Search NASA⌕ Search

SEARCH · Search NASA

Results for “Cryogenic system design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Cryogenic system design of 11 GEV/C super high momentum spectrometer superconducting magnets at Jefferson Lab

The design of the cryogenic system for the 11 GeV/c Super High Momentum Spectrometer (SHMS) is presented. A description of the cryogenic control reservoir and the cryogenic transfer line is given. Details of the cryogenic control reservoirs, cryogenic transfer lines, and pressure piping are summarized. Code compliance is ensured through following the requirements of the ASME Pressure Vessel Code and Pressure Piping Code. An elastic-plastic-analysis-based combined safety factor approach is proposed to meet the low stress requirement of ASME 2007 Section VIII, Division 2 so that Charpy V-notch (CVN) impact testing can be avoided through analysis. Material toughness requirements in ASME 2007 Section VIII, Division 2 are adopted as CVN impact testing rules of stainless steel 304 piping at 4.2 K and 77 K. A formula-based combined safety factor approach for pressure piping is also proposed to check whether the impact testing can be avoided due to low stress. Analysis and calculation have shown that no CVN impact testing of base metal and heat affected zones is required for the helium reservoir, nitrogen reservoir, and their relevant piping. Total heat loads to liquid helium and liquid nitrogen are studied also. The total heat load to LHe for SHMS is estimated to be 137 W, and the total load to LN2 is calculated to be 420 W.

36 MATERIALS SCIENCE↗

SAFETY ASPECTS OF BIG CRYOGENIC SYSTEMS DESIGN

Superconductivity and helium cryogenics are key technologies in the construction of large scientific instruments, like accelerators, fusion reactors or free electron lasers. Such cryogenic systems may contain more than hundred tons of helium, mostly in cold and high-density phases. In spite of the high reliability of the systems, accidental loss of the insulation vacuum, pipe rupture or rapid energy dissipation in the cold helium can not be overlooked. To avoid the danger of over-design pressure rise in the cryostats, they need to be equipped with a helium relief system. Such a system is comprised of safety valves, bursting disks and optionally cold or warm quench lines, collectors and storage tanks. Proper design of the helium safety relief system requires a good understanding of worst case scenarios. Such scenarios will be discussed, taking into account different possible failures of the cryogenic system. In any case it is necessary to estimate heat transfer through degraded vacuum superinsulation and mass flow through the valves and safety disks. Even if the design of the helium relief system does not foresee direct helium venting into the environment, an occasional emergency helium spill may happen. Helium propagation in the atmosphere and the origins of oxygen-deficiency hazards will be discussed.

42 ENGINEERING↗

Conceptual design of pressure relief systems for cryogenic application

The conceptual design of pressure relief systems is an important aspect in the early phase of any cryogenic system design, because a prudent and responsible evaluation of relief systems involves much more than just relief devices. The conceptual design consists of various steps: At first, hazard scenarios must be considered and the worst-case scenario identified. Next, a staged interaction against pressure increase is to be defined. This is followed by the selection of the general type of pressure relief device for each stage, such as safety valve and rupture disc, respectively. Then, a decision concerning their locations, their capacities and specific features must be taken. Furthermore, it is mandatory to consider the inlet pressure drop and the back pressure in the exhaust line for sizing the safety devices. And last but not least, economic and environmental considerations must be made in case of releasing the medium to the atmosphere. The development of the system's safety concept calls for a risk management strategy based on identification and analysis of hazards, and consequent risk mitigation using a system-based approach in compliance with the standards.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PIP-II Linac Cryogenic Distribution System Design Challenges

The PIP-II linac Cryogenic Distribution System (CDS) is characterized by extremely small heat inflows and robust mechanical design. It consists of a Distribution Valve Box (DVB), Intermediate Transfer Line, Tunnel Transfer Line, comprising 25 Bayonet Cans, and ends with a Turnaround Can. Multiple helium streams, each characterized by distinct helium parameters, flow through each of these elements. The CDS geometry allows maintaining an acceptable pressure drop for each helium stream, considering the planned flows and helium parameters in different operation modes. This is particularly crucial for the return line of helium vapors, which return from cryomodules to the cold compressors and thus have very restrictive pressure drop requirements. On both sides of the DVB there are fixed supports for process pipes. One of the DVB design challenges was to route the process pipes in such a way that their shape provided sufficient compensation for thermal shrinkage. This ensures th at the forces resulting from thermal shrinkage acting on the cryogenic valves remain at a level acceptable to the manufacturer. The required thermal budget of the CDS was achieved by thermo-mechanical optimization of its components, like process pipes fixed supports in Bayonet Cans.

