Search NASASearch

SEARCH · Search NASA

Results for “DER interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Distributed Energy Resource Integration

This webinar focuses on the subject of DER integration, outlining the current industry state of the art and status of DER adoption in the US, a holistic view and roadmap of DER integration, DER interconnection standards, interconnection screening and study processes, interconnection automation, DER hosting capacity, AMI analytics, and non-wires alternatives.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Distributed Energy Resource Interconnection Roadmap

Adopting strategic reforms to DER interconnection can help reduce interconnection delays, fairly allocate costs, improve transparency and equity, and support efficient and strategic investment in distribution and sub-transmission grids that can accommodate a rapidly evolving energy landscape. The Interconnection Innovation e-Xchange envisions this roadmap and its transmission system companion volume as collaborative resources to facilitate continued stakeholder discussions, problem-solving, and innovation as the U.S. works together to enable simpler, faster, and fairer interconnection of clean energy resources all while enhancing the reliability, resiliency, and security of our electric grid.

24 POWER TRANSMISSION AND DISTRIBUTION

Evaluating the Thermal Impacts of Inadvertent Export on Service Transformers

As more DER interconnect to the system there are times where the total generation (or load) of a DER cannot be supported by the system. To more quickly allow these DER to interconnect they may need to regulate their output to a different export capacity than their nameplate capacity via a power control system (PCS). In the time it takes PCS to respond, however, an inadvertent export may occur, where the DER operates beyond its export limit. This report evaluates the potential thermal impact such momentary violations may have on service transformers, to determine whether response times should be more tightly controlled or not.

42 ENGINEERING

Antigua and Barbuda Distributed Energy Resources Deployment Guidelines

This document is designed to provide comprehensive considerations, best practices and guidance for deployment of Distributed Energy Resources (DERs) in Antigua and Barbuda. The document provides lists of various technology selection guidance including technical specifications, requirements and applicable key standards and code associated with key DERs and balance of plant equipment. The document also presents the key microgrid design considerations to integrate the DERs to achieve the economic, decarbonization and resiliency goals. Taking into account sensitive grid for such islands, for grid readiness and screening the potential DER interconnection, general approach is highlighted along with the potential technical interconnection requirements. Furthermore, this document shows the key stakeholders involved in such DER integration and/or microgrid project and how key responsible project team can be qualified. Finally, this document refers to key information about warranties and consumer rights and maintenance of the systems.

24 POWER TRANSMISSION AND DISTRIBUTION

Real-time evaluation of cybersecurity threats to DER inverter grid-support functions

In this project we aim to contribute to the understanding of the type and severity of potential cybersecurity attacks to the grid-support functionalities of DER systems interconnected to the AC distribution grid via inverters. Our preliminary work focused on developing a small-scale testbed allowing to study cybersecurity threats to an isolated photovoltaic-battery system using a real-time simulator (Typhoon HIL602+) with a real DNP3 communication connection over TCP/IP, allowing for safe and efficient monitoring and manipulation of data traffic between the simulated hardware and supervisory control and data acquisition (SCADA) system. In this project we propose to expand upon this development by utilizing a) a recently acquired NovaCor RTDS (Real Rime digital Simulator) to emulate the DER-inverter-grid topology including main grid-support functions as defined by IEEE Std. 1547-2018, and b) an industrial control and automation device to enable realistic evaluation of control functions and utilization of communication protocols for real-time data transmission.

24 POWER TRANSMISSION AND DISTRIBUTION

Key Insights: Interconnecting Behind-the-Meter Microgrids

This technical brief explores the interconnection challenges and evolving standards associated with behind-the-meter (BTM), facility-scale microgrids. It clarifies key functions related to customer microgrids and backup systems while addressing critical questions regarding certification coverage, operational impacts, customer relationships, and testing requirements for BTM microgrid systems. The document emphasizes the need for updated standards and additional witness testing to ensure safe and effective microgrid operation as well as improved grid integration and compliance with power quality standards.

24 POWER TRANSMISSION AND DISTRIBUTION

Voices from Rural Electric Cooperatives: A Call for a DER Integration Playbook for Rural and Agricultural Income & Savings from Renewable Energy (RAISE)

