Search NASA⌕ Search

SEARCH · Search NASA

Results for “DERMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of Communication Issues in Primal-Dual-Based Distributed Energy Resource Management Systems (DERMS)

With the increasing adoption of distributed energy resources (DERs) in distribution networks, DERMS is becoming an attractive option to coordinate the control of DERs, especially primal-dual-based DERMS which is a well-developed class of them. In order to help lower the uncertainty in commercializing them, we evaluate and find the upper limits of severity for some common issues that can occur within the communication systems on which a primal-dual-based DERMS relies on; these include packet losses, link failures, and delays. This information can help a DERMS operator decide on the specifications for the communication infrastructure it will invest in for the DERMS. Our evaluation is based on numerical simulations of a real-world feeder with around 2,000 nodes and a DERMS that controls 163 PV generators and 140 energy storage batteries. In general, we found that the DERMS becomes less resistant to communication issues as the information flows closer to the DERs implementing the controllable power injections.

communication delay↗

Evaluation of Communication Issues in Primal-Dual-Based Distributed Energy Resource Management Systems (DERMS): Preprint

With the increasing adoption of distributed energy resources (DERs) in distribution networks, DERMS is becoming an attractive option to coordinate the control of DERs, especially primal-dual-based DERMS which is a well-developed class of them. In order to help lower the uncertainty in commercializing them, we evaluate and find the upper limits of severity for some common issues that can occur within the communication systems on which a primal-dual-based DERMS relies on; these include packet losses, link failures, and delays. This information can help a DERMS operator decide on the specifications for the communication infrastructure it will invest in for the DERMS. Our evaluation is based on numerical simulations of a real-world feeder with around 2,000 nodes and a DERMS that controls 163 PV generators and 140 energy storage batteries. In general, we found that the DERMS becomes less resistant to communication issues as the information flows closer to the DERs implementing the controllable power injections.

communication delay↗

Architectural Approaches for Integrating ADMS and DERMS: Challenges, Comparisons, and Real-World Use Cases

The electrical distribution landscape is rapidly transforming due to the proliferation of distributed energy resources (DERs) such as solar panels, wind turbines, battery storage systems, combined heat and power units, and electric vehicles, introducing variability and uncontrollability that traditional grid operators are ill-equipped to manage. This transformation is further accelerated by advancements in Information and Communication Technology infrastructure that connects control centers with end devices, demanding automation and a deeper understanding of new technologies by utility personnel. Advanced grid control techniques using system-level optimization, Artificial Intelligence, and Machine Learning at the enterprise level and distributed level are evolving to address these issues. There is also an opportunity to utilize the enormous data created by these new DER technologies in the grid. Advanced Distribution Management Systems (ADMS) and Distributed Energy Resource Management Systems (DERMS) are critical in addressing these challenges by automating grid operations and enhancing reliability. Given the relatively recent development of ADMS and DERMS, and the still relatively low level of ADMS and DERMS deployment in the industry, there is a notable deficiency in the comprehensive understanding of the challenges and benefits associated with these new technologies, especially with their complementary natures and integration architectures. This paper aims to bridge the knowledge gap in ADMS and DERMS integration, presenting three distinct integration architectures currently available, and discussing the challenges and benefits of each architecture to guide utilities, industry professionals, and researchers in optimizing grid management and decision-making processes for a resilient and efficient energy future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Study of Communication Boundaries of Primal-Dual Based Distributed Energy Resource Management Systems (DERMS)

As the coordination of distributed energy re-sources becomes more necessary to provide grid services through a distributed energy resource management system (DERMS), studying the communication requirements for suc-cessful real-world, low-cost implementation becomes increasingly important. Specifically, this paper studies the necessary communication time resolutions between the different system components for a primal-dual-based DERMS, a highly de-veloped DERMS framework. We design a metric to evaluate the functionality of a DERMS with respect to providing grid services. Using numerical simulations based on a real-world feeder in Colorado, we show that the upper bound on the time resolutions is on the order of minutes instead of the previously assumed order of seconds.

communication time resolution↗

DERMS-RT (Distributed Energy Resource Management Solution using Real-Time Optimization) [SWR-20-46]

DERMS-RT provides a distributed energy resource management solution using real-time optimization to control different types of distributed energy resources (DERs) — such as rooftop PVs, battery energy storage systems, HVAC loads, electric water heater loads, and EV charging loads, and use these DERs to provide distribution voltage regulation and peak demand management services. The control approach implemented by DERM-RT is developed based on the real-time optimal power flow and distributed control previously developed by NREL researchers. The software codes are designed to provide modular DER management solution that can be easily applied to control heterogeneous DERs in distribution grids in coordination with centralized utility management systems. Also, DERMS-RT provides application programming interface (API) to extract useful grid model information from an open-source power system simulation software, use the information to solve the optimization problem, and apply the optimal set-points to the controlled DERs. In this way, DERMS-RT provides a plug-and-play function for implementing the real-time DER control on different utility system models, and it can be used as a simulation testbed to demonstrate the impact of real-time DER optimization on improving grid operations.

