Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crewed”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Assessment of HRA method predictions against operating crew performance: Part II: Overall simulator data, HRA method predictions, and intra-method comparisons

This is the third in a series of four papers documenting two large-scale human reliability analysis (HRA) empirical studies – the International HRA Empirical Study and the US HRA Empirical Study. Here, the goal of the two studies was to develop an empirically-based understanding of the performance, strengths, and weaknesses of HRA methods by comparing HRA method predictions against actual operator performance in simulated accident scenarios on nuclear power plant (NPP) simulators. However, since in most cases only a single HRA team applied a given method in the International study, it was often difficult to separate analyst effects from variability in results related to the methods themselves. Since at least two HRA teams used each of the HRA methods in the US Study, intra-method comparisons were performed to identify method strengths and weaknesses independent of analyst specific effects where possible. This paper first summarizes the intra-method comparison results from the U.S. Study. Then, it discusses the reasons for the observed HRA predictive differences and the underlying methodological and guidance limitations that permitted the differences to arise. In the fourth paper, this information is combined wit h the results of the comparisons of method predictions to the actual crew data, from both the International and U.S. Studies, to develop the final conclusions about overall strengths and weaknesses of HRA methods.

97 MATHEMATICS AND COMPUTING↗

Logging Crew Attributes by Region in the Southeast USA

Urbanization, shrinking markets, and reduced forestry investment may affect harvesting efficiency in regions of the US South. To monitor these conditions, logging businesses have been tracked by surveys conducted by universities and trade associations. This project used a sampling approach coordinated with FIA utilization studies to sample logging crews based on a harvesting location. The approach was used to develop relationships among firm attributes and site attributes in six southeastern states (AL, GA, FL, NC, SC, and VA) from 2011 to 2018. The data included harvest attributes (location, harvest size and stand type) and logging firm attributes (production, crew labor, crew number, the number of machines by type, and machine age). For crew capital value, an equation was developed for this study using machine number and average machine age. The data from logging crews on 419 harvests were analyzed by region, harvest size, and stand type. Mean values for crew labor ranged from 3.1 to 7.1 workers. The average capital value per crew ranged from $\$220,000$ to $\$524,000$ per crew in the Coastal Plain with a narrower range in the Piedmont. In the Coastal Plain, higher productivity was detected for larger harvests and pine versus hardwood and mixed stands; however, in the Piedmont those trends were less obvious. Ratio of feller-bunchers, skidders and loaders were mostly 1:1:1 or 1:2:1 with 41% and 24% of samples, respectively. There were notable trends among Coastal Plain loggers regarding capital value and productivity with evidence supported by a production function. The differences in Piedmont (e.g., ownership size, market access, terrain, population density, etc.) may combine to limit daily production and labor productivity.

54 ENVIRONMENTAL SCIENCES↗

Toward a Synthetic Model for Distribution System Restoration and Crew Dispatch

Distribution service restoration (DSR) is critical for improving the resilience and reliability of modern distribution systems by strategically and sequentially energizing the system components and customer loads. Restoring electricity service to affected customers also requires multiple crews with different skill sets to perform multiple tasks that are procedurally interdependent with safety guaranteed. However, in existing DSR practices, switch operations and crew dispatch are scheduled separately, and their interdependence is not fully considered. As advanced technologies are enabling remote communication, control, and dispatch, utilities now desire an integrated DSR framework to achieve seamless coordination among multiple DSR tasks such as switch operation, crew dispatch, and component repair. In this paper, we introduce a synthetic model that integrates the service restoration model and the crew dispatch model based on a universal routing model. The proposed model can provide the estimated time of restoration for each load, the switching sequence for safely operating remotely/manually operated switches, and dispatch solutions for crews with different skill sets. The proposed synthetic model is formulated as a mixed-integer linear programming model, and its effectiveness is evaluated via the IEEE 123 bus test feeder and several large-scale test feeders (EPRI Ckt5, Ckt7, Ckt24, and IEEE 8500 node test feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Continuous Reliability Enhancement for Wind (CREW) Database: Wind Plant Reliability Benchmark

