Search NASA⌕ Search

SEARCH · Search NASA

Results for “DEWATERING EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Assessment of Algal Farm Designs Using a Dynamic Modular Approach

The notion of renewable energy provides an important mechanism for diversifying an energy portfolio, which ultimately would have numerous benefits including increased energy resilience, reduction of foreign energy supplies, reduced GHG emissions, development of a green energy sector that contributes to economic growth, and providing a sustainable energy supply. The conversion of autotrophic algae to liquid transportation fuels is the basis of several decades of research to competitively bring energy-scale production into reality; however, many challenges still remain for making algal biofuels economically viable. Addressing current challenges associated with algal production systems, in part, requires the ability to assess spatial and temporal variability, rapidly evaluate alternative algal production system designs, and perform large-scale assessments considering multiple scenarios for thousands of potential sites. We introduce the Algae Logistics Model (ALM) which helps to address these challenges. The flexible nature of the ALM architecture allows the model to: 1) interface with external biomass production and resource assessment models, as well as other relevant datasets including those with spatiotemporal granularity; 2) interchange design processes to enable operational and economic assessments of multiple design configurations, including the integration of current and new innovative technologies; and 3) conduct trade-off analysis to help understand the site-specific techno-economic trade-offs and inform technology decisions. This study uses the ALM to investigate a baseline open-pond production system determined by model harmonization efforts conducted by the U.S. Department of Energy. Six sites in the U.S. southern-tier were sub-selected and assessed using daily site-specific algae biomass productivity data to determine the economic viability of large-scale open-pond systems. Results show that costs can vary significantly depending on location and biomass productivity and that integration of novel dewatering equipment, order of operations, and equipment scaling can also have significant impacts on economics.

09 BIOMASS FUELS↗

Optimized controls for thickeners

Tailings thickeners are often run inefficiently as they lack a reliable bed level interface transmitter and a turbidity transmitter to give feedback on how the flocculant dosing system is working. Hawk Measurement Systems has developed a range of multiple crystal array sonar transducers capable of penetrating suspended solids to give reliable performance measuring the heavy density bed level. The second channel can be used to give turbidity output. In a case study reported, the system was provided for a coal preparation plant processing multiple coal types with different settling characteristics. 1 fig., 3 photos

01 COAL, LIGNITE, AND PEAT↗

Shipping Grossly Dewatered resins in the RT-100 Type B Transportation Cask - 16068

Ion-exchange resins are used in the purification of coolant water in boiling water reactor nuclear power plants. The spent resins are a form of low-level or intermediate-level radioactive waste. These resins may have a relatively high specific activity level and are normally transported to a disposal facility within a secondary container placed in a Type B transportation cask. During transportation, hydrogen gas may build up in the cask due to radiolysis of the hydrogenous material in the contents. In the licensing process, a Type B cask is carefully analyzed to ensure that the maximum amount of hydrogen gas generated does not exceed 5%. The calculation to determine the mole fraction of hydrogen gas generated is a function of many variables, including the properties of the contents and the volume ratios of the contents. Because water generates hydrogen gas when it undergoes radiolysis, the amount of water present in the waste is normally limited. Typically, Type B transportation casks are allowed to carry dewatered resins, meaning less than 1% free-standing water by volume. To ensure compliance with this limitation, the dewatering process requires specialized equipment to pump the water from the secondary container. In an effort to enhance the usability of the RT-100 Type B transportation cask, Robatel Technologies re-analyzed the hydrogen gas generation calculation for contents including 'grossly dewatered' resins. Grossly dewatered resins are defined as resins containing less than 20% free-standing water by volume. This higher limit is made possible by a more thorough hydrogen gas generation calculation, which ensures that the flammability limit is not reached during shipment. In July 2015, The USNRC issued Revision 1 of the Certificate of Compliance for the Robatel Technologies RT-100 Type B transportation cask. This revision allows the cask to be used for grossly dewatered resins. With the revised Certificate of Compliance, the RT-100 is the first of its kind whose authorized contents include greater than 1% free liquids by volume. As a result of this change, the cask user can meet the 20% maximum free-standing water volume with a much simpler gravity-driven dewatering process. It is no longer necessary to have a complex dewatering system to ensure compliance with regulatory requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Applied Membrane Technology for Processing Ethanol from Biomass