Ding, Fei↗

Study of Communication Boundaries of Primal-Dual Based Distributed Energy Resource Management Systems (DERMS): Preprint

As the coordination of distributed energy resources (DERs) becomes more necessary to provide grid services through a distributed energy resources management system (DERMS), studying the communication requirements for successful real-world low-cost implementation becomes increasingly important. Specifically, this paper studies the needed communication time resolutions between the different system components for a primal-dual based DERMS which is a highly-developed DERMS framework. We design a metric to evaluate the functionality of a DERMS with respect to providing grid services. Using numerical simulations based on a real-world feeder in Colorado, we show that the upper bound on the time resolutions is on the order of minutes instead of the previously assumed order of seconds.

communication time resolution↗

Study of Communication Boundaries of Primal-Dual-Based Distributed Energy Resource Management Systems (DERMS)

As the coordination of distributed energy resources becomes more necessary to provide grid services through a distributed energy resource management system (DERMS), studying the communication requirements for successful real-world, low-cost implementation becomes increasingly important. Specifically, this paper studies the necessary communication time resolutions between the different system components for a primal-dual-based DERMS, a highly developed DERMS framework. We design a metric to evaluate the functionality of a DERMS with respect to providing grid services. Using numerical simulations based on a real-world feeder in Colorado, we show that the upper bound on the time resolutions is on the order of minutes instead of the previously assumed order of seconds.

communication time resolution↗

Real Time-Optimal Power Flow-Based Distributed Energy Resource Management System (DERMS)

This project aims to promote lab-proven clean energy technology to commercially scalable versions of the technology, integrate the technology with broader systems, provide extended performance data, and validate the manufacturability and reliability of the technology. The lab-proven technology, RT-OPF DERMS, was developed and validated through previous U.S. Department of Energy-funded efforts, including Advanced Research Projects Agency-Energy funding under the Network Optimized Distributed Energy Systems program and Holy-Cross Energy High Impact Project. In the Advanced Research Projects Agency-Energy Network Optimized Distributed Energy Systems project, the RT-OPF DERMS was developed and implemented in multiple hardware platforms, demonstrating its performance and capabilities in the lab and field environments. The technology was also evaluated and matured via a participation in the U.S. Department of Energy I-Corps program, whose goal is to pair teams of researchers with industry mentors for an intensive 2-month training in which the researchers define technology value propositions, conduct customer discovery interviews, and develop viable market pathways for their technologies. These activities indicate the high technology maturity and Technology Readiness Level of the RT-OPF DERMS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Beyond DERMS: Demonstration of Automated Grid Services, Mode Transition, and Resilience

This report describes the results of more advanced use cases including Ancillary Services, Black-sky-day operation, and Mode Switching from Phase 3 of the “Beyond DERMS” project aiming to build, deploy, and demonstrate a holistic platform that supports the integrated operation and planning of future power distribution networks with bi-directional power flows, many diverse distributed energy resources (DERs), and inverter-based resources. These test results demonstrated how a Beyond DERMS platform can fuse together AMI, SCADA, and DER data to provide a utility with deep insights into distribution network operations and planning, extending the value of DERMS and BTM DER resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Architecture Guidance Specification for FAST-DERMS (V.1.0)

This document provides grid architecture guidance to support the Grid Modernization Laboratory Consortium (GMLC) Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solution (FAST-DERMS) project. The FAST-DERMS project seeks to develop an architecture and reference implementation solution that enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs).

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Case Study in NREL DERMS Asset Management Implementation

The National Renewable Energy Laboratory (NREL) and Smarter Grid Solutions (SGS) plan to present a case study on their implementation of SGS' Strata Grid Distributed Energy Resource Management System at NREL's Energy Systems Integration Facility (ESIF). The ESIF is one of the nation's premier energy systems integration laboratory facilities focused on development and deployment of clean energy technologies and resilient delivery systems. NREL looked for a DERMS to install at the ESIF that is capable of replicating real world scenarios to control and monitor distributed devices from small residential scale to the grid substation level. The DERMS system demonstrates the use cases of beneficial operation and coordination of modern grid devices, leverage DERs for improved grid planning and operation, demand-side management and customer engagement through bidirectional communication with utilities and energy market operations. The presentation will cover the delivery strategy of NREL and SGS, how the use cases help NREL's research, and NREL and SGS plan to expand the system and use cases.

ARIES↗

Flexible Resource Scheduler for FAST-DERMS (FRS-FASTDERMS) v0.9

The Flexible Resource Scheduler is a hierarchical controller that manages the distributed energy resources in a distribution substation or distribution feeder to provide a firm commitment of power flow at the substation or feeder head to be scheduled in transmission-level markets as an aggregated demand resource. It is the reference controller for the FAST-DERMS Architecture, developed in tandem with the architecture under the DOE FAST-DERMS project. It is comprised of a day-ahead stochastic optimization, which schedules substation power flow and reserves, a intra-hour MPC, which generates dispatch base points for DER, and a real-time PID controller maintaining that dispatches DER to maintain the substation power around the base points. The repository also includes a representative aggregator controller, and all of the necessary components to run a simulation using PNNL's GridAPPS-D software with the controller.