43 PARTICLE ACCELERATORS↗

Spiral 2 cryogenic system overview: Design, construction and performance test

The new particle accelerator project Spiral 2 at GANIL (“Grand Accélérateur d’Ions Lourds, i.e. National Large Heavy Ion Accelerator) in Caen (France) is a very large installation, intended to serve fundamental research in nuclear physics. The heart of the future machine features a superconductor linear accelerator, delivering a beam until 20Mev/A, which are then used to bombard a matter target. The resulting reactions, such as fission, transfer, fusion, etc. will generate billions of exotic nuclei. To achieve acceleration of the beam, 26 cavities which are placed inside cryomodules at helium cryogenic temperature will be used. AL-AT (Air Liquide Advanced Technologies) takes part to the project by supplying cryogenic plant. The plant includes the liquefier associated to its compressor station, a large dewar, a storage tank for helium gas and transfer lines. In addition, a helium recovery system composed of recovery compressor, high pressure storage and external purifier has been supplied. Customized HELIAL LF has been designed, manufactured and tested by AL-AT to match the refrigeration power need for the Spiral 2 project which is around 1300 W equivalent at 4.5 K.

43 PARTICLE ACCELERATORS↗

Cryogenic System Preliminary Design for a 0.5m-Long, Conduction-Cooled Nb3Sn Undulator Magnet Prototype

There are several NbTi superconducting undulator (SCU) magnets currently in operation at the Advanced Photon Source (APS) at Argonne National Laboratory (ANL). The development on Nb3Sn-based superconducting undulator magnets at APS is underway due to the potential to further enhance the performance of the SCUs. Superconducting undulator magnets need to keep temperature gradients minimized in order to retain thermal and operating current margin. We have designed the thermal links for efficient heat conduction using 3D finite element analysis (FEA) simulation in COMSOL Multiphysics software, which was later used for the calculation of the temperature distribution across a 0.5 m long, conduction-cooled, Nb3Sn undulator magnet prototype that includes both conductive heat transfer and radiative heating components. We have modelled the evolution of the thermal properties of the magnet winding as well as other cold parts during cool-down from ambient temperature with the operation of a SHI RDK-415D cryocooler to examine the estimated time that is needed for the cooldown as well as the baseline temperature we could achieve. A key result was that a maximum coil delta T = 0.11 K along the designed thermal links and a temperature range of 3.42 K-3.53 K for the winding were predicted at steady state. A pair of G10 support rods for carrying the magnet as well as a pair of current leads made of metals were also designed and optimized for the testing system, targeting for an operation temperature of 4 K and a coil current of 950 A DC.

Zhang, Danlu↗

Cryogenic sub-system for the 56 MHz SRF storage cavity for RHIC

A 56 MHz Superconducting RF Storage Cavity is being constructed for the RHIC collider. This cavity is a quarter wave resonator that will be operated in a liquid helium bath at 4.4 K. The cavity requires an extremely quiet environment to maintain its operating frequency. The cavity, besides being engineered for a mechanically quiet system, also requires a quiet cryogenic system. The helium is taken from RHIC's main helium supply header at 3.5 atm, 5.3K at a phase separator tank. The boil-off is sent back to the RHIC refrigeration system to recover the cooling. To acoustically separate the RHIC helium supply and return lines, a condenser/boiler heat exchanger condenses the helium vapor generated in the RF cavity bath. A system description and operating parameters are given about the cryogen delivery system. The 56 MHz superconducting storage RF cavity project is making progress. The cryogenic system design is in its final stage. The helium supply lines have been tapped into the RHIC helium distribution lines. The plate-and-fin heat exchanger design is near completion and specification will be sent out for bid soon. The cold helium vapor heating system design will start soon as well. A booster compressor specification is underway. The first phase separator and transfer line design work is near completion and will be sent out for bid soon.

