Search NASA⌕ Search

SEARCH · Search NASA

Results for “DOUG”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Robotics On-Board Trainer (ROBoT)

ROBoT is an on-orbit version of the ground-based Dynamics Skills Trainer (DST) that astronauts use for training on a frequent basis. This software consists of two primary software groups. The first series of components is responsible for displaying the graphical scenes. The remaining components are responsible for simulating the Mobile Servicing System (MSS), the Japanese Experiment Module Remote Manipulator System (JEMRMS), and the H-II Transfer Vehicle (HTV) Free Flyer Robotics Operations. The MSS simulation software includes: Robotic Workstation (RWS) simulation, a simulation of the Space Station Remote Manipulator System (SSRMS), a simulation of the ISS Command and Control System (CCS), and a portion of the Portable Computer System (PCS) software necessary for MSS operations. These components all run under the CentOS4.5 Linux operating system. The JEMRMS simulation software includes real-time, HIL, dynamics, manipulator multi-body dynamics, and a moving object contact model with Tricks discrete time scheduling. The JEMRMS DST will be used as a functional proficiency and skills trainer for flight crews. The HTV Free Flyer Robotics Operations simulation software adds a functional simulation of HTV vehicle controllers, sensors, and data to the MSS simulation software. These components are intended to support HTV ISS visiting vehicle analysis and training. The scene generation software will use DOUG (Dynamic On-orbit Ubiquitous Graphics) to render the graphical scenes. DOUG runs on a laptop running the CentOS4.5 Linux operating system. DOUG is an Open GL-based 3D computer graphics rendering package. It uses pre-built three-dimensional models of on-orbit ISS and space shuttle systems elements, and provides realtime views of various station and shuttle configurations.

Johnson, Genevieve↗

STS-99 Countdown Status Briefing

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This radar system produced unrivaled 3-D images of the Earth's Surface. The mission was launched at 12:31 on February 11, 2000 onboard the space shuttle Endeavour. This tape presents a pre-launch briefing for the press held on Jan. 28, 2000. Statements were given by Doug Lyons, Shuttle Test Director; Scott Higginbotham, STS-99 Payload Director and Ed Priselac, Shuttle Weather Officer. Doug Lyons reported on the checkout of the equipment. Scott Higgenbotham reviewed the steps required to assemble and test the SRTM instrumentation and equipment. Ed Priselac gave the weather forecast for the expected launch day. The questions concerned a possible problem with a part onboard the shuttle and the likely impact this might have on the launch.

Source record↗

Preliminary Geological Findings on the BP-1 Simulant

The following is a summation of information and discussion between Doug Stoeser of the USGS and Doug Rickman of NASA in February and March, 2010 pertaining to the BP-1 simulant. The analytical results and the bulk of the text are from communications from Dr. Stoeser. The BP-1 simulant is made from Black Point Basalt Flow, San Francisco Volcanic Field, northern Arizona. There is an aggregate (road metal) quarry on the northern margin of the flow towards the west end that was used as a Desert Research and Technology Studies (Desert RATS) analog test site. Silty material from this site was also used in laboratory tests and found to have geotechnical properties similar to the LHT-2M and Chenobi regolith simulants and is being proposed as a possible simulant for geotechnical use. It currently has the designation of BP-1 (Black Point 1). Figure

Rickman, D. L.↗

EVA Swab Kit: Tools and Techniques for Collecting Aseptic Samples from Crewed Space Missions

