Terra Constellation Exit (Part 2)
The Terra Constellation Exit power point presentation will discuss the baseline and proposed constellation exit plan and debris concerns.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
The Terra Constellation Exit power point presentation will discuss the baseline and proposed constellation exit plan and debris concerns.
The Aqua Mission Director has requested the Aqua Flight Operations Team present the current status of the Aqua Constellation Exit Manaeuver (CEM) and End of Mission Plan (EMOP) to the Earth Science Constellation Mission Operations Working Group (MOWG) meeting planned as a virtual meeting from September 29 - October 2, 2020.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This package presents the plans for Terra lowering its orbit by 5-6 kms and effectively removing itself from the 705km constellation in October 2022. Also, presented is all the work done to get ready for these maneuvers from both the Flight Dynamics and Flight Operations Team perspective, as well discussion of any contingencies and their associated pre-planned responses.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This presentation describe the present status and future plans for operating the Terra Spacecraft. Specific details are providing about the constellation exit plan and NASA HQ decision process.
A six-year analysis between Aqua and TanSat was conducted in order to assess whether or not TanSat would be a continued threat to Aqua. It is predicted that TanSat will cross Aqua seven times prior to Aqua's predicted constellation exit and lowering in February 2022. The predicted crossing geometry is generally favorable at any of the crossings due to TanSat's orbit eccentricity.
NASA Terra satellite has provided earth observations from its 5 onboard instruments for 25 years since its launch in December 1999. All these instruments are still mostly healthy, and observations are expected to extend 2 more years of life into late 2026. The onboard fuel is preserved by ceasing inclination adjust maneuvers (IAMs, stopped 2020) and drag make-up maneuvers (DMUs, stopped 2022). Without IAMs, the orbital plane is drifting, changing the sunlight conditions by late 2026 from nominal 10:30 AM to 8:30 AM local time at descending node (LTDN). The ceasing of DMUs combined with a constellation exit maneuver in October 2022 result in orbit altitude drifting down. Altitude will drift from a nominal mean of 715 km to 702 km by late 2026. A companion earth observing satellite, Aqua, is going through a similar orbit drift process. This presentation shows the details of the drifts, that have potentials to impact data products, especially those products from the Moderate Resolution Imaging Spectroradiometer (MODIS) instruments on Terra and Aqua satellites.
At the end of a mission, satellites embedded in a constellation must first perform propulsive maneuvers to safely exit the constellation before they can begin with the usual end-of-mission activities: deorbit, passivation, and decommissioning. The target orbit for these exit maneuvers must be sufficiently below the remaining constellation satellites such that, once achieved, there is no longer risk of close conjunctions. Yet, the exit maneuvers must be done based on the spacecraft's state of health and operational capability when the decision to end the mission is made. This paper focuses on the recently developed exit strategy for the CloudSat mission to highlight problems and issues, which forced the discarding of CloudSat's original EoM Plan and its replacement with a new plan consistent with changes to the spacecraft's original operational mode. The analyses behind and decisions made in formulating this new exit strategy will be of interest to other missions in a constellation currently preparing to update their End-of-Mission Plan.
The collaborative science obtained from the satellites in the A-Train is an unparalleled success. The constellation framework that has evolved is well-formulated and documented by its international members. Communication between teams is enhanced by a web-based Constellation Coordination System. Safety and correlated observations are ensured by defining independent control boxes with buffers in between. Each mission stays within its control box by regular drag makeup maneuvers. Annual inclination adjustments are coordinated by all missions to maintain their absolute and relative Mean Local Time of Ascending Node (MLTAN). Since the satellites are in different orbit planes their separation involves a three-dimensional triad made up of the along track separations, reference groundtracks and MLTAN's. For further safety, a Constellation Envelope has been defined to determine safe entry and exit orbits.
In April 2011, NASA's pioneering cloud profiling radar satellite, CloudSat, experienced a battery anomaly that placed it into emergency mode and rendered it operations incapable. All initial attempts to recover the spacecraft failed as the resultant power limitations could not support even the lowest power mode. Originally part of a six-satellite constellation known as the "A-Train", CloudSat was unable to stay within its assigned control box, posing a threat to other A-Train satellites. CloudSat needed to exit the constellation, but with the tenuous power profile, conducting maneuvers was very risky. The team was able to execute a complex sequence of operations which recovered control, conducted an orbit lower maneuver, and returned the satellite to safe mode, within one 65 minute sunlit period. During the course of the anomaly recovery, the team developed several bold, innovative operational strategies. Details of the investigation into the root-cause and the multiple approaches to revive CloudSat are examined. Satellite communication and commanding during the anomaly are presented. A radical new system of "Daylight Only Operations" (DO-OP) was developed, which cycles the payload and subsystem components off in tune with earth eclipse entry and exit in order to maintain positive power and thermal profiles. The scientific methodology and operational results behind the graduated testing and ramp-up to DO-OP are analyzed. In November 2011, the CloudSat team successfully restored the vehicle to consistent operational collection of cloud radar data during sunlit portions of the orbit. Lessons learned throughout the six-month return-to-operations recovery effort are discussed and offered for application to other R&D satellites, in the context of on-orbit anomaly resolution efforts.
This presentation will discuss NASA HQ perspective, current state of the mission, Landsat 7 and Terra exit plans, long term plans for all mission, CARA updates, Spring 2016 IAM series plans and current status, CCS future release plans, and results of covariance calculation meetings.
This EOS Terra Constellation Exit/Future Maneuver Plans Update presentation will discuss brief history of Terra EOM work; lifetime fuel estimates; baseline vs. proposed plan origin; resultant exit orbit; baseline vs. proposed exit plan; long term orbit altitude; revised lifetime proposal and fallback options.