Search NASA⌕ Search

SEARCH · Search NASA

Results for “Combined License”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Review Team Focused Modeling Analysis of Radial Collector Well Operation on the Hypersaline Groundwater Plume beneath the Turkey Point Site near Homestead, Florida

Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company’s application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units—Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction and operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Aerosol penetration of leak pathways : an examination of the available data and models.

Data and models of aerosol particle deposition in leak pathways are described. Pathways considered include capillaries, orifices, slots and cracks in concrete. The Morewitz-Vaughan criterion for aerosol plugging of leak pathways is shown to be applicable only to a limited range of particle settling velocities and Stokes numbers. More useful are sampling efficiency criteria defined by Davies and by Liu and Agarwal. Deposition of particles can be limited by bounce from surfaces defining leak pathways and by resuspension of particles deposited on these surfaces. A model of the probability of particle bounce is described. Resuspension of deposited particles can be triggered by changes in flow conditions, particle impact on deposits and by shock or vibration of the surfaces. This examination was performed as part of the review of the AP1000 Standard Combined License Technical Report, APP-GW-GLN-12, Revision 0, 'Offsite and Control Room Dose Changes' (TR-112) in support of the USNRC AP1000 Standard Combined License Pre-Application Review.

99 GENERAL AND MISCELLANEOUS↗

COL Application Content Guide for HTGRs: Revision to RG 1.206, Part 1 - Status Report

A combined license (COL) application is required by the Nuclear Regulatory Commission (NRC) for all proposed nuclear plants. The information requirements for a COL application are set forth in 10 CFR 52.79, “Contents of Applications; Technical Information in Final Safety Analysis Report.” An applicant for a modular high temperature gas-cooled reactor (HTGR) must develop and submit for NRC review and approval a COL application which conforms to these requirements. The technical information necessary to allow NRC staff to evaluate a COL application and resolve all safety issues related to a proposed nuclear plant is detailed and comprehensive. To this, Regulatory Guide (RG) 1.206, “Combined License Applications for Nuclear Power Plants” (LWR Edition), was developed to assist light water reactor (LWR) applicants in incorporating and effectively formatting required information for COL application review (Ref. 1). However, the guidance prescribed in RG 1.206 presumes a LWR design proposal consistent with the systems and functions associated with large LWR power plants currently operating under NRC license.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NGNP (Next Generation Nuclear Plant Project): High Temperature Gas-Cooled Reactor Key Definitions, Plant Capabilities, and Assumptions

This document is intended to provide a Next Generation Nuclear Plant (NGNP) Project tool in which to collect and identify key definitions, plant capabilities, and inputs and assumptions to be used in ongoing efforts related to the licensing and deployment of a high temperature gas-cooled reactor (HTGR). These definitions, capabilities, and assumptions are extracted from a number of sources, including NGNP Project documents such as licensing related white papers and previously issued requirement documents. Also included is information agreed upon by the NGNP Regulatory Affairs group's Licensing Working Group and Configuration Council. The NGNP Project approach to licensing an HTGR plant via a combined license (COL) is defined within the referenced white papers and reference, and is not duplicated here.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Structural Design Challenges in Design Certification Applications for New Reactors

The licensing framework established by the U.S. Nuclear Regulatory Commission under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” provides requirements for standard design certifications (DCs) and combined license (COL) applications. The intent of this process is the early reso- lution of safety issues at the DC application stage. Subsequent COL applications may incorporate a DC by reference. Thus, the COL review will not reconsider safety issues resolved during the DC process. However, a COL application that incorporates a DC by reference must demonstrate that relevant site-specific de- sign parameters are confined within the bounds postulated by the DC, and any departures from the DC need to be justified. This paper provides an overview of structural design chal- lenges encountered in recent DC applications under the 10 CFR Part 52 process, in which the authors have participated as part of the safety review effort.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Seismic Analysis Issues in Design Certification Applications for New Reactors

The licensing framework established by the U.S. Nuclear Regulatory Commission under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” provides requirements for standard design certifications (DCs) and combined license (COL) applications. The intent of this process is the early reso- lution of safety issues at the DC application stage. Subsequent COL applications may incorporate a DC by reference. Thus, the COL review will not reconsider safety issues resolved during the DC process. However, a COL application that incorporates a DC by reference must demonstrate that relevant site-specific de- sign parameters are within the bounds postulated by the DC, and any departures from the DC need to be justified. This paper provides an overview of several seismic analysis issues encountered during a review of recent DC applications under the 10 CFR Part 52 process, in which the authors have participated as part of the safety review effort.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modular HTGR Safety Basis and Approach

