examination methods to validate the desired life of the facility while minimizing reconstruction or major modifications. Detailed stress analyses using a finite element computer program and a numerical integration program were performed on critical areas of the tunnel. Critical vessel areas were evaluated for remaining fatigue life. Fracture mechanics analyses of the shell were performed at various regions, and critical flaw sizes at each location were determined. Analysis of the test data permitted the remaining useful life of the tunnel to be estimated at 8 to 10 years.

Taylor, J. T.↗

Characterizing and Modeling the Cost of Rework in a Library of Reusable Software Components

In this paper we characterize and model the cost of rework in a Component Factory (CF) organization. A CF is responsible for developing and packaging reusable software components. Data was collected on corrective maintenance activities for the Generalized Support Software reuse asset library located at the Flight Dynamics Division of NASA's GSFC. We then constructed a predictive model of the cost of rework using the C4.5 system for generating a logical classification model. The predictor variables for the model are measures of internal software product attributes. The model demonstrates good prediction accuracy, and can be used by managers to allocate resources for corrective maintenance activities. Furthermore, we used the model to generate proscriptive coding guidelines to improve programming, practices so that the cost of rework can be reduced in the future. The general approach we have used is applicable to other environments.

Basili, Victor R.↗

Characterizing the Benefits of Seismic Isolation of Nuclear Structures in Terms of Reduced Risk and Cost

Seismic isolation is a mature technology that has been implemented in many civil structures, including buildings, bridges, liquid natural gas tanks, and off shore oil platforms, both in the United States and other countries, to mitigate the damaging effects of earthquakes. Seismic isolation has also been used in nuclear structures in France and South Africa, but not yet in the United States: neither in the Department of Energy facilities nor in commercial nuclear power plants (NPPs). This is primarily due to a lack of guidelines, codes and standards for the analysis, design and construction specific to seismically isolated nuclear structures. However, seismic isolation of nuclear structures has seen increased research interest in the recent years and the recently published national consensus standard, America Society of Civil Engineers (ASCE) Standard 4-16 'Seismic analysis of safety related nuclear structures', now incorporates language and commentary (Chapter 12) for seismically isolating surface or near-surface-mounted nuclear facilities, including NPPs. Seismic isolation substantially reduces horizontal seismic loads (demands) on structures, systems, and components. Reduction in demand results in four potential benefits: (1) economic: reduction in capital cost, (2) increased safety: reduction in the mean annual frequency of unacceptable performance, (3) insurance: protection against increases in the known seismic hazard after construction by minimizing the effort to re-qualify and re-certify structures, systems and components, and (4) recertification: the opportunity to certify an existing NPP design for a region of higher seismic hazard. Item (2) above, an increase in safety (reduction of seismic risk), was explored in Huang et al., wherein it was demonstrated that the implementation of seismic isolation reduced seismic risk in nuclear power plant structures. Studies that assess item (1) have not been performed although the use of isolation may lead to large reductions in the capital cost of safety-related nuclear facilities. Funding provided by Nuclear Safety Research and Development in the Department of Energy (DOE) allowed the authors to develop a framework for assessing the economic benefits and reductions in seismic risk afforded by the use of seismic (base) isolation. The framework includes probabilistic risk assessment and estimation of overnight capital costs (OCC's) of a sample generic DOE nuclear facility (GDNF). The project is documented in detail in Bolisetti et al. and Yu et al., and key results are presented here. The GDNF considered in this study is based on a facility constructed at the Idaho National Laboratory. The GDNF is a two-story reinforced concrete building with an embedded basemat and is founded on soft rock at the boundary of Site Class B and Site Class C (B/C boundary) as characterized by ASCE/SEI Standard 7. The GDNF is assumed to handle radiological materials, and its structure, systems and components (SSC's) are designed to effectively confine these materials in the event of an internal failure. The GDNF is populated with components that are generic to safety-related nuclear structures. A single system, which is intended to confine a loss of materials-at-risk (MAR) to the interior of the structure, is chosen for this study. Accordingly, a hypothetical event tree and fault tree are assumed for risk assessment. The isolation system for the GDNF is designed per Chapter 12 of ASCE/SEI 4-16 but is not optimized. The isolation system consists of 38 lead rubber bearings installed in one horizontal plane below the basemat. Details of the GDNF, including the SSC's, event tree and fault tree, and isolation system, are presented in the project report and Yu et al.. This study includes seismic risk assessment and cost estimation for four cases: (1) the GDNF is located at a site of low to moderate seismic hazard and is constructed on a conventional (non-isolated) foundation; (2) the GDNF is located at the same site as case 1, but is seismically isolated; (3) the GDNF is located at a site of high seismic hazard and is constructed on a conventional foundation; and (4) the GDNF is located at the same site of high seismic hazard as case 3, but is seismically isolated. In this study, the DOE site at Idaho National Laboratory (INL) is chosen as the low to moderate seismic hazard site for cases 1 and 2, and the Los Alamos National Laboratory (LANL) is chosen as the high seismic hazard site for cases 3 and 4.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Fast Scattering Code (FSC): Validation Studies and Program Guidelines

