Search NASA⌕ Search

SEARCH · Search NASA

Results for “Configuration planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Configuration Management Plan

The Los Alamos Neutron Science Center (LANSCE) is located at Technical Area 53 (TA-53) at Los Alamos National Laboratory (LANL) in Los Alamos, New Mexico. LANSCE is driven by an 800 megaelectronvolt (MeV) proton accelerator that delivered its first beam in 1972. The LANSCE accelerator is unique in that it accelerates both H– (to full energy of 800 MeV) and H+ ions (up to 100 MeV currently but has accelerated high-power H+ beam to 800 MeV in the past) and supports five separate experimental areas that operate simultaneously, with each having different timing and beam current requirements. Many of the LANSCE accelerator front-end components date back to original commissioning in 1972, including the ion sources, Cockcroft-Walton (CW) generators, and the Drift Tube LINAC (DTL), which accelerates the beam up to 100 MeV.

43 PARTICLE ACCELERATORS↗

Document Configuration Management (DCM) Team Weapon Product Definition Group

Document Configuration Management (DCM) is the ongoing process of identifying and managing changes to deliverables and other work products. ALDW’s Document Configuration Plan provides a systematic, standardized process for the configuration management of documents to ensure that the most current and/or appropriate documents are being used, that any canceled or superseded document is properly processed, and that both a clear history and traceability of previous revisions are available.

99 GENERAL AND MISCELLANEOUS↗

SU-G-201-09: Evaluation of a Novel Machine-Learning Algorithm for Permanent Prostate Brachytherapy Treatment Planning

Purpose: A novel, automated, algorithm for permanent prostate brachytherapy (PPB) treatment planning has been developed. The novel approach uses machine-learning (ML), a form of artificial intelligence, to substantially decrease planning time while simultaneously retaining the clinical intuition of plans created by radiation oncologists. This study seeks to compare the ML algorithm against expert-planned PPB plans to evaluate the equivalency of dosimetric and clinical plan quality. Methods: Plan features were computed from historical high-quality PPB treatments (N = 100) and stored in a relational database (RDB). The ML algorithm matched new PPB features to a highly similar case in the RDB; this initial plan configuration was then further optimized using a stochastic search algorithm. PPB pre-plans (N = 30) generated using the ML algorithm were compared to plan variants created by an expert dosimetrist (RT), and radiation oncologist (MD). Planning time and pre-plan dosimetry were evaluated using a one-way Student’s t-test and ANOVA, respectively (significance level = 0.05). Clinical implant quality was evaluated by expert PPB radiation oncologists as part of a qualitative study. Results: Average planning time was 0.44 ± 0.42 min compared to 17.88 ± 8.76 min for the ML algorithm and RT, respectively, a significant advantage [t(9), p = 0.01]. A post-hoc ANOVA [F(2,87) = 6.59, p = 0.002] using Tukey-Kramer criteria showed a significantly lower mean prostate V150% for the ML plans (52.9%) compared to the RT (57.3%), and MD (56.2%) plans. Preliminary qualitative study results indicate comparable clinical implant quality between RT and ML plans with a trend towards preference for ML plans. Conclusion: PPB pre-treatment plans highly comparable to those of an expert radiation oncologist can be created using a novel ML planning model. The use of an ML-based planning approach is expected to translate into improved PPB accessibility and plan uniformity.

