Search NASA⌕ Search

SEARCH · Search NASA

Results for “Constructions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Industrialized and Robotic Construction Advances in Terrestrial Construction and Opportunities in Space Construction

Advanced Building Construction (ABC) methods such as industrialized prefabrication and robotically controlled additive deposition are becoming promising technologies to support rapid construction of buildings at volume and scale. However, apart from the structural shell of the building, optimal integration of other systems – mechanical, electrical, plumbing, thermal, power generation, storage and distribution, is key to enabling functional buildings. Leveraging ABC methods to integrate such systems in the buildings requires the building design to be optimized for constructability constraints imposed by the industrialized and robotically controlled production setups entailing such ABC methods. The Industrialized Construction Innovation (ICI) team at the National Renewable Energy Laboratory (NREL) has been focusing on research and development of such ABC technologies and processes that can lead to production of buildings which are resilient to extreme climatic conditions at reduced cost and time. There is a potential synergy between such advancements in terrestrial construction, which can be leveraged for the benefit of space (orbital and extra-terrestrial) construction. Similarly, advances in space construction can lend itself to accelerated adoption of robotic construction methods in terrestrial construction. This presentation will give an overview of selective research efforts of the ICI team at NREL, along with a vision for potential collaborations with agencies like NASA.

3D printing↗

Specific SPS construction studies: Construction tasks, construction base

A concept for building the 5000 MW reference solar power satellite in Earth orbit is discussed. The system uses silicon solar cells. The GEO base has contiguous facilities for concurrent assembly and subsequent mating of the satellite energy conversion system and its power transmission antenna. The end builder construction system uses 10 synchronized beam machines to automatically fabricate continuous longitudinal beams for the energy conversion system.

Mccaffrey, R. W.↗

Immersive Industrialized Construction Environments for Energy Efficiency Construction Workforce

The National Renewable Energy Laboratory is actively developing and testing Immersive Industrialized Construction Environments (IICE) for construction automation and worker-machine interaction to investigate possible solutions and increase workforce productivity. At full scope and matured functionality, IICE allows us to accelerate the development of and better explore industrialized construction approaches such as prefabrication. IICE also enables wider adoption of energy-efficient products and Industry 4.0 construction automation through worker-machine interaction pilots. Industry 4.0 and industrialized construction approaches can encourage workforce specialization in energy efficiency construction, address the lack of multi-skilled workers, and increase workforce productivity with construction automation. However, recent attempts to integrate these concepts with the industry have only been moderately successful. To address this, focusing the pedagogy on using a digital twin, its digital models, and virtual reality could make the experience of continuing education on construction automation more affordable, accessible, scalable, immersive, and safer, and could greatly improve the efficiency and robustness of the building and construction industry. IICE accurately represents the realities of construction uncertainties without having to create full scale physical prototypes of machines. In this paper, we address the following research question: How can a digital twin and its models in virtual reality enhance the learning experience and productivity of energy efficiency construction workers to gain the skills in operating Industry 4.0 components such as construction automation and handling energy-efficient products in industrialized construction factories and on-site? We introduce original research on developing IICE and present preliminary findings from time and motion pilot studies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Lunar Surface Construction Activity at NASA Marshall Space Flight Center

Introduction: The goal of the Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Project at NASA Marshall Space Flight Center (MSFC) is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure elements on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms, and blast shields using lunar regolith-based materials. MSFC has strong collaborations with industry, academia, and other NASA Centers to accomplish this goal. The MMPACT project consists of three elements. The first focuses on the development of an autonomous construction system. The second focuses on construction feedstock materials development. The third element focuses on the development of a microwave sintering construction capability. The team plans to demonstrate construction on a small Commercial Lunar Payload Services (CLPS) lander in the 2025 timeframe, with a future goal of constructing a subscale landing pad in 2028-2029.The MMPACT project is funded through the Lunar Surface Innovation Initiative, which is part of the Space Technology Mission Directorate. Technology Development: The MMPACT team will evaluate multiple autonomous construction and microwave construction technologies, materials, and construction element forms. Selected technologies will be matured; processes and operations will be defined for the two flight missions. Evaluations of materials, as well as the technology itself, will be demonstrated in simulated lunar environments as part of the technology maturation process. The team is keenly aware of the properties of the lunar environment. Its temperature swings, negligible exosphere, and unprepared site foundations factor into the materials for both construction and hardware, the concept of operations, and the technology’s interdependencies. Materials: The team is looking at materials that can be produced from in-situ resources in an effort to make lunar construction cost-effective. The particular focus of the materials team is cementitious materials, metals, and sintered and melted regolith. These materials will be studied for tensile, compressive, and flexural strength. They will also be tested for their ability to handle thermal swings and vacuum. They will be fully characterized using various microscopy techniques to examine micro-structures, chemistry, and crystal formation. Interdependencies: There are many interdependencies that MMPACT has already identified. These include: •Excavation interface •Regolith feedstock beneficiation •Regolith feedstock storage and provision •Requirements for structures •Site-to-site mobility systems •Availability of lunar simulant •Lander off-loading capabilities •Navigation systems •Power •Regolith composition and mineralogy •Lander specifications •Communication protocols Technology developments in these additional areas would be beneficial to MMPACT.

