Search NASA⌕ Search

SEARCH · Search NASA

Results for “Cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Assessing the Battery Cost at Which Plug-In Hybrid Medium-Duty Parcel Delivery Vehicles Become Cost-Effective

The National Renewable Energy Laboratory (NREL) validated diesel-conventional and diesel-hybrid medium-duty parcel delivery vehicle models to evaluate petroleum reductions and cost implications of hybrid and plug-in hybrid diesel variants. The hybrid and plug-in hybrid variants are run on a field data-derived design matrix to analyze the effect of drive cycle, distance, engine downsizing, battery replacements, and battery energy on fuel consumption and lifetime cost. For an array of diesel fuel costs, the battery cost per kilowatt-hour at which the hybridized configuration becomes cost-effective is calculated. This builds on a previous analysis that found the fuel savings from medium duty plug-in hybrids more than offset the vehicles' incremental price under future battery and fuel cost projections, but that they seldom did so under present day cost assumptions in the absence of purchase incentives. The results also highlight the importance of understanding the application's drive cycle specific daily distance and kinetic intensity.

25 ENERGY STORAGE↗

Towards cost-competitive middle distillate fuels from ethanol within a market-flexible C2 platform-based biorefinery concept

Ethanol to middle distillates (ETMD) is a promising pathway to produce sustainable liquid fuels to decarbonize the hard-to-electrify transportation sectors due to (1) the abundant sugar/starch and lignocellulosic biomass, (2) the existing deployment scale of fuel ethanol production (similar to 29 billion gallons per year globally), and (3) emerging opportunities in C2+ alcohol synthesis from CO2. Here we report a conceptual market-responsive biorefinery centered around a new ETMD pathway based on one-step ethanol to butene-rich olefins (ETO) over a Cu-Zn-Y/Beta catalyst. Specifically, this ethanol conversion pathway comprises one-step ETO, oligomerization, and hydrotreating. This ETO is distinct from that in the conventional ethanol-to-jet process which is based on two-step ethanol to ethylene and ethylene oligomerization to butenes. Butene-rich olefins can be shifted to butadiene-rich products by simply changing the reaction atmosphere from hydrogen to inert gas over the same ETO catalyst. Leveraging the experimental results, baseline techno-economic analysis (TEA) and sensitivity analysis indicate that the ethanol conversion cost is $0.60 per gallon gasoline equivalent (GGE), with opportunities for further cost reduction via improving the liquid hydrocarbon yield and space velocities, and process optimization on balancing dewatering of ethanol feed prior to the ETO step. The minimum fuel selling price (MFSP) of liquid hydrocarbons derived from corn starch ethanol with butadiene as coproduct is $1.64 per GGE, in the range that is cost competitive with petroleum kerosene-type jet fuel. Projected MFSP for cellulosic ethanol (corn stover) derived hydrocarbons is below $3.00 per GGE and co-production of butadiene further reduces the MFSP to $1.70 per GGE. The Well-to-Wake life-cycle analysis indicates that 85% greenhouse gas emission reduction can be achieved when using corn stover compared to petroleum reference and the associated carbon credits will provide significant economic incentives to favor the cellulosic ethanol-derived hydrocarbon fuels. This study demonstrates a low-cost pathway to middle distillate fuels leveraging existing ethanol infrastructure, where catalysis innovation drives the reduction of process complexity and flexible coproduction of a value-added chemical product.

Zhang, Junyan↗

Development and validation of chemistry agnostic flow battery cost performance model and application to nonaqueous electrolyte systems: Chemistry agnostic flow battery cost performance model

A chemistry agnostic cost performance model is described for a nonaqueous flow battery. The model predicts flow battery performance by estimating the active reaction zone thickness at each electrode as a function of current density, state of charge, and flow rate using measured data for electrode kinetics, electrolyte conductivity, and electrode-specific surface area. Validation of the model is conducted using a 4kW stack data at various current densities and flow rates. This model is used to estimate the performance of a nonaqueous flow battery with electrode and electrolyte properties used from the literature. The optimized cost for this system is estimated for various power and energy levels using component costs provided by vendors. The model allows optimization of design parameters such as electrode thickness, area, flow path design, and operating parameters such as power density, flow rate, and operating SOC range for various application duty cycles. A parametric analysis is done to identify components and electrode/electrolyte properties with the highest impact on system cost for various application durations. A pathway to 100$kWh -1 for the storage system is identified.