Introduction: When we send humans to search for life on other planets, we'll need to know what we brought with us versus what may already be there. To ensure our crewed spacecraft meet planetary protection requirements—and to protect our science from human contamination—we'll need to assess and verify whether micro-organisms may be leaking/venting from our spacesuits. This requires collecting samples under Extravehicular Activity (EVA) conditions. Detailed, systematic research on forward contamination from robotic spacecraft has been steadily progressing since the Viking missions, but systematic studies of contamination from space suits has not been conducted in many years. The modern EMU (Extravehicular Mobility Unit) suit used by NASA is designed to leak at rates as high as 100 cc/min. Before humans land on Mars there is a critical need to understand the types and quantities of microbes that could be introduced via space suits. The Human Forward Contamination Assessment team at NASA’s Johnson Space Center (JSC) has developed a prototype EVA swab tool [1,2,3,4] designed for use in space to sample cleaned and uncleaned space suits to determine the present day microbial load and eventually the rate of leakage. The ability to assess microbial leakage early in advanced space suit and life support system design cycles will help avoid costly hardware redesign later. Test Objectives: The primary objective of EMU testing was to characterize the type of micro-organisms typically found on or near selected suit pressure joints under suit differential pressure conditions. Most human-borne microbes can fit through a 0.5 to 1.0 µm gap. Knowing which joints are more likely to leak will inform hardware design decisions. Knowing which types of micro-organisms may leak from EVA suits provides a basis for subsequent studies to characterize the viability of those organisms under destination conditions, as well as how far they might spread through natural or human-influenced processes. That data, in turn, will inform exploration mission operations and hardware design. The secondary objective of testing was to evaluate the interface between a fully suited test subject and the EVA swab tool at vacuum. Bulky EVA suits can restrict movement and limit visibility through the helmet visor. Fully suited testing is important for identifying tool design issues prior to flight. At exploration destinations, such as Mars, suited crew may be required to periodically sample their suits as part of an environmental monitoring protocol. Suit Microbial Sampling Results: This report details results of microbial swabs collected from current flight suit configurations worn by crew members assigned to upcoming ISS expedition missions as well as swabs collected from prototype suits intended for use on the Orion spacecraft. These tests were intended to characterize the types of contaminants found on flight suits under current, typical handling conditions. No attempt was made to change suit handling procedures, provide additional sterilization, or to limit typical potential contaminant sources. Using culture based techniques, we cultivated 235 CFU (colony forming units) comprised of 26 bacterial species and one fungal species on the outside of the suits. The fungal species and 14 of the bacterial species were unique to the suit surfaces and were not detected in any of the background samples collected within the chambers. We sequenced 755,434 ribosomal fragments on all of the suit surfaces from swab samples. 557,016 of these sequences represent DNA that survived at least 4 hours at vacuum. These sequences formed 2,464 OTU's (Operational Taxonomic Units, 97% similarity) showing low diversity in the samples. The most abundant sequences that survived vacuum belong to the genera Staphyloccocus, Ralstona, Bacillus and Rhodobacter all of which are common to the human microbiome. [5] See Danko et al., (2021) for more complete details of these first analyses. Further analysis of EVA suit materials with respect to the efficacy of various cleaning protocols and engineered containment solutions is planned to inform suit design for NASA’s Artemis Moon to Mars program crew testing. Swab Tool Function Results: The kit was demonstrated for fit and function in suited subject vacuum tests to determine how well the tool worked as an aseptic microbial