The technical objectives of this program were to demonstrate, with Compact Membrane Systems, Inc. (CMS) membrane technology, a water-ethanol system that would have significantly improved water transmission rate and would be economically attractive for a low cost azeotrope-breaking process. The overall objective was to indicate that a CMS membrane in line with existing distillation equipment can dramatically reduce the overall cost of dewatering ethanol for fuel-grade ethanol (FGE). The objectives of this program fell into three areas. The first objective was to demonstrate the feasibility that the CMS membranes have a unique capability for rapid transport of water or water vapor and significant water vapor-ethanol separation. The second objective was that the purity of ethanol and the inherent process is consistent with the needs and uses in the fuel grade ethanol industry. Thirdly, that this can be done in a manner that is significantly superior to existing processes.

09 BIOMASS FUELS↗

Osmotically assisted reverse osmosis for high salinity brine treatment

Here, this work evaluates a novel osmotically assisted reverse osmosis (OARO) process for dewatering high salinity brines using readily available membranes and equipment. While traditional reverse osmosis processes are limited to treating brines with osmotic pressures below the membrane burst pressure, in OARO, the osmotic pressure difference across a membrane is reduced with a permeate side saline sweep. A series of OARO stages can be used to sequentially reduce the concentration of the feed until a traditional RO process can obtain fully desalinated water. This paper develops an OARO model to identify feasible operating conditions for this process and to estimate the water recovery and energy consumption across a range of brine feed concentrations. For a feed of 100–140 g/L sodium chloride, we estimate that the OARO process is capable of a 35–50% water recovery with an energy consumption of 6–19 kWh per m 3 of product water. Finally, the results suggest that an OARO dewatering process improves upon the recovery of reverse osmosis for high salinity brines and has a comparable or lower energy consumption than mechanical vapor compression.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Strength Measurements of Archive K Basin Sludge Using a Soil Penetrometer

Spent fuel radioactive sludge present in the K East and K West spent nuclear fuel storage basins now resides in the KW Basin in six large underwater engineered containers. The sludge will be dispositioned in two phases under the Sludge Treatment Project: (1) hydraulic retrieval into sludge transport and storage containers (STSCs) and transport to interim storage in Central Plateau and (2) retrieval from the STSCs, treatment, and packaging for shipment to the Waste Isolation Pilot Plant. In the years the STSCs are stored, sludge strength is expected to increase through chemical reaction, intergrowth of sludge crystals, and compaction and dewatering by settling. Increased sludge strength can impact the type and operation of the retrieval equipment needed prior to final sludge treatment and packaging. It is important to determine whether water jetting, planned for sludge retrieval from STSCs, will be effective. Shear strength is a property known to correlate with the effectiveness of water jetting. Accordingly, the unconfined compressive strengths (UCS) of archive K Basin sludge samples and sludge blends were measured using a pocket penetrometer modified for hot cell use. Based on known correlations, UCS values can be converted to shear strengths. Twenty-six sludge samples, stored in hot cells for a number of years since last being disturbed, were identified as potential candidates for UCS measurement and valid UCS measurements were made for twelve, each of which was found as moist or water-immersed solids at least 1/2-inch deep. Ten of the twelve samples were relatively weak, having consistencies described as 'very soft' to 'soft'. Two of the twelve samples, KE Pit and KC-4 P250, were strong with 'very stiff' and 'stiff' consistencies described, respectively, as 'can be indented by a thumb nail' or 'can be indented by thumb'. Both of these sludge samples are composites collected from KE Basin floor and Weasel Pit locations. Despite both strong sludges having relatively high iron concentrations, attribution of their high strengths to this factor could not be made with confidence as other measured sludge samples, also from the KE Basin floor and of high iron concentration, were relatively weak. The observed UCS and shear strengths for the two strong sludges were greater than observed in any prior testing of K Basin sludge except for sludge processed at 185 C under hydrothermal conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Solid rocket booster retrieval operations