25 ENERGY STORAGE↗

CPUC Avoided Transmission and Distribution Cost Study to Support the Avoided Cost Calculator: Avoided Transmission Costs Draft Research Plan

Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) have been contracted by the California Public Utilities Commission (CPUC) Energy Division (ED) to perform a study which explores and selects an improved methodology to estimate avoided electricity transmission and distribution (T&D) infrastructure costs that can be attributed to the presence of distributed energy resources (DERs). PNNL is performing the study for avoided electricity transmission infrastructure costs and LBNL is performing the study for avoided electricity distribution infrastructure costs. This document summarizes CPUC’s research questions related to avoided transmission infrastructure costs and PNNL’s proposed technical approach to answer these questions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tensor hypercontracted ppRPA: Reducing the cost of the particle-particle random phase approximation from O(r {sup 6}) to O(r {sup 4})

In recent years, interest in the random-phase approximation (RPA) has grown rapidly. At the same time, tensor hypercontraction has emerged as an intriguing method to reduce the computational cost of electronic structure algorithms. In this paper, we combine the particle-particle random phase approximation with tensor hypercontraction to produce the tensor-hypercontracted particle-particle RPA (THC-ppRPA) algorithm. Unlike previous implementations of ppRPA which scale as O(r{sup 6}), the THC-ppRPA algorithm scales asymptotically as only O(r{sup 4}), albeit with a much larger prefactor than the traditional algorithm. We apply THC-ppRPA to several model systems and show that it yields the same results as traditional ppRPA to within mH accuracy. Our method opens the door to the development of post-Kohn Sham functionals based on ppRPA without the excessive asymptotic cost of traditional ppRPA implementations.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Levelized cost of energy for a Backward Bent Duct Buoy

The Reference Model Project, supported by the U.S. Department of Energy, was developed to provide publically available technical and economic benchmarks for a variety of marine energy converters. The methodology to achieve these benchmarks is to develop public domain designs that incorporate power performance estimates, structural models, anchor and mooring designs, power conversion chain designs, and estimates of the operations and maintenance, installation, and environmental permitting required. The reference model designs are intended to be conservative, robust, and experimentally verified. The Backward Bent Duct Buoy (BBDB) presented in this paper is one of three wave energy conversion devices studied within the Reference Model Project. Comprehensive modeling of the BBDB in a Northern California climate has enabled a full levelized cost of energy (LCOE) analysis to be completed on this device.

marine hydrokinetic energy development↗

Manufacturing Cost Analysis for PEM Electrolyzers and Perspectives for Future Cost Reduction

Electrolyzer capital costs strongly influence the total levelized cost of hydrogen production and have implications for hydrogen deployment. Current electrolyzer costs are high, and large cost reductions may be needed to achieve competitive hydrogen costs and targets. Understanding pathways for cost reduction via R&D and deployment is a critical research area for informed energy planning and enabling hydrogen use. This work presents bottom-up cost estimates of polymer electrolyte membrane (PEM) electrolyzer systems tied to design specifications and discusses perspectives for cost reduction opportunities based on ongoing research. We use a detailed manufacturing and process model for a 1 MW PEM electrolyzer stack and balance of plant (BOP) for rigorous cost estimation. This allows for robust estimates of component and manufacturing costs and examination of key cost contributors. Stack costs are dominated by material costs such as iridium and platinum catalysts, especially at high manufacturing rates; power electronics and hydrogen purification equipment are the largest contributors to BOP cost. At higher manufacturing rates, better equipment utilization could reduce stack costs significantly, and we estimate that experience and bulk purchasing will allow for cost reductions to some BOP components. Still, many well-established BOP technologies and stack material costs are less likely to see significant cost reductions at high manufacturing rates. As such, manufacturing scale is limited in how much it can reduce electrolyzer costs, and additional advances for cost reduction may be needed to achieve cost targets. It will likely take many combined strategies to achieve significant cost reductions for electrolyzers and enable low-cost hydrogen production. We can use our manufacturing cost model to quantify potential cost reductions from the considerations described above and demonstrate pathways to lower cost electrolyzers. This allows for better understanding of cost reduction strategies and enables more informed research, development, and deployment for electrolyzers.