To benchmark the current U.S. wind turbine fleet reliability performance and identify the major contributors to component-level failures and other downtime events, the Department of Energy (DOE) funded the development of the Continuous Reliability Enhancement for Wind (CREW) database by Sandia National Laboratories. This report is the second annual Wind Plant Reliability Benchmark, to publically report on CREW findings for the entire wind industry. The CREW database uses both high resolution Supervisory Control and Data Acquisition (SCADA) data from operating plants and Strategic Power Systems’ (SPS) ORAPWind® (Operational Reliability Analysis Program for Wind) data, which consists of downtime and reserve event records and daily summaries of Generating, Unavailable, and Reserve time for each turbine. Together, these data are used as inputs into CREW’s reliability modeling. The results presented here include: the primary CREW Benchmark statistics (operational availability, utilization, capacity factor, mean time between events, and mean downtime); time accounting from an availability perspective; time accounting in terms of the combination of wind speed and generation levels; power curve analysis; and top system and component contributors to unavailability.

Peters, Valerie A.↗

Continuous Reliability Enhancement for Wind (CREW) database :

To benchmark the current U.S. wind turbine fleet reliability performance and identify the major contributors to component-level failures and other downtime events, the Department of Energy funded the development of the Continuous Reliability Enhancement for Wind (CREW) database by Sandia National Laboratories. This report is the third annual Wind Plant Reliability Benchmark, to publically report on CREW findings for the wind industry. The CREW database uses both high resolution Supervisory Control and Data Acquisition (SCADA) data from operating plants and Strategic Power Systems ORAPWindª (Operational Reliability Analysis Program for Wind) data, which consist of downtime and reserve event records and daily summaries of various time categories for each turbine. Together, these data are used as inputs into CREW s reliability modeling. The results presented here include: the primary CREW Benchmark statistics (operational availability, utilization, capacity factor, mean time between events, and mean downtime); time accounting from an availability perspective; time accounting in terms of the combination of wind speed and generation levels; power curve analysis; and top system and component contributors to unavailability.

Hines, Valerie Ann-Peters↗

Continuous Reliability Enhancement for Wind (CREW). Program Update

Sandia's Continuous Reliability Enhancement for Wind (CREW) Program is a follow on project to the Wind Plant Reliability Database and Analysis Program. The goal of CREW is to characterize the reliability performance of the US fleet to serve as a basis for improved reliability and increased availability of turbines. This document states the objectives of CREW and describes how data collected for CREW will be used in analysis. A critical aspect to the success of the CREW project is data input from participating owner/operators. The level of detail and the quality of input data provided dictates the type of analysis that can be accomplished. Options for analysis range from high level availability summaries to detailed analysis of failure modes for individual equipment items. Specific types of input data are identified followed by samples of the type of output that can be expected along with a discussion of benefits to the user community.

17 WIND ENERGY↗

Weatherization Crew Leader Job Task Analysis

The US Department of Energy's Guidelines for Home Energy Professionals project maintains job task analyses for jobs in the Weatherization Assistance Program and home performance industry. One of those jobs is Crew Leader, defined as: 'A Crew Leader is responsible for supervising and assisting in the retrofitting activities specified in the scope of work. He or she is responsible for interacting with the client plus managing personnel and materials on the job site in a safe and effective manner. The Crew Leader is responsible for quality control, testing procedures, documentation, and conducting a walk through in preparation that all work is completed in a satisfactory manner.' This document is an updated version of the Crew Leader job task analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Science-based HRA: experimental comparison of operator performance to IDAC (Information-Decision-Action Crew) simulations

Information-Decision-Action Crew (IDAC) operator model simulations of a Steam Generator Tube Rupture are compared to student operator performance in studies conducted in the Ohio State University’s Nuclear Power Plant Simulator Facility. This study is presented as a prototype for conducting simulator studies to validate key aspects of Human Reliability Analysis (HRA) methods. Seven student operator crews are compared to simulation results for crews designed to demonstrate three different decision-making strategies. The IDAC model used in the simulations is modified slightly to capture novice behavior rather that expert operators. Operator actions and scenario pacing are compared. A preliminary review of available performance shaping factors (PSFs) is presented. After the scenario in the NPP Simulator Facility, student operators review a video of the scenario and evaluate six PSFs at pre-determined points in the scenario. This provides a dynamic record of the PSFs experienced by the OSU student operators. In this preliminary analysis, Time Constraint Load (TCL) calculated in the IDAC simulations is compared to TCL reported by student operators. We identify potential modifications to the IDAC model to develop an “IDAC Student Operator Model.” This analysis provides insights into how similar experiments could be conducted using expert operators to improve the fidelity of IDAC simulations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Combined Repair Crew Dispatch Problem for Resilient Electric and Natural Gas System Considering Reconfiguration and DG Islanding