Rural-serving electric utilities (RSEUs)—including electric cooperatives, municipal systems, and small investor-owned utilities—are essential players in the evolving energy landscape. These community-focused entities are increasingly being asked to consider distributed energy resources (DERs) such as rooftop and ground-mounted solar, wind, battery storage, smart water heaters, and demand response programs (NRECA 2025; Lenhart et al. 2020). Yet the path to DER adoption is far from straightforward in the rural context. This report is based on in-depth interviews with managers of rural electric cooperatives across the United States. These conversations offer a grounded, unvarnished look at how DERs are perceived, what barriers exist, and what conditions might enable integration and adoption. While the utilities interviewed vary in geography, size, and DER experience, several clear and common themes emerged across electric cooperatives such that the report recommends the development of a DER Integration Runbook to help utilities assess readiness, define local use cases, engage stakeholders, pilot projects, and iterate, expanding over time.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Defining a Platform Approach and Market Participation: Data Driven Business Models for Solid State Transformer-Based Synthetic Inertia and Voltage Stability Controls (CRADA Final Report, Project 1, Mod 1)

The primary objective of this project is to determine the incremental value created with the medium voltage solid-state transformer (MV SST) technology to different stakeholders in view of the updated DER grid regulations. This includes studying the benefits of the MV SST technology in a range of use cases for EV and DER penetration including (1) “corridor charging” for EVs and (2) solar plus storage (FERC 2222). The potential customers of this technology include utilities for EV charging, DER installers who must meet utility interconnection requirements, balancing authorities, and DER aggregators. The traditional transformers on the grid could be a limiting factor for the EV-grid integration as the distribution transformers were not designed to handle the dynamic and fluctuating EV charging loads. Thus, the issues such as voltage fluctuations, increased losses and reduced efficiency [1] can negatively impact the grid operation. To address these challenges, transformers with flexibility and adaptability become imperative to meet the evolving energy demands. In this regard, the concept of Medium Voltage Solid-State Transformers.

14 SOLAR ENERGY

Planning Roadmap for DER Integration in India: Industry Best Practices and Resource Guide

Ensuring safe, reliable, cost-effective DER integration at scale requires holistic planning, broad stakeholder engagement, and should address key development areas such as standards adoption, equipment testing and certification, interoperability and cybersecurity, interconnection procedures, and advanced forecasting and DER management. Each of these areas currently represent significant challenges for utilities, regulators, OEMs, developers, and even consumers worldwide. India has already seen significant growth of DERs and has announced targets for substantial growth yet to come, with the potential for DERs to make up a non-negligible portion of the country's overall generation capacity. As such, it is of critical importance that Indian stakeholders consider the potential impacts of wide-spread adoption of DERs and take preemptive action related to the five development areas listed here, among others. India should consider strategies including the adoption of key DER standards related to interconnection, testing, and cybersecurity; enabling effective and secure communication channels for DER interoperability; testing and certifying DER equipment in accredited testing laboratories; building robust, streamlined interconnection procedures; and revamping legacy system planning structures to incorporate DERs in a holistic planning framework.

24 POWER TRANSMISSION AND DISTRIBUTION

Probabilistic Deliverability Assessment of Distributed Energy Resources via Scenario-Based AC Optimal Power Flow

As electric grids decarbonize and distributed energy resources (DERs) become increasingly prevalent, interconnection assessments must evolve to reflect operational variability and control flexibility. This paper highlights key modeling limitations observed in practice and reviews approaches for modeling uncertainty. It then introduces a Probabilistic Deliverability Assessment (PDA) framework designed to complement and extend existing procedures. The framework integrates scenario-based AC optimal power flow (AC OPF), corrective dispatch, and optional multi-temporal constraints. Together, these form a structured methodology for quantifying DER utilization, deliverability, and reliability under uncertainty in load, generation, and topology. Outputs include interpretable metrics with confidence intervals that inform siting decisions and evaluate compliance with reliability thresholds across sampled operating conditions. A case study on Puerto Rico’s publicly available bulk power system model demonstrates the framework’s application using minimal input data, consistent with current interconnection practice. Across staged fossil generation retirements, the PDA identifies high-value DER sites and regions requiring additional reactive power support. Results are presented through mean dispatch signals, reliability metrics, and geospatial visualizations, demonstrating how the framework provides transparent, data-driven siting recommendations. The framework’s modular design supports incremental adoption within existing workflows, encouraging broader use of AC OPF in interconnection and planning contexts.

14 SOLAR ENERGY

Real-Time Testbed for Studying Cyberattacks and Defense in DER-integrated Smart Inverter Systems

