Proceedings of the Second NASA-industry Program Plans Conference, Washington, D.C., February 11-12, 1963
Nasa-industry program plans conference
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Nasa-industry program plans conference
Abstract not provided.
Conference presentation for WM2022 Symposia. Presentation is very similar to presentation just submitted entitled 'Updated Waste Management System Analysis Tool Requirements and Enhancements'
To address the growing uncertainties in the future transportation industry, planners and engineers have identified and implemented scenario planning, a multi-step and strategic approach, in long-range transportation planning. A comprehensive examination of how equity is envisioned, planned, and analyzed during this process remains absent, despite several key guidelines of scenario planning exercises. This paper conducts a systematic literature review focusing on how equity has been considered and evaluated in scenario planning. The resources include academic papers, agency reports, and materials from the recent scenario planning conference, the 2nd Conference on Scenario Planning in Transportation hosted by the Transportation Research Board. This paper examines equity in scenario planning in three important ways: 1) the ways equity has been integrated across steps; 2) how equity analysis has evolved; and 3) when it is necessary to consider equity. This work adds value to the existing body of knowledge by presenting the policy implications based on the review of the current scenario planning research and practices. Early policy recommendations include the need for more vertical equity evaluations, the construction of robustness and justice indicators, and the adoption of a flexible mindset of planning for rather than being fixated on a single scenario.
A major theme was the opportunity offered by the International Space Year (ISY) to initiate a long-term program of Earth observation mission coordination and worldwide data standardization. The challenge is immense and extremely time critical. A recommendation was made to inventory the capabilities of Earth observing spacecraft scheduled during the next decade. The ISY effort to strengthen coordination and standardization should emphasize global issues, and also regional initiatives of particular relevance to developing nations. The concepts of a Global Information System Test (GIST) was accepted and applied to specific issues of immediate concern. The importance of ISY Earth observation initiatives extending beyond research to include immediate and direct applications for social and economic development was stressed. Several specific Mission to Planet Earth proposals were developed during the Conference. A mechanism was set up for coordinating participation of the national space agencies or equivalent bodies.
The overall goal of the Mesoscale-to-Microscale Coupling (MMC) project is to improve coupling between mesoscale and microscale simulations via improved guidance and new strategies for setting up simulations and for the development of new tools that can be used across the community. Including the mesoscale forcing is critical to modeling the full energy transfer across scales in the atmosphere. The project-specific objectives include: 1) To apply rigorous verification and validation (V&V) techniques to the new modeling tools that are developed as part of the project to ensure the accuracy of our codes and results and to develop estimates of the relative uncertainty. 2) To improve computational performance of the coupled MMC models through the development of methods that can be used to reduce turbulence spin-up time and hence the size of computational domains. 3) To improve representation of the surface layer in microscale models to enhance simulations of hub-height wind speed. 4) To develop guidance for the community describing the best ways to couple mesoscale and microscale models, including specific spatial scales at which the handoff to the microscale model should occur. 5) To prepare documentation and a suite of software tools that can be used across the community. And 6) To transition MMC research to the offshore environment. Major progress was made in each of these areas during FY20. The land-based portion of the project is reported herein, while the offshore portion will be reported separately. The team continued to advance the MMC tools and methodologies as well as to document their performance in journal papers and conference presentations, although several planned conferences were cancelled due to the COVID-19 pandemic.
Planning and technological issues involved in rotorcraft and commuter fixed-wing air transportation are discussed. Subject areas include the future community environment, aircraft technology, community transportation planning, and regulatory perspectives.
This is a brief presentation on land use planning for large-scale solar, which will be part of a panel session at the Upper Midwest Regional Planning Conference (a multi-state conference for urban and regional planners). The presentation focuses on examples and opportunities to plan for low-impact solar that will maximize local benefits.