sampling device as well as to identify any design elements that could be upgraded for EVA task specific improvement. It was found that sample acquisition efficacy could be enhanced by redesign of the sample canister to end-effector interface. Several modifications of the sample caddy assemblies to optimize EVA safety and functionality were also identified. Consequently, fabrication of the redesigned sample canister to end-effector assembly interfaces and and the sample caddy assemblies are required. Fabrication of sixteen flight sample canister assemblies (8 per each of two EVA Swab Kits) and two sample caddy assemblies are in process to be followed by hardware testing and certification to produce two flight-certified EVA Swab Kits for transport to ISS no earlier than summer of 2022. Sampling Strategy: The International Space Station is an ideal testbed for systematic studies of contamination from crewed vehicles since it has been continuously occupied for 20 years and exposed to non-terrestrial conditions. We will sample the exterior of the ISS during EVA using a purpose-built swab tool capable of maintaining sterility while undergoing temperature changes from -151 to +121°C under hard vacuum. Prior to each EVA, the project team will work with ISS mission managers to identify precise sampling locations, which will vary by EVA based on the translation paths and worksites scheduled for that particular EVA. Ideally, translation path handrails and areas near ECLSS (Environmental Control and Life Support System) external vent openings on a spacecraft would be assessed. There are currently more than a dozen ECLSS external vents on the ISS. Some are connected to systems that vent waste products, while others are intended to equalize cabin pressure. As EVA opportunity allows, microbial samples from any of these external vents would provide a valuable data point, though some will be more useful than others. Four criteria have been identified to help prioritize sampling sites near vents: • EVA Accessibility: To minimize cost, it is desired to piggy-back onto a planned EVA. Therefore, the sampling location must be readily accessible by an EVA crew • Type of Vented Products: Vent products that have been in direct contact with crew, such as cabin air, are more likely to contain microorganisms than vent products associated with isolated systems, such as experiment module combustion products. • Mass of Vented Products: Higher-flow vents are more likely to contain detectible levels of microbial contaminants than lower-flow vents. • Local Environment: Sample locations with relatively benign local conditions, such as warm surfaces shielded from direct ultraviolet (UV) radiation exposure, may be more likely to support microbial growth than locations with harsher local environmental conditions. Because EVA accessibility is the most important criteria, the proposal team worked with an astronaut and flight controllers using the Dynamic Onboard Ubiquitous Graphics (DOUG) tool. The DOUG virtual environment allows an operator to “fly” around the current ISS vehicle configuration to assess EVA translation paths, attach points, and keep-out zones. While analysis on station or rapid return to Earth would be preferable, samples collected from the exterior of the ISS have already been exposed to temperature variations between -157 and +121 °C as well as hard vacuum. Therefore, they should be fairly stable and robust. We hypothesize that samples collected from the ISS exterior could be stored for up to 6 months at -80°C without degradation. Sample canisters will be returned to Earth while frozen at -80°C for analysis, and sterilized canisters can be re-flown back to ISS to support additional sampling opportunities Relevance to NASA Exploration Objectives: These data will allow us to identify new or improved methods, technologies, and procedures for spacecraft sterilization and leakage mitigation to minimize the amount of contamination introduced to the environment by human explorers. This work is funded by NASA research grant: NNH18ZDA001N-PPR References: [1] Bell, M.S. et al. (2015) LPS XLVI, Abst. #1832 [2] Rucker et al. (2018) 42nd COSPAR (PPP.3) [3] Bell, M.S. et al. (2019) Mars Extant Life Conference, Abst. #5096.[4] Bell, M.S. et al., (2020) 43rd COSPAR (BO.2).[5] Danko D, et.al.,(2021)Front.Microbiol.12:608478.

