Search NASASearch

SEARCH · Search NASA

Results for “Commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Commissioning of the Liquid Nitrogen Thermo-Siphon System for NASA-JSC Chamber-A

NASA's Space Environment Simulation Laboratory's (SESL) Chamber A, located at the Johnson Space Center in Houston Texas has recently implemented major enhancements of its cryogenic and vacuum systems. The new liquid nitrogen (LN2) thermo-siphon system was successfully commissioned in August of 2012. Chamber A, which has 20 K helium cryo-panels (or shrouds ) which are shielded by 80 K nitrogen shrouds, is capable of simulating a deep space environment necessary to perform ground testing of NASA s James Webb Space Telescope (JWST). Chamber A s previous system used forced flow LN2 cooling with centrifugal pumps, requiring 200,000 liters of LN2 to cool-down and consuming 180,000 liters per day of LN2 in steady operation. The LN2 system did not have the reliability required to meet the long duration test of the JWST, and the cost estimate provided in the initial approach to NASA-JSC by the sub-contractor for refurbishment of the system to meet the reliability goals was prohibitive. At NASA-JSC's request, the JLab Cryogenics Group provided alternative options in 2007, including a thermo-siphon, or natural flow system. This system, eliminated the need for pumps and used one tenth of the original control valves, relief valves, and burst disks. After the thermo-siphon approach was selected, JLab provided technical assistance in the process design, mechanical design, component specification development and commissioning oversight, while the installation and commissioning operations of the system was overseen by the Jacobs Technology/ESC group at JSC. The preliminary commissioning data indicate lower shroud temperatures, 70,000 liters to cool-down and less than 90,000 liters per day consumed in steady operation. All of the performance capabilities have exceeded the design goals. This paper will outline the comparison between the original system and the predicted results of the selected design option, and the commissioning results of thermo-siphon system.

Homan, J.

Commissioning of the Liquid Nitrogen Thermo-Siphon System for NASA-JSC Chamber A

NASA s Space Environment Simulation Laboratory s (SESL) Chamber A, located at the Johnson Space Center in Houston Texas has recently implemented major enhancements of its cryogenic and vacuum systems. The new liquid nitrogen (LN) thermo-siphon system was successfully commissioned in August of 2012. Chamber A, which has 20 K helium cryo-panels (or shrouds ) which are shielded by 80 K nitrogen shrouds, is capable of simulating a deep space environment necessary to perform ground testing of NASA s James Webb Space Telescope (JWST). Chamber A s previous system used forced flow LN cooling with centrifugal pumps, requiring 220,000 liters of LN to cool-down and consuming 180,000 liters per day of LN in steady operation. The LN system did not have the reliability required to meet the long duration test of the JWST, and the cost estimate provided in the initial approach to NASA-JSC by the subcontractor for refurbishment of the system to meet the reliability goals was prohibitive. At NASA-JSC s request, the JLab Cryogenics Group provided alternative options in 2007, including a thermo-siphon, or natural flow system. This system, eliminated the need for pumps and used one tenth of the original control valves, relief valves, and burst disks. After the thermo-siphon approach was selected, JLab provided technical assistance in the process design, mechanical design, component specification development and commissioning oversight, while the installation and commissioning operations of the system was overseen by the Jacobs Technology/ESC group at JSC. The preliminary commissioning data indicate lower shroud temperatures, 68,000 liters to cool-down and less than 91,000 liters per day consumed in steady operation. All of the performance capabilities have exceeded the design goals. This paper will outline the comparison between the original system and the predicted results of the selected design option, and the commissioning results of thermo-siphon system.

Homan, J.

