Search NASA⌕ Search

SEARCH · Search NASA

Results for “Constructions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Specific SPS construction studies: Construction tasks, construction base

A concept for building the 5000 MW reference solar power satellite in Earth orbit is discussed. The system uses silicon solar cells. The GEO base has contiguous facilities for concurrent assembly and subsequent mating of the satellite energy conversion system and its power transmission antenna. The end builder construction system uses 10 synchronized beam machines to automatically fabricate continuous longitudinal beams for the energy conversion system.

Mccaffrey, R. W.↗

Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Lunar Surface Construction Activity at NASA Marshall Space Flight Center

Introduction: The goal of the Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Project at NASA Marshall Space Flight Center (MSFC) is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure elements on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms, and blast shields using lunar regolith-based materials. MSFC has strong collaborations with industry, academia, and other NASA Centers to accomplish this goal. The MMPACT project consists of three elements. The first focuses on the development of an autonomous construction system. The second focuses on construction feedstock materials development. The third element focuses on the development of a microwave sintering construction capability. The team plans to demonstrate construction on a small Commercial Lunar Payload Services (CLPS) lander in the 2025 timeframe, with a future goal of constructing a subscale landing pad in 2028-2029.The MMPACT project is funded through the Lunar Surface Innovation Initiative, which is part of the Space Technology Mission Directorate. Technology Development: The MMPACT team will evaluate multiple autonomous construction and microwave construction technologies, materials, and construction element forms. Selected technologies will be matured; processes and operations will be defined for the two flight missions. Evaluations of materials, as well as the technology itself, will be demonstrated in simulated lunar environments as part of the technology maturation process. The team is keenly aware of the properties of the lunar environment. Its temperature swings, negligible exosphere, and unprepared site foundations factor into the materials for both construction and hardware, the concept of operations, and the technology’s interdependencies. Materials: The team is looking at materials that can be produced from in-situ resources in an effort to make lunar construction cost-effective. The particular focus of the materials team is cementitious materials, metals, and sintered and melted regolith. These materials will be studied for tensile, compressive, and flexural strength. They will also be tested for their ability to handle thermal swings and vacuum. They will be fully characterized using various microscopy techniques to examine micro-structures, chemistry, and crystal formation. Interdependencies: There are many interdependencies that MMPACT has already identified. These include: •Excavation interface •Regolith feedstock beneficiation •Regolith feedstock storage and provision •Requirements for structures •Site-to-site mobility systems •Availability of lunar simulant •Lander off-loading capabilities •Navigation systems •Power •Regolith composition and mineralogy •Lander specifications •Communication protocols Technology developments in these additional areas would be beneficial to MMPACT.

Moon to Mars Planetary Autonomous Construction Tec↗

Directions for lunar construction - A derivation of requirements from a construction scenario analysis

This paper provides an initial trade-off study among several lunar construction options available to the Space Exploration Initiative. The relative time effectiveness of Extra-Vehicular Activity (EVA), Intra-Vehicular Activity (IVA), and Earth-based remote control assembly and construction methods are studied. Also considered is whether there is any construction time savings to building roads in advance, or surveying the construction sites with orbiters or rovers in advance. The study was conducted by adding detail to a potentially real scenario - a nuclear power plant - and applying time multipliers for the various control options and terrain alternatives, provided by roboticists among the authors. The authors conclude that IVA is a faster construction method than either EVA or construction conducted remotely from Earth. Surveying proposed sites in advance, with orbiters and rovers, provides a significant time savings through adding to certainty, and therefore may be cost effective. Developing a heavy-lift launch capability and minimizing assembly and construction processes by landing large payloads is probably worthwhile to the degree possible, as construction activities would use a large amount of surface operations time.

Dias, William S.↗

Additive Construction with Mobile Emplacement: Multifaceted Planetary Construction Materials Development

The National Aeronautics and Space Administration's Additive Construction with Mobile Emplacement (ACME) project is developing construction materials with which infrastructure elements, including habitats, will be additively constructed for planetary surface missions. These materials must meet requirements such as the ability to be produced from available in-situ resources to eliminate the cost of launching materials from Earth, the ability to be emplaced via three dimensional building techniques, the ability to resist aging in extreme environments including radiation and micrometeorite bombardment, and the ability to provide the necessary structural integrity for a given building. This paper reviews the constraints placed on such planetary construction materials and details the work of the ACME team in characterizing materials that could one day construct planetary surface structures on Mars or the Moon. Material compositions, compressive strength, and requirements for additive construction on planetary surfaces are discussed. Due to the multifunctional requirements of the material, an optimization is necessary to balance between the site-specific regolith composition, emplacement via additive construction techniques, and characteristics of the final structure.

simulant↗

Space construction system analysis. Part 2: Construction analysis

The construction methods specific to the end to end construction process for building the ETVP in low Earth orbit, using the space shuttle orbiter as a construction base, are analyzed. The analyses concerned three missions required to build the basic platform. The first mission involved performing the fabrication of beams in space and assembling the beams into a basic structural framework. The second mission was to install the forward support structure and aft support structure, the forward assembly, and a TT&C antenna. The third mission plan was to complete the construction of the platform and activate it to begin operations in low Earth orbit. The integration of the activities for each mission is described along with the construction requirements and construction logic.

Roebuck, J. A.↗

Additive Construction with Mobile Emplacement (ACME) / Automated Construction of Expeditionary Structures (ACES) Materials Delivery System (MDS)

The purpose of the Automated Construction of Expeditionary Structures, Phase 3 (ACES 3) project is to incorporate the Liquid Goods Delivery System (LGDS) into the Dry Goods Delivery System (DGDS) structure to create an integrated and automated Materials Delivery System (MDS) for 3D printing structures with ordinary Portland cement (OPC) concrete. ACES 3 is a prototype for 3-D printing barracks for soldiers in forward bases, here on Earth. The LGDS supports ACES 3 by storing liquid materials, mixing recipe batches of liquid materials, and working with the Dry Goods Feed System (DGFS) previously developed for ACES 2, combining the materials that are eventually extruded out of the print nozzle. Automated Construction of Expeditionary Structures, Phase 3 (ACES 3) is a project led by the US Army Corps of Engineers (USACE) and supported by NASA. The equivalent 3D printing system for construction in space is designated Additive Construction with Mobile Emplacement (ACME) by NASA.

Mueller, R. P.↗

TeleLayering: Teleoperated Construction 3D Printing Using Multimodal Feedback for Extraterrestrial and Terrestrial Construction

In this paper, we propose a teleoperated construction 3D printing technology, called TeleLayering, for planetary and terrestrial applications. The TeleLayering technology is enabled by effective multimodal control and monitoring systems and enhanced construction 3D printing robots to build or repair a variety of structures in extreme environments without the need for human presence on the jobsite. This paper presents a general description, main technical requirements, implementation challenges, and applications of this technology.

TeleLayering↗

The Present Status of Airship Construction, Especially of Airship-framing Construction

This work proposes to sketch, in broad outline, the status of airship construction in the various countries, at a time when commerce over great distances might be finally opened up to the airship through the performances of the "Graf Zeppelin." After a short historical review, a survey of the most important rigid and semirigid airships built since 1925, their differences and special problems, is made. In more detailed treatment, the framing construction of the more recent rigid airships and some especially interesting structural questions are investigated.

Ebner, Hans↗

Advanced construction management for lunar base construction - Surface operations planner

The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

Kehoe, Robert P.↗