Moon to Mars Planetary Autonomous Construction Tec↗

Directions for lunar construction - A derivation of requirements from a construction scenario analysis

This paper provides an initial trade-off study among several lunar construction options available to the Space Exploration Initiative. The relative time effectiveness of Extra-Vehicular Activity (EVA), Intra-Vehicular Activity (IVA), and Earth-based remote control assembly and construction methods are studied. Also considered is whether there is any construction time savings to building roads in advance, or surveying the construction sites with orbiters or rovers in advance. The study was conducted by adding detail to a potentially real scenario - a nuclear power plant - and applying time multipliers for the various control options and terrain alternatives, provided by roboticists among the authors. The authors conclude that IVA is a faster construction method than either EVA or construction conducted remotely from Earth. Surveying proposed sites in advance, with orbiters and rovers, provides a significant time savings through adding to certainty, and therefore may be cost effective. Developing a heavy-lift launch capability and minimizing assembly and construction processes by landing large payloads is probably worthwhile to the degree possible, as construction activities would use a large amount of surface operations time.

Dias, William S.↗

Additive Construction with Mobile Emplacement: Multifaceted Planetary Construction Materials Development

The National Aeronautics and Space Administration's Additive Construction with Mobile Emplacement (ACME) project is developing construction materials with which infrastructure elements, including habitats, will be additively constructed for planetary surface missions. These materials must meet requirements such as the ability to be produced from available in-situ resources to eliminate the cost of launching materials from Earth, the ability to be emplaced via three dimensional building techniques, the ability to resist aging in extreme environments including radiation and micrometeorite bombardment, and the ability to provide the necessary structural integrity for a given building. This paper reviews the constraints placed on such planetary construction materials and details the work of the ACME team in characterizing materials that could one day construct planetary surface structures on Mars or the Moon. Material compositions, compressive strength, and requirements for additive construction on planetary surfaces are discussed. Due to the multifunctional requirements of the material, an optimization is necessary to balance between the site-specific regolith composition, emplacement via additive construction techniques, and characteristics of the final structure.

simulant↗

How the Modular Construction Industry Is Changing the Construction Workforce [Slides]

564,000 - that's the number of construction workers the United States lacked in 2023. This is not a new or unfamiliar problem, but high interest rates, housing shortages, and an aging workforce are amplifying the pressure to build faster and recruit new talent. Panelized and modular construction are often touted as a solution to this workforce challenge and have seen year over year increases in market share. While research confirms industrialized construction can increase building efficiencies, researchers at the National Renewable Energy Laboratory (NREL), RMI, Washington State University, Dodge Construction Network and Guidehouse were curious how workers are being impacted both on construction sites, at factories, and all the stages in between.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

PANDORA: A Parallel Dendrogram Construction Algorithm for Single Linkage Clustering on GPU

This paper introduces Pandora, a parallel algorithm for computing dendrograms, the hierarchical cluster trees for single linkage clustering (SLC). Current parallel approaches construct dendrograms by partitioning a minimum spanning tree and removing edges. However, they struggle with skewed, hard-to-parallelize real-world dendrograms. Consequently, computing dendrograms is the sequential bottleneck in HDBSCAN*[21], a popular SLC variant. Pandora uses recursive tree contraction to address this limitation. Pandora contracts nodes to construct progressively smaller trees. It computes the smallest contracted dendrogram and expands it by inserting contracted edges. This recursive strategy is highly parallel, skew-independent, work-optimal, and well-suited for GPUs and multicores. We develop a performance portable implementation of Pandora in Kokkos[31] and evaluate its performance on multicore CPUs and multi-vendor GPUs (e.g., Nvidia, AMD) for dendrogram construction in HDBSCAN*. Multithreaded Pandora is 2.2x faster than the current best-multithreaded implementation. Our GPU version achieves 6-20x speedup on AMD GPUs and 10-37x on NVIDIA GPUs over multithreaded Pandora. Pandora removes HDBSCAN*’s sequential bottleneck, greatly boosting efficiency, particularly with GPUs.