Mary Suzanne Bell↗

STS-99 Countdown Status Briefing

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This radar system produced unrivaled 3-D images of the Earth's Surface. The mission was launched at 12:31 on February 11, 2000 onboard the space shuttle Endeavour. This tape presents a pre-launch briefing for the press held on Feb 8, 2000. Statements were given by Doug Lyons, Shuttle Test Director; Scott Higginbotham, STS-99 Payload Director and Ed Priselac, Shuttle Weather Officer. Mr. Lyons reported on the replacement of the Master Control Unit on board Endeavour, the part that had caused a delay in the launch. He reviewed the work that had to be done and the timeline for completion. Scott Higginbotham reported that there were no problems with the SRTM. Ed Priselac reported on favorable weather conditions for the launch. Discussion after the statements concerned a possible problem with a cable, and the possibility of a further delay to the launch.

Source record↗

A study of heavy precipitation events in Taiwan during 10-13 August, 1994: mesoscale model simulations

Heavy rainfall occurred over the western side of Taiwan's complex terrain from August 10 to 13, 1994 after Typhoon Doug moved northward from the East China Sea into Taiwan and on towards the Yellow Sea. On August 10, most of the rainfall fell over sloped areas. The heaviest daily rainfall totals were in excess of 200 mm over southwestern as well as central Taiwan. However, not much rainfall occurred over northern Taiwan. The lack of rainfall over northern Taiwan also occurred on August 11, 12 and 13. The larger rainfall amounts shifted westward from the sloped areas on August 10 toward lower terrain on August 11. On August 12 and 13, most of the higher rainfall amounts were found over the coastal area in southwestern Taiwan. Notably, about 300 to 400 mm per day fell over the coastal area in southwest Taiwan on August 12 and 13. The distribution of rainfall amount was different on August 10 and 11 (termed as Case 1) compared to August 12 and 13 (termed as Case 2). The environmental situation and precipitation characteristics are analyzed using EC/TOGA data, ground-based radar data, surface rainfall patterns, surface wind data, and upper air soundings. Chen at al. (2001) also categorized the precipitation pattern into two types, propagating and quasi-stationary. For the propagating type of precipitation, rainrates increased or remained the same as systems went from the plains to mountainous regions. With the quasi-stationary type of precipitation, however, rainrates decreased as precipitation propagated across the plains and into the mountains. The focus of this study is to understand what causes the h1aher amounts of rainfall over Taiwan, and what factors influence where the higher amounts of rainfall will occur, over sloped areas or over coastal areas.

Tao, W.-K.↗

Lower Thermospheric Composition Studies in the Auroral Zone

This TIMED/CEDAR grant had two major objectives. The GUVI instrument on TIMED should routinely produces maps of the flux of energetic particles and their average energy. However, while those data will be available soon there were no plans to routinely produce the O/N2 ratio in the auroral. Ground-based photometric techniques have been available for years which routinely measure all three quantities in the auroral zone. The first objective of the previous proposal was to use these ground-based techniques to provide some validation for the routine measure of average energy. The second objective was to use the ground-based to data to validate GUVI algorithms for the measure of O/N2 in the auroral zone. We have made some progress to these goals while we await the release of the properly precessed GUVI data. For now these objectives are being addressed by making use of algorithms by one of us (Doug Strickland of CPI) that are being used for specific GUVI level 1B data sets that contain data coincident with the groundbased measurements. Also we have collected ground-based data from two Alaska sites and they are available on our web site and on the CEDAR website. The details of the progress we have made are discussed.

Hecht, James↗

Effects of Piezoelectric (PZT) Sensor Bonding and the Characteristics of the Host Structure on Impedance Based Structural Health Monitoring

This study was conducted to investigate the effects of certain factors on the impedance signal in structural health monitoring. These factors were: the quality of the bond between the sensor and the host structure, and the characteristics of the host structure, such as geometry, mass, and material properties. This work was carried out to answer a set of questions, related to these factors, that were developed by the project team. The project team was comprised of Dr. Doug Ramers and Dr. Abdul Jalloh of the Summer Faculty Fellowship Program, Mr. Arnaldo Colon- Perez, a student intern from the University of Puerto Rico of Turabo, and Mr. John Lassiter and Mr. Bob Engberg of the Structural and Dynamics Test Group at NASA Marshall Space Flight Center (MSFC). This study was based on a review of the literature on structural health monitoring to investigate the factors referred to above because there was not enough time to plan and conduct the appropriate tests at MSFC during the tenure of the Summer Faculty Fellowship Program project members. The surveyed literature documents works on structural health monitoring that were based on laboratory tests that were conducted using bolted trusses and other civil engineering type structures for the most part. These are not the typical types of structures used in designing and building NASA s space vehicles and systems. It was therefore recommended that tests be conducted using NASA type structures, such as pressure vessels, to validate the observations made in this report.