cost↗

Cost Estimates for NPP Decommissioning Projects and Insights from Cost Analysis - 18118

The technical ability to decommission NPPs shut down after normal operation has been well demonstrated. However, concerns remain about the ability to accurately calculate and demonstrate the validity of decommissioning cost estimates, and to control costs during decommissioning. This paper describes recent international guidance on quality cost estimates for nuclear decommissioning projects and explores the potential added value that could be attained through more systematic analysis and reporting of decommissioning project costs. The OECD Nuclear Energy Agency (NEA) and the International Atomic Energy Agency (IAEA) have long been concerned about the need to promote greater transparency in decommissioning costing and have collaborated in a number of initiatives in pursuit of this objective. Together with the European Commission, they published 'The International Structure for Decommissioning Costing (ISDC)' in 2012. The ISDC provides a useful common reporting format for decommissioning costing. The NEA has also published guidance on the international peer reviews of decommissioning cost studies (2014) and on the practice of decommissioning cost estimation (2015). In September 2017, the NEA and IAEA published detailed guidance on addressing uncertainties in decommissioning cost estimates (the 'Addressing Uncertainties' report). This joint report sets out an approach to treating uncertainties reflecting current good practices in cost estimating. Specifically, it describes how uncertainties in decommissioning cost estimation can be addressed using standardized methods of estimating uncertainty and risk analysis. Its recommendations aim at enabling a consistent and comprehensive treatment of risk and uncertainty in the preparation of decommissioning cost estimates. Together these publications establish a good basis for producing comprehensive and high-quality cost estimates for nuclear decommissioning projects and for enhancing confidence in the estimates through improving transparency concerning the underpinning data and calculations, and more explicit representation of the uncertainties that may impact on project costs. There is increasing attention on understanding variations between cost estimates and apparent escalation of decommissioning costs. This arises both from the need to assure the adequacy of financing arrangements for future decommissioning projects and the ambition to improve the performance and ensure value-for-money in the delivery of decommissioning projects and services. A systematic analysis of actual decommissioning project costs in relation to the cost estimates would be expected to yield valuable insights about key cost drivers in actual decommissioning projects, and the extent to which current cost estimates accurately capture and reflect these. Aligning the reporting of decommissioning project costs with the underpinning cost estimates for the projects would also facilitate the identification of causes of major deviations between projected and actual costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Breakeven Cost for Residential Photovoltaics in the United States: Key Drivers and Sensitivities (Report Summary) (Presentation)

"Break-even cost" for photovoltaic (PV) technology is defined as the point where the cost of PV-generated electricity equals the cost of electricity purchased from the grid. Break-even cost is expressed in $/W of an installed system. Achieving break-even cost is a function of many variables. Consequently, break-even costs vary by location and time for a country, such as the United States, with a diverse set of resources, electricity prices, and other variables. In this presentation, we introduce an analysis of PV break-even costs for residential customers in the United States, including an evaluation of some of the key drivers of PV breakeven both regionally and over time. This presentation includes our methodology and presents results for both near-term residential breakeven costs(2009) and future market sensitivities of break-even costs (2015). See also the the report "Break-Even Cost for Residential Photovoltaics in the United States: Key Drivers and Sensitivities". Presentation for NREL/TP-6A2-45991.

