Search NASA⌕ Search

SEARCH · Search NASA

Results for “Coeur d'Alene”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Coeur d'Alene Tribe Fisheries Program : Implementation of Fisheries Enhancement Opportunities on the Coeur d’Alene Reservation : 2007 Annual Report.

Historically, the Coeur d'Alene Indian Tribe depended on runs of anadromous salmon and steelhead along the Spokane River and Hangman Creek, as well as resident and adfluvial forms of trout and char in Coeur d'Alene Lake, for survival. Dams constructed in the early 1900s on the Spokane River in the City of Spokane and at Little Falls (further downstream) were the first dams that initially cut-off the anadromous fish runs from the Coeur d'Alene Tribe. These fisheries were further removed following the construction of Chief Joseph and Grand Coulee Dams on the Columbia River. Together, these actions forced the Tribe to rely solely on the resident fish resources of Coeur d'Alene Lake for their subsistence needs. The Coeur d'Alene Tribe is estimated to have historically harvested around 42,000 westslope cutthroat trout (Oncorhynchus clarki lewisi) per year (Scholz et al. 1985). In 1967, Mallet (1969) reported that 3,329 cutthroat trout were harvested from the St. Joe River, and a catch of 887 was reported from Coeur d'Alene Lake. This catch is far less than the 42,000 fish per year the tribe harvested historically. Today, only limited opportunities exist to harvest cutthroat trout in the Coeur d'Alene Basin. It appears that a suite of factors have contributed to the decline of cutthroat trout stocks within Coeur d'Alene Lake and its tributaries (Mallet 1969; Scholz et al. 1985; Lillengreen et al. 1993). These factors included the construction of Post Falls Dam in 1906, major changes in land cover types, impacts from agricultural activities, and introduction of exotic fish species. The decline in native cutthroat trout populations in the Coeur d'Alene basin has been a primary focus of study by the Coeur d'Alene Tribe's Fisheries and Water Resources programs since 1990. The overarching goals for recovery have been to restore the cutthroat trout populations to levels that allow for subsistence harvest, maintain genetic diversity, and increase the probability of persistence in the face of anthropogenic influences and prospective climate change. This included recovering the lacustrine-adfluvial life history form that was historically prevalent and had served to provide both resilience and resistance to the structure of cutthroat trout populations in the Coeur d'Alene basin. To this end, the Coeur d'Alene Tribe closed Lake Creek and Benewah Creek to fishing in 1993 to initiate recovery of westslope cutthroat trout to historical levels. However, achieving sustainable cutthroat trout populations also required addressing biotic factors and habitat features in the basin that were limiting recovery. Early in the 1990s, BPA-funded surveys and inventories identified limiting factors in Tribal watersheds that would need to be remedied to restore westslope cutthroat trout populations. The limiting factors included: low-quality, low-complexity mainstem stream habitat and riparian zones; high stream temperatures in mainstem habitats; negative interactions with nonnative brook trout in tributaries; and potential survival bottlenecks in Coeur d'Alene Lake. In 1994, the Northwest Power Planning Council adopted the recommendations set forth by the Coeur d'Alene Tribe to improve the Reservation fishery (NWPPC Program Measures 10.8B.20). These recommended actions included: (1) Implement habitat restoration and enhancement measures in Alder, Benewah, Evans, and Lake Creeks; (2) Purchase critical watershed areas for protection of fisheries habitat; (3) Conduct an educational/outreach program for the general public within the Coeur d'Alene Reservation to facilitate a 'holistic' watershed protection process; (4) Develop an interim fishery for tribal and non-tribal members of the reservation through construction, operation and maintenance of five trout ponds; (5) Design, construct, operate and maintain a trout production facility; and (6) Implement a monitoring program to evaluate the effectiveness of the hatchery and habitat improvement projects. These activities provide partial mitigation for the extirpation of anadromous fish resources from usual and accustomed harvest areas and Reservation lands. Since that time, much of the mitigation activities occurring within the Coeur d'Alene sub-basin have had a connection to the BPA project entitled 'Implement of Fisheries Enhancement Opportunities on the Coeur d'Alene Reservation' (1990-044-00), which is sponsored and implemented by the Coeur d'Alene Tribe Fisheries Program.