60 APPLIED LIFE SCIENCES↗

Neutron Absorber Plate Characterization Plan for Criticality Experiments Design

After being used in nuclear installations, depleted fuel can still be highly reactive and must be handled securely to prevent any radiological or criticality concerns. In particular, spent fuel from use in nuclear power reactors must be stored and transported in specifically designed containers using neutron absorber materials to prevent criticality. Various neutron absorber material types exist and are manufactured by various entities, as thoroughly described in the Handbook of Neutron Absorber Materials for Spent Nuclear Fuel Storage and Transportation Applications written by EPRI. Presently, one of the most modern and most widely used types of neutron absorber material contains particles of boron carbide, or B 4 C, embedded in aluminum matrix: Boralcan, manufactured by Rio Tinto. It is very important for the community to know as much as possible about such neutron absorber materials. Therefore, in the recent years, a US Department of Energy National Nuclear Security Administration–Nuclear Criticality Safety Program funded project initiated design of an experiment that places Boralcan neutron-absorbing plates in an established critical assembly using low-enriched uranium fuel at the Sandia Pulsed Reactor Facility/Critical Experiments (SPRF/CX) apparatus at Sandia National Laboratories. The goal of the experiment is to produce high-quality benchmark data to submit to the International Criticality Safety Benchmark Evaluation Project (ICSBEP), for use in validating calculational tools and nuclear data by criticality safety analysts. The project, named IER-554, is currently in its final design stage, following a successful preliminary design. In the work documented in the design study, ten critical configurations using Boralcan neutron absorber plates were designed, and the experiment was proven to be feasible, with a predicted low k eff uncertainty around 100 pcm. An overview of the modeled cutout of the critical assembly with a Boralcan plate is shown in Figure 1, representing one of the configurations planned for the critical experiments. Before the plates are inserted in the critical assembly, it is necessary to know more about their composition and uniformity. This summary focuses on the plate characterization plans. Each plate will undergo (1) neutron transmission measurements at different locations to determine the 10 B areal density and (2) an in-depth x-ray computed tomography (XCT) examination to obtain the exact Sizes and distribution of the B4C powder particles inside the plates. In parallel, plate modeling studies are performed with a goal to determine the validity of the currently used approximation of modeling the neutron absorber plates as a homogeneous mixture of Aluminum 1100 alloy and B4C— instead of explicitly modeling the B4C particles. By using the experimental 10 B areal density measurements, and the exact size and location of the B4C particles obtained by XCT, a plate model can theoretically be built that reproduces the plate with extremely high fidelity. The results of this modeling study could increase the confidence of the criticality safety community in its modeling methods when using this type of neutron absorber material, and the industry could use these validations to change the boron loading credit limits from the U.S. Nuclear Regulatory Commission standard review plan for dry cask storage of spent nuclear fuel. The modeling calculations are performed with SCALE 6.3.0 using the KENO V.a sequence for criticality calculations with the ENDF/B-VIII.0 continuous-energy cross section library.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

October 2019 SAPHIRE 8 Software Quality Assurance Oversight Status Report

The software quality assurance oversight consists of updating and maintaining revision control of the System Analysis Program for Hands-on Integrated Reliability Evaluations (SAPHIRE) Version 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE Version 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, Significance Determination Process (SDP) Interface Training Manual, and the SAPHIRE 8 “New Features and Capabilities Overview.” These documents are referred to and can be transmitted upon request of the Nuclear Regulatory Commission (NRC) Contracting Officer’s Representative (COR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Availability Considerations in the Design of K-DEMO

A DEMO device has been considered the next step following ITER as a near-term prototypical reactor design that is tritium self-sufficient and produces a limited amount of net electricity. The machine maintenance approach and planned configuration concept plays a major role in establishing the design point. DEMO will also need to show that adequate operating availability can be achieved over a reasonable time period, as a last step before full-scale electricity production. The ability to operate with high availability/reliability plays a key ingredient in defining the DEMO configuration, fostering the need for rapid removal/replacement of limited-life in-vessel components. DEMO pre-conceptual studies are being carried out by South Korea (with US participation) and other countries. The device designs span a range of maintenance approaches from full radial extraction of large in-vessel modules through all TF horizontal openings to vertical maintenance of segmented in-vessel components. Progress made on the S. Korea's K-DEMO design will be provided with emphasis on the design choices identified to promote high availability.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Pre-Project Planning for a Flameless Pressurized Oxy-Combustion Pilot Plant (Final Technical Report)

The team of Southwest Research Institute® (SwRI®), ITEA, Electric Power Research Institute, Inc. (EPRI), GE Global Research (GE), Jacobs Engineering (Jacobs), and Peter Reineck Associates (PRA) are advancing Flameless Pressurized Oxy-Combustion (FPO), a novel coal technology. This effort seeks to complete the preliminary engineering and planning of a 50-MWth Pilot Plant that produces electricity and steam for district heating. The technology, pioneered by ITEA at the 5-MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this project was to bring all of the core cycle components to the same level of design maturity. Extensive cycle modeling and evaluation explored various configurations of the process. Different coals, operating conditions, and heat recovery devices were considered and modeled using Aspen Plus. The results of the cycle modeling informed the pilot plant configuration and the planned configuration at the commercial scale. The system pressurization is maintained in the flue gas clean-up and water removal. This allows for efficient and cost-effective carbon dioxide compression and sequestration package. Once the cycle was optimized, preliminary drawings, layouts, and plans defined the pilot facility. Process flow diagrams (PFD) were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. A detailed cost estimate for the planned configuration was completed with an Association for the Advancement of Cost Engineering (AACE) Class IV level of cost analysis. A site selection effort evaluated a variety of potential candidate sites. The selection effort focused on three sites for an in-depth evaluation of the merits and viability of hosting a pilot demonstration. The ability of the host site to support the project with cost sharing was also assessed. The selection process chose the University of Wyoming (UW) as the host site, and cost estimates for the pilot capital estimate were made using local data. A preliminary test plan and operation plan, which creates figures of merit, control, and instrumentation was produced. An effort that outlines methods of pilot cost reduction was completed near the end of the project. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