In this paper, we propose a Hardware-in-the-Loop (HIL) simulation testbed suitable for the implementation and testing of realistic cyberattacks on grid-tied smart inverter systems integrated with Distributed Energy Resources (DER) that use the Distributed Network Protocol-3 (DNP3) protocol for communications between grid components. Specifically, our testbed combines a Real-Time Digital Simulator (RTDS) NovaCor device, outfitted with GNETx2 network interface cards, a gridtied DER topology implemented via the RTDS software package RSCAD, and a custom virtual network that emulates a man in the middle attacker. The Man-in-the-Middle (MITM) attacker captures DNP3 traffic and falsifies telemetry data in DNP3 packets to trigger unwarranted commands from a DNP3 controller that exploit smart inverter grid support functions. We choose DNP3 and implement grid support functions according to the IEEE Std. 1547-2018 mandated for the interconnection and interoperability of DER power systems with associated power components. Furthermore, we develop a protocol payload agnostic attack detection framework that leverages the round-trip time (RTT) anomalies between DNP3 requests and responses and can detect the presence of attacks without having to analyze the payload’s contents, while balancing trade-offs between false alarm counts, missed detections, and time to detection. To facilitate further research, we publicly release benign and attack network traffic exchanged between various sensors, controllers, and actuators in our grid-tied inverter testbed.

24 POWER TRANSMISSION AND DISTRIBUTION

Least-cost Optimal Distribution Grid Expansion (LODGE): Utility Pilots

The Least-cost Optimal Distribution Grid Expansion (LODGE) model provides the optimal portfolio of distribution system upgrades—e.g., voltage regulators, feeder reconductoring, transformer upgrades and non-wires alternatives (NWA), such as strategic siting of storage and distributed generation—to interconnect distributed energy resources (DERs) and enable load growth. It can be used to assess grid infrastructure costs and explore policy and regulatory solutions for distribution planning and DER valuation.In 2025, Berkeley Lab conducted three pilot analyses to validate LODGE results with empirical utility data before the model’s first release in 2026. The pilots, done with utilities in Washington, Colorado, and New Mexico, provide examples that illustrate how the model works, what it can do, and the value of the analysis.

Heleno, Miguel

Smart Contracts for Power Grid Applications Using the Advanced DLT Cyber Grid Guard Testbed

In this study is presented two power system applications with distributed ledger technology (DLT) and smart contracts (SC) that were assessed in a Cyber-Grid-Guard System (CGGS) advanced testbed, with protective relays, power meters, communication devices, DLT devices, synchronized time source, clock displays and real time simulator. This CGGS testbed was set in the Advanced Protection Lab, 252 lab space of the Grid Research Integration and Deployment Center (GRID- C), at Oak Ridge National Laboratory. In power grids, customer-owned distributed energy resources (DERs) are more frequent than in the past, and the numbers of points of interconnection (POI) with customer-owned DERs have increased. Disruptive operation from DERs presents a risk to grid operations, and protective relays located at the POI are used to isolate out-of-tolerance or poorly behaving of DERs. Ensuring the integrity of data from the relays at the POI, and DLT could enhance the security of the power grids. The first application is a SC to define and control the allowable total power factor (TPF) of the DER (wind farm) output, and the terms of the SC are implemented using DLT with a CGGS for a customer-owned DER. The TPF SC was implemented by the CGGS using DLT. The experimental model was performed with a real-time simulator using a CGGS and relay in-the-loop. The data collected from the CGGS were used to execute the TPF SC. The TPF limits were between +0.9 and +1.0, and the breakers’ operation in the POI was controlled by the relay using the SC. The events were collected from the real-time simulator, CGGS, and SEL 700GT relay to validate a successful application of the TPF SC using DLT. The second application is a SC to measure and control the allowable voltage service limits (VSL) by the CGGS using DLT. The tests were performed by using a real-time simulator, CGGS and relay in-the-loop. The data was collected from the CGGS that executed the SC. The main constraints were defined based on ANSI C84.1 service voltage limits, and the operation of the breakers in the POI. The events were collected from the CGGS, and SEL 700GT relay to assess a successful operation of the VSL SC using DLT.

24 POWER TRANSMISSION AND DISTRIBUTION

Fast Iterative Multi-site Hosting Capacity Analysis for Distribution Systems With Search Space Pruning

Interconnection studies for distributed energy resources (DERs) is a time-intensive process, primarily due to the necessity of solving large number of power flow scenarios. Hosting capacity analysis (HCA) is a time-consuming aspect of interconnection studies that is divided into single-site HCA (SHCA) and multi-site HCA (MHCA). From a computational and understandable standpoint, the industry seeks iteration-based solutions for SHCA, although it doesn't maximize the total DER hosting capacity (DERHC) of the grid, as MHCA does. While non-iterative solutions are available for MHCA, they involve a trade-off between the modeling accuracy of the distribution system, solution quality, and ease of understanding. In this work, we present a fast iterative solution for MHCA, reducing computational complexity by eliminating the need to solve power flows for a large amount of search space, thus making iterative solutions feasible. This iterative approach guarantees both a global optimal solution with sufficient time and a fast, close-to-optimal solution through efficient search space pruning. It also easily integrates with existing utility HCA tools. The results are demonstrated on select locations in the IEEE-123 bus system for community-scale interconnection studies. We highlight the benefits of skipping the need to solve millions of power flows, all while maximizing the grid's total DERHC.

