Search NASASearch

SEARCH · Search NASA

Results for “Crawler Transporter #2”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Crawler Solids Unknown Analysis

Crawler Transporter (CT) #2 has been undergoing refurbishment to carry the Space Launch System (SLS). After returning to normal operation, multiple filters of the gear box lubrication system failed/clogged and went on bypass during a test run to the launch pad. Analysis of the filters was done in large part with polarized light microscopy (PLM) to identify the filter contaminates and the source of origin.

Polarized Light Microscopy

Crawler Transporter Steering and Jel Systems

The transporter weighing 2.8 million kilograms (6.3 million pounds) was used to lift a 5.7-million-kilogram (12.6-million-pound) combination of mobile launcher and space vehicle, transfer this load approximately 5.6 kilometers (3.5 miles) from its point of assembly, negotiate curves of 152-meter (500-foot) mean radius, climb a 5-percent grade while maintaining the 122-meter (400-foot) structure in a vertical position within 10 minutes of arc, and smoothly position this huge structure to within plus or minus 5.1 centimeters (plus or minus 2 inches) on support pedestals at the launch pad. The crawler-transporter is described in detail.

Davis, V. L.

Role of EIS in Materials and Coatings Selection for NASA's Launch Facilities

Corrosion studies began at NASA's John F. Kennedy Space Center (KSC) in 1966, during the Gemini/Apollo Programs, with the evaluation of long-term anti-corrosion coatings for carbon steel structures. NASAIKSC's Atmospheric Exposure Test Site was established at that time on the beach near the launch pad. In the years that followed, numerous studies at the site have identified materials, coatings, and maintenance procedures for launch hardware and equipment exposed to the highly corrosive environment at the launch pad. The atmosphere at the launch pad is highly corrosive due to the proximity of the Atlantic Ocean, high heat from rocket exhaust, and since the introduction of the Space Shuttle, the acidic combustion products of the Solid Rocket Boosters (SRBs). Currently, NASAIKSC maintains about $2 billion worth of unique equipment and facilities, not including the orbiters, each valued at about $1.8 billion. Among the items: two launch complexes, two crawler transporters, three mobile launch platforms, and specialized testing equipment. Atmospheric exposure provides very valuable data but it takes a long time and relies on human visual inspection. NASA Technical Standard for Protective Coatings requires 18 months of good performance at the Atmospheric Exposure Test Site for preliminary approval and continued good performance for 5 years for final approval of a coating system. The use of electrochemical impedance spectroscopy (EIS) was introduced at KSC in 1989 as a supplement to the traditional dc electrochemical techniques and atmospheric exposure studies. This paper presents and overview of several projects in which EIS was used in order to select materials and coatings to be used at NASA's launch facilities [1-2].

Calle, Luz Marina

Space Shuttle Crawler Transporter Sound Attenuation Study

The crawler transporter (CT) is the world's largest tracked vehicle known, weighing 6 million pounds with a length of 131 feet and a width of 113 feet. The Kennedy Space Center (KSC) has two CTs that were designed and built for the Apollo program in the 1960's, maintained and retrofitted for use in the Space Shuttle program. As a key element of the Space Shuttle ground systems, the crawler transports the entire 12-million-pound stack comprising the orbiter, the mobile launch platform (MLP), the external tank (ET), and the solid rocket boosters (SRB) from the Vehicle Assembly Building (VAB) to the launch pad. This rollout, constituting a 3.5-5.0-mile journey at a top speed of 0.9 miles-per-hour, requires over 8 hours to reach either Launch Complex 39A or B. This activity is only a prelude to the spectacle of sound and fury of the Space Shuttle launch to orbit in less than 10 minutes and traveling at orbital velocities of Mach 24. This paper summarizes preliminary results from the Crawler Transporter Sound Attenuation Study, encompassing test and engineering analysis of significant sound sources to measure and record full frequency spectrum and intensity of the various noise sources and to analyze the conditions of vibration. Additionally, data such as ventilation criteria, plus operational procedures were considered to provide a comprehensive noise suppression design for implementation. To date, sound attenuation study and results on Crawler 2 have shown significant noise reductions ranging from 5 to 24 dBA.

Margasahayam, Ravi N.

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo

WSTF Transporting of Spare Altitude Chamber from LM Site to CSM Site

Transporting of Spare Altitude Chamber from Lunar Module (LM) Site to Command Service Module (CSM) Site. The video is broken into three parts: - Part 1: Run time of 21 min., 21 sec.; color; no sound - Part 2: Run time of 17 min., 14 sec.; color; no sound - Part 3: Run time of 18 min., 41 sec.; color, no sound All videos are in the mp4 format.

Heavy Equipment

Center Planning and Development: Multi-User Spaceport Initiatives

The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any additional questions posed by potential proposers. After amending the AFP and posting additional material for potential users to consider, proposals are being accepted until July 31, at which point they will be evaluated to determine the proposer which best meets the objectives of the government. By identifying VAB HB2 as available and seeking proposals from the commercial sector for VAB HB2 and MLP use, Center Planning and Development is ensuring Kennedy Space Centers relevance in the evolving launch industry of the 21st century.

AFP

Tight Fits for Americas Next Moon Rocket, Ares V

America has begun the development of a new heavy lift rocket which will enable humans to return to the moon and reach even farther destinations. Five decades ago, the National Aeronautics and Space Administration designed a system (called Saturn/Apollo) to carry men to the moon and back; the rocket which boosted them to the moon was the Saturn V. Saturn V was huge relative to contemporary rockets and is still the largest rocket ever launched. The new moon rocket is called Ares V. It will insert 40% more payload into low earth orbit than Saturn V; and after docking with the crew spacecraft, it will insert 50% more payload onto the translunar trajectory than Saturn V. The current design of Ares V calls for two liquid-fueled stages and 2 "strap-on" solid rockets. The solid rockets are extended-length versions of the solid rockets used on the Shuttle. The diameter of the liquid stages is at least as large as the first stage of the Saturn V; the height of the lower liquid stage (called the core stage) is longer than the external tank of the Shuttle. Huge rockets require huge infrastructure and, during the Saturn/Apollo era, America invested significantly in manufacturing, assembly and launch facilities which are still in use today. Since the Saturn/Apollo era, America has invested in additional infrastructure for the Shuttle program. Ares V must utilize this existing infrastructure, with reasonable modifications. Building a rocket with 50% more capability in the same buildings, testing it in the same test stands, shipping on the same canals under the same bridges, assembling it in the same building, rolling it to the pad on the same crawler, and launching it from the same launch pad is an engineering and logistics challenge which goes hand-in-hand with designing the structure, tanks, turbines, engines, software, etc. necessary to carry such a large payload to earth orbit and to the moon. This paper quantitatively discusses the significant "tight fits" that are constraining Ares V. The engineers designing and building the infrastructure for the Saturn/Apollo program usually added margins and growth capability; sometimes the size of existing facilities (such as the width of a draw bridge) was not a constraint. Ares V may utilize the "extra" space in the existing facilities and expand other tight fits. Some of the tight fits cannot be overcome without great expense; raising the roof on the Vertical Assembly Building for example. Other tight fits are easily overcome; the transporter at the manufacturing facility for the core stage can pass under low ceilings and later over a dike (without dragging the middle) by retracting or extending the struts which support the stage. Tight fits discussed in this paper include manufacturing (jigs, widths, heights, and local transportation), testing (test stand sizes and crane capability), transportation to the test stands and the launch site (barge, waterway, and rail), assembly (VAB internal dimensions and door size), roll-out limits, and launch pad size.

Jaap, John