13 HYDRO ENERGY↗

Coeur d'Alene Tribe Fisheries Program : Implementation of Fisheries Enhancement Opportunities on the Coeur d'Alene Reservation : 2006 Annual Report.

This annual report summarizes previously unreported data collected to fulfill the contractual obligations for BPA project No.1990-044-00, 'Coeur d'Alene Subbasin Fisheries Habitat Enhancement', during the 2006 calendar year. Even though the contract performance period for this project crosses fiscal and calendar years, the timing of data collection and analysis, as well as implementation of restoration projects, lends itself to this reporting schedule. The 2006 performance period marked the first year that BPA implemented its Process Improvement Initiative with the Pisces system serving as the vehicle for developing statements of work and tracking project performance. This document attempts to provide some consistency between the project objectives, around which past reports have been structured, and the new work element format adopted for use in Pisces. The report is formatted into three primary sections that respectively provide results and discussion of: (1) monitoring and evaluation of biological and physical habitat indicators; (2) implementation of restoration and enhancement projects; and (3) education and outreach work performed during 2006. The relevant work elements and/or milestones found in the statement of work are listed under these section headings and described in the body of the report.

13 HYDRO ENERGY↗

Coeur d’Alene Tribe Benewah Market Energy Efficiency Project Final Technical Report

The Coeur d’Alene Reservation has been the home of the Coeur d’Alene Tribe since time immemorial and it is fitting that the Tribe’s name in the Coeur d’Alene language is schitsu’umsh, “the ones who were found here.” The Reservation is located in northern Idaho, is approximately 345,000 acres and is comprised of forest land, agricultural land, several streams, Coeur d’Alene Lake and the St. Joe River and a small amount of developed land. The project area was conducted within the boundaries of the Coeur d’Alene Reservation. The population of the Reservation is 6,760 (2010 Census). Currently, there are approximately 2,463 enrolled Coeur d’Alene Tribal members (Coeur d’Alene Tribe Enrollment 2016). The Benewah Market is a Tribally-owned and operated facility located at 1111 B St. Plummer, ID 83851. The Benewah Market is an approximately 23,500 square foot single-story structure. The majority of the building is occupied by a grocery store with a full meat department, deli, and bakery. Approximately 20% of the floor area at the northeast corner is occupied by an Ace Hardware retailer. The largest part of the building is approximately 17,000 square feet, is separately metered and houses the grocery store which was constructed in 1984. The market is the largest full service market serving the Coeur d’Alene Reservation and is the only full service market in a 35-mile radius. The Tribe has benefited greatly from the Benewah Market Energy Efficiency Project and will continue to do so for many years: The health and safety of the food has been improved greatly now that the refrigeration and freezer cases are at a constant and safe temperature on a monitoring and alarm system. There is no longer a thaw and freeze cycle that allows fluctuations in temperature. If the power goes out, there is an immediate alarm and contact so that time may be tracked and food kept safe during an outage. The overall annual energy use in the Benewah Market has dropped by 22.9% -Energy costs for the Market decreased by an estimated 11,620 dollars in one year due to this project. The Tribe has seen an increase in the cost of energy from Plummer Power and this was offset by the reduction in energy consumed. This estimate assumes that the Tribe would have consumed the same amount of energy as the prior year. -Maintenance costs are estimated to have decreased by $10,000 in just the one year since installation in contract repair and maintenance. The Tribe estimates that it has saved 24,000 dollars over a one-year time period in labor costs to maintain the older system. Due to having a more efficient store, with safer, more attractive display of food and lower energy and maintenance costs, the store is able to be more viable economically. The store has increased its sales and has been able to pass along operations and maintenance savings to its customers and employees. The Tribe hosted a ribbon-cutting ceremony on February 28, 2017 at the Benewah Market with Chris Deschene, then Office of Indian Energy Director, as well as representatives from the Coeur d’Alene Tribe and Bonneville Power Administration. While the ribbon-cutting ceremony was going on, the Tribe’s media outlets covered the ceremony and placed information about the project on the Tribe’s Facebook page on two separate occasions. The Coeur d’Alene Tribe’s Natural Resources Department and the Tribe’s Development Corporation are thankful for the opportunity that the Benewah Market Energy Efficiency Project has afforded the Coeur d’Alene Tribal community. Without the U.S. Department of Energy’s Indian Energy Program funding and its dedicated staff, this project would not have been completed. This has been a lot of work for all parties involved but has provided benefits to thousands of people for many years to come.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Coeur d'Alene Tribe Energy Efficiency Feasibility Study