Mars 2020 Perseverance Rover Surface Operations Commissioning Phase Overview

This paper presents work done by the Mars 2020 Project to plan, test, and execute the Mars 2020 Perseverance Rover surface operations commissioning phase. Immediately after the successful landing of Mars 2020 Perseverance rover at Jezero Crater on February 18, 2021, the rover autonomously initiated mission critical commanding necessary to transition the vehicle from a Cruise/EDL to Surface operations configuration. This began the surface operations commissioning phase, referred to as Surface Operations Transition (SOX). The objective of SOX phase is to establish vehicle health and safety and to verify that the operational characteristics of the vehicle, now operating in the Martian environment, are as-expected and safe to proceed into nominal operations. The SOX commissioning phase is organized into six logical sub-phases occurring in the following chronological order; (1) SOX1a, (2) FSW Transition, (3) SOX1b, (4) SOX2a, (5) Heli, (6) SOX2b. In total, the SOX commissioning phase was expected to take up-to 111 sols (Martian days). The Perseverance rover is an extremely complex, highly-integrated, robotic system-of-systems that requires numerous activities to incrementally and methodically verify their safe operations. This paper will discuss the development process used to plan, test, and execute the SOX commissioning phase for Mars 2020 Perseverance rover surface operations. We will discuss key challenges associated with SOX development as well as actual operations execution experience.

Koch, Justin

The UNO Aviation Monograph Series: Aviation Security: An Annotated Bibliography of Responses to the Gore Commission

This monograph is a companion to UNOAI Monograph 96-2, "The Image of Airport Security: An Annotated Bibliography," compiled in June 1996. The White House Commission on Aviation Safety and Security, headed by Vice President Al Gore, was formed as a result of the TWA Flight 800 crash in August 1996. The Commission's final report included 31 recommendations addressed toward aviation security. The recommendations were cause for security issues to be revisited in the media and by the aviation industry. These developments necessitated the need for an updated bibliography to review the resulting literature. Many of the articles were written in response to the recommendations made by the Gore Commission. "Aviation Security: An Annotated Bibliography of Responses to the Gore Commission" is the result of this need.

Carrico, John S.

Solar Dynamics Observatory Launch and Commissioning

The Solar Dynamics Observatory (SDO) was launched on February 11, 2010. Over the next three months, the spacecraft was raised from its launch orbit into its final geosynchronous orbit and its systems and instruments were tested and calibrated in preparation for its desired ten year science mission studying the Sun. A great deal of activity during this time involved the spacecraft attitude control system (ACS); testing control modes, calibrating sensors and actuators, and using the ACS to help commission the spacecraft instruments and to control the propulsion system as the spacecraft was maneuvered into its final orbit. This paper will discuss the chronology of the SDO launch and commissioning, showing the ACS analysis work performed to diagnose propellant slosh transient and attitude oscillation anomalies that were seen during commissioning, and to determine how to overcome them. The simulations and tests devised to demonstrate correct operation of all onboard ACS modes and the activities in support of instrument calibration will be discussed and the final maneuver plan performed to bring SDO on station will be shown. In addition to detailing these commissioning and anomaly resolution activities, the unique set of tests performed to characterize SDO's on-orbit jitter performance will be discussed.

O'Donnell, James R., Jr.

Commissioning of a 20 K Helium Refrigeration System for NASA-JSC Chamber A

A new 20 K helium refrigerator installed at NASA Johnson Space Center s Space Environment Simulation Laboratory (SESL) was successfully commissioned and tested in 2012. The refrigerator is used to create a deep space environment within SESL s Chamber A to perform ground testing of the James Webb Space Telescope (JWST). The chamber previously and currently still has helium cryo-pumping panels (CPP) and liquid nitrogen shrouds used to create low earth orbit environments. Now with the new refrigerator and new helium shrouds the chamber can create a deep space environment. The process design, system analysis, specification development, and commissioning oversight were performed by the cryogenics department at Jefferson Lab, while the contracts and system installation was performed by the ESC group at JSC. Commissioning data indicate an inverse coefficient of performance better than 70 W/W for a 18 kW load at 20 K (accounting for liquid nitrogen pre-cooling power) that remains essentially constant down to one third of this load. Even at 10 percent of the maximum capacity, the performance is better than 150 W/W at 20 K. The refrigerator exceeded all design goals and demonstrated the ability to support a wide load range from 10 kW at 15 K to 100 kW at 100 K. The refrigerator is capable of operating at any load temperature from 15 K to ambient with tight temperature stability. The new shroud (36 tons of aluminum) can be cooled from room temperature to 20 K in 24 hours. This paper will outline the process design and commissioning results.