Resilience is an overarching concept that requires combined efforts from interdependent critical infrastructures to achieve. As the interdependence between the power system and the natural gas system grows, the roles of coordination in post-disaster repair will be unneglectable to improve the resilience of the two systems. In this paper, a combined repair crew dispatch problem for the interdependent power and natural gas systems is proposed. The repair schedule of the two systems is coordinated and co-optimized. Both power system topology reconfiguration and intentional DG islanding are modeled as operational measures to further improve the resilience of the interdependent systems. Case studies validate the effectiveness of the proposed method in reducing load shedding and repair duration, and prove that the interdependence has a significant impact on the repair sequence and crew coordination.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A look back 75 years at Little Boy, the crew, the plane and the Lab’s first mission

Hours before the sun would rise over Tinian island on the morning of August 6, 1945, a B- 29 airplane was positioned above a specially built bomb-loading pit, as crews readied it with cargo unlike anything the world had ever known. Preparations on the tiny Pacific island—nearly 6,600 miles from Los Alamos and about 1,500 miles from its intended target in Japan—had begun months before on April 3. And months before that, pilot Paul Tibbets Jr. and his crew had practiced dropping dummy concrete bombs on targets in Utah. Even years before that, development of this cargo destined for Japan began in secrecy under the direction of a physicist and an Army general in the mountains of Northern New Mexico. It was all leading to one day that would help end years of bloodshed and change the world forever.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Decision support system for outage management and automated crew dispatch

A decision support system is provided for utility operations to assist with crew dispatch and restoration activities following the occurrence of a disturbance in a multiphase power distribution network, by providing a real-time visualization of possible location(s). The system covers faults that occur on fuse-protected laterals. The system uses real-time data from intelligent electronics devices coupled with other data sources such as static feeder maps to provide a complete picture of the disturbance event, guiding the utility crew to the most probable location(s). This information is provided in real-time, reducing restoration time and avoiding more costly and laborious fault location finding practices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Disaster Recovery Logistics of Distribution Systems: Co-Optimize Service Restoration With Repair Crew and Mobile Power Source Dispatch

Repair crews (RCs) and mobile power sources (MPSs) are critical resources for distribution system (DS) outage management after a natural disaster. However, their logistics have not been well investigated. We propose a resilient scheme for disaster recovery logistics to co-optimize DS restoration with the dispatch of RCs and MPSs. A novel co-optimization model is formulated to route RCs and MPSs in the transportation network, schedule them in the DS, and reconfigure the DS for microgrid formation coordinately, etc. The model incorporates different timescales of DS restoration and RC/MPS dispatch, the coupling of transportation and power networks, etc. To ensure radiality of the DS with variable physical structure and MPS allocation, we also model topology constraints based on the concept of spanning forest. The model is convexified equivalently and linearized into a mixed-integer linear programming. To reduce its computation time, preprocessing methods are proposed to preassign a minimal set of repair tasks to depots and reduce the number of candidate nodes for MPS connection. Resilient recovery strategies thus are generated to enhance service restoration, especially by dynamic formation of microgrids that are powered by MPSs and topologized by repair actions of RCs and network reconfiguration of the DS. Case studies demonstrate the proposed methodology.