43 PARTICLE ACCELERATORS↗

Preliminary design of a helium cryogenic system for SAND detector at LBNF-DUNE near site

The Long-Baseline Neutrino Facility (LBNF) is providing a helium cryogenic system to support the superconducting solenoid magnet of the System for on-Axis Neutrino Detection (SAND) for the Deep Underground Neutrino Experiment (DUNE) Near Site at Fermilab in Batavia, IL. The design started in 2020 and construction is set to begin in the mid 2020‘s.The helium cryogenic system primarily consists of a helium refrigerator system, distribution valve boxes, vacuum-jacketed helium and nitrogen transfer lines, warm gaseous helium transfer system, instruments and control system, and gaseous helium storage tanks. It is designed to provide supercritical helium at around 3 bara and 5 K with expansion from 3 to 1.2 bara in the SAND cryostat and 70K forced cold gas helium to cool the thermal shields of the SAND cryostat. The SAND superconductive magnet is indirectly cooled through a liquid helium thermosiphon cycle. A pair of 3 kA leads is cooled by the gas helium vaporized from the liquid helium reservoir in the cryostat turret. The helium system will share the liquid nitrogen tank and liquid nitrogen phase separator with the Near Site Liquid Argon system. The helium recycle compressor system, GHe tanks and LN2 tank will be located on the Surface. The cryogenic facilities including refrigerator cold box, valve boxes and LN2 phase separator will be located on the shaft cryo-mezzanine in the underground cavern. The shaft connecting surface and cavern is more than 60 meter deep. The helium vacuum-jacketed transfer line between the cold box and the SAND magnet is more than 50 meter long. This paper presents the preliminary design of the helium cryogenic system including the design scheme, process flow diagram, heat load estimates, layout plan and so on.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Flexible linkages for thermal management at cryogenic temperatures

Cryogenic system design often presents the competing requirements of thermal coupling between components while de-coupling them structurally. Good thermal coupling is necessary for adequate thermal management during cryogenic operation of the system and to reduce the cooldown time from the ambient to cryogenic temperature. Structural de-coupling is essential to reduce thermal stresses during cooldown, mitigate the trasmission of vibration and loads to sensitive and/or fragile components, and compensate for integration misalignments. Flexible thermal links (FTLs) are an essential component of cryogenic systems that provides a balance between thermal coupling and structural isolation.

42 ENGINEERING↗

Design progress of cryogenic hydrogen system for China Spallation Neutron Source

China Spallation Neutron Source (CSNS) is a large proton accelerator research facility with 100 kW beam power. Construction started in October 2011 and is expected to last 6.5 years. The cryogenic hydrogen circulation is cooled by a helium refrigerator with cooling capacity of 2200 W at 20 K and provides supercritical hydrogen to neutron moderating system. Important progresses of CSNS cryogenic system were concluded as follows. Firstly, process design of cryogenic system has been completed including helium refrigerator, hydrogen loop, gas distribution, and safety interlock. Secondly, an accumulator prototype was designed to mitigate pressure fluctuation caused by dynamic heat load from neutron moderation. Performance test of the accumulator has been carried out at room and liquid nitrogen temperature. Results show the accumulator with welding bellows regulates hydrogen pressure well. Parameters of key equipment have been identified. The contract for the helium refrigerator has been signed. Mechanical design of the hydrogen cold box has been completed, and the hydrogen pump, ortho-para hydrogen convertor, helium-hydrogen heat exchanger, hydrogen heater, and cryogenic valves are in procurement. Finally, Hydrogen safety interlock has been finished as well, including the logic of gas distribution, vacuum, hydrogen leakage and ventilation. Generally, design and construction of CSNS cryogenic system is conducted as expected.