Guddanti, Kishan Prudhvi

Barriers to Balcony Solar and Plug-In Distributed Energy Resources in the United States

Plug-in distributed energy resources (DERs), such as balcony solar, backfeed power to the home through a standard plug. These systems may represent the future of residential solar and storage, particularly as recent net metering policies have reduced the economic appeal of rooftop solar. While plug-in DERs have seen widespread success in Europe, their U.S. market is stagnant. This paper reviews the technical, interconnection, and regulatory barriers hindering the adoption of plug-in DERs. We first discuss the technical barriers, which include touch safety, breaker masking, and bidirectional ground-fault circuit interrupters. We then examine utility perspectives on plug-in DERs and strategies for navigating interconnection challenges. Finally, we discuss regulatory hurdles related to UL standards and the National Electrical Code.

Gerber, Daniel L. (ORCID:0000000219720679)

Cybersecurity Certification Requirements for Distributed Energy Resources: A Survey of SunSpec Alliance Standards

This survey paper explores the cybersecurity certification requirements defined by the SunSpec Alliance for Distributed Energy Resource (DER) devices, focusing on aspects such as software updates, device communications, authentication mechanisms, device security, logging, and test procedures. The SunSpec cybersecurity standards mandate support for remote and automated software updates, secure communication protocols, stringent authentication practices, and robust logging mechanisms to ensure operational integrity. Furthermore, the paper discusses the implementation of the SAE J3072 standard using the IEEE 2030.5 protocol, emphasizing the secure interactions between electric vehicle supply equipment (EVSE) and plug-in electric vehicles (PEVs) for functionalities like vehicle-to-grid (V2G) capabilities. This research also examines the SunSpec Modbus standard, which enhances the interoperability among DER system components, facilitating compliance with grid interconnection standards. This paper also analyzes the existing SunSpec Device Information Models, which standardize data exchange formats for DER systems across communication interfaces. Finally, this paper concludes with a detailed discussion of the energy storage cybersecurity specification and the blockchain cybersecurity requirements as proposed by SunSpec Alliance.

Tsikteris, Sean (ORCID:0009000524202250)

Use of Hardware-in-the-Loop to De-Risk Field Deployment of Hydrogen Assets

Grid-forming assets are required in microgrids to act as voltage-frequency masters. These grid-forming assets can operate in two modes of operation: grid-following mode and grid-forming mode. In grid-following mode of operation, these assets will follow real power and reactive power setpoints and in grid-forming mode of operation these assets will follow voltage and frequency setpoints. Traditionally, diesel generators or natural gas-based generators are widely used to act as a voltage-frequency master. However, many utilities are aiming to replace generators with grid forming-inverters supplied by solar photovoltaics (PV), batteries or fuel cells. Since grid-forming assets need a long-term reliable energy source, fuel cells are a reasonable and viable choice to supply the grid-forming inverters, but some of the challenges facing the wide deployment of grid-forming fuel cell inverters need to be addressed. Specifically, in our proposed work, we aim to focus on the interconnection and interoperability requirements of grid-forming fuel cell inverters. Currently, state-of-the-art fuel cell inverters follow the general interconnection requirements of distributed energy resources (DERs) and general interoperability requirements of DERs, but these requirements were built with PV and battery systems in mind. Fuel cells have different operational requirements, and therefore these requirements need to be appropriately modified for the grid operators to use. These additional steps add to the investment and operational cost to the grid operators. Through the ARIES platform, this proposed project aims to bridge this gap and use power hardware-in-the-loop (PHIL) and controller hardware-in-the-loop (CHIL) experiments to inform the creation of open-source interconnection and interoperability information that can aid in faster and cheaper installation and operation of grid-forming fuel cell inverters.

08 HYDROGEN

UL 1741SC Conformance Development, Evaluation, and Proposal [Slides]

V2G AC is a type of grid interconnection by mobile battery that transforms an EV into a DER with the potential to stabilize the grid and lower costs for electricity. UL 1741SC is a critical new standard to enable grid interconnection of V2G AC-capable vehicles, by defining requirements for V2G AC-intended EVSEs as a gatekeeper between the grid and the EV to support grid safety, such as through redundant voltage trip (namely oversight). EVSE manufacturers need a clear set of conformance test cases and criteria by which to evaluate their equipment and confirm the compliance with UL 1741SC, so that the EVSEs performs as intended for the grid safety. Hence, NLR identified necessary conformance tests and performed the tests identified to understand the maturity.

29 ENERGY PLANNING, POLICY, AND ECONOMY