The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) capable of producing electricity and/or high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) process, as recommended in the NGNP Licensing Strategy - A Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy [DOE/NRC 2008]. Nuclear Regulatory Commission (NRC) licensing of the NGNP plant utilizing this process will demonstrate the efficacy for licensing future HTGRs for commercial industrial applications. This information paper is one in a series of submittals that address key generic issues of the priority licensing topics as part of the process for establishing HTGR regulatory requirements. This information paper provides a summary level introduction to HTGR history, public safety objectives, inherent and passive safety features, radionuclide release barriers, functional safety approach, and risk-informed safety approach. The information in this paper is intended to further the understanding of the modular HTGR safety approach with the NRC staff and public stakeholders. The NGNP project does not expect to receive comments on this information paper because other white papers are addressing key generic issues of the priority licensing topics in greater detail.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NEXT GENERATION NUCLEAR PLANT LICENSING BASIS EVENT SELECTION WHITE PAPER

The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) plant capable of producing the electricity and high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) application process, as recommended in the Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy. NRC licensing of the NGNP plant utilizing this process will demonstrate the efficacy of licensing future HTGRs for commercial industrial applications. This white paper is one in a series of submittals that will address key generic issues of the COL priority licensing topics as part of the process for establishing HTGR regulatory requirements.

99 GENERAL AND MISCELLANEOUS↗

License Structure for Multi-Module Facilities

The Next Generation Nuclear Plant (NGNP) Project is intended to be the prototype for multi-module commercial high temperature gas reactors (HTGRs) for process heat and/or electricity generation. Part of the objectives of the project are to establish the conditions that would govern or enhance the design, licensing, construction and operation of numerous, modular nuclear plants, particularly suited for industrial applications or that could reduce the risk of such projects. A determination is desired regarding whether a multi-module reactor plant can be licensed with a single Nuclear Regulatory Commission (NRC) review, hearing, and safety evaluation report. If it is determined that a multi-modular reactor plant can be licensed under a single review/hearing process, the structure and the duration of the license for each module will also need to be determined. The purpose of this paper is to describe for the NRC the NGNP position on these two issues and obtain either NRC general concurrence or comments on the approach to these issues. While the current NGNP planning provides for only a single reactor module, the project is intended to provide the basis and establish a licensing framework that can be used by future commercial HTGRs and other reactor designs, including a variety of small modular reactor technologies, with configurations reflecting design standardization of multi-module plants. Therefore, it is important to identify a path for addressing these modular reactor plant issues so that the resolution can be factored into the NGNP Project planning. The NGNP position is that a single combined license (COL) application can be submitted for a multi-modular reactor facility, the COL application can undergo a single NRC review/hearing process, and each module should be issued a separate license.

99 GENERAL AND MISCELLANEOUS↗

Engineering Evaluation of X/Q Values Consistent with Regulatory Guide 1.145

A goal for the Next Generation Nuclear Power (NGNP) is to demonstrate compliance with regulatory dose limits bases on an exclusion area boundary and emergency planning zones boundaries set nominally to 400 meters. This paper presents the development of the atmospheric dispersion (X/Q) estimates for use in calculating doses at this distance and evaluating the resultant X/Q for an 800 meter receptor against X/Q values submitted to the NRC for review as part of Design Control Documentation (DCD) in support of future combined licensing (COL) Applications.

Ross, Steven B.↗

Dismantling of the 904 Cell at the HAO/Sud Facility - 13466

La Hague facility, in France, is the spent fuel recycling plant wherein a part of the fuel coming from some of the French, German, Belgian, Swiss, Dutch and Japanese nuclear reactors is reprocessed before being recycled in order to separate certain radioactive elements. The facility has been successively handled by the CEA (1962-1978), Cogema (1978-2006), and AREVA NC (since 2006). La Hague facility is composed of 3 production units: The UP2-400 production unit started to be operated in 1966 for the reprocessing of UNGG metal fuel. In 1976, following the dropout of the graphite-gas technology by EDF, an HAO workshop to reprocess the fuel from the light water reactors is affiliated and then stopped in 2003. - UP2-400 is partially stopped in 2002 and then definitely the 1 January 2004 and is being dismantled - UP2-800, with the same capacity than UP3, started to be operated in 1994 and is still in operation. And UP3 - UP3 was implemented in 1990 with an annual reprocessing capacity of 800 tons of fuel and is still in operation The combined licensed capacity of UP2-800 and UP3 is 1,700 tons of used fuel. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

EIS No. 20100312 EIS Comanche Peak Nuclear Power Plant Units 3 and 4

In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA's comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA's comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100312, Draft EIS, NRC, TX, Comanche Peak Nuclear Power Plant Units 3 and 4, Application for Combined Licenses (COLs) for Construction Permits and Operating Licenses, (NUREG-1943), Hood and Somervell Counties, TX, Comment Period Ends: 10/26/2010.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

HFE Process Guidance and Standards for potential application to updating NRC guidance