Jalloh, Abdul↗

Analysis of Piezoelectric Structural Sensors with Emergent Computing Techniques

The purpose of this project was to try to interpret the results of some tests that were performed earlier this year and to demonstrate a possible use of emergence in computing to solve IVHM problems. The test data used was collected with piezoelectric sensors to detect mechanical changes in structures. This project team was included of Dr. Doug Ramers and Dr. Abdul Jallob of the Summer Faculty Fellowship Program, Arnaldo Colon-Lopez - a student intern from the University of Puerto Rico of Turabo, and John Lassister and Bob Engberg of the Structural and Dynamics Test Group. The tests were performed by Bob Engberg to compare the performance two types of piezoelectric (piezo) sensors, Pb(Zr(sub 1-1)Ti(sub x))O3, which we will label PZT, and Pb(Zn(sub 1/3)Nb(sub 2/3))O3-PbTiO, which we will label SCP. The tests were conducted under varying temperature and pressure conditions. One set of tests was done by varying water pressure inside an aluminum liner covered with carbon-fiber composite layers (a cylindrical "bottle" with domed ends) and the other by varying temperatures down to cryogenic levels on some specially prepared composite panels. This report discusses the data from the pressure study. The study of the temperature results was not completed in time for this report. The particular sensing done with these piezo sensors is accomplished by the sensor generating an controlled vibration that is transmitted into the structure to which the sensor is attached, and the same sensor then responding to the induced vibration of the structure. There is a relationship between the mechanical impedance of the structure and the resulting electrical impedance produced in the in the piezo sensor. The impedance is also a function of the excitation frequency. Changes in the real part of impendance signature relative to an original reference signature indicate a change in the coupled structure that could be the results of damage or strain. The water pressure tests were conducted by pressurizing the bottle on a test stand, and running sweeps of excitations frequencies for each of the piezo sensors and recording the resulting impedance. The sweeps were limited to 401 points by the available analyzer, and it was decided to perform individual sweeps at five different excitation frequency ranges. The frequency ranges used for the PZTs were different in two of the five ranges from the ranges used for the SCP. The bottles were pressurized to empty (no water), 0psig, 77 psig, 155 psig, 227 psig in nearly uniform increments of about 77psi. One of each of the two types of piezo sensors was fastened on to the bottle surface at two locations: about midway between the ends on cylindrical portion of the bottle and at the very edge of one of the end domes. The data was collected in files by sensor type (2 cases), by location (2 cases), by frequency range (5 cases), and pressure (5cases) to produce 100 data sets of 401 impedances. After familiarization with the piezo sensing technology and obtaining the data, the team developed a set of questions to try to answer regarding the data and made assignments of responsibilities. The next section lists the questions, and the remainder of the report describes the data analysis work performed by Dr. Ramers. This includes a discussion of the data, the approach to answering the question using statistical techniques, the use of an emergent system to investigate the data where statistical techniques were not usable, conclusions regarding the data, and recommendations.

Ramers, Douglas L.↗

ITOS to EDGE "Bridge" Software for Morpheus Lunar/Martian Vehicle

My project Involved Improving upon existing software and writing new software for the Project Morpheus Team. Specifically, I created and updated Integrated Test and Operations Systems (ITOS) user Interfaces for on-board Interaction with the vehicle during archive playback as well as live streaming data. These Interfaces are an integral part of the testing and operations for the Morpheus vehicle providing any and all information from the vehicle to evaluate instruments and insure coherence and control of the vehicle during Morpheus missions. I also created a "bridge" program for Interfacing "live" telemetry data with the Engineering DOUG Graphics Engine (EDGE) software for a graphical (standalone or VR dome) view of live Morpheus nights or archive replays, providing graphical representation of vehicle night and movement during subsequent tests and in real missions.

Hirsh, Robert↗

An Onboard ISS Virtual Reality Trainer

Prior to the retirement of the Space Shuttle, many exterior repairs on the International Space Station (ISS) were carried out by shuttle astronauts, trained on the ground and flown to the station to perform these repairs. After the retirement of the shuttle, this is no longer an available option. As such, the need for the ISS crew members to review scenarios while on flight, either for tasks they already trained or for contingency operations has become a very critical subject. In many situations, the time between the last session of Neutral Buoyancy Laboratory (NBL) training and an Extravehicular Activity (EVA) task might be 6 to 8 months. In order to help with training for contingency repairs and to maintain EVA proficiency while on flight, the Johnson Space Center Virtual Reality Lab (VRLab) designed an onboard immersive ISS Virtual Reality Trainer (VRT), incorporating a unique optical system and making use of the already successful Dynamic Onboard Ubiquitous Graphical (DOUG) graphics software, to assist crew members with current procedures and contingency EVAs while on flight. The VRT provides an immersive environment similar to the one experienced at the VRLab crew training facility at NASA Johnson Space Center. EVA tasks are critical for a mission since as time passes the crew members may lose proficiency on previously trained tasks. In addition, there is an increased need for unplanned contingency repairs to fix problems arising as the ISS ages. The need to train and re-train crew members for EVAs and contingency scenarios is crucial and extremely demanding. ISS crew members are now asked to perform EVA tasks for which they have not been trained and potentially have never seen before.