01 COAL, LIGNITE, AND PEAT↗

WE-G-BRA-02: SafetyNet: Automating Radiotherapy QA with An Event Driven Framework

Purpose: Quality assurance is an essential task in radiotherapy that often requires many manual tasks. We investigate the use of an event driven framework in conjunction with software agents to automate QA and eliminate wait times. Methods: An in house developed subscription-publication service, EventNet, was added to the Aria OIS to be a message broker for critical events occurring in the OIS and software agents. Software agents operate without user intervention and perform critical QA steps. The results of the QA are documented and the resulting event is generated and passed back to EventNet. Users can subscribe to those events and receive messages based on custom filters designed to send passing or failing results to physicists or dosimetrists. Agents were developed to expedite the following QA tasks: Plan Revision, Plan 2nd Check, SRS Winston-Lutz isocenter, Treatment History Audit, Treatment Machine Configuration. Results: Plan approval in the Aria OIS was used as the event trigger for plan revision QA and Plan 2nd check agents. The agents pulled the plan data, executed the prescribed QA, stored the results and updated EventNet for publication. The Winston Lutz agent reduced QA time from 20 minutes to 4 minutes and provided a more accurate quantitative estimate of radiation isocenter. The Treatment Machine Configuration agent automatically reports any changes to the Treatment machine or HDR unit configuration. The agents are reliable, act immediately, and execute each task identically every time. Conclusion: An event driven framework has inverted the data chase in our radiotherapy QA process. Rather than have dosimetrists and physicists push data to QA software and pull results back into the OIS, the software agents perform these steps immediately upon receiving the sentinel events from EventNet. Mr Keranen is an employee of Varian Medical Systems. Dr. Moran’s institution receives research support for her effort for a linear accelerator QA project from Varian Medical Systems. Other quality projects involving her effort are funded by Blue Cross Blue Shield of Michigan, Breast Cancer Research Foundation, and the NIH.

60 APPLIED LIFE SCIENCES↗

SU-F-T-225: Is It Time to Have Pre-Configured Therapeutic Beams Available in Commercial Treatment Planning Systems?

Purpose: Commissioning radiation beams requires considerable effort to obtain the beam data for beam configuration in a commercial treatment planning system. With the advances in technology, the manufacturer of accelerators now has the ability to adjust radiation beam parameters to meet pre-determined specifications with high precision. This study aims to illustrate the feasibility of making pre-configured radiation beams available in commercial treatment planning systems. Methods: In recent years, Varian has made a set of measured beam data from the TrueBeam accelerator available to users. Although the beam data are provided as “suggestive data” without warranty, the commissioned data measured by users have been shown to be in excellent agreement with the data set provided when the beams from the installed Linacs were adjusted to meet the beam specifications. An unofficial survey among Varian Linac TrueBeam users shows that the suggestive data set has been used with validation by users in some clinics. This indicates that radiation beams from a specified Linac can be standardized and pre-configured in a treatment planning system. Results: Two newly installed Varian TrueBeam accelerators at two different centers were examined in which one set of commissioned beam data was obtained from measurements performed by an independent physics consulting company and the other was measured by local physicists in the department. All beams from both accelerators were tuned to meet the manufacturer’s specifications. Discrepancies of less than 1% were found between the commissioned beam data from both accelerators and the suggestive data set provided by Varian. Conclusion: It may be feasible that radiation beams can be pre-configured in commercial treatment planning systems. The radiation beam users will perform the beam validation and end-to-end tests instead of configuring beams. This framework can increase both the efficiency and the accuracy in commercial radiation treatment planning systems.

