GMLC Technical Assistance to States: DER Interconnection Workshop #3

NREL hosted this workshop to help state public utility commissions (PUCs) understand the materials and support available to assist in distributed energy resource (DER) interconnection activities. This workshop focused on DER interconnection and included four speakers, whose material will be posted at https://www.nrel.gov/grid/ieee-standard-1547/workshops.html. The slides in this deck were for the facilitator to provide context to the attendees as well as additional resources on the topics discussed.

DER↗

GMLC Technical Assistance to States: DER Interconnection Workshop #2 [Slides]

NREL hosted this workshops to help state public utility commissions (PUCs) understand the materials and support available to assist in distributed energy resource (DER) interconnection activities. This workshop focused on "Modern DER Capabilities and Deployment Concerns" and included four speakers, whose material will be posted at https://www.nrel.gov/grid/ieee-standard-1547/workshops.html. The slides in this deck were for the facilitator to provide context to the attendees, as well as additional resources on the topics discussed.

1547↗

Options for Upgrading Low-Voltage Spot Network Protection to Increase DER Interconnection Capacity

Existing standards and policies for interconnecting distributed energy resources (DERs) into low voltage spot networks severely limits the amount of DER installed on those networks to avoid negative impacts on protection systems. This report investigates options for upgrading the protection systems of spot networks to allow for additional DER installations beyond the normal limits (i.e., no reverse power flows allowed onto the MV system). Eight potential upgrade options are discussed that span various methods for new network protector algorithms, hardware upgrades, and the addition of communication. Each method has tradeoffs in terms of accuracy of detecting faults, requirements to upgrade equipment in the spot networks, need for communication, and sensitivity to false trips—all of which are explored in this report.

42 ENGINEERING↗

An Overview of Distributed Energy Resource (DER) Interconnection: Current Practices and Emerging Solutions

This guidebook provides an overview of key issues for utilities and utility regulators to consider as deployments of distributed energy resources (DER) increase, including what has been tried in the field and emerging good practices. Topics covered include: Interconnection Applications and Application Processing; Interconnection Standards; Advanced Inverters; Impact Screening and Evaluation; Estimating Future DER deployments; Distribution System Upgrades and Planning in a DER context; Cybersecurity; Storage and Solar plus Storage Interconnection; and Cost Allocation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

USAID Colombia Young Leaders Workforce Training Program Action Plans: Regulatory Road Map for Distributed Energy Resource (DER) Interconnection and Interoperability

As part of the U.S. Agency for International Development (USAID)-National Renewable Energy Laboratory (NREL) Young Leaders Workforce Training Program in Colombia, participants from Colombia's Energy and Gas Regulatory Commission (CREG) leveraged their training and professional experience to develop a regulatory roadmap for the interconnection and interoperability of increasing integration of distributed energy resources (DERs). CREG was one of four teams selected by the training program development team to receive continued technical assistance and strategic advisory support from the USAID-NREL Partnership for action plan development and implementation. This case study provides an overview of the key activities and outcomes of the technical assistance provided by NREL on the CREG Action Plan, and key next steps for implementation of Colombia's DER Integration Regulatory Roadmap.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Commercialization of Distribution System Load Modeling Tool for Improved DER Interconnection Studies

Residential and commercial buildings have huge potential to contribute value to improve grid resilience by participating grid services. To reveal the significant value, it is critical to estimate the grid service capability from these buildings. Unlike the large-scale distributed energy resources such as wind and solar farms, those buildings need to participate grid services in aggregation, not by individual. Therefore, it is important to appropriately group buildings for aggregation. The load profiles in the same group will have similar characteristics at the same time step, so grid operators can send the grid service signal to the customer group with a higher chance to respond at that time step. In this paper, we develop a load profile clustering method to classify the building-level load profiles for grid service capability estimation. In our two-step clustering approach, we first calculate the total load consumption for each building, clustering the load profiles based on energy consumption level. Then, we further cluster the load profiles in each energy cluster based on the load shape. The parameter selection for each clustering step is discussed. The proposed method is applied on actual building-level load profiles, and the results have proved the effectiveness of this method.