The Fast Scattering Code (FSC) is a frequency domain noise prediction program developed at the NASA Langley Research Center (LaRC) to simulate the acoustic field produced by the interaction of known, time harmonic incident sound with bodies of arbitrary shape and surface impedance immersed in a potential flow. The code uses the equivalent source method (ESM) to solve an exterior 3-D Helmholtz boundary value problem (BVP) by expanding the scattered acoustic pressure field into a series of point sources distributed on a fictitious surface placed inside the actual scatterer. This work provides additional code validation studies and illustrates the range of code parameters that produce accurate results with minimal computational costs. Systematic noise prediction studies are presented in which monopole generated incident sound is scattered by simple geometric shapes - spheres (acoustically hard and soft surfaces), oblate spheroids, flat disk, and flat plates with various edge topologies. Comparisons between FSC simulations and analytical results and experimental data are presented.

Tinetti, Ana F.↗

Tools and Incentives for Implementing Codes of Ethics to Help Prevent the Reemergence of Chemical Weapons

Since the entry into force of the Chemical Weapons Convention (CWC) and the establishment of the Organisation for Prohibition of Chemical Weapons (OPCW) in 1997, 96% of the world’s declared stockpile, comprising 72,305 metric tons of chemical warfare agents have been destroyed. Despite this notable progress, the convergence of chemistry and biology brings new challenges to preventing chemical weapons production, as the technical capability to manipulate the chemistry of microorganisms has diffused beyond the chemical industry and academic research communities. The development and voluntary adoption by chemical practitioners around the world of ethical codes or guidelines, such as The Hague Ethical Guidelines and the Global Chemists’ Code of Ethics (GCCE) , are important steps in strengthening international nonproliferation efforts through their potential to impact the intent of the individual by normalizing ethical behavior. However, the simple act of adopting a code does not guarantee ethical behavior. Care must be taken to ensure those adopting the code understand specifically the behavior being asked of them, and they must be given ample opportunities to practice exercising those behaviors in low-risk situations and encouragement to keep trying when they fail. Furthermore, in small-to-medium chemical companies, concerns that adopting such measures could negatively impact profit margins may dissuade some business owners from voluntarily adopting ethical codes, while a country’s decision makers may not prioritize establishment of new regulatory mechanisms that could address some of these concerns. In this paper, factors that may positively influence a chemical company’s decision to adopt ethical guidelines, such as integration of social sustainability elements into frameworks and approaches to maintain social legitimacy in the eyes of the broader community, are explored. Voluntary adoption of ethical codes gives teeth to arms control regimes. By encouraging chemical companies to become engaged in the community around them and providing easy-to-use tools like scenario-based E-learning to enable remote engagement and facilitate understanding of the principles undergirding the GCCE, they actively participate in making the world a better place and minimizing the potential for reemergence of chemical weapons.