Miralles, Evelyn↗

An Onboard ISS Virtual Reality Trainer

Prior to the retirement of the Space Shuttle, many exterior repairs on the International Space Station (ISS) were carried out by shuttle astronauts, trained on the ground and flown to the Station to perform these specific repairs. With the retirement of the shuttle, this is no longer an available option. As such, the need for ISS crew members to review scenarios while on flight, either for tasks they already trained for on the ground or for contingency operations has become a very critical issue. NASA astronauts prepare for Extra-Vehicular Activities (EVA) or Spacewalks through numerous training media, such as: self-study, part task training, underwater training in the Neutral Buoyancy Laboratory (NBL), hands-on hardware reviews and training at the Virtual Reality Laboratory (VRLab). In many situations, the time between the last session of a training and an EVA task might be 6 to 8 months. EVA tasks are critical for a mission and as time passes the crew members may lose proficiency on previously trained tasks and their options to refresh or learn a new skill while on flight are limited to reading training materials and watching videos. In addition, there is an increased need for unplanned contingency repairs to fix problems arising as the Station ages. In order to help the ISS crew members maintain EVA proficiency or train for contingency repairs during their mission, the Johnson Space Center's VRLab designed an immersive ISS Virtual Reality Trainer (VRT). The VRT incorporates a unique optical system that makes use of the already successful Dynamic On-board Ubiquitous Graphics (DOUG) software to assist crew members with procedure reviews and contingency EVAs while on board the Station. The need to train and re-train crew members for EVAs and contingency scenarios is crucial and extremely demanding. ISS crew members are now asked to perform EVA tasks for which they have not been trained and potentially have never seen before. The Virtual Reality Trainer (VRT) provides an immersive 3D environment similar to the one experienced at the VRLab crew training facility at the NASA Johnson Space Center. VRT bridges the gap by allowing crew members to experience an interactive, 3D environment to reinforce skills already learned and to explore new work sites and repair procedures outside the Station.