43 PARTICLE ACCELERATORS↗

Helium refrigeration considerations for cryomodule design

Many of the present day accelerators are based on superconducting radio frequency (SRF) cavities, packaged in cryo-modules (CM), which depend on helium refrigeration at sub-atmospheric pressures, nominally 2 K. These specialized helium refrigeration systems are quite cost intensive to produce and operate. Particularly as there is typically no work extraction below the 4.5-K supply, it is important that the exergy loss between this temperature level and the CM load temperature(s) be minimized by the process configuration choices. This paper will present, compare and discuss several possible helium distribution process arrangements to support the CM loads.

43 PARTICLE ACCELERATORS↗

Design of the cryogenic systems for the Near and Far LAr-TPC detectors of the Short-Baseline Neutrino program (SBN) at Fermilab

The Short-Baseline Neutrino (SBN) physics program at Fermilab and Neutrino Platform (NP) at CERN are part of the international Neutrino Program leading to the development of Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) science project. The SBN program consisting of three Liquid Argon Time Projection Chamber (LAr-TPC) detectors positioned along the Booster Neutrino Beam (BNB) at Fermilab includes an existing detector known as MicroBooNE (170-ton LAr-TPC) plus two new experiments known as SBN’s Near Detector (SBND, ~260 tons) and SBN’s Far Detector (SBN-FD, ~760 tons). All three detectors have distinctly different design of their cryostats thus defining specific requirements for the cryogenic systems. Fermilab has already built two new facilities to house SBND and SBN-FD detectors. The cryogenic systems for these detectors are in various stages of design and construction with CERN and Fermilab being responsible for delivery of specific sub-systems. This contribution presents specific design requirements and typical implementation solutions for each sub-system of the SBND and SBN-FD cryogenic systems.

43 PARTICLE ACCELERATORS↗

OVERVIEW AND STATUS OF THE 12 GeV CRYOGENIC SYSTEM UPGRADE AT JLAB

As part of the planned Jefferson Laboratory's electron accelerator (CEBAF) power upgrade, ten additional superconducting RF cryomodules will be added to its accelerator linacs. Although physically the same size as each of the original 40 linac cryomodules, each new cryomodule will have approximately 4 times the acceleration power. To support the additional cryomodule heat loads generated, the existing 2 K, 4600 W Central Helium Liquefier (CHL) plant capacity will be doubled to a total of 9200 W at 2 K plus 24,000 W at 35 K for shield loads. The specified base line process cycle has been modeled after the laboratory's 'Ganni Helium Cycle' process technology. In addition, a fourth physics experimental 'Hall D' will be constructed which will have an additional stand alone 200 W at 4 K helium cryogenic plant. In October of 2008, Jefferson Laboratory (JLab) received approval for project 'Critical Decision 3' construction phase status from the US Department of Energy. An overview of the planned cryogenic systems and current design baseline as it relates to operations will be presented.

42 ENGINEERING↗

Proton Improvement Plan II Cryogenic Distribution System thermodynamic design

The Proton Improvement Plan – II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beams for neutrino production. The Linac requires cooling at 40 K, 5 K, and 2 K temperatures, which will be provided by cryogenic helium produced by a Helium Cryoplant and distributed by a Cryogenic Distribution System (CDS). Based primarily on the Linac heat load requirements at each temperature and the allowable pressure drop, we have made a preliminary thermodynamic design of the CDS. The design also incorporates special requirements such as controlled and/or fast cooldown of the superconducting RF cavities and their dual maximum allowable working pressures. This paper presents the overall features of the PIP-II CDS, sizing of helium process circuits, different operating modes, and calculated mass flow capacities that cater to these operating modes.

43 PARTICLE ACCELERATORS↗

Fermilab PIP-II CDS & CM Cryogenic Controls System

Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules. Design includes Siemens PCS7 Controls System with 26 Remote IO Rittal Cabinets and 48 Relay Racks for Temperature Readouts, Valve Positioners, Level, Heater Controls etc. Electrical Drawings and Design have been completed with focus now on fabrication of the 26 Rittal Cabinets and 48 Relay Racks. All materials have been procured. EPICS will be used as a SCADA system communicating to S7 Controllers via OPC UA.

Patel, Pratik [Fermilab]↗