Technical Gaps in Hanford High-Level Waste Solids Settling Behavior and Settling Time Evaluation for Direct Feed High-Level Waste (DFHLW) Operations

Settling of high-level waste (HLW) solids in process vessels is a key conceptual process step in providing HLW feed directly to the Hanford Waste Treatment and Immobilization Plant (WTP) HLW Vitrification Facility. Direct Feed High-Level Waste (DFHLW) is a potential approach to initiating HLW vitrification prior to completing of the WTP Pretreatment Facility. Settling would be used with subsequent supernatant decant to concentrate HLW feed. To support planning for DFHLW, Washington River Protection Solutions (WRPS) requested support from the Pacific Northwest National Laboratory to evaluate the current data set available to predict the time needed for HLW solids to settle, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling time. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers including: Gap 1: In-Tank Settling Rates Faster than Settling of Laboratory Samples, Gap 2: Effect of Sludge Leaching/Washing on Predicted Settling Times, Gap 3: Predicting Waste Settling from Waste Chemistry (Waste Type), Gap 4: Predicting Waste Settling from Particle Size and Density Distributions (PSDDs), Gap 5: Insufficient Laboratory and In-Tank Settling Data to Represent Hanford Waste, Gap 6: Methods for Real-Time, In-Tank Tracking of Settling, Gap 7: Prediction of Sediment Erosion Resistance as a Function of Settling Time, and Gap 8: Prediction of Sediment Solids Content as a Function of Settling Time. In addition to the data gaps, an overarching observation of the settling rate and settled layer data is the significant variation in behavior. At similar solids concentrations, settling rates can vary by as much as 3 orders of magnitude depending on the source waste tank, and significantly different settling rates are noted between laboratory and in situ tests for the same waste tank. The range of average solids concentration in existing HLW sediment, which may have been quiescent for decades, can vary from less than 7 wt% to greater than 74 wt% solids. The shear strengths (or yield stresses) measured on laboratory samples range from less than 27 Pa to greater than 6400 Pa. These variations can challenge process planning for the application of a settle/decant process for DFHLW. This report describes the significance of the gaps to the settle/decant process and presents uncertainties by way of examples. Potential technical approaches for resolving these gaps are described and the estimated difficulty in resolving these gaps is evaluated. Based on the significance of the gap and the difficulty of resolution, recommendations are made to address specific gaps. Scoping estimates of the potential settling times for DFHLW solids have been made based on the existing data set with its associated gaps. Depending on the process vessel depth and final sediment concentration, substantial fractions of the scoping estimate results for settling times for characterized HLW exceed the 2-week period that has been previously assumed for process planning. There is also significant disparity, potentially greater than a factor of 5000 difference, in the estimated settling times depending on process vessel depth and final sediment solid concentration. This variation in results underscores the significance of the identified gaps and uncertainties with respect to process planning for utilizing settle/decant operations for DFHLW.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Configuration Evaluation for Process Settling of Hanford Waste Solid Particles

Direct Feed High-Level Waste (DFHLW) is a potential flowsheet operations approach to initiating high-level waste (HLW) vitrification prior to completion of the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility. A settle/decant process has been proposed to concentrate solids prior to delivery to the WTP HLW Facility during DFHLW operations, wherein the solids in a settled layer would be remixed with the supernatant liquid remaining after decanting operations to provide the feed at required solids concentrations. Settling would be used in lieu of purpose-built filtration or other solids separation equipment. Pacific Northwest National Laboratory (PNNL) is providing baseline technical support to the Washington River Protection Solutions (WRPS) Flowsheet Integration group. To support planning for DFHLW, WRPS previously requested that PNNL evaluate the current data set available to predict the time needed for HLW solids to settle and the solids concentration and strength of that settled layer, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling times. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers. In addition to the data gaps, an overarching observation was made that there is significant variation in behavior of settling rate and settled layer data. The settling time required to concentrate solids via a settle/decant process was determined from the limited data to have a difference of potentially more than a factor of 5,000 in the estimated settling times, varying from 0.2 to 1,060 days for example depending on process vessel depth and final sediment solids concentration. In contrast, successful processes of liquid-forward output streams resulting from in-tank settling and decanting forward liquid have been reported for operations conducted at the Hanford Site. The purpose of this current report is to further support DFHLW planning by evaluating double-shell tank (DST) and alternate vessel equipment and operational configurations to enable optimization of the settle/decant process to concentrate solids. Hanford waste processing behavior specific to liquid feed availability following a slurry transfer in a DST is summarized, including process stream characteristics and process equipment configurations. The performance of DST process equipment configurations is evaluated for possible improvements using computational fluid dynamics (CFD) and simple analytical models. Potential new vessel design(s) specific to enabling effective settle/decant processes, and cursory summary of other separate and inline solids separations processes, are also provided. The CFD results indicated that improvement in outflow solids concentration was promoted by a reduction in the slurry flow rate, angling the distributor nozzles downward, and lifting the transfer pump. The solid-liquid analysis evaluating particle trajectory confirmed that the potential for particle ingestion (in the transfer pump) was decreased with increased radial separation between the inlet and outlet (transfer pump inlet), decreased inlet flow, and decreased liquid density and viscosity for a neutrally buoyant inlet flow. An assessment was also made of the potential for inflow configuration changes to result in the discrete mounding or piling of solids within the tank. Based on the characterization of the settled waste to date, HLW sediments will be unlikely to sustain a substantial angle of repose to facilitate significant variations in the elevation of the settled solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