Small Chemical Companies, Codes of Ethics, E-learn↗

Knowledge base methodology: Methodology for first Engineering Script Language (ESL) knowledge base

The primary goal of reusing software components is that software can be developed faster, cheaper and with higher quality. Though, reuse is not automatic and can not just happen. It has to be carefully engineered. For example a component needs to be easily understandable in order to be reused, and it has also to be malleable enough to fit into different applications. In fact the software development process is deeply affected when reuse is being applied. During component development, a serious effort has to be directed toward making these components as reusable. This implies defining reuse coding style guidelines and applying then to any new component to create as well as to any old component to modify. These guidelines should point out the favorable reuse features and may apply to naming conventions, module size and cohesion, internal documentation, etc. During application development, effort is shifted from writing new code toward finding and eventually modifying existing pieces of code, then assembling them together. We see here that reuse is not free, and therefore has to be carefully managed.

Peeris, Kumar↗

Proceedings of the First NASA Formal Methods Symposium

Topics covered include: Model Checking - My 27-Year Quest to Overcome the State Explosion Problem; Applying Formal Methods to NASA Projects: Transition from Research to Practice; TLA+: Whence, Wherefore, and Whither; Formal Methods Applications in Air Transportation; Theorem Proving in Intel Hardware Design; Building a Formal Model of a Human-Interactive System: Insights into the Integration of Formal Methods and Human Factors Engineering; Model Checking for Autonomic Systems Specified with ASSL; A Game-Theoretic Approach to Branching Time Abstract-Check-Refine Process; Software Model Checking Without Source Code; Generalized Abstract Symbolic Summaries; A Comparative Study of Randomized Constraint Solvers for Random-Symbolic Testing; Component-Oriented Behavior Extraction for Autonomic System Design; Automated Verification of Design Patterns with LePUS3; A Module Language for Typing by Contracts; From Goal-Oriented Requirements to Event-B Specifications; Introduction of Virtualization Technology to Multi-Process Model Checking; Comparing Techniques for Certified Static Analysis; Towards a Framework for Generating Tests to Satisfy Complex Code Coverage in Java Pathfinder; jFuzz: A Concolic Whitebox Fuzzer for Java; Machine-Checkable Timed CSP; Stochastic Formal Correctness of Numerical Algorithms; Deductive Verification of Cryptographic Software; Coloured Petri Net Refinement Specification and Correctness Proof with Coq; Modeling Guidelines for Code Generation in the Railway Signaling Context; Tactical Synthesis Of Efficient Global Search Algorithms; Towards Co-Engineering Communicating Autonomous Cyber-Physical Systems; and Formal Methods for Automated Diagnosis of Autosub 6000.

Denney, Ewen↗

Achieving Integrated Daylighting and Electric Lighting Systems: Current State of the Art and Needed Research

This paper presents the results of a multi-disciplinary scoping study, the goals of which were to see the seamless integration and application of light in buildings, regardless of source, that is purposely modulated to illuminate surfaces and designed in a way that is comfortable, healthy, pleasing, cost effective, and energy efficient. The scoping study was performed in order to set the stage for transforming the design and realization of lighting systems integration (daylight and electric). This, in turn, will support achieving the the U.S. Department of Energy’s (DOE) Building Technologies Office (BTO) long-term energy savings goals. Holistic lighting systems of the future should include components that are adaptable to change, resilient to disruption, and robust. The system of codes, standards, guidelines, and contracts employed to design and implement lighting systems should be structured to help them to flourish, rather than being barriers to realization. Finally, the research thrusts and mechanisms should be engaged with these goals in mind. While integrated lighting systems may reduce lighting energy use in buildings, a broader web of non-energy impacts affecting occupant’s overall health, comfort, and satisfaction may also guide technology investment goals when the entire lighting systems lifecycle is considered. Daylighting systems are separated from electric lighting systems, and both are characteristically detached from other systems such as safety, security, communications, and information systems. Being disconnected from the inputs and outputs of other building systems precludes the ability to acquire and utilize information about occupation, status of systems, and interior and exterior environmental conditions. The outcome of this separation is that the standard building is not fulfilling the potential for creating dynamic and holistic lighting for building occupants.