The U.S. Nuclear Regulatory Commission (NRC) reviews and evaluates the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of these guidance documents to ensure that they remain state-of-the-art design evaluation tools. Thus, the NRC has initiated a project with BNL to update the NRC guidance to remain current with recent research on human performance, advances in HFE methods and tools, and new technology. INL supported Brookhaven National Lab (BNL) to update the detailed HFE review criteria contained in NUREG-0711 and NUREG-0700 based on (1) feedback obtained from end users, (2) the results of NRC research and development efforts supporting the NRC staff’s HFE safety reviews, and (3) other material the project staff identify as applicable to the update effort. INL submitted comments on development plans and sections of NUREGs 0800, 0711, and 0700. The contractor prepared the report attached here as the deliverable for this work.

99 GENERAL AND MISCELLANEOUS↗

Updating Human Factors Engineering Guidelines for Conducting Safety Reviews of Nuclear Power Plants

The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. This paper describes the role of HFE guidelines in the safety review process and the content of the key HFE guidelines used. Then we will present the methodology used to develop HFE guidance and update these documents, and describe the current status of the update program.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Human Factors Engineering Program Review Model (NUREG-0711)Revision 3: Update Methodology and Key Revisions

The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. NUREG-0711 is the first document to be addressed. We present the methodology used to update NUREG-0711 and summarize the main changes made. Finally, we discuss the current status of the update program and the future plans.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Informed, Performance-Based, Technology-Inclusive Regulatory Infrastructure: Technology-Inclusive Determination of Mechanistic Source Terms for Offsite Dose-Related Assessments for Advanced Nuclear Reactor Facilities

This report summarizes a risk informed, performance-based and technology-inclusive approach to determine source terms for dose related assessments at advanced nuclear facilities. This approach uses a graded process which allows both the non-mechanistic source terms calculation methods, which adopt conservative approaches and assumptions based on known physical and chemical principles, and more importantly the mechanistic source term calculation methods, which consider design-specific scenarios and use best estimate models with uncertainty quantification for a range of licensing basis events (LBEs), to be used for the design and licensing of advanced nuclear technologies. The source terms developed with this graded approach, and radionuclide inventories elsewhere in the facility that are determined during source term analysis, can be used to address licensing issues to support the application processes of 10 CFR Part 50 for a construction permit and operating license or 10 CFR Part 52 for a Combined Operating License (COL), Standard Design Certification, Early Site Permit, Standard Design Approval or Manufacturing License. They can also be used for other purposes including equipment environmental qualification, control room habitability analyses, and assessments of severe accident risks in environmental impact statements. There are many advanced reactor concepts being developed including high temperature gas-cooled reactor (HGTR), sodium-cooled fast reactor (SFR), lead-cooled fast reactor (LFR), molten salt reactor (MSR), micro-reactor, etc. The graded approach presented in this report for source terms determination is, to the extent possible, generic to any of these reactor designs and to future reactor designs. This report provides information on the review of the regulatory foundation for use of conservative bounding source terms as well as event-specific mechanistic source terms for advanced nuclear reactor designs.

07 ISOTOPE AND RADIATION SOURCES↗

NGNP Licensing Plan, PLN-3202

The nuclear energy industry has been traditionally using light water reactor (LWR) technology for the generation of electricity. This technology limits process steam temperature to approximately 300°C. Alternatively, high temperature gas-cooled reactor (HTGR) technology can provide both electricity and the high temperature heat needed for industrial processes. In fact, HTGR technology is expected to supply process heat as an alternative to existing carbon-based sources in commercial applications. These potential applications include co-generation of electricity and steam supply or high temperature gas supply to petrochemical and refining plants, electricity and steam supply for oil sands oil recovery, and high temperature steam or gas and electricity for hydrogen production. Applied in this way, HTGR technology can significantly reduce the use of premium fossil fuels for the production of process heat and reduce greenhouse gas releases, thus providing a significant competitive advantage for U.S. industrial markets. The Next Generation Nuclear Plant (NGNP) will be a licensed commercial HTGR plant capable of producing the electricity and high temperature process heat for the industrial markets discussed above. The NGNP Project will design, construct, and operate the HTGR plant and associated technologies to establish the technological basis for commercialization of this new generation of advanced nuclear plants. The Nuclear Regulatory Commission (NRC) will license the NGNP for operation, which is consistent with the Energy Reorganization Act of 1974 that assigns the responsibility for licensing new Department of Energy (DOE) reactors to the NRC if they are used to generate power for an electric utility system or operated in any manner to demonstrate the suitability for subsequent use by the commercial power industry. NRC licensing of the NGNP will demonstrate the efficacy of licensing future gas-cooled reactors for commercial industrial applications.

42 ENGINEERING↗

Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