14 SOLAR ENERGY↗

Knowledge Spillovers and Cost Reductions in Solar Soft Costs

Despite the commonly acknowledged importance of knowledge spillovers in reducing solar soft costs, we are only beginning to answer a fundamental question: who learns what (knowledge acquisition), from whom (knowledge production), and how (spillover mechanisms)? Until recently, this important topic has been largely unexplored in the case of solar soft costs. Thus, this project set out to identify how knowledge spillovers affect soft costs in the U.S. photovoltaic (PV) installation industry, specifically how important spillovers are, what types of knowledge are most likely to spillover, and how networks of actors affect spillovers. Our findings offer insights for designing solutions that address problems associated with knowledge spillovers and that leverage spillovers to reduce solar soft costs. Recognizing the ambiguity in the definition of soft costs, i.e., “non-hardware costs,” and variability in soft cost categories, we developed the Solar Soft Cost Ontology (SSCO) to systematically identify key concepts related to soft costs, network actors, learning processes, and the relationships between them. This ontology served as a foundational organizational structure for the methodology of the remaining tasks: case studies, surveys, pricing analysis, patent analysis, network analysis, and project integration across tasks. While there is substantial learning among installers that is reducing the soft costs for PV installations, most of that learning is retained by firms rather than spread across the industry. The positive relationship between experience accumulation and cost reductions is typically explained as learning by doing (LBD), but we find that LBD effects are mediated by other learning mechanisms, including learning by searching and learning by interacting. Knowledge spillovers have significant potential to reduce solar PV soft costs, but successful knowledge spillover pathways are complex and non-trivial. There are a wide variety of ways to construct an installation business, thus categories of firms that can effectively cross-learn directly are small and what knowledge is relevant to whom is challenging and costly for firms to assess. This fragmentation limits the critical mass needed for spillover related soft cost reductions. Knowledge does not flow directly between installers. Indirect knowledge transfer pathways are critical: distributors, software providers, collaboratives, and hiring. Furthermore, diverse, more integrated knowledge networks tend to promote successful learning by organizations and across the system as a whole. Accordingly, we find the need to supporting the whole ecosystem using an integrated policy and programmatic approach to support installers, distributors, complementary sector, and facilitators. Overall, a deliberate policy-mix design is needed to reduce the solar PV deployment barrier in terms of installation cost reductions, because deployment policies could potentially interact with policies that facilitate network-building and technological innovation. A combination of deployment policies, innovation-support policies, and network-facilitating policies could potentially lead to a more desired market outcome through achieving higher joint learning rates from firms’ cumulative experiences developed in a more integrated production and deployment ecosystem.

14 SOLAR ENERGY↗

Decommissioning costs - some international perspectives and initiatives. Presentation for Panel discussion. Session No. 024: 'Getting a Handle on Decommissioning Costs - a Global Perspective'

Financing for decommissioning: Are the cost estimates valid? Are the financing arrangements suitable? Are the fund management systems appropriate? Cost estimates are estimated, analysed and updated on a regular basis, but cost comparisons are not straight-forward. There is an incomplete understanding of variability between estimates. Multiple internal and external factors impact estimates: Institutional, legal and policy, purpose, Strategies and plans, overall context, Facility characteristics and history Contingencies and risk, Limited actual cost data. The financing arrangements: there exists a range of systems in place for the implementation of Funding Policy and Strategy, but there are Considerable variations in: Calculating funding requirements, contributions/provisions, Allocating risks and requirements for securities Managing funds and accounting, adjusting the system, Managing disbursements, Reporting and supervision. All cost estimates for future decommissioning activities include considerable uncertainties. These uncertainties will gradually diminish with growing experience from current and planned projects. Different costing methods have different data requirements. Their reliability depends on the extent to which various data are available and applicable to the specific case being considered. Independent of the assessment method, some uncertainty is inevitable in all estimates of future costs. Analysis of the costing method may be useful in order to locate the key uncertainties in each specific estimate. NEA's Decommissioning Cost Estimation Group (DCEG) was Created in 2008 to foster the exchange of information and experience. It Aims to enhance the credibility, reliability, and auditability of the cost estimation process. It Helps define international good practices in decommissioning cost estimation. However, some major challenges remain. Weaknesses in: Understanding relations between estimates and actual costs, Lack of relevant cost data, sharing data. How might be addressed: Improved sharing of cost data, Systematic analyses of estimates and actual costs, Developing benchmarking approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost and Potential of Monolithic CIGS Photovoltaic Modules

A bottom-up cost analysis of monolithic, glass-glass Cu(In,Ga)(Se,S)2 (CIGS) modules is presented, illuminating current cost drivers for this technology and possible pathways to reduced cost. At 14% module efficiency, for the case of U.S. manufacturing, a manufacturing cost of $0.56/WDC and a minimum sustainable price of $0.72/WDC were calculated. Potential for reduction in manufacturing costs to below $0.40/WDC in the long-term may be possible if module efficiency can be increased without significant increase in $/m2 costs. The levelized cost of energy (LCOE) in Phoenix, AZ under different conditions is assessed and compared to standard c-Si.