43 PARTICLE ACCELERATORS↗

RED-BL: Evaluating dynamic workload relocation for data center networks

In this study, we present RED-BL (Relocate Energy Demand to Better Locations), a framework to minimize the electricity cost for operating data center networks over consecutive intervals of fixed duration. Within each interval, RED-BL provides a mapping of workload to a set of geographically distributed data centers. To this end, RED-BL uses the geographical and temporal variations in electricity prices as exhibited by electrical energy markets. In addition, we incorporate the transition costs associated with a change in workload mapping from one interval to the next, over a planning window comprising multiple such intervals. This results in a sequence of workload mappings that is optimal over the entire planning window, even though the workload mapping in a given interval may not be locally optimal. Our evaluation of RED-BL uses electricity prices from the US markets and workload traces from live Internet applications with millions of users. We find that RED-BL can reduce the electric bill by as much as 45% compared to the case when the workload is uniformly distributed. When compared to existing workload relocation solutions, for a wide range of data center deployment sizes, RED-BL achieves electricity cost savings that are 8.28% higher, on average. This seemingly modest reduction can save millions of dollars for the operators. The cost of this saving is an inexpensive computation at the start of each planning window.

97 MATHEMATICS AND COMPUTING↗

Optimizing dynamic wireless charging for electric buses: A data-driven approach to infrastructure planning

The network configuration significantly impacts the performance of dynamic wireless charging (DWC) technology for electric buses. Here, this study presents a novel approach to planning charging infrastructure for public transit using data-driven nonconvex mixed-integer optimization. Integrating DWC and charging station technologies reveals a trade-off between enroute and stationary charging times. Our framework optimizes bus frequency settings and transmitter coil arrangements to minimize operational and infrastructure costs. A case study in Chattanooga, Tennessee, demonstrates the method's effectiveness in mitigating range anxiety and reducing charging expenses. This research implies that integrating DWC technology into public transit systems can enhance the feasibility and cost-effectiveness of electric bus operations, promoting sustainable urban mobility.

33 ADVANCED PROPULSION SYSTEMS↗

SU-E-T-541: Measurement of CT Density Model Variations and the Impact On the Accuracy of Monte Carlo (MC) Dose Calculation in Stereotactic Body Radiation Therapy for Lung Cancer

Purpose: To measure the CT density model variations between different CT scanners used for treatment planning and impact on the accuracy of MC dose calculation in lung SBRT. Methods: A Gammex electron density phantom (RMI 465) was scanned on two 64-slice CT scanners (GE LightSpeed VCT64) and a 16-slice CT (Philips Brilliance Big Bore CT). All three scanners had been used to acquire CT for CyberKnife lung SBRT treatment planning. To minimize the influences of beam hardening and scatter for improving reproducibility, three scans were acquired with the phantom rotated 120° between scans. The mean CT HU of each density insert, averaged over the three scans, was used to build the CT density models. For 14 patient plans, repeat MC dose calculations were performed by using the scanner-specific CT density models and compared to a baseline CT density model in the base plans. All dose re-calculations were done using the same plan beam configurations and MUs. Comparisons of dosimetric parameters included PTV volume covered by prescription dose, mean PTV dose, V5 and V20 for lungs, and the maximum dose to the closest critical organ. Results: Up to 50.7 HU variations in CT density models were observed over the baseline CT density model. For 14 patient plans examined, maximum differences in MC dose re-calculations were less than 2% in 71.4% of the cases, less than 5% in 85.7% of the cases, and 5–10% for 14.3% of the cases. As all the base plans well exceeded the clinical objectives of target coverage and OAR sparing, none of the observed differences led to clinically significant concerns. Conclusion: Marked variations of CT density models were observed for three different CT scanners. Though the differences can cause up to 5–10% differences in MC dose calculations, it was found that they caused no clinically significant concerns.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Dynamic System Simulation of the KRUSTY Experiment

The proposed KRUSTY experiment is a demonstration of a reactor operating at power. The planned experimental configuration includes a highly enriched uranium (HEU) reflected core, cooled by multiple heat pipes leading to Stirling engines for primary heat rejection. Operating power is expected to be approximately four (4) to five (5) kilowatts with a core temperature above 1,000 K. No data is available on any historical reactor employing HEU metal that operated over the temperature range required for the KRUSTY experiment. Further, no reactor has operated with heat pipes as the primary cooling mechanism. Historic power reactors have employed either natural or forced convection so data on their operation is not directly applicable to the KRUSTY experiment. The primary purpose of the system model once developed and refined by data from these component experiments, will be used to plan the KRUSTY experiment. This planning will include expected behavior of the reactor from start-up, through various transient conditions where cooling begins to become present and effective, and finally establishment of steady-state. In addition, the model can provide indicators of anticipated off-normal events and appropriate operator response to those conditions. This information can be used to develop specific experiment operating procedures and aids to guide the operators in conduct of the experiment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SU-G-206-16: Investigation of Dosimetric Consequence Via Cone-Beam CT Based Dose Reconstruction in Hepatocellular Carcinoma Radiotherapy