The 1985 World Administrative Radio Conference (WARC-ORB-85) was held to determine which space radio services should be planned and which planning methods should be used. The second session of this Conference (WARC-ORB-88) will meet to develop the required plans. This paper presents the results of WARC-ORB-85, assesses the impact of those decisions, and identifies the intersessional work to be conducted by administrations and the CCIR (Consultative Committee on International Radio). The major decisions of WARC-ORB-85 were: (1) the restriction of additional planning to the fixed satellite service at identified frequencies; and (2) the selection of a planning method consisting of two parts (a) an allotment plan, and (b) improved procedures. The paper also discusses WARC-ORB-85 decisions relative to the Region 2 broadcast satellite service plans at 12 GHz, feederlink planning for Regions 1 and 3 broadcast satellites at 12 GHz, and sound broadcast satellite service.
The 1985 World Administrative Radio Conference (WARC-ORB-85) was held to determine which space radio services should be planned and which planning methods should be used. The second session of this Conference (WARC-ORB-88) will meet to develop the required plans. This paper presents the results of WARC-ORB-85, assesses the impact of those decisions, and identifies the intersessional work to be conducted by administrations and the CCIR (consultative Committee on International Radio). The major decisions of WARC-ORB-85 were: (1) the restriction of additional planning to the fixed satellite service at identified frequencies; and (2) the selection of a planning method consisting of two parts: (a) an allotment plan, and (b) improved procedures. The paper also discusses WARC-ORB-85 decisions relative to the Region 2 broadcast satellite service plans at 12 GHz, feederlink planning for Regions 1 and 3 broadcast satellites at 12 GHz, and sound broadcast satellite service.
The summer of 1997 will not only be noted by NASA for the mission to Mars by the Pathfinder but also for the 179 brilliant apprentices that participated in the SHARP Program. Apprentice participation increased 17% over last year's total of 153 participants. As indicated by the End-of-the-Program Evaluations, 96% of the programs' participants rated the summer experience from very good to excellent. The SHARP Management Team began the year by meeting in Cocoa Beach, Florida for the annual SHARP Planning Conference. Participants strengthened their Education Division Computer Aided Tracking System (EDCATS) skills, toured the world-renowned Kennedy Space Center, and took a journey into space during the Alien Encounter Exercise. The participants returned to their Centers with the same goals and objectives in mind. The 1997 SHARP Program goals were: (1) Utilize NASA's mission, unique facilities and specialized workforce to provide exposure, education, and enrichment experiences to expand participants' career horizons and inspire excellence in formal education and lifelong learning. (2) Develop and implement innovative education reform initiatives which support NASA's Education Strategic Plan and national education goals. (3) Utilize established statistical indicators to measure the effectiveness of SHARP's program goals. (4) Explore new recruiting methods which target the student population for which SHARP was specifically designed. (5) Increase the number of participants in the program. All of the SHARP Coordinators reported that the goals and objectives for the overall program as well as their individual program goals were achieved. Some of the goals and objectives for the Centers were: (1) To increase the students' awareness of science, mathematics, engineering, and computer technology; (2) To provide students with the opportunity to broaden their career objectives; and (3) To expose students to a variety of enrichment activities. Most of the Center goals and objectives were consistent with the overall program goals. Modem Technology Systems, Inc., was able to meet the SHARP Apprentices, Coordinators and Mentors during their site visits to Stennis Space Center, Ames Research Center and Dryden Flight Research Center. All three Centers had very efficient programs and adhered to SHARP's general guidelines and procedures. MTSI was able to meet the apprentices from the other Centers via satellite in July during the SHARP Video-Teleconference(ViTS). The ViTS offered the apprentices and the NASA and SHARP Coordinators the opportunity to introduce themselves. The apprentices from each Center presented topical "Cutting Edge Projects". Some of the accomplishments for the 1997 SHARP Program year included: MTSI hiring apprentices from four of the nine NASA Centers, the full utilization of the EDCATS by apprentices and NASA/SHARP Coordinators, the distribution of the SHARP Apprentice College and Scholarship Directory, a reunion with former apprentices from Langley Research Center and the development of a SHARP Recruitment Poster. MTSI developed another exciting newsletter containing graphics and articles submitted by the apprentices and the SHARP Management Team.
