Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

MARS 2020 Contingency Planning Overview

Case study on contingency planning for the MARS 2020 rover launch. Intended as part of a training for international consequence management personnel for IAEA and/or NATO-sponsored training classes. Funded through NA-81

61 RADIATION PROTECTION AND DOSIMETRY↗

Resource Conservation and Recovery Act General Contingency Plan for Hazardous Waste Treatment, Storage, and Disposal Units at the Y-12 National Security Complex. Revision 12

This document, Y/TS-1015/R12, Resource Conservation and Recovery Act General Contingency Plan for Hazardous Waste Treatment, Storage, and Disposal Units at the Y-12 National Security Complex, is for reference purposes. It is a consolidation of the August 10, 2018, versions of Attachment 6, “Contingency Plan,” from Tennessee Hazardous Waste Management Permits TNHW-122 and TNHW-127. It is not intended to supersede any requirements in these permits and any differences are unintentional. The decision to implement this contingency plan, as part of the Emergency Plan, depends upon whether an imminent or actual incident involving a RCRA treatment, storage, or disposal unit could threaten human health or the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wash Vehicle Fleet Sizing for Contingency Planning Against Dust Storms: Preprint

Wash vehicles containing either high- or low-pressure water sprayers, a collection of rotating brushes, or a combination of these, are frequently utilized in concentrating solar power (CSP) plants to maintain a high level of optical efficiency in the solar field. In recent years, multiple modeling approaches have been developed to obtain fleet sizes and mirror-washing schedules that optimize the tradeoff of vehicle capital and use costs and labor versus lost revenues due to soiling. These planning models cover normal operating conditions well but do not consider rare events such as dust storms which can a significant reduction in receiver productivity, or shut down operations until most or all of the solar field’s mirrors have been cleaned. To that end, we propose a methodology that evaluates whether additional capital should be deployed to hedge against these events by weighing the net present value of the expected benefits against the capital costs. The output of this method is a breakeven frequency, a metric we sue to determine whether an additional vehicle should be purchased to address the contingency of dust storms by comparing it to the expected annual storm frequency We develop a small collection of case studies using commercial-scale CSP tower plants and obtain breakeven frequencies that mostly fall between 0.1 and 1.0 storms per year, depending on the existing fleet size and storm severity.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Wash Vehicle Fleet Sizing for Contingency Planning Against Dust Storms

Wash vehicles containing either high- or low-pressure water sprayers, a collection of rotating brushes, or a combination of these, are frequently utilized in concentrating solar power (CSP) plants to maintain a high level of optical efficiency in the solar field. In recent years, multiple modeling approaches have been developed to obtain fleet sizes and mirror-washing schedules that optimize the tradeoff of vehicle capital and use costs and labor versus lost revenues due to soiling. These planning models cover normal operating conditions well but do not consider rare events such as dust storms which can cause a significant reduction in receiver productivity, or shut down operations until most or all of the solar field's mirrors have been cleaned. To that end, we propose a methodology that evaluates whether additional capital should be deployed to hedge against these events by weighing the net present value of the expected benefits against the capital costs. The output of this method is a breakeven frequency, a metric we sue to determine whether an additional vehicle should be purchased to address the contingency of dust storms by comparing it to the expected annual storm frequency We develop a small collection of case studies using commercial-scale CSP tower plants and obtain breakeven frequencies that mostly fall between 0.1 and 1.0 storms per year, depending on the existing fleet size and storm severity.

concentrating solar power↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

A Long Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected conditions or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment.

54 ENVIRONMENTAL SCIENCES↗

FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of the groundwater in the 200-ZP-1 OU. The alternatives considered provide a range of potential response actions (i.e., no action; institutional controls and monitored natural attenuation [MNA]; and pump-and-treat with MNA, flow-path control, and institutional controls) that are appropriate to address site-specific conditions. The alternatives are evaluated against seven of the nine CERCLA evaluation criteria defined in Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (EPA/540/G-891004). The remaining two CERCLA criteria will be formally assessed during the public comment period. The FS evaluation serves as the basis for identifying a remedy to mitigate potential risks to human health and the environment. A preferred alternative (or alternatives) will be presented to the public for review and comment in the proposed plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Addressing the Need for Independence in the CSE Model

Abstract Information system security risk, defined as the product of the monetary losses associated with security incidents and the probability that they occur, is a suitable decision criterion when considering different information system architectures. Risk assessment is the widely accepted process used to understand, quantify, and document the effects of undesirable events on organizational objectives so that risk management, continuity of operations planning, and contingency planning can be performed. One technique, the Cyberspace Security Econometrics System (CSES), is a methodology for estimating security costs to stakeholders as a function of possible risk postures. In earlier works, we presented a computational infrastructure that allows an analyst to estimate the security of a system in terms of the loss that each stakeholder stands to sustain, as a result of security breakdowns. Additional work has applied CSES to specific business cases. The current state-of-the-art of CSES addresses independent events. In typical usage, analysts create matrices that capture their expert opinion, and then use those matrices to quantify costs to stakeholders. This expansion generalizes CSES to the common real-world case where events may be dependent.

99 GENERAL AND MISCELLANEOUS↗

The Use of Dispersants in Marine Oil Spill Response

Whether the result of an oil well blowout, vessel collision or grounding, leaking pipeline, or other incident at sea, each marine oil spill will present unique circumstances and challenges. The oil type and properties, location, time of year, duration of spill, water depth, environmental conditions, affected biomes, potential human community impact, and available resources may vary significantly. Also, each spill may be governed by policy guidelines, such as those set forth in the National Response Plan, Regional Response Plans, or Area Contingency Plans. To respond effectively to the specific conditions presented during an oil spill, spill responders have used a variety of response options—including mechanical recovery of oil using skimmers and booms, in situ burning of oil, monitored natural attenuation of oil, and dispersion of oil by chemical dispersants. Because each response method has advantages and disadvantages, it is important to understand specific scenarios where a net benefit may be achieved by using a particular tool or combination of tools.

Hazen, Terry C.↗

Evaluating penalized logistic regression models to predict Heat-Related Electric grid stress days

Understanding the conditions associated with stress on the electricity grid is important in the development of contingency plans for maintaining reliability during periods when the grid is stressed. In this paper, heat-related grid stress and the relationship with weather conditions is examined using data from the eastern United States. Penalized logistic regression models were developed and applied to predict stress on the electric grid using weather data. The inclusion of other weather variables, such as precipitation, in addition to temperature improved model performance. Several candidate models and datasets were examined. A penalized logistic regression model fit at the operation-zone level was found to provide predictive value and interpretability. Additionally, the importance of different weather variables observed at different time scales were examined. Maximum temperature and precipitation were identified as important across all zones while the importance of other weather variables was zone specific. The methods presented in this work are extensible to other regions and can be used to aid in planning and development of the electrical grid.

Bramer, L. M.↗

Emerging Best Practices for Electric Utility Planning with Climate Variability: A Resource for Utilities and Regulators

This report is intended to support electric utilities and regulators as they work together to increase the climate resilience of the power system in the United States. It focuses on best practice methods and examples of conducting utility forecasting with climate change (Section 2) as well as three overlapping types of electric utility planning for climate change: resource planning (Section 3), asset planning (Section 4), and contingency planning (Section 5). This report also addresses data development and access (Section 6), emerging pathways for planning including decision-making under deep uncertainty and storylines approaches (Section 7), regulatory considerations (Section 8), and coordination and innovative funding and cost sharing approaches to planning for climate variability (Section 9).

24 POWER TRANSMISSION AND DISTRIBUTION↗