MacDonald, Jason [Lawrence Berkeley National Labor↗

Beyond DERMS: Platform Development, Flexibility, Prediction, and Value Measurements

This report describes the results from the “Beyond DERMS” project that aims to build, deploy, and demonstrate - at megawatt scale with thousands of devices - a holistic platform that supports the integrated operation and planning of future power distribution networks with bi-directional power flows, many diverse distributed energy resources (DERs), and inverter-based resources. The results demonstrate how emerging ‘internet of energy’ technologies can be leveraged to simultaneously solve the grid problems of today and prepare for the challenges of tomorrow in a way that goes beyond the capabilities of existing distributed energy resource management systems (DERMS).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Insights from PPL's DERMS Implementation

PPL Electric Utilities’ Keystone Solar Future Project (KSFP) is part of the U.S. Department of Energy’s Office of Energy Efficiency and Renewables, Energy Enabling Extreme Real-time Grid Integration of Solar Energy (ENERGISE) grant. The three-year project, beginning in October, 2017, funded an innovative pilot program to develop and evaluate a technology platform and framework for managing high levels of distributed energy resources (DER), and improving future DER interconnection. The KSFP aimed to bridge gaps between existing and future technology, including Distributed Energy Resource Management Systems (DERMS), by monitoring, managing, and optimizing a system with high penetration of solar and other DER. Specifically, the project worked to make Demand Management Systems (DMS) applications, devices, and real-time communications technology DER-aware to allow for advanced applications for utility operations. Here, by installing and implementing a DERMS, project designers transformed how DERs interact with PPL’s distribution system, offering learnings and results worth sharing industry-wide.

Leader, Jared↗

DERMS Online: A New Voltage Sensitivity-Enabled Feedback Optimization Framework: Preprint

This paper proposes a distributed energy resource management system (DERMS) solution by developing a new voltage sensitivity enabled feedback optimization framework. The key idea is to adopt a measurement feedback scheme to reformulate the original nonlinear optimization into a linear programming (LP) problem via perturb and observe-based voltage sensitivity analysis. The proposed solution eliminates the dependence on load knowledge and can be implemented online thanks to an efficient open-source solver for LP problems. The proposed DERMS online platform is generalizable to deal with various types of distributed energy resources (DERs), including distributed photovoltaics (PVs), energy storage, electric vehicles, demand response, etc. Comparison results with other control methods on a realistic distribution feeder in Southern California highlight the feasibility as well as benefits for the proposed framework.

distributed energy resources management↗

Real Time - Optimal Power Flow Based Distributed Energy Resources Management System (DERMS) (CRADA Number CRD-20-16909 Final Report)

The integration of behind-the-meter distributed energy resources (DERs) into distribution systems brings transformative changes to power systems. This requires operators and planners to find solutions to modernize electric grids and to effectively manage DERs for grid services. NREL developed novel DER management algorithms (referred to as Real-Time Optimal Power Flow, RT-OPF) through U.S. Department of Energy (DOE)-funded efforts, including Advanced Research Projects Agency–Energy (ARPA-E) Network Optimized Distributed Energy Systems (NODES) funding. This cutting-edge control technology aims to modernize distribution systems with large amounts of DER integration, which will help utilities solve issues brought by renewable integration and build resilient and renewable-based electric grids nationwide. Utilidata worked with NREL to investigate the commercialization opportunity of this RT-OPF-based distributed energy resource management system (DERMS). In this project, NREL performs the technology transfer of the RT-OPF to Utilidata to help them fully understand the RT-OPF solution, to identify potential engineering hurdles, and to assess the expected commercial value of various RT-OPF use cases and deployment. The technology transfer work includes two major tasks. First, NREL performs an in-depth knowledge transfer of the entire RT-OPF solution to Utilidata to help them gain an extensive and detailed understanding of the complete RT-OPF solution. In this task, NREL provides exhaustive information (e.g., documentation, code packages, laboratory and field trial data, performance results) while conducting in-depth training sessions to provide a thorough explanation of the entire solution. NREL hosts meetings to present different topics related to the RT-OPF solution, and question-and-answer sessions are included in each meeting to better explain the RT-OPF-related work. Second, the RT-OPF simulations are performed in a laboratory environment. The main objectives of this task are to walk through with Utilidata engineers how to set up a simulation of RT-OPF, identifying each RT-OPF code block/component in operation, learning how these components interact with each other, and eventually running RT-OPF simulations under various system conditions. This task helps Utilidata engineers understand performance limitations and constraints while also quantifying the commercial value of the RT-OPF for different use cases. Based on these two tasks, Utilidata engineers should be able to define and prioritize the next steps of RT-OPF implementation with an eye toward commercial success and scalability of the solution. The next steps are expected to be part of a new project following the conclusion of this project.

24 POWER TRANSMISSION AND DISTRIBUTION↗