Disaster recovery logistics↗

Multiperiod Distribution System Restoration With Routing Repair Crews, Mobile Electric Vehicles, and Soft-Open-Point Networked Microgrids

This paper proposes a distribution system restoration model which is in response to multiple outages caused by natural disasters. The proposed restoration model includes the coordination of routing repair crews (RRCs), mobile batterycarried vehicles (MBCVs), and networked microgrids (NMGs) formed by soft open points (SOPs). The travel and repair time constraints are modeled for each RRC; travel path and charging strategy are modeled for each MBCV; and the network reconfiguration is developed considering the optimal operation of SOP-based NMGs. Furthermore, the proposed model is presented as a mixedinteger linear program which is solved by an auxiliary induce function based algorithm to reduce the computational complexity. The modified IEEE 33-bus and 69-bus distribution systems are tested with multiple outages. The presented results demonstrate the effectiveness of the proposed model

24 POWER TRANSMISSION AND DISTRIBUTION↗

NREL Job Task Analysis: Crew Leader

A summary of job task analyses for the position of crew leader when conducting weatherization work on a residence.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessment of HRA method predictions against operating crew performance: Part I: Study background, design and methodology

This is the first in a series of four papers document ing two large -scale human reliability analysis (HRA) empirical studies – the International HRA Empirical Study and the US HRA Empirical Study. The two studies are the first major efforts in recent years to benchmark HRA methods by comparing HRA method predictions against actual operator performance in accident scenarios simulated on nuclear power plant (NPP) simulators. When a met hod was applied by different analyst teams, the predictions of the different teams were also compared against each other. The purpose of the comparisons was to obtain insights concerning the strengths and weaknesses of the HRA methods addressed in the studies as well as the factors contributing to inter-analyst (or intra-method) variability. The background and motivation for the studies is first presented in the article. Then, the overall study design is described with a discussion on high-level tasks and participants. Next, the methodology to achieve the high-level tasks is discussed. Finally, concluding remarks are made concerning lessons learned on benchmarking HRA methods with crew performance of scenarios on NPP simulators.

97 MATHEMATICS AND COMPUTING↗

The reactivity of experimentally reduced lunar regolith simulants: Health implications for future crewed missions to the lunar surface

Crewed missions to the Moon may resume as early as 2026 with NASA's Artemis III mission, and lunar dust exposure/inhalation is a potentially serious health hazard that requires detailed study. Current dust exposure limits are based on Apollo-era samples that spent decades in long-term storage on Earth; their diminished reactivity may lead to underestimation of potential harm that could be caused by lunar dust exposure. In particular, lunar dust contains nanophase metallic iron grains, produced by “space weathering”; the reactivity of this unique component of lunar dust is not well understood. Herein, we employ a chemical reduction technique that exposes lunar simulants to heat and hydrogen gas to produce metallic iron particles on grain surfaces. We assess the capacity of these reduced lunar simulants to generate hydroxyl radical (OH*) when immersed in deionized (DI) water, simulated lung fluid (SLF), and artificial lysosomal fluid (ALF). Lunar simulant reduction produces surface-adhered metallic iron “blebs” that resemble nanophase metallic iron particles found in lunar dust grains. Reduced samples generate ~5–100× greater concentrations of the oxidative OH* in DI water versus non-reduced simulants, which we attribute to metallic iron. SLF and ALF appear to reduce measured OH*. The increase in observed OH* generation for reduced simulants implies high oxidative damage upon exposure to lunar dust. Low levels of OH* measured in SLF and ALF imply potential damage to proteins or quenching of OH* generation, respectively. Reduction of lunar dust simulants provides a quick cost-effective approach to study dusty materials analogous to authentic lunar dust.

54 ENVIRONMENTAL SCIENCES↗

Assessment of HRA method predictions against operating crew performance: Part III: Conclusions and achievements

This is the last in a series of three papers documenting two large-scale human reliability analysis (HRA) empirical studies – the International HRA Empirical Study and the US HRA Empirical Study. The goal of the two studies was to develop an empirically-based understanding of the performance, strengths, and weaknesses of HRA methods by comparing HRA method predictions against actual operator performance in simulated accident scenarios on nuclear power plant (NPP) simulators. This paper first addresses areas where there is convergence between the two studies and where differences lie. Then it summarizes the combined insights and conclusions, including key findings on HRA in general through lessons learned about the HRA methods assessed in the studies and specific recommendations for improving guidance, practice and methods. Then it discusses the relevance and usefulness of simulator data for HRA in general. Finally, it presents the key achievements and overall conclusions of the two studies taken together.

97 MATHEMATICS AND COMPUTING↗