Solid Rocket Booster Retrieval operations are discussed in detail. The recovery of expended boosters and associated hardware without damage attributable to retrieval procedures is the main goal. The retrieval force consists tof ship's personnel and retrieval team members, each of whom has been trained and is highly skilled in multi-faceted operations. The retrieval force is equipped with two specially-built, highly maneuverable ships outfitted with parachute reels, retrieval cranes, towing winches, large volume-low pressure air compressors, SCUBA diving gear, inflatable boats with outboard motors and diver-operated SRB dewatering devices. The two ships are deployed in sufficient time to conduct an electronic and visual search of the impact area prior to launch. Upon search completeion, each ship takes station a safe distance from the predetermined impact point initiating both visual and electronic search in the direction of flight path, ensuring SRB acquisition at splashdown. When safe, the ships enter the impact area and commence recovery of all floating flight hardware which is subsequently returned to the Disassembly Facility for refurbishment and reuse. Retrieval techniques have evolved in parallel with equipment and flight hardware configuration changes. Additional changes have been initiated to improve personnel safety.

Rasmussen, A. M.↗

JPL Activated Carbon Treatment System (ACTS) for sewage

An Activated Carbon Treatment System (ACTS) was developed for sewage treatment and is being applied to a one-million gallon per day sewage treatment pilot plant in Orange County California. Activities reported include pyrolysis and activation of carbon-sewage sludge, and activated carbon treatment of sewage to meet ocean discharge standards. The ACTS Sewage treatment operations include carbon-sewage treatment, primary and secondary clarifiers, gravity (multi-media) filter, filter press dewatering, flash drying of carbon-sewage filter cake, and sludge pyrolysis and activation. Tests were conducted on a laboratory scale, 10,000 gallon per day demonstration plant and pilot test equipment. Preliminary economic studies are favorable to the ACTS process relative to activated sludge treatment for a 175,000,000 gallon per day sewage treatment plant.

Source record↗

Kraft black liquor concentration with graphene oxide membranes: Process simulations and technoeconomic analysis

Abstract Black liquor (BL) dewatering by multi‐effect evaporation in the kraft papermaking process is highly energy‐intensive. It was previously shown that graphene oxide (GO) nanofiltration membranes can remove lignin, other organics, and inorganic salts from BL while exhibiting stability in caustic BL conditions. Here, we design and simulate several candidate dewatering processes and evaluate their technoeconomic characteristics. All processes concentrate BL from 15 to 30 wt% solutes while producing aqueous permeate. Two process options were analyzed—option A including “last‐mile” permeate treatment to reduce solutes to 0.2 wt%, and option B excluding this treatment and producing a 3–4 wt% solutes stream. These processes were simulated in custom‐built ASPEN Plus flowsheets interfaced with Microsoft Excel and MATLAB. All processes deliver large (>40%) energy savings. Detailed technoeconomic analysis showed that option A processes are profitable in mills equipped with condensing turbines, but unprofitable with only purchased fuel savings. Option B processes are profitable in both situations, but require the caustic permeate to be utilized in other kraft process units. They are also profitable with electricity generation when operated at smaller scales matching the requirements of other process units. Monte‐Carlo sensitivity analysis shows that Option A can yield median 20‐year NPVs up to ~$10MM and Option B up to ~$25MM. Overall, GO membrane‐based BL dewatering is economically promising, assuming successful slipstream piloting and scale‐up campaigns. It would have immediate sustainability benefits from large energy savings, and broader implications for biorefinery processes due to the ability to fractionate biomass feedstock components under harsh conditions.

Wang, Zhongzhen↗

Firefighting Module

Firefly II pump module is NASA's Marshall Space Flight Center's commercial offshoot of a NASA/US Coast Guard program involving development of a lightweight, helicopter-transportable firefighting module for a quick response in combating shipboard or harbor fires. Operable on land or water, the Amphib One is equipped with 3 water cannons. When all 3 are operating, unit pumps more than 3,000 gallons a minute. Newly developed model used by U.S. Coast Guard can pump 5,000 gallons per minute. It was designed for applications such as firefighting onboard ship fires, emergency dockside water pumping, dewatering ships in danger of sinking, flood control, and emergency water supply at remote locations.