Davis, Robert G.↗

Test-Based Calibration of Safety Factors for Capacity Models

In this paper, a simple procedure to calibrate the safety factor of capacity models is presented. The calibration can be carried out based on any available database of experimental tests, even of limited size. The procedure aims to assess the model capability of predicting the test results and to calibrate the safety factor so that the capacity equation meets the target reliability level required by the code or sought by the calibrator. After predicting each test of the database with the capacity equation under consideration, the test-prediction pairs are checked for the property of linearity, and the relative error for the properties of homoscedasticity and normality. Once these properties are fulfilled—which may require a nonlinear transformation of the test values and/or the predictions—the closed-form equation proposed in this paper is employed to compute a target design value. The model safety factor is finally obtained by comparing such target design value with the design value obtained from the code. The paper also proposes two approximate analytical equations to compute the tolerance factor, used to attain any given fractile, as a function of the (even small) number of tests, with any assigned confidence level. A fundamental outcome of the procedure is that it yields an objective indicator of the model accuracy, measured by the standard deviation of its error, which may be regarded as a parameter useful for selecting the most reliable model among different competing ones. In the long run, the application of the proposed procedure will allow achieving a uniform reliability level throughout all capacity models used in codes and guidelines. A further advantage is that the partial safety factors so derived can be straightforwardly updated when more experiments become available. Finally, as an example, the proposed procedure is herein applied to the ACI 318 shear design capacity equation for concrete members unreinforced in shear.

42 ENGINEERING↗

Solar/Photovoltaic DC Systems: Information for Electrical Workers and Firefighters

Solar photovoltaic (PV) systems are common and continue to gain popularity. This article helps electrical workers and firefighters understand basic operating principles and hazards of PV dc arrays. The effects of solar radiation and temperature on power output are discussed including; PV-module testing standards; methods for calculating the number of modules in a PV string; some National Electrical Code (NEC) guidelines that are aimed toward improving array safety; dc-array commissioning, periodic maintenance, and testing; arc-flash-hazard potential ways firefighters can work safely around PV arrays; potential risks posed by moonlight and other light sources; some unique dc-system hazards. We also present statistics on PV dc-array electrical incidents and injuries.

14 SOLAR ENERGY↗

Failure Analysis for Molten Salt Thermal Energy Storage Tanks for In-Service CSP Plants

