Search NASA⌕ Search

SEARCH · Search NASA

Results for “Culebra, Tamarisk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Basic Data Report for Drillhole SNL-18 (C-3233)

SNL -18 (permitted by the New Mexico (NM) State Engineer as C.3233) was drilled and completed during June 2006 to provide geological data and hydrological testing of the Culebra Dolomite Member of the Permian Rustler Formation along the margin of the northeastern arm of Nash Draw, north of the Waste Isolation Pilot Plant (WIPP) site. SNL -18 is in the area where upper Salado Formation halite has been dissolved and is in the mudflat facies tract of Rustler mudstone -halite units. Culebra transmissivity is expected to be relatively high. SNL -18 is located near the southeast corner of section 20, T21S, R31E, in eastern Eddy County, NM. SNL.18 was drilled to a total depth (TD) of 566 feet (ft) below ground level (bgl), based on driller’s measurements. Below the caliche pad, SNL.18 encountered poorly consolidated sands, the Mescalero caliche, and the Gatuña, Dewey Lake, and Rustler Formations. The Santa Rosa and upper Dewey Lake have been eroded at SNL -18. The Rustler was cored from the lower Forty-niner Member into the upper Culebra Dolomite Member, with generally poor recovery. Geophysical logs were acquired from the open hole to a depth near TD. Water was encountered in the interval including lower Dewey Lake to Forty -niner Member. SNL -18 was drilled to 307 ft (Dewey Lake) using air. Air and mist were used to drill and core from 307–496 ft. From 496 ft to TD, mud was used for drilling and coring with poor to no returns circulating to the surface. Coring was abandoned in the upper Culebra Dolomite due to hole conditions. Core recovery was variable, and cuttings are limited to lacking below 496 ft. Cement was pumped into the drillhole to control loss of circulation and fill during drilling. The Los Medaños was drilled through mudstone 2 (M -2) and into the top of anhydrite 1 (A -1) based on geophysical logs and drilling rates. The thickness of M -2 is normal. No cuttings were obtained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Well Plugging and Abandonment Activities for Fiscal Year 2009

The Waste Isolation Pilot Plant (WIPP) facility is a U.S. Department of Energy (DOE) facility for disposal of transuranic mixed waste under a permit issued by the New Mexico Environment Department. The WIPP facility is 26 miles southeast of Carlsbad, New Mexico, in eastern Eddy County. Disposal panels are mined in the Permian Salado Formation at a depth of 2,150 feet below ground surface (bgs). Field activities for this Basic Data Report were initiated in June 2009, and concluded in July 2009. The FY 2009 program included the plugging and abandonment (P&A) of two monitoring wells, which permanently removed them from the monitoring network. This Basic Data Report presents the summary of procedures followed for each well completion as documented by the Subcontract Technical Representative (STR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Drillhole SNL-6 and -6A (C-3151)

SNL-6 and SNL-6A were drilled in the southeast quarter of section 7, T21S, R32E, in western Lea County, NM. This location places the drillholes north-northeast of the WIPP site. An original drillhole (now designated SNL-6A) on the wellpad could not be completed and was plugged and abandoned. A second well (known as SNL-6) was drilled and completed on the same wellpad, and it is monitored for water levels. The focus of this report is the completed well (SNL-6), with reference as appropriate to geologic and other data from SNL.6A. Appendix material will be referred to in the text for details of drilling, logging, and plugging and abandoning of SNL-6A. SNL-6 is located 1,847 ft from the south line (fsl) and 1,413 ft from the east line (fel) of the section. SNL-6 was begun on August 23, 2005, and was completed September 10, 2005. SNL-6 is used to monitor groundwater levels of the Culebra Dolomite Member of the Permian Rustler Formation for WIPP in an area of low transmissivity and near the northeastern corner of the hydrological modeling domain. SNL-6 was permitted by the NM State Engineer as C-3151. Official correspondence regarding permitting and regulatory information must reference this permit number. Most drillholes at WIPP have been described after completion to provide an account of the geologic, hydrologic, or other basic data acquired during drilling and immediate completion of the drillhole. In addition, the basic data report provides an account of the drilling procedures and activities that may be helpful to later interpretations of data or for further work in the drillhole, including test activities and eventual plugging and abandoning activities. The basic data report also provides a convenient means of reporting information about administrative activities necessary to drill the hole.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