Purpose: Many patients with technically unresectable or medically inoperable hepatocellular carcinoma (HCC) had hepatic dosimetric variations as a result of inter-fraction anatomical deformation. This study was conducted to assess the hepatic dosimetric consequences via reconstructing weekly dose in HCC patients receiving three dimensional conformal radiation therapy. Methods: Twenty-one HCC patients with 21 planning CT (pCT) scans and 63 weekly Cone-beam CT (CBCT) scans were enrolled in this investigation. Among them, six patients had been diagnosed of radiation induced liver disease (RILD) and the other fifteen patients had good prognosis after treatment. And each patient had three weekly CBCT before re-planning. In reconstructing CBCT-based weekly dose, we registered pCT to CBCT to provide the correct Hounsfield units for the CBCT using gradient-based deformable image registration (DIR), and this modified CBCT (mCBCT) were introduced to enable dose calculation.To obtain the weekly dosimetric consequences, the initial plan beam configurations and dose constraints were re-applied to mCBCT for performing dose calculation, and the mCBCT were extrapolated to 25 fractions. Besides, the manually delineated contour was propagated automatically onto the mCBCT of the new patient by exploiting the deformation vectors field, and the reconstructed weekly dose was mapped back to pCT to understand the dose distribution difference. Also, weekly dosimetric variations were compared with the hepatic radiation tolerance in terms of D50 and Dmean. Results: Among the twenty-one patients, the three weekly D50 increased by 0.7Gy, 5.1Gy and 6.1Gy, respectively, and Dmean increased by 0.9%, 4.7% and 5.5%, respectively. For patients with RILD, the average values of the third weekly D50 and Dmean were both high than hepatic radiation tolerance, while the values of patients without RILD were below. Conclusion: The planned dose on pCT was not a real dose to the liver, and the liver overdose increased the risk of RILD. The author would like to express great thanks to Lei Xing, Daniel S Kapp and Yong Yang in the Stanford University School of Medicine for their valuable suggestions to this work. This work is supported by NSFC(61471226), China Postdoctoral Science Foundation (2015T80739,2014M551949) and research funding from Shandong Province (JQ201516).

60 APPLIED LIFE SCIENCES↗

Subcritical Copper-Reflected-α-phase Plutonium (SCRαP) Integral Experiment Design

A Subcritical Copper-Reflected α-phase Plutonium (SCRαP) integral benchmark experiment is proposed where multiplication will be approximated using correlated neutron data from a detector system consisting of {sup 3}He tubes inside polyethylene. Measurements will be performed on various subcritical experimental configurations consisting of a weapons-grade plutonium sphere surrounded by different Cu thicknesses. In addition to the proposed base experimental configurations with Cu, additional configurations are planned with the plutonium ball nested in various thicknesses of interleaved polyethylene spherical shells mixed in with the Cu shells. The polyethylene is intended to provide fast neutron moderation and reflection, resulting in additional measurements with differing multiplication, spectra, and nuclear data sensitivity. The proposed experiments will performed at the National Criticality Experiments Research Center (NCERC). NCERC is home to a 4.5-kg α-phase stainless steel clad plutonium sphere that is referred to as the BeRP (Beryllium-Reflected Plutonium) ball due to its historical use in a beryllium-reflected critical experiment. In 2014, similar subcritical measurements were performed with the BeRP ball surrounded by nickel and tungsten. The nickel-reflected measurements were documented as a benchmark evaluation which was accepted by the International Criticality Safety Benchmark Evaluation Project (ICSBEP). Similar to past measurements, the proposed work will help both identify deficiencies and quantify uncertainties in nuclear data and validate computational methods related to neutron multiplication inference for subcritical benchmark evaluations. Monte Carlo simulations were performed for the preliminary design of a subcritical Copper-Reflected - phase Plutonium (SCRP) integral benchmark experiment. Specifically, MCNP{sup R} version 6 was used to determine the k{sub eff} and associated nuclear data sensitivities for different preliminary configurations (reflector thickness, material type). The final experimental design process will include continuous-energy nuclear data sensitivity analysis. This will help assess the potential impact of this integral measurement as it relates to international efforts to continuously improve current libraries (ENDF, JEFF, JENDL etc) that still tend to over/under-estimate the measured results of integral experiments, sometimes significantly. Deficiencies in underlying nuclear data quantities such as Nubar have been shown to have an effect on inferred values from subcritical measurements as well. The proposed experiments and subsequent computational validation will help identify such deficiencies. It will also help validate new nuclear data evaluations, including one for Cu that was recently performed in the resolved region up to 100 MeV for {sup 65}Cu and {sup 63}Cu which is expected to improve Cu-related benchmark simulation performance. The final experimental design phase will also include simulation results that will incorporate the detectors that will be used for the subcritical measurements. For the benchmark portion of the measurements, the main detectors that are being considered are portable neutron multiplicity counters made up of {sup 3}He tubes embedded in polyethylene and lined with cadmium. These detectors employ a data acquisition system that produces list-mode data (correlated information where each event is listed sequentially) that can be analyzed using the Feynman variance-to-mean method. Other detector systems including SNAP (single {sup 3}He tube embedded in polyethylene), and a high-purity germanium (HPGe) detector are being considered for supplementary measurements only and are not intended to be used for the final benchmark measurements. Decoupling the supplementary detectors from the system eliminates any contribution to the total system multiplication, and greatly simplifies the final computational benchmark model. Therefore, an optimization of the portable neutron multiplicity counter placement in the benchmark measurements will be performed to ensure that there is minimal contribution to the total system multiplication. In addition, new temperature measurement techniques and hardware will be explored. (authors)