Miralles, Evelyn↗

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

Clearance Analysis of CTC2 (on ELC4) to S-TRRJ HRS Radiator Rotation Envelope

In response to the planned retirement of the Space Shuttle Program, International Space Station (ISS) management began stockpiling spare parts on the ISS. Many of the larger orbital replacement units were stored on the Expedite the Processing of Experiments to Space Station (EXPRESS) Logistics Carriers (ELCs) mounted on the end of the S3 and P3 truss segments, immediately outboard of the Thermal Radiator Rotary Joints (TRRJs) and their attached radiators. In an August 2009 computer-aided design (CAD) assessment, it was determined that mounting the Cargo Transport Container (CTC) 2 on the inboard face of ELC4 as planned would create insufficient clearance between the CTC2 and the rotational envelope of the radiators when the TRRJs were rotated to a gamma angle of 35.0 degrees. The true clearance would depend on how the Unpressurized Cargo Carrier Attachment System (UCCAS) was mounted to the S3 truss and how the ELC4 was attached to it. If the plane of the UCCAS attachment points were tilted even slightly inboard, it would significantly change the clearance between CTC2 and the Starboard TRRJ (S-TRRJ) radiators. Additionally, since CTC2 would be covered in multilayer insulation (MLI), the true outer profile of CTC2 was not captured in the CAD models used for the clearance assessment. It was possible that, even if the S-TRRJ radiators cleared CTC2, they could snag the MLI covering. In the fall of 2010, the Image Science and Analysis Group (ISAG) was asked to perform an on-orbit clearance analysis to determine the location of CTC2 on ELC4 and the S-TRRJ radiators at the angle of closest approach so that a positive clearance could be assured. To provide the measurements as quickly as possible to aid in the assessment, it was decided that the clearance analysis would be broken into two phases. Phase I: The location and orientation of the UCCAS fittings, which support and hold the ELC4 in place, would be measured relative to the ISS Analytical Coordinate System (ISSACS) as defined by nine preexisting Space Vision System (SVS) targets affixed to the forward/zenith side of the S1 and S3 truss segments. The location of the outboard edge of the S-TRRJ radiator would also be measured when positioned at the angle of closest approach to CTC2 (gamma = 35.0 degrees). This data would allow the Digital Pre-Assembly Group to predict how the ELC4 would sit on the UCCAS and how that would translate into the clearance between CTC2 and the S-TRRJ radiators. Phase II: After the ELC4 was delivered and installed into the UCCAS, the position of the CTC2 mounting plate on the inboard face of ELC4, would be measured in the ISSACS coordinate system relative to the SVS control points used in Phase I. Although CTC2 would not yet be mounted on ELC4, the working envelope of CTC2 could be mathematically added to the measured position of ELC4 to produce a best estimate for CTC2's mounted location. Comparing CTC2's best estimated location to the S-TRRJ radiator (measured in Phase I); relative to the ISSACS coordinate system, would provide a direct measurement of the expected clearance. Due to the impending delivery of ELC4 (scheduled for January 2011), planning for the Phase I clearance analysis began immediately. Using the Dynamic Onboard Ubiquitous Graphics (DOUG) program, ISAG designed a way to acquire images of the SVS control points on truss segments S1 and S3, the aft facing edge of the S-TRRJ Heat Rejection Subsystem (HRS) radiator, and the three UCCAS latch mechanisms mounted on the zenith face of the S3 truss using the Space Station Remote Manipulator System (SSRMS). To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which they are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which the majority of the needed imagery could be acquired. Five additional images would be acquired using the CP-3 external ISS camera mounted on the S1 truss immediately inboard of ELC4. Based on a photogrammetric simulation, it was estimated that the measured location of the HRS radiator and UCCAS latch points would be accurate to about 0.3 in. in each of the three axes relative to ISSACS. Working with ROBO, ISAG collected 78 images of the ISS December 29, 2010. From this imagery, the best 40 were selected for use in the analysis process. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for the nine SVS targets on the S1 and S3 trusses in the ISSACS coordinate system.

Liddle, Donn↗

Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

Comstock, Douglas A.↗

Pisgah Lava Cave Communication Test: Science Case Study for the Networked Constellations Initiative

As part of the science case study for the Networked Constellations initiative, a team of JPL scientists explore the possibility of a mission to study the lava caves on Mars. Natural caves on Mars and the Moon present a unique opportunity to learn about the planetary geology and to provide a shelter for human explorers. Due to power and communication challenges, a network of assets has significant advantages over a single asset sent inside a cave. However, communication between the assets and the data downlink present significant difficulties due to the presence of rough walls, boulders, and other obstacles with unknown dielectric constant inside a typical cave, disturbing the propagation of the radio waves. A detailed study is needed to establish the limitations of the current communication technologies and to develop requirements for the new communication technology applicable to the cave environment. On May 4 of 2017, Konstantin Belov, Doug Ellison, and Abby Fraeman visited a lava cave in Pisgah, CA. The purpose of the visit was to build a 3D map of the cave, which could be used to create a model of radio wave propagation, and to conduct a series of communication tests using off-the-shelf equipment to verify the in-cave communication challenges. This experiment should be considered as a simple 'proof of concept' and is the subject of this report.