The Coeur d'Alene Tribe's Energy Efficiency Feasibility Study (EEFS) is the culminating document that compiles the energy efficiency and building performance assessment and project prioritization process completed on 36 Tribally owned and operated facilities within Tribal lands. The EEFS contains sections on initial findings, utility billing analyses, energy conservation measures and prioritization and funding sources and strategies for energy project implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Senior Housing Complex Energy Efficiency and Solar Energy Project

As part of a longer-term energy efficiency and solar development program on the Coeur d'Alene reservation, the Coeur d'Alene Tribe completed energy efficiency measures and deployed a solar photovoltaic system at its Senior Housing Complex. The project generated nearly 68,000 kWh of solar energy in its first year, and reduced energy used at the senior housing complex by 95,192 kWh, saving $7,144.56 in energy costs, and saving 48.1 metric tons of carbon dioxide.

14 SOLAR ENERGY↗

Bunker Hill Sediment Characterization Study

The long history of mineral extraction in the Coeur d’Alene Basin has left a legacy of heavy metal laden mine tailings that have accumulated along the Coeur d’Alene River and its tributaries (U.S. Environmental Protection Agency, 2001; Barton, 2002). Silver, lead and zinc were the primary metals of economic interest in the area, but the ores contained other elements that have become environmental hazards including zinc, cadmium, lead, arsenic, nickel, and copper. The metals have contaminated the water and sediments of Lake Coeur d’Alene, and continue to be transported downstream to Spokane Washington via the Spokane River. In 1983, the EPA listed the Bunker Hill Mining and Metallurgical Complex on the National Priorities List. Since that time, many of the most contaminated areas have been stabilized or isolated, however metal contaminants continue to migrate through the basin. Designation as a Superfund site causes significant problems for the economically depressed communities in the area. Identification of primary sources of contamination can help set priorities for cleanup and cleanup options, which can include source removal, water treatment or no action depending on knowledge about the mobility of contaminants relative to water flow. The mobility of contaminant mobility under natural or engineered conditions depends on multiple factors including the physical and chemical state (or speciation) of metals and the range of processes, some of which can be seasonal, that cause mobilization of metals. As a result, it is particularly important to understand metal speciation (National Research Council, 2005) and the link between speciation and the rates of metal migration and the impact of natural or engineered variations in flow, biological activity or water chemistry.

54 ENVIRONMENTAL SCIENCES↗

Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

13 HYDRO ENERGY↗

Coeur Center Solar Project

This project consisted of installing a 35.2kW rooftop solar photovoltaic system located at the Coeur Center Family and Youth Center, operated by the Coeur d’Alene Tribe’s Marimn Health and Wellness, in Worley, Idaho.

Coeur d’Alene↗

Kootenai River Nutrient Dosing System and N-P Consumption: Year 2008.