42 ENGINEERING↗

Electron beam test of key elements of the laser-based calibration system for the muon g - 2 experiment

We report the test of many of the key elements of the laser-based calibration system for muon g - 2 experiment E989 at Fermilab. The test was performed at the Laboratori Nazionali di Frascati's Beam Test Facility using a 450 MeV electron beam impinging on a small subset of the final g - 2 lead-fluoride crystal calorimeter system. The calibration system was configured as planned for the E989 experiment and uses the same type of laser and most of the final optical elements. We show results regarding the calorimeter's response calibration, the maximum equivalent electron energy which can be provided by the laser and the stability of the calibration system components.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

BlackCAT CubeSat: a soft x-ray sky monitor, transient finder, and burst detector for high-energy and multimessenger astophysics

Here we present the conceptual design of a wide field imager onboard a 6U class CubeSat platform for the study of GRB prompt and afterglow emission and detection of electromagnetic counterparts of gravitational waves in soft X-rays. The planned instrument configuration consists of an array of X-ray Hybrid CMOS detectors (HCD), chosen for their soft-X-ray response, flexible and rapid readout rate, and low power, which makes these detectors well suited for detecting bright transients on a CubeSat platform. The wide field imager is realized by a 2D coded mask. This paper will give an overview of the instrument design and the scientific requirements of the proposed mission.

79 ASTRONOMY AND ASTROPHYSICS↗

A New Experimental Station for Liquid Interface X-Ray Scattering At NSLS-II Beamline 12-ID

Open Platform and Liquids Scattering (OPLS) is a new experimental station recently built and currently being commissioned at the Soft Matter Interfaces (SMI) beamline 12-ID at NSLS-II. The new instrument expands SMI’s beamline scientific capabilities via the addition of X-ray scattering techniques from liquid surfaces and interfaces. The design of this new instrument, located inside the 12-ID beamline shielding enclosure (hutch B), is based on a single Ge (111) crystal deflector, which bounces the incident x-ray beam downward towards a liquid sample which must be maintained in a horizontal orientation (gravity-driven consideration). The OPLS instrument has a variable deflector-to-sample distance ranging from 0.6 m to 1.5 m. X-ray detectors are mounted on a 2-theta scattering arm located downstream of the sample location. The 2-theta arm is designed to hold up to three X-ray detectors, with fixed 2-theta angular offsets, each dedicated to a different X-ray technique such as X-ray reflectivity, grazing-incidence X-ray scattering, and small- and wide-angle X-ray scattering. Currently, the OPLS experimental station intercepts the SMI beam that otherwise propagates to the experimental endstation located in hutch C and can be retracted to a ’parking’ position laterally out of this beam to allow installation of a removable beam pipe that is needed to support operations in hutch C. The design of OPLS is flexible enough to quickly adapt to a planned future configuration of the SMI beamline in which a OPLS is illuminated separately from the main SMI branch via a second, canted undulator source and a separate photon delivery system. In this future configuration, both branches will be able to operate independently and simultaneously.

36 MATERIALS SCIENCE↗