Sao, Piyush↗

Space construction system analysis. Part 2: Construction analysis

The construction methods specific to the end to end construction process for building the ETVP in low Earth orbit, using the space shuttle orbiter as a construction base, are analyzed. The analyses concerned three missions required to build the basic platform. The first mission involved performing the fabrication of beams in space and assembling the beams into a basic structural framework. The second mission was to install the forward support structure and aft support structure, the forward assembly, and a TT&C antenna. The third mission plan was to complete the construction of the platform and activate it to begin operations in low Earth orbit. The integration of the activities for each mission is described along with the construction requirements and construction logic.

Roebuck, J. A.↗

BRE‐X Emissions Database for End‐of‐Life Scenarios of Selective Building Construction Materials to Enable Circular Economy in Construction

In the United States, construction and demolition debris predominately end up in landfills with minimal end‐of‐life Re‐X (recover, recycle, reuse, etc.) scenarios, resulting in large environmental impacts and lost opportunities for material recovery. Except for concrete and metals, which seem to have a few well‐defined end‐of‐life pathways, there seems to be a lack of well‐documented end‐of‐life scenarios for other construction materials, let alone their emissions data. Hence, there is a need for documented end‐of‐life Re‐X scenarios and end‐of‐life data of more building materials to motivate widespread use of Re‐X strategies in building design. This paper outlines the efforts of the National Renewable Energy Laboratory, Carbon Leadership Forum, Building Transparency, and Skidmore, Owings & Merrill to (a) create an open‐access BRE‐X (Building Re‐X) end‐of‐life emissions database consisting of greenhouse gas emissions data associated with various end‐of‐life scenarios for a select list of high‐impact building construction materials, and (b) integrate the BRE‐X end‐of‐life emissions database with CAD/BIM/LCA tools for evaluating various end‐of‐life scenarios. The paper also presents a few existing life cycle inventory databases that contain sparse amounts of end‐of‐life data for a few construction materials and their limitations in terms of scaling and data consolidation. Finally, a sample of how the collected data can be ingested into whole‐building LCA tools using open data formats and a public access link to the BRE‐X end‐of‐life emissions database is also included.

36 MATERIALS SCIENCE↗

Modeled Results of Four Residential Energy Efficiency Measure Packages for Deriving Advanced Building Construction Research Targets

The Advanced Building Construction (ABC) Initiative from the U.S. Department of Energy Building Technologies Office is working to accelerate industrialized construction innovations for decarbonizing buildings. To inform performance and cost targets for research under the ABC Initiative, this analysis used the ResStock™ tool to evaluate the energy savings, utility bill impacts, and carbon emissions impacts of four simulated upgrade packages with specific target performance levels on a large sample of residential dwelling units (approximately 550,000) representative of the U.S. housing stock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

GNET2: an R package for constructing gene regulatory networks from transcriptomic data

Abstract Motivation The Gene Network Estimation Tool (GNET) is designed to build gene regulatory networks (GRNs) from transcriptomic gene expression data with a probabilistic graphical model. The data preprocessing, model construction and visualization modules of the original GNET software were developed on different programming platforms, which were inconvenient for users to deploy and use. Results Here, we present GNET2, an improved implementation of GNET as an integrated R package. GNET2 provides more flexibility for parameter initialization and regulatory module construction based on the core iterative modeling process of the original algorithm. The data exchange interface of GNET2 is handled within an R session automatically. Given the growing demand for regulatory network reconstruction from transcriptomic data, GNET2 offers a convenient option for GRN inference on large datasets. Availability and implementation The source code of GNET2 is available at https://github.com/jianlin-cheng/GNET2. Supplementary information Supplementary data are available at Bioinformatics online.