In early 2006 we designed and built low energy consumption, pump-operated system, for dosing of the liquid nutrient in the summer 2006 season. This operated successfully, and the system was used again during the 2007 and 2008 seasons for dosing. During the early winter period, 2008, laboratory tests were made of the liquid nutrient pump system, and it was noted that small amounts of air were being entrained on the suction side of the pump, during conditions when the inlet pressure was low. It was believed that this was the cause of diurnal fluctuations in the flow supplied, characteristic of the 2007 year flow data. Replacement of '0' rings on the inlet side of the pumps was the solution to this problem, and when tested in the field during the summer season, the flow supplied was found to be stable. A decision was made by the IKERT committee at the meeting of 20th to 21st May 2008 (held in Coeur d'Alene, Idaho) to use an injection flow rate of liquid fertilizer (polyammonium phosphate 10-34-0) to achieve a target phosphorus concentration of 3.0 {micro}g/L, after complete mixing in the river. This target concentration was the same as that used in 2006 and 2007. The proposed starting date was as early as possible in June 2008. Plans were made to measure the dosing flow in three ways. Two of the three methods of flow measurement (1 and 2 below) are inter-dependent. These were: (1) Direct measurement of flow rate by diverting dosing flow into a 1000 mL volume standard flask. The flow rate was computed by dividing the flask volume by the time required to fill the flask. This was done a few times only during the summer period. (2) Adjusting the flow rate reading of the Gamma dosing pump using the 'calibration' function to achieve agreement with the flow rate computed by method 1 above. (3) Direct measurement by electrical signal from conductive fluid passing through a magnetic field (Seametrics meter, as used in previous years). Values were recorded every 4 minutes by a data-logger. This instrument has been shown to be reliable, and in agreement with method 1 to within the expected uncertainty (within 2%). Liquid nutrients were delivered to the site in late May, and system testing was done the same day. High concentrations of suspended sediment in the water column, as indicated by shallow Secchi depth readings, were present in the river in the last part of May, into June. A plan was made to delay the start up of nutrient addition to a date later than 1st June, because the aquatic productivity was almost certainly to be compromised by insufficient light availability. Daily monitoring of Secchi depths was done, showing declining turbidity in early June. A decision was made to start the system on 15th June, by which time conditions were good.

13 HYDRO ENERGY↗

Microreactors Electrify the Future of Mining

This presentation is for the Joint Coeur d’Alene and Columbia Basin meeting of the Society for Mining, Metallurgy & Exploration on May 12. The presentation briefly defines microreactor technology, potential markets, provide an example of a remote mining case study in Alaska, describes ways to extend the product value chain, presents a concept for a microreactor powered integrated mining operation, and describes Environmental, Social and Governance (ESG) considerations in mining.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Depositional Influences on Porewater Arsenic in Sediments of a Mining-Contaminated Freshwater Lake

Arsenic-containing minerals mobilized during mining activities and deposited to Lake Coeur d'Alene (CDA), Idaho sediments represent a potential source of soluble As to the overlying water. Our objective was to delineate the processes controlling porewater As concentrations within Lake CDA sediments. Sediment and porewater As concentrations were determined, and solid-phase As associations were probed using X-ray absorption near-edge structure (XANES) spectroscopy. Although maximum As in the sediment porewaters varied from 8.4 to 16.2 microM, As sorption on iron oxyhydroxides at the oxic sediment-water interface prevented flux to overlying water. Floods deposit sediment containing variable amounts of arsenopyrite (FeAsS), with majorfloods depositing large amounts of sediment that bury and preserve reduced minerals. Periods of lower deposition increase sediment residence times in the oxic zone, promoting oxidation of reduced minerals, SO4(2-) efflux, and formation of oxide precipitates. Depositional events bury oxides containing sorbed As, transitioning them into anoxic environments where they undergo dissolution, releasing As to the porewater. High Fe:S ratios limit the formation of arsenic sulfides in the anoxic zone. As a result of As sequestration at the sediment-water interface and its release upon burial, decreased concentrations of porewater As will not occur unless As-bearing erosional inputs are eliminated.

54 ENVIRONMENTAL SCIENCES↗

Powering Sovereign Communities, Sustaining Future Generations

Brochure with an overview of the U.S. Department of Energy Office of Indian Energy programs and projects designed to assist American Indians and Alaska Native villages with energy and infrastructure development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