14 SOLAR ENERGY↗

Solar soft cost ontology: a review of solar soft costs

The continued deployment of renewable energy is critical to the energy transition necessary for climate change mitigation. Since cost is one of the primary drivers of solar adoption, we must continue to reduce the cost of solar to hasten the transition to clean energy. Currently, solar soft costs account for 52%–70% of the cost of an installed residential solar photovoltaic (PV) system in the U.S. These costs are persistent and an increasing share of the costs, since hardware costs continue to decline. The consensus on a definition of soft costs is 'non-hardware costs', but defining something by what it is not does not tell us what it is, which makes it difficult to study and understand. To this end, we developed the solar soft cost ontology (SSCO) to provide a comprehensive view of the complex and variable knowledge domain of solar soft costs. In this work, we identify the main categories of solar soft costs, how they relate to each other, how that knowledge is created, shared, and acquired, and the relevant actors in the solar soft cost knowledge ecosystem. Developed by coding a corpus of nearly 130 academic articles, the resulting ontology in web ontology language (OWL) includes 136 classes and 87 properties. The SSCO can facilitate and enhance knowledge transfer of research findings and best practices within and between stakeholder communities, including researchers, practitioners, and policy makers, that seek to address solar soft costs. We conclude with a discussion of potential applications and use cases for the SSCO among this diverse stakeholder community.

14 SOLAR ENERGY↗

Phase I Microgrid Cost Study: Data Collection and Analysis of Microgrid Costs in the United States

The U.S. Department of Energy (DOE) Office of Electricity Microgrid Cost Study project is looking at identifying the costs of components, integration and installation of U.S. microgrids and project cost improvements and technical accelerators over the next 5 years and beyond. This information could then be used by the DOE among others, to develop R&D agendas for the development of the next generation microgrids that provide cost effective, reliable and clean energy solutions. Microgrids are gaining in popularity because of their adaptability and flexible expandability, the need for increased electricity reliability, the increased affordability of distributed energy resources (DERs) and grid intelligence devices, goals to reduce greenhouse gas emissions, and other factors. The U.S. Department of Energy commissioned the National Renewable Energy Laboratory to complete a microgrid cost study and develop a microgrid cost model. The goal is to elucidate the variables that have the highest impact on costs as well as potential areas for cost reduction. This study consists of two phases. Phase I comprises the collection and analysis of data from microgrid projects built in the United States and is the subject of this report. In Phase II, NREL will assess current barriers facing the industry and identify potential solutions with help from industry representatives. Microgrid components are classified as follows in the form used to collect cost data from industry representatives for NREL's microgrid cost database: DERs: diesel, natural gas, combined heat and power (CHP), biofuel, solar photovoltaic (PV), wind, and fuel cell and energy storage; microgrid controller: primary, secondary, or tertiary; additional infrastructure: distribution system infrastructure, information technology communications upgrades, metering, etc.; soft costs: engineering, construction, commissioning, and regulatory. The purposes of Phase I are to better determine the contribution of individual components to total project size and to identify cost differences in projects within the same market segment. Phase II will use the results of Phase I to have an initial indication of the costs that might be driving the cost of development the most.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Evaluation of Energy Storage Cost and Performance Characteristics

The energy storage industry continues to expand globally as costs continue to fall and opportunities in consumer, transportation and grid applications are defined. As the rapid evolution of the industry continues, it has become increasingly important to understand how varying technologies compare in terms of cost and performance. This paper defines and evaluates cost and performance parameters of six battery energy storage technologies (BESS) - lithium-ion batteries, lead-acid batteries, redox flow batteries, sodium-sulfur batteries, sodium metal halide batteries, and zinc-hybrid cathode batteries - four non-BESS storage technologies - pumped storage hydropower, flywheels, compressed air energy storage, and ultracapacitors - and combustion turbines. Cost and performance information was compiled based on an extensive literature review, conversations with vendors and stakeholders, and costs of systems procured at sites across the United States. Detailed cost and performance estimates are presented for 2018 and projected out to 2025. Annualized costs were also calculated for each technology.

Mongird, Kendall↗