59 BASIC BIOLOGICAL SCIENCES↗

An Intelligent Distributed Ledger Construction Algorithm for IoT

Blockchain is the next generation of secure data management that creates near-immutable decentralized storage. Secure cryptography created a niche for blockchain to provide alternatives to well-known security compromises. However, design bottlenecks with traditional blockchain data structures scale poorly with increased network usage and are extremely computation-intensive. This made the technology difficult to combine with limited devices, like those in Internet of Things networks. In protocols like IOTA, replacement of blockchain's linked-list queue processing with a lightweight dynamic ledger showed remarkable throughput performance increase. However, current stochastic algorithms for ledger construction suffer distinct trade-offs between efficiency and security. This work proposed a machine-learning approach with a multi-arm bandit that resolved these issues and was designed for auditing on limited devices. This algorithm was tested in a reinforcement-learning environment simulating the IOTA ledger's construction with a decision tree. This study showed through regret analysis and experimentation that this approach was secure against impulse manipulation attacks while remaining energy-efficient. Although the IOTA protocol was a pioneer for lightweight distributed ledgers, it is expected that future blockchain protocols will adopt techniques similar to those presented in this work.

multi-arm bandit↗

Additive Construction with Mobile Emplacement (ACME) / Automated Construction of Expeditionary Structures (ACES) Materials Delivery System (MDS)

The purpose of the Automated Construction of Expeditionary Structures, Phase 3 (ACES 3) project is to incorporate the Liquid Goods Delivery System (LGDS) into the Dry Goods Delivery System (DGDS) structure to create an integrated and automated Materials Delivery System (MDS) for 3D printing structures with ordinary Portland cement (OPC) concrete. ACES 3 is a prototype for 3-D printing barracks for soldiers in forward bases, here on Earth. The LGDS supports ACES 3 by storing liquid materials, mixing recipe batches of liquid materials, and working with the Dry Goods Feed System (DGFS) previously developed for ACES 2, combining the materials that are eventually extruded out of the print nozzle. Automated Construction of Expeditionary Structures, Phase 3 (ACES 3) is a project led by the US Army Corps of Engineers (USACE) and supported by NASA. The equivalent 3D printing system for construction in space is designated Additive Construction with Mobile Emplacement (ACME) by NASA.

Mueller, R. P.↗

A cosine-based correlation information entropy approach for building automatic fault detection baseline construction

Building automatic fault detection and diagnosis (AFDD) technologies have shown great potential for energy savings. To enable AFDD, a baseline depicting the normal operation mode is needed to detect whether the building operation deviates from normality. Existing research using physics-based knowledge and models for AFDD has mainly taken a trial-and-error approach to determine if a given baseline is sufficient via empirical experiments. A mechanism to support decisions such as how many samples and what samples should be included in the baseline is currently lacking. In this study, a data-driven method for AFDD baseline construction based on information entropy is developed. The entropy is derived based on cosine similarity among typical building automation system measurements in conjunction with outdoor weather information. The performance of the proposed method is evaluated using real building data. Evaluation results indicate that the fault detection strategy adopting the proposed method has similar or better accuracy in detecting faults compared to the same fault detection strategy using the baseline construction method from the literature. Additionally, the use of entropy enables the proposed method to automatically construct and assess the baseline consisting of information-rich samples.

42 ENGINEERING↗

An independent analysis of bias sources and variability in wind plant pre-construction energy yield estimation methods

The wind resource assessment community has long had the goal of reducing the bias between wind plant pre-construction energy yield assessment (EYA) and the observed annual energy production (AEP). This comparison is typically made between the 50% probability of exceedance (P50) value of the EYA and the long-term corrected operational AEP (hereafter OA P50), and is known as the P50 bias. The industry has critically lacked an independent analysis of bias reduction investigated across multiple consultants to identify the greatest sources of uncertainty and variance in the EYA process and the best opportunities for uncertainty reduction. The present study addresses this gap by benchmarking consultant methodologies against each other and against operational data at a scale not seen before in industry collaborations. We consider data from 10 wind plants and evaluate discrepancies between eight consultancies in the steps taken from estimates of gross to net energy. Consultants tend to overestimate the gross energy produced at the turbines and then compensate by further overestimating downstream losses, leading to a mean P50 bias near zero, still with significant variability among the individual wind plants. Within our data sample, we find that consultant estimates of all loss categories, except environmental losses, tend to reduce the project-to-project variability of the P50 bias. The disagreement between consultants, however, remains flat throughout the addition of losses. Finally, we find that differences in consultants’ estimates of project performance can lead to differences up to $10/MWh in the levelized cost of energy for a wind plant.

Todd, Austin C.↗