Thermal Energy Storage (TES) is a fundamental component in concentrating solar power (CSP) plants to increase the plant's dispatchability, capacity factor, while reducing the levelized cost of electricity. In central receivers CSP plants, nitrate molten salts have been used for several years for operation temperatures of up to 565 degrees C. Despite many efforts to advance nitrate salt to higher operation temperatures (even considering a replacement with molten chloride salts) to achieve higher energy conversion efficiencies, the 565 degrees C temperature is currently considered the state-of-the art. Although molten salt tanks have been broadly deployed in commercial CSP plants worldwide, several failures have been reported in these tanks after a few months or years of operation, causing significant economic loss and mistrust in CSP technologies. Most of these failures are associated with the infancy of the technology and multiple issues related to tank design, fabrication, commissioning, and aggressive operation. A technical standard dedicated to the design and fabrication of molten nitrate TES tanks does not exist today. Current in-service molten salt tanks have been generally designed based on the American Petroleum Institute's (API) 650 and ASME Section II standards. The API 650 code provides guidelines for dimensions and fabrication for oil storage tanks up to 260 degrees C. The ASME standard provides allowable stress values for various materials at a range of temperatures and conditions. Both standards seem to be limited for molten salt TES tanks where high temperatures, thermal cycling, and transient conditions are expected. In 2020, NREL released the Concentrating Solar Power Best Practices Study (NREL/TP-5500-75763) that summarized multiple issues in CSP plants, along with potential alternatives and recommendations to address those issues based on information collected from participants representing about 80% of operating CSP plants in the world. One of the recommendations from this study was the development of accurate and validated models to evaluate the plant's transient operation, capable of capturing the effect of short-term clouds and operator response, while being flexible in being adapted to various spatial and temporal resource data. The "Failure Analysis for Molten Salt Thermal Energy Tanks for In-Service CSP Plants" project was inspired on this recommendation and was focused on (1) the development and validation of a physics-based model for a representative, commercial-scale molten salt tank, (2) performing simulations to evaluate the behavior of the tank as a function of typical plant operation conditions, (3) understanding tank failures mechanisms, (4) determining the residual stress and distortion in the tank floor after welding fabrication and evaluating their impact in the stresses developed in the tank during operation, (5) assessing the impact of key operation parameters on the temperature and stress distribution, (6) conduct a preliminary evaluation of design features to reduce stress and improve tank's reliability, and (7) estimate the tank's service life based on the stress developed under diverse operation scenarios. From the analysis conducted in the project and presented in this report, it was found that maximum stresses surpassing the yield strength point of the stainless steel (SS) 347H are developed on the tank floor near the perimeter. These large stresses are strongly influenced by the initial residual stresses and distortion of the tank floor after welding fabrication. During operation, large stresses are developed in the tank floor at high operation temperatures with large salt inventory levels during transient operation. High stresses are also related to elevated temperature gradients in the tank floor that could be attributed to insufficient mixing within the salt inflow and the salt inventory. Based on the analysis, creep is the predominant failure mechanism. However, the large stress levels could favor the plastic deformation into buckles, and crack formation due to stress relaxation cracking during cycle operation. A lifetime below 3 years was estimated for the typical plant operation conditions and a specific initial residual stress and deformation distribution of the tank floor. The estimated life agrees with the service time to failure reported in several commercial molten salt tanks. Desing and operation guidelines can be extracted from the analysis presented in this report, which could be adopted by tank manufacturers and CSP operators to advance toward an ultimate solution for tank failures by reducing residual and operational stresses to achieve a tank service life of more than 30 years. Addressing failures in molten salt TES tanks is fundamental for the CSP industry's survivability, but it is also important for other industrial and power generation applications using this technology, including nuclear and concentrating solar thermal.

14 SOLAR ENERGY↗

Facilitating Implementation of High-Volume Fly Ash Use in Pre-cast Concrete Construction to Increase Beneficial Utilization

The main goal of this project was to increase the beneficial use of fly ash as a supplementary cementitious material for precast concrete applications. A major focus was to develop balanced concrete mix design strategies which collectively satisfy the follow objectives: 1) increase fly ash beneficial use by at least 15% in the precast concrete industry, 2) maintain or exceed stringent structural property requirements (e.g., compressive strength at initial prestress, modulus of rupture, etc.), 3) exhibit little or no additional cost relative to conventional mixtures, and 4) mitigate detrimental environmental consequences inadvertently caused by increased beneficial use. Outcomes from this project include recommendations for design guidelines and code provisions for sustainable concrete mix designs, facilitating diversion and harvesting of large quantities of fly ash from landfills or impoundments, and multiple frameworks for incorporating discarded fly ash materials (i.e., landfilled or ponded fly ash after separating the impurities) in concrete construction.

01 COAL, LIGNITE, AND PEAT↗

Utilization of low-redundancy convolutional codes

This paper suggests guidelines for the utilization of low-redundancy convolutional codes with emphasis on providing a quick look capability (no decoding) and a moderate amount of coding gain. The performance and implementation complexity of threshold, Viterbi, and sequential decoding when used with low-redundancy, systematic, convolutional codes is discussed. An extensive list of optimum, short constraint length codes is found for use with Viterbi decoding, and several good, long constraint length codes are found for use with sequential decoding.