Source record↗

Radioactive Spent Ion-Exchange Resins Conditioning by the Hot Supercompaction Process at Tihange NPP - Early Experience - 12200

Spent ion-exchange resins are considered to be problematic waste that, in many cases, requires special approaches and precautions during their conditioning to meet the acceptance criteria for disposal. In Belgium, for economical reasons, the Volume Reduction Factor is a key criterion. After Tractebel Engineering performed a technical and economical comparison of the industrially available systems, Tihange NPP decided to install a spent ion-exchange resins hot supercompaction unit with Tractebel Engineering in the role of architect-engineer. The treatment and conditioning unit processes the spent ion-exchange resins through the following steps: dewatering of the resins, drying the resins under deep vacuum, discharging the dried resins into compactable drums, super-compacting the drums to generate pellets, grouting the pellets into standard 400 litres waste drums (overpacks) licensed for final disposal in the near-surface repository in Belgium. Several developments were required to adapt the reference process and equipment to PWR spent ion-exchange bead resins and Belgian radioactive waste acceptance criteria. In order to avoid cracks on the compacted drum, and external surface contamination from resin leaks, some improvements were achieved to minimize spring-back as well as the risk of cracking the drum wall. Placing the compactable drum inside a second, slightly larger drum, guarantees clean and reproducible pellets. Currently the commissioning phase is on-going. Numerous process validation tests have been completed. An acceptance file was transmitted to the Belgian Waste Management Authority recently. This will be followed by demonstration tests necessary to obtain their final acceptance of the installation. More than 3 800 drums of mixed powdered and bead resins have been processed by the reference Hot Compaction process, achieving a Volume Reduction Factor (VRF) of 2.5. The equipment has been proven to be a reliable technology with low operation and maintenance costs. Tractebel Engineering has managed the construction of a new application of this process in Belgium at Tihange NPP. Several developments were required to adapt the reference process and equipment to PWR spent ion-exchange bead resins and Belgian radioactive waste acceptance criteria. The chosen method of conditioning (draining, drying and compaction of the spent resins followed by grouting of the pellets in a 400 litres drum) immobilizes the spent resins under the form of a solid, compact, stable, and non dispersible block free of interstitial water. The various series of inactive tests which were conducted at Tihange NPP, helped among others to determine the best design of the compactable drum and lid and to set the value of critical parameters such as vapour temperature at the end of drying, speed, force and duration of compaction. In an environment of very limited space for interim storage and in the absence of an operational final repository site, or in the case of high final disposal costs, the process exhibits the following key advantages: - Achieving a Volume Reduction Factor (VRF) close to 1 (overpack included) for the interim storage instead of increased volumes observed with other currently available processes; - Achieving a water free end product; - Creating a flexible waste product for interim storage (pellet), which can be retrieved and routed into alternative types of package later, if not initially grouted; - Using well proven standard technologies like drying and compaction; - Flexible use of the system components for the supercompaction of other operational solid waste streams when not conducting resins conditioning campaigns. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Pond Sludge - Lessons Learned from Initial De-sludging of Sellafield's Pile Fuel Storage Pond - 12066