The annual String Data conferences have become the flagship annual meeting for the subfield at the interface of formal high energy theory, pure mathematics, and machine learning. String Data 2023 featured invited plenary talks by leading researchers in addition to a parallel session. The funds helped mitigate conference planning and provided support to young researchers.
GEOS 1 performance, tracking and data processing operations, and GEOS B experiment and launching plans - conference
The NASA/VOA Direct Broadcast Satellite-Radio (DBS-R) Program will be using a NASA Tracking Data Relay Satellite (TDRS) satellite at 62 deg. West longitude to conduct live satellite S-band propagation experiments and demonstrations of satellite sound broadcasting over the next two years (1993-1994). The NASA/VOA DBS-R program has applied intensive effort to garner domestic and international support for the DBS-R concept. An S-band DBS-R allocation was achieved for Region 2 at WARC-92 held in Spain. With this allocation, the DBS-R program now needs to conduct S-band propagation experiments and systems demonstrations that will assist in the development of planning approaches for the use of Broadcast Satellite Service (Sound) frequency bands prior to the planning conference called for by WARC-92. These activities will also support receiver concept development applied to qualities ranging from AM to Monophonic FM, Stereophonic FM, Monophonic CD, and Stereophonic CD quality.
The balance between receiver complexity and the required satellite equivalent isotropically radiated power (EIRP) for Direct Broadcast Satellite-Radio (DBS-R) service is addressed. In general the required receiver complexity and cost can be reduced at the expense of higher space-segment cost by allowing a higher satellite EIRP. The tradeoff outcome is sensitive to the total number of anticipated receivers in a given service area, the number of audio programs, and the required audio quality. An understanding of optimum choice of satellite EIRP for DBS-R under various service requirements is a critical issue at this time when International Radio Consultative Committee (CCIR) is soliciting input in preparation for the International Telecommunications Union (ITU) planning conference for the service.
The NASA/VOA Direct Broadcast Satellite - Radio (DBS-R) Program will be using a NASA Tracking Data Relay Satellite (TDRS) at 62 deg West longitude to conduct live satellite S-band propagation experiments and demonstrations of satellite sound broadcasting over the next two years (1993-1994). The NASA/VOA DBS-R program has applied intensive effort to garner domestic and international support for the DBS-R concept. An S-band DBS-R allocation was achieved for Region 2 at WARC-92 held in Spain. With this allocation, the DBS-R program now needs to conduct S-band propagation experiments and systems demonstrations that will assist in the development of planning approaches for the use of Broadcast Satellite Service (Sound) frequency bands prior to the planning conference called for by WARC-92. These activities will also support receiver concept development applied to qualities ranging from AM to Monophonic FM, Stereophonic FM, Monophonic CD, and Stereophonic CD quality.
The NASA/VOA Direct Broadcast Satellite - Radio (DBS-R) Program will be using a NASA Tracking Data Relay Satellite (TDRS) satellite at 62 deg West longitude to conduct live satellite S-band propagation experiments and demonstrations of satellite sound broadcasting over the next two years (1993-1994). The NASA/VOA DBS-R program has applied intensive effort to garner domestic and international support for the DBS-R concept. An S-band DBS-R allocation was achieved for Region 2 at WARC-92 held in Spain. With this allocation, the DBS-R program now needs to conduct S-band propagation experiments and systems demonstrations that will assist in the development of planning approaches for the use of Broadcast Satellite Service (Sound) frequency bands prior to the planning conference called for by WARC-92. These activities will also support receiver concept development applied to qualities ranging from AM to Monophonic FM, Stereophonic FM, Monophonic CD, and Stereophonic CD quality.