Belov, K.↗

Development of New Lunar Highland Regolith Simulant, NUW-LHT-5M

Introduction: NASA has a need for large quantities of lunar simulants that closely match future manned lunar missions at landing sites near the Lunar South Pole. The current simulant was designed to approximate NU-LHT-2M, and -4M, except using natural minerals and a fully synthetic, non-basaltic, high calcium glass. Washington Mills in Niagara Falls, NY was contracted to produce this new simulant due to their electric arc furnace (EAF) fusion technology and capabilities for crushing and sizing ceramics. The primary objectives of this work were: (1) to create a commercially produced simulant that contains a high fidelity, high calcium (An90+), low Mg/Fe glass without basaltic constituents; (2) to create a simulant that uses existing, terrestrially mined, and readily available minerals blended with a synthetic glass, and (3) accomplish objectives (1) and (2) using conventional processing methods capable of production levels that can meet substantial current and future demands of NASA projects. Another consideration was that highland simulants closest to meeting these requirements, NU-LHT-2M and -4M types, are out of production and largely out of stock. Design: The design chosen for development and production for this work is NU-LHT-2M, de-signed by Doug Stoeser and Douglas Rickman, which uses Stillwater anorthosite and norite rocks and synthetic glass. The composition targeted the average composition, glass content and particle size distribution of Apollo 16 samples [1]. The design utilizes two Stillwater minerals, anorthosite (37.7 wt.%), norite (17.6 wt.%), a commercially sourced olivine (4.7 wt.%), and a synthetic glass (40 wt.%). Processing: Stillwater rocks were hand collected and initially crushed by the USGS. Further crushing and milling was performed at Washing-ton Mills. For the glass, oxides were blended in the ap-propriate ratios, blended in a v-blender, and placed in a graphite lined, water cooled pot. The mixture was fused in Washington Mills’ pilot scale, 500 kW EAF. The molten glass was then poured into water and quenched to inhibit crystallization. Several pour/quench cycles were required to produce the total quantity of glass needed. Anorthosite, norite and olivine were milled together to the target particle size in a ball mill. The glass was ball milled separately. The complete simulant was produced by blending the milled materials. Particle size distribution, phase and chemical analyses of the materials was were per-formed at Washington Mills. Results: The glass composition was found to match the Apollo 16 oxide content average [1] quite well, with the exception of SiO2 and Fe2O3. The deviation of SiO2 and Fe2O3 from batched content was believed to be due to limitations inherent in the use of the arc furnace technique for these types of materials. A particle size distribution of the full simulant formulation closely matching the average for the Apollo 16 samples was also achieved. Fig. 1 shows the morphology of the final simulant particles. The size distribution is compared to the target in Fig. 2. Conclusions: A new lunar highlands type simulant containing a high-quality synthetic glass, closely matching an average composition of the Apollo 16 regolith was produced. Processing utilized easily scalable mineral and glass making methods.

simulant↗

AXAF-I Low Intensity-Low Temperature (LILT) Testing of the Development Verification Test (DVT) Solar Panel

The planned orbit of the AXAF-I spacecraft will subject the spacecraft to both short, less than 30 minutes for solar and less than 2 hours for lunar, and long earth eclipses and lunar eclipses with combined conjunctive duration of up to 3 to 4 hours. Lack of proper Electrical Power System (EPS) conditioning prior to eclipse may cause loss of mission. To avoid this problem, for short eclipses, it is necessary to off-point the solar array prior to or at the beginning of the eclipse to reduce the battery state of charge (SOC). This yields less overcharge during the high charge currents at sun entry. For long lunar eclipses, solar array pointing and load scheduling must be tailored for the profile of the eclipse. The battery SOC, loads, and solar array current-voltage (I-V) must be known or predictable to maintain the bus voltage within acceptable range. To address engineering concerns about the electrical performance of the AXAF-I solar array under Low Intensity and Low Temperature (LILT) conditions, Marshall Space Flight Center (MSFC) engineers undertook special testing of the AXAF-I Development Verification Test (DVT) solar panel in September-November 1997. In the test the DVT test panel was installed in a thermal vacuum chamber with a large view window with a mechanical "flapper door". The DVT test panel was "flash" tested with a Large Area Pulse Solar Simulator (LAPSS) at various fractional sun intensities and panel (solar cell) temperatures. The testing was unique with regards to the large size of the test article and type of testing performed. The test setup, results, and lessons learned from the testing will be presented.

Alexander, Doug↗