The Pile Fuel Storage Pond (PFSP) at Sellafield was built and commissioned between the late 1940's and early 1950's as a storage and cooling facility for irradiated fuel and isotopes from the two Windscale Pile reactors. The pond was linked via submerged water ducts to each reactor, where fuel and isotopes were discharged into skips for transfer along the duct to the pond. In the pond the fuel was cooled then de-canned underwater prior to export for reprocessing. The plant operated successfully until it was taken out of operation in 1962 when the First Magnox Fuel Storage Pond took over fuel storage and de-canning operations on the site. The pond was then used for storage of miscellaneous Intermediate Level Waste (ILW) and fuel from the UK's Nuclear Programme for which no defined disposal route was available. By the mid 1970's the import of waste ceased and the plant, with its inventory, was placed into a passive care and maintenance regime. By the mid 1990s, driven by the age of the facility and concern over the potential challenge to dispose of the various wastes and fuels being stored, the plant operator initiated a programme of work to remediate the facility. This programme is split into a number of key phases targeted at sustained reduction in the hazard associated with the pond, these include: - Pond Preparation: Before any remediation work could start the condition of the pond had to be transformed from a passive store to a plant capable of complex retrieval operations. This work included plant and equipment upgrades, removal of redundant structures and the provision of a effluent treatment plant for removing particulate and dissolved activity from the pond water. - Canned Fuel Retrieval: Removal of canned fuel, including oxide and carbide fuels, is the highest priority within the programme. Handling and export equipment required to remove the canned fuel from the pond has been provided and treatment routes developed utilising existing site facilities to allow the fuel to be reprocessed or conditioned for long term storage. - Sludge Retrieval: In excess of 300 m{sup 3} of sludge has accumulated in the pond over many years and is made up of debris arising from fuel and metallic corrosion, wind blown debris and bio-organic materials. The Sludge Retrieval Project has provided the equipment necessary to retrieve the sludge, including skip washer and tipper machines for clearing sludge from the pond skips, equipment for clearing sludge from the pond floor and bays, along with an 'in pond' corral for interim storage of retrieved sludge. Two further projects are providing new plant processing routes, which will initially store and eventually passivate the sludge. - Metal Fuel Retrieval: Metal Fuel from early Windscale Pile operations and various other sources is stored within the pond; the fuel varies considerably in both form and condition. A retrieval project is planned which will provide fuel handling, conditioning, sentencing and export equipment required to remove the metal fuel from the pond for export to on site facilities for interim storage and disposal. - Solid Waste Retrieval: A final retrieval project will provide methods for handling, retrieval, packaging and export of the remaining solid Intermediate Level Waste within the pond. This includes residual metal fuel pieces, fuel cladding (Magnox, aluminium and zircaloy), isotope cartridges, reactor furniture, and miscellaneous activated and contaminated items. Each of the waste streams requires conditioning to allow it to be and disposed of via one of the site treatment plants. - Pond Dewatering and Dismantling: Delivery of the above projects will allow operations to progressively remove the radiological inventory, thereby reducing the hazard/risk posed by the plant. This will then allow subsequent dewatering of the pond and dismantling of the structure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Intensified Flue Gas Desulfurization Water Treatment for Reuse, Solidification, and Discharge

The goal of this final project report is to summarize the work conducted on project DE-FE0031555. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UK CAER) (Recipient) developed a hybrid electrochemical-membrane technology for treating wet flue gas desulfurization (WFGD) blowdown from coal-fired power generation plants that (1) removes government-regulated species and total suspended solids (TSS) via electrocoagulation with solid/liquid separation to avoid further treatments by a biological method specifically for selenium, and (2) reduces total dissolved solids (TDS) in a nanofiltration unit to promote water recycle and reduce freshwater intake. Additional technological configurations were pursued, including (1) nanofiltration combined with zeolite dewatering for a near-zero liquid discharge (ZLD) scenario, and (2) polishing discharge from zeolite dewatering using capacitive deionization (CDI) with 90+% salt rejection to produce water with less than 100ppm TDS for more beneficial use. Project results verified that UK CAER’s hybrid approach addressed the complexities of WFGD blowdown with simplified unit operation at relatively low capital investment by demonstrating: (1) an effective in-situ generated solid sorbent material, green-rust (GR), that specifically removes regulated dissolved species in WFGD blowdown, including selenium, arsenic, and nitrates; (2) a low-cost, high flux nanofiltration treatment that removes both monovalent and divalent species at >80% rejection to adequately provide water recycle and extend the life of FGD equipment by mitigating chloride aided pitting corrosion mechanisms; and (3) a solidification and stabilization process using pozzolanic agents that retain regulated species and satisfy the Resource Conservation and Recovery Act (RCRA) leachate requirements. UK CAER proved electrocoagulation with GR to be an intensified solution for effluent limit guidelines (ELG), and based on preliminary techno-economic analysis (TEA), in comparison to DOE’s Case 1 for Biological Wastewater Treatment that had a purchased equipment cost (PEC) of $\$$5.26 million and a Total plant cost (TPC) of $\$$30.0 million, the EC process had a PEC of $\$$2.67 million and the TPC of $\$$17.0 million. While the electricity consumption for Case 1 was 53 kW, it was 110 kW for the EC process due to dissolving iron for a three-stage reaction design. However, electricity consumption for the EC process could be significantly reduced by adopting a counter-current reactor design for at least a 6-stage chemical reaction operation.