Homan, J.

Geothermal research and development program of the US Atomic Energy Commission

Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

Werner, L. B.

Report of the Presidential Commission on the Space Shuttle Challenger Accident, Volume 1

The findings of the Commission regarding the circumstances surrounding the Challenger accident are reported and recommendations for corrective action are outlined. All available mission data, subsequent tests, and wreckage analyses were reviewed and specific failure scenarios were developed. The Commission concluded that the cause of the Mission 51-L accident was the failure of the pressure seal in the aft field joint of the right solid rocket motor. The failure was due to a faulty design unacceptably sensitive to a number of factors. These factors were the effects of temperature, physical dimensions, the character of materials, the effects of reuse, processing, and the reaction of the joint to dynamic loading. In addition to analyzing the material causes of the accident, the Commission examined the chain of decisions that culminated in approval of the launch. It concluded that the decision making process was flawed in several ways including (1) failure in communication resulting in a launch decision based on incomplete and misleading information, (2) a conflict between engineering data and management judgements, and (3) a NASA management structure that permitted flight safety problems to bypass key Shuttle managers.

Rogers, W. P.

Implementation of the Recommendations of the Presidential Commission on the Space Shuttle Challenger Accident

This final status report describes the actions taken by NASA in response to the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident (Mission 51-L). The Commission recommendations and NASA's responses to them are summarized in the Executive Summary, which is accompanied by a schedule showing significant program milestones. A detailed discussion of the activities undertaken by NASA to implement each of the nine Commission recommendations is included and other related NASA actions required for safe return to flight are discussed. A copy of the interim plan submitted to the President one year ago and other significant reference documents are included as appendixes.

Source record

Commissioning Results on the JWST Testbed Telescope

The one-meter 18 segment JWST Testbed Telescope (TBT) has been developed at Ball Aerospace to facilitate commissioning operations for the JWST Observatory. Eight different commissioning activities were tested on the TBT: telescope focus sweep, segment ID and Search, image array, global alignment, image stacking, coarse phasing, fine phasing, and multi-field phasing. This paper describes recent commissioning results from experiments performed on the TBT.

Dean, Bruce H.

NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

Hoover, Jay C.

Dynamic Control System Performance during Commissioning of the Space Technology 7-Disturbance Reduction System Experiment of LISA Pathfinder

The Space Technology-7 Disturbance Reduction System (DRS) launched aboard the European Space Agencys LISA Pathfinder spacecraft on December 3, 2015, after more than a decade in development. DRS consists of three prima-ry components: an Integrated Avionics Unit (IAU), Colloidal MicroNewton Thrusters, and Dynamic Control System (DCS) algorithms implemented on the IAU. During the portions of the mission in which the DRS was under control, the DCS was responsible for controlling the spacecraft and the free-floating test masses that were part of the LISA Test Package. The commissioning period was originally divided into two periods: before propulsion separation and after pro-pulsion separation. A recommissioning period was added after an anomaly oc-curred in the thruster system. The paper will describe the activities used to com-mission DRS, present results from the commissioning of the DCS and the re-commissioning activities performed after the thruster anomaly.

Hsu, Oscar

Dynamic Control System Performance during Commissioning of the Space Technology 7-Disturbance Reduction System Experiment of LISA Pathfinder

The Space Technology-7 Disturbance Reduction System (DRS) launched aboard the European Space Agency's LISA Pathfinder spacecraft on December 3, 2015, after more than a decade in development. DRS consists of three primary components: an Integrated Avionics Unit (IAU), Colloidal MicroNewton Thrusters, and Dynamic Control System (DCS) algorithms implemented on the IAU. During the portions of the mission in which the DRS was under control, the DCS was responsible for controlling the spacecraft and the free-floating test masses that were part of the LISA Test Package. The commissioning period was originally divided into two periods: before propulsion separation and after propulsion separation. A recommissioning period was added after an anomaly occurred in the thruster system. The paper will describe the activities used to commission DRS, present results from the commissioning of the DCS and the recommissioning activities per-formed after the thruster anomaly.