Cain, J. B.↗

Assessment of Literature Related to Combustion Appliance Venting Systems

In many residential building retrofit programs, air tightening to increase energy efficiency is often constrained by safety concerns with naturally vented combustion appliances. Tighter residential buildings more readily depressurize when exhaust equipment is operated, making combustion appliances more prone to backdraft or spill combustion exhaust into the living space. Several measures, such as installation guidelines, vent sizing codes, and combustion safety diagnostics, are in place with the intent to prevent backdrafting and combustion spillage, but the diagnostics conflict and the risk mitigation objective is inconsistent. This literature review summarizes the metrics and diagnostics used to assess combustion safety, documents their technical basis, and investigates their risk mitigations. It compiles information from the following: codes for combustion appliance venting and installation; standards and guidelines for combustion safety diagnostics; research evaluating combustion safety diagnostics; research investigating wind effects on building depressurization and venting; and software for simulating vent system performance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Report on the completion of long-lead components procurement of new sodium materials test loop

This report provides an update on the completion of long-lead components procurement of new sodium materials test loop. The loop, designated as SMT-3, is a forced-convection sodium loop to be used for the evaluation of sodium compatibility of advanced Alloy 709 with emphasis on long term exposures of tensile, creep, fatigue, creep fatigue, and fracture toughness ASTM-size specimens in support of ASME Code qualification and NRC licensing. The report is a deliverable (Level 4) in FY18 (M4NT-18AN050503013), under the Work Package NT-18AN05050301, “A709 Sodium Compatibility” performed by Argonne National Laboratory (ANL), as part of the Advanced Materials Program for the Advanced Reactor Technology. This work package enables the development of advanced structural materials by providing corrosion, microstructure, and mechanical property data from the standpoint of sodium compatibility of advanced structural alloys. The first sodium loop (SMT-1) with a single tank was constructed in 2011 at ANL and has been in operation for exposure of subsize sheet specimens of advanced alloys at a single temperature. The second sodium loop with dual tanks (SMT-2) was constructed in 2013 and has been in operation for the exposure of subsize sheet specimens of advanced alloys at two different temperatures. The current loop (SMT-3) has been designed to incorporate sufficient chamber capacity to expose a large number of ASTM-size specimens to evaluate the sodium effects on tensile, creep, fatigue, creep-fatigue, and fracture toughness properties, in support of ASME Code Qualification and USNRC Licensing. Three major long lead items were identified: 1) Selection and approval of location for the new loop and installation of the necessary infrastructure, such as transformer, power supply panels, and wiring, that is adequate for the long term operation of the loop, 2) Perform a detailed piping analysis that meets the ANL QA and Safety guidelines as well as complying with ASME Code requirements, and 3) Design and fabrication of the specimen exposure vessels that are capable of at least 42 tensile, creep, and fatigue specimens in each vessel and is compliant and compatible with ASME Code and the piping design analysis. The SMT-3 loop will be located in Building 206 adjacent to the currently operating SMT-2 loop. In addition, we have removed the aged power supply system in Building 206 and installed a new transformer, wiring, and power panels for the new loop. The preliminary loop design was sent to an outside vendor for a detailed piping analysis, to ensure compliance with the ASME Code guidelines. The piping design was completed in FY2017. The construction of components such as cold trap, economizers, piping arrangement etc. will be performed in the central shops at ANL. About 150 liters of sodium for the loop will be procured in early FY2018. The loop system is designed to circulate sodium through the sample tanks and he associated loop without an operator for an extended period of time. With the three sodium loops (i.e., single-tank, dual-tank and four–tank), materials can be tested at different sodium temperatures, and large tensile, creep, fatigue, creep-fatigue, and fracture toughness specimens can be exposed to sodium for extended periods of time and generate data on mechanical properties in support of ASME Code Qualification and USNRC Licensing of advanced Alloy 709 for use as a structural material in SFRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