01 COAL, LIGNITE, AND PEAT↗

A high-fidelity model for coupling flow and mechanical deformation of the porous paper web - a key to improved understanding of dewatering and rewet at the press section in paper making

The U.S. pulp and paper industry is the third-largest manufacturing user of energy, with an energy demand of 2,540 trillion Btu in 2010. Within the papermaking process, drying consumes over 400 trillion Btu annually which makes it one of the largest energy saving opportunities. In the 2014 Forest Products Industry Technology Roadmap, it is concluded that increasing the paper web solid content entering the dryer section from the current 45- 55 percent to approaching 65 percent, which would save 1.0 MMBtu per ton or 20 percent of the energy used in drying, is one of the most needed technology breakthroughs to achieve a more sustainable approach for manufacturing pulp and paper products. Achieving such significant energy savings highly depends on understanding the fundamental dynamics of the wet press process and then developing optimized solutions for design of more energy-efficient press processes and equipment. The objective of this project is to develop reliable computational capabilities to accurately simulate the flow of water from/to the porous pulp medium (dewatering/rewetting) during the pressing process in paper making.

42 ENGINEERING↗

Application of SIAL{sup R} Solidification Technology for Processing of Problematic Waste Streams - 18267

SIAL{sup R} is a proven, safe, cost-effective and licensed waste solidification technology that has been used successfully for 20 years in Slovakia and the Czech Republic for processing of various problematic radioactive waste streams. This abstract presents and summarises the most interesting performance records of the SIAL{sup R} geopolymer solidification technology, the applied mobile devices as well as the characteristics of final products. Radioactive waste solidification into matrix SIAL{sup R} is based on polycondensation of inorganic aluminosilicate components with chemical composition similar to average cement. The main components of matrix SIAL{sup R} are natural inorganic raw materials containing SiO{sub 2}, Al{sub 2}O{sub 3}, CaO, MgO, Na{sub 2}O, K{sub 2}O, Fe{sub 2}O{sub 3}, and TiO{sub 2}. The treatment/solidification process is modified for individual radioactive streams with different compositions. To determine the most appropriate composition, the SIAL{sup R} application technology is laboratory tested on real samples of each individual waste stream identified for solidification. Then an appropriate mixture of aluminosilicate composition and other inorganic compounds is defined for a given solidification application. When determining the most appropriate mixture, other requirements are taken into consideration: maximum dose rate on the drum with solidified product, mass, volume, alpha radionuclide content in the final product, need for a waste's dewatering before solidification, dry matter content in the solidification product as well as other specific waste acceptance criteria (i.e., compressive strength, leachability, diffusion coefficients, radiation stability, biodegradability of matrix, distribution and partition coefficients, influence of frost and water presence to the product stability including long term physical stability in water, dustiness, flammability, time dependence of compression strength and water reduction, product homogeneity and also radiolytic G-value for hydrogen release, GH{sub 2}). The Amec Foster Wheeler baseline approach to implementing the SIAL{sup R} waste treatment process is structured on three steps - waste characterization, waste retrieval and pre-treatment and at last the solidification of pre-treated waste itself. The equipment used for the solidification process is relatively small, lightweight and designed for the specific application on site, directly 'in situ' or local to the tanks storing the sludge's/resins/other waste streams. This mitigates the problems normally experienced by transferring sticky, tight waste through long pipes. The equipment is normally 'tailor-made' to take into account the real space conditions and other existing facility requirements. At Bohunice and Dukovany sites, the facilities for encapsulation were designed to occupy existing areas of the plants in close proximity to the tanks where the waste was being stored. This allowed for the removal of the waste using Remote Operated Vehicles and for the waste to be immediately treated on site without the need for transportation thus saving both, time and resource. To date, SIAL{sup R} has been used successfully to immobilize approximately 2 x 10{sup 6} kg of waste which includes sludge, resin, crystalline borates and contaminated organic waste from Bohunice and Mochovce, Slovakia and approximately 300 m{sup 3} of spent ion exchange resins and sludge from tanks on site at the Dukovany NPP (Nuclear Power Plant) in the Czech Republic. The technology now has a track record of over 20 years which includes on-going research and development. The International missions WANO (the World Association of Nuclear Operators) and OSART (the Operational Safety Review Team) evaluated the SIAL{sup R} matrix technology at Dukovany NPP as an example of good practice. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Energy System with Beneficial Carbon Dioxide (CO2) Use - Final Scientific/Technical Report