Hsu, Oscar

Astrobee On-Orbit Commissioning

The Astrobee free flying robots operate in the interior of the International Space Station (ISS) under supervisory control of a ground operator or ISS crew. They replace the Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) as research platforms for zero-g free-flying robotics. Astrobee also provides a tool for improving the efficiency of ISS operations as a mobile camera/sensor platform available to flight and payload controllers. The Astrobee system consists of three robots with perching arms, a docking station, and a ground data system. Development began in late-2014, and flight hardware has been deployed to ISS on several launches starting in November 2018 and concluding in October 2019. Shortly after the first two robots arrived on ISS in April, we began a series of "commissioning" activities to validate both space and ground segments. We plan to complete commissioning and become an operational facility available to guest scientists by the end of 2019. This paper provides an overview of the Astrobee system, a description of the on-orbit activities, and commissioning results.

ISS

Commissioning MMS: Challenges and Lessons Learned

This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

Space Operations Center

Commissioning MMS

This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

Space Operations Center

Kepler Commissioning Data for Measurement of the Pixel Response Function and Focal Plane Geometry

This document describes the Kepler PRF/FPG data release. This data was taken on April 27-29, 2009, during Kepler's commissioning phase in order to measure the pixel response function (PRF) (Bryson et al., 2010a) and focal plane geometry (FPG) (Tenenbaum and Jenkins, 2010). 33,424 stellar targets were observed for 243 long cadences, each with a duration of 14.7 minutes (half the duration of a normal Kepler long cadence). During these 243 cadences the Kepler photometer was moved, pointing in a dither pattern to facilitate PRF measurement. Motion occurred during the even cadences (second, fourth, etc.), with the telescope in stable fine point at each pointing in the dither pattern during the odd cadences (first, third, etc.). The first and last cadences were at the center of the dither pattern. Motion cadences are included in this release, but they do not contain any data. For details on how this data was used to derive the Kepler PRF and FPG models, see Bryson et al. (2010a) and Tenenbaum and Jenkins (2010). Descriptions of the PRF and FPG models are found in Thompson et al. (2016), x2.3.5.17 and x2.3.5.16 respectively. The data in this release can be used to recompute the Kepler PRF and FPG. Such a reconstruction, however, would not reflect measured seasonal changes in the PRF described in Van Cleve et al. (2016b), x5.2.The dither pattern is shown in Figure 1. The crosses show the commanded pointings and the circles show the measured pointings. Measured pointings are different from the commanded pointings due to the early state of calibration of the fine guidance sensors during commissioning (Van Cleve et al., 2016a). The measured offsets from the center of the pattern are given in RADEC offsets and pixel offsets in Table 1. The order of the offsets was randomized during data collection to avoid time-dependent systematics.

Kepler

Magnetospheric Multiscale (MMS) Mission Commissioning Phase Orbit Determination Error Analysis

The Magnetospheric MultiScale (MMS) mission commissioning phase starts in a 185 km altitude x 12 Earth radii (RE) injection orbit and lasts until the Phase 1 mission orbits and orientation to the Earth-Sun li ne are achieved. During a limited time period in the early part of co mmissioning, five maneuvers are performed to raise the perigee radius to 1.2 R E, with a maneuver every other apogee. The current baseline is for the Goddard Space Flight Center Flight Dynamics Facility to p rovide MMS orbit determination support during the early commissioning phase using all available two-way range and Doppler tracking from bo th the Deep Space Network and Space Network. This paper summarizes th e results from a linear covariance analysis to determine the type and amount of tracking data required to accurately estimate the spacecraf t state, plan each perigee raising maneuver, and support thruster cal ibration during this phase. The primary focus of this study is the na vigation accuracy required to plan the first and the final perigee ra ising maneuvers. Absolute and relative position and velocity error hi stories are generated for all cases and summarized in terms of the ma ximum root-sum-square consider and measurement noise error contributi ons over the definitive and predictive arcs and at discrete times inc luding the maneuver planning and execution times. Details of the meth odology, orbital characteristics, maneuver timeline, error models, and error sensitivities are provided.

Chung, Lauren R.