Search NASA⌕ Search

SEARCH · Search NASA

Results for “Core internal changeout outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Reactor Walkway Design for Gear Box Support Beam Removal

The walkway over the reactor is intended to be used in the core internal changeout (CIC) outage to replace the gear box suport beams. (GBSB) The current configuration of the in-tank platform prevents easily discharging the GBSB to the canal through the drop chute. The walkway's purpose is to increase operators access to the south irration deck, where the GBSB will be put into discharge cans, as well as the drop chute.

42 ENGINEERING↗

Nuclear Requalification of the New ATR Core

The Advanced Test Reactor (ATR) creates a unique high neutron flux materials testing environment that subsequently causes neutron embrittlement damage to its beryllium reflector eventually requiring a replacement during a reactor Outage. Concurrently, a piece-for-piece core replacement is conducted to maintain reactor functionality called a core internals changeout (CIC). Once changeout is complete, ATR Reactor Engineering utilizes previous CIC data to model and predict criticality scenarios for the new unirradiated core. However, CIC data has been inconsistently reported over the years making it difficult to find data trends that could be useful for the modeling and prediction process. So nuclear requalification testing is conducted using different flux and irradiation tests to accurately verify the models and to recalibrate nuclear monitoring instrumentation in the ATR core allowing for safe re-start of normal operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Nuclear Requalification of the ATR Core

The Advanced Test Reactor (ATR) creates a unique, high neutron flux materials testing environment that subsequently causes neutron embrittlement damage to its beryllium reflector. The reflector is eventually required to be replaced during a reactor Outage. Concurrently, a piece-for-piece core replacement is conducted to maintain reactor functionality called a core internals changeout (CIC). Once changeout is complete, ATR Reactor Engineering utilizes previous CIC data, notably 1977-1994 CIC data, to conduct predictive criticality analysis on the new, unirradiated core. However, CIC data has been inconsistently reported over the years making it difficult, and in some cases impossible, to utilize. These inconsistencies arise in various forms of not using correct units, inconsistent diagram usage, and not portraying the same kind of data similarly across the reports. To work around this inconsistency issue, Reactor Engineering is implementing the use of several new neutronic modeling codes that utilize modern computation speeds and methods to model the new core in different criticality environments. Further validation is then conducted by nuclear testing and bringing the reactor critical and conducting various irradiation tests. Upon completion and certification that the reactor passed all testing requirements, ATR can once again re-start normal operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