This report presents an integrated energy system that combines the production of substitute natural gas through coal hydrogasification with an algae process for beneficial carbon dioxide (CO2) use and biofuel production (funded under Department of Energy (DOE) contract DE-FE0001099). The project planned to develop, test, operate and evaluate a 2 ton-per-day coal hydrogasification plant and 25-acre algae farm at the Arizona Public Service (APS) 1000 Megawatt (MW) Cholla coal-fired power plant in Joseph City, Arizona. Conceptual design of the integrated system was undertaken with APS partners Air Liquide (AL) and Parsons. The process engineering was separated into five major areas: flue gas preparation and CO2 delivery, algae farming, water management, hydrogasification, and biofuel production. The process flow diagrams, energy and material balances, and preliminary major equipment needs for each major area were prepared to reflect integrated process considerations and site infrastructure design basis. The total project also included research and development on a bench-scale hydrogasifier, one-dimensional (1-D) kinetic-model simulation, extensive algae stressing, oil extraction, lipid analysis and a half-acre algae farm demonstration at APS?s Redhawk testing facility. During the project, a two-acre algae testing facility with a half-acre algae cultivation area was built at the APS Redhawk 1000 MW natural gas combined cycle power plant located 55 miles west of Phoenix. The test site integrated flue gas delivery, CO2 capture and distribution, algae cultivation, algae nursery, algae harvesting, dewatering and onsite storage as well as water treatment. The site environmental, engineering, and biological parameters for the cultivators were monitored remotely. Direct biodiesel production from biomass through an acid-catalyzed transesterification reaction and a supercritical methanol transesterification reaction were evaluated. The highest oil-to-biodiesel conversion of 79.9% was achieved with a stressed algae sample containing 40% algae oil. The effort concluded that producing biodiesel directly from the algae biomass could be an efficient, cost-effective and readily scalable way to produce biodiesel by eliminating the oil extraction process.

09 BIOMASS FUELS↗

Dewatering of contaminated river sediments

Dewatering of slurries has been successfully accomplished by the proper use of polymers in flocculating the fine particulate matter suspended in mineral processing streams. The U.S. Bureau of Mines (USBM) entered into a cooperative research effort with the U.S. Army Corps of Engineers (Corps) for the purpose of testing and demonstrating the applicability of mining flocculation technology to dredging activities associated with the removal of sediments from navigable waterways. The Corps has the responsibility for maintaining the navigable waterways in the United States. Current technology relies primarily on dredging operations which excavate the material from the bottom of waterways. The Corps is testing new dredging technology which may reduce resuspension of sediments by the dredging operation. Pilot plant dredging equipment was tested by the Corps which generated larger quantities of water when compared to conventional equipment, such as the clam shell. The transportation of this 'excess' water adds to the cost of sediment removal. The process developed by the USBM consists of feed material from the barge being pumped through a 4-in line by a centrifugal pump and exiting through a 4-in PVC delivery system. A 1,000-gal fiberglass tank was used to mix the polymer concentrate. The polymer was pumped through a 1-in line using a variable speed progressive cavity pump and introduced to the 4-in feed line prior to passing through a 6-in by 2-ft static mixer. The polymer/feed slurry travels to the clarifying tank where the flocculated material settled to the bottom and allowed 'clean' water to exit the overflow. A pilot scale flocculation unit was operated on-site at the Corps' 'Confined Disposal Facility' in Buffalo, NY.

Church, Ronald H.↗