14 SOLAR ENERGY↗

Overcoming Challenges for DER Interconnection - Spotlight on Energy Storage

The Distributed Generation Integration Collaborative (DGIC) convened a half-day interactive workshop in Washington, D.C. on July 29, 2019. Organized by the Electric Power Research Institute (EPRI) and the National Renewable Energy Laboratory (NREL), the workshop explored a variety of issues related to the grid interconnection of energy storage and solar+storage systems, primarily on distribution.This document provides the workshop's proceedings as well as stakeholder perspectives, documented during a workshop breakout exercise, on a range of industry actions that can be undertaken to improve energy storage interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy Resource Integration

This webinar focuses on the subject of DER integration, outlining the current industry state of the art and status of DER adoption in the US, a holistic view and roadmap of DER integration, DER interconnection standards, interconnection screening and study processes, interconnection automation, DER hosting capacity, AMI analytics, and non-wires alternatives.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Considerations for Distributed Energy Resource Integration in Puerto Rico: DOE Multi-Lab Grid Modeling Support for Puerto Rico; Analytical Support for Interconnection and IEEE Std 1547-2018 National Renewable Energy Laboratory (Task 3.0)

To ensure the sustainable long-term recovery of Puerto Rico's electric power grid from hurricanes María and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, the U.S. Department of Energy (DOE) convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. A resilient electric grid is vital to Puerto Rico's security, economy, and way of life, and it will provide the foundation for essential services that people and businesses on the island rely on every day. This report shows progress for a grid modeling task under the DOE-sponsored project that is a collaboration among the National Renewable Energy Laboratory (NREL) and other national laboratories. In Phase 1 of the multilab effort to support Puerto Rico's recovery, NREL provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This Phase 2 report focuses on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico. This report is intended to familiarize the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provides considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard (RPS) goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers (IEEE) 1547-2018 interconnection standard.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Keystone Solar Future Project (KSFP)

The Keystone Solar Future Project (KSFP, also referred to as “Keystone Project” in the report) implements a cost-effective, secure, reliable, and safe technology platform that paves the way for future interconnected distributed energy resources (DER), creates a framework that enables high penetration of DER, and transforms the DER interconnection process. The project is important and necessary in a few aspects. First, the industry definition of Distributed Energy Resource Management System (DERMS) is not yet validated against field deployments and mostly implemented in small pilots relying on third party integration. Keystone project implements a direct plug and play communication to inverter based DER systems. Secondly, most interconnection application portal is not yet fully integrated with back-end system, thus lacks the capability to drive a complete and accurate modeling of DER assets into the planning and operational systems. Keystone project rolled out a fully integrated modeling process of DERs from interconnection to operational management. Lastly, customers were given an opportunity to learn about the advanced functions of the inverters and take full advantages of their benefits through participation in the pilot program. During the project, the technical effectiveness and economic feasibility of DER management were investigated and demonstrated in real life events and simulation studies. The project highlighted the importance of coordinated DER interconnection, installation and management with the rest of the distribution system.

14 SOLAR ENERGY↗

Optimal Voltage Reference for Droop-Based DERs in Distribution Systems

Due to the newly issued standards on distributed energy resources (DERs), the droop-based operation modes (Q-V and P-V droops) become a requirement for all the interconnected DER units at the distribution level. Voltage references of the DER units can be assigned to improve the operational behavior of the distribution system in the smart grid context. This paper presents a novel formulation for optimally setting voltage reference of the droop-based DER units in distribution systems with the objective of minimizing the system ohmic loss. This problem is formulated as a mixed-integer quadratic convex optimization problem in MATLAB and solved by the MATLAB and CPLEX solvers. The IEEE 123-bus system and the EPRI test system Ckt5 are used to validate the proposed formulation. The result obtained from the proposed formulation is compared with the result of the original problem solved by the heuristic method. Based on the numerical study results, system loss can be reduced after the proposed voltage reference assignment. The computational expense of the new formulation is also much lower than that of the heuristic approach.

distributed energy resource integration↗

Draft Electric Rule 21 Test Protocols for Advanced Inverter Functions

Disclaimer: The following document includes draft certification protocols and should not be viewed as a consensus-based performance standard. Distributed energy resources (DERs), such as photovoltaic (PV) systems, when deployed in a large scale, are capable of significantly influencing the operation of bulk and local power systems. Looking to the future, European and American stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. One of the jurisdictions considering modifications to the DER interconnection requirements is California. To determine what changes could improve electric grid reliability and allow greater penetrations of renewable energy, the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC), in conjunction with consultant Frances Cleveland, convened the Smart Inverter Working Group (SIWG) in January 2013. The SIWG--composed of state agencies, utility engineers, national laboratories, manufacturers, trade associations, and advocacy groups--provided the CPUC a set of recommendations in early 2014 1 . The recommendations included specific advanced DER functions and interoperability requirements, along with a proposed timeline, for California to add new capabilities to grid-interconnected DER. On August 18, 2014 the three California Investor-Owned Utilities (IOUs)--Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE) and San Diego Gas & Electric Company (SDG&E)--drafted a Advice Letter filing to the CPUC setting forth revisions to Electric Tariff Rule 21 to conform to the seven recommendations made by the Working Group 2 . After a comment period, the CPUC issued an update to the IOU recommendations 3 . At the time of this publication, there was no final legal ruling on the CPUC Rulemaking (R.) 11-09-011 ("Order Instituting Rulemaking on the Commission's Own Motion to improve distribution level interconnection rules and regulations for certain classes of electric generators and electric storage resources"). In the U.S., Nationally Recognized Test Laboratories (NRTLs) independently verify products to safety and functional standards. PV inverters are certified to Underwriters Laboratories (UL) Standard 1741 4 . However, new advanced inverter functions described in the SIWG and IOU proposals are not included in this standard, so there is a critical need to develop test protocols for these functions in preparation of a positive ruling by the CPUC. Through a California Solar Initiative Grant, Sandia National Laboratories (Sandia or SNL), Underwriters Laboratories (UL), Electric Power Research Institute, Inc. (EPRI), Xanthus Consulting, SunSpec Alliance, Loggerware, and utility and PV inverter manufacturers have collaborated to draft this certification protocol for the Rule 21 SIWG Phase 1 advanced inverter functions. This report also includes test procedures for Phase 2 and Phase 3 functions that will be demonstrated later in the CSI4 project. This collaborative effort was performed in close junction with the UL 1741 Standards Technical Panel (STP) working group. This document represents a snapshot of the draft testing protocols at the time of publication and not a consensus certification protocol for advanced inverters. 1 California Public Utilities Commission, "Recommendations for Updating the Technical Requirements for Inverters in Distributed Energy Resources, Smart Inverter Working Group Recommendations," Filed 7 Feb 2014. 2 J.J. Newlander, R.G. Litteneker, S.W. Walter, M. Dwyer, Joint motion of Pacific Gas and Electric Company (U 39 E), Southern California Edison Company (U 338 E) and San Diego Gas & Electric Company (U 902 E) regarding implementation of smart inverter functionalities, Rulemaking 11-09-011 Advice Letter, 18 July, 2014. 3 J.T. Sullivan, CPUC Rulemaking 11-09-011 Agenda ID #13460, 13 Nov, 2014. 4 Underwriters Laboratories Std. 1741 Ed. 2, "Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources," 2010.

42 ENGINEERING↗

Distributed Energy Resource Interconnection Roadmap

Adopting strategic reforms to DER interconnection can help reduce interconnection delays, fairly allocate costs, improve transparency and equity, and support efficient and strategic investment in distribution and sub-transmission grids that can accommodate a rapidly evolving energy landscape. The Interconnection Innovation e-Xchange envisions this roadmap and its transmission system companion volume as collaborative resources to facilitate continued stakeholder discussions, problem-solving, and innovation as the U.S. works together to enable simpler, faster, and fairer interconnection of clean energy resources all while enhancing the reliability, resiliency, and security of our electric grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IEEE 1547 Standards Advancing Grid Modernization

Technology advances including development of advanced distributed energy resources (DER) and grid-integrated operations and controls functionalities have surpassed the requirements in current standards and codes for DER interconnection with the distribution grid. The full revision of IEEE Standards 1547 (requirements for DER-grid interconnection and interoperability) and 1547.1 (test procedures for conformance to 1547) are establishing requirements and best practices for state-of-the-art DER including variable renewable energy sources. The revised standards will also address challenges associated with interoperability and transmission-level effects, in addition to strictly addressing the distribution grid needs. This paper provides the status and future direction of the ongoing development focus for the 1547 standards.