At least 19 records

Assessment of Methane Emissions – Impact of Using Natural Gas Engines in Unconventional Resource Development

Researchers at the Center for Alternative Fuels, Engines, and Emissions (CAFEE) completed a multi-year program under DE-FE0013689 entitled, “Assessing Fugitive Methane Emissions Impact Using Natural Gas Engines in Unconventional Resource Development.” When drilling activity was high and industry sought to lower operating costs and reduce emissions they began investing in dual fuel and dedicated natural gas engines to power unconventional well equipment. From a review of literature we determined that the prime-movers (or major fuel consumers) of unconventional well development were the service trucks (trucking), horizontal drilling rig (drilling) engines, and hydraulic stimulation pump (fracturing) engines. Based on early findings from on-road studies we assessed that conversion of prime movers to operate on natural gas could contribute to methane emissions associated with unconventional wells. As such, we collected significant in-use activity data from service trucks and in-use activity, fuel consumption, and gaseous emissions data from drilling and fracturing engines. Our findings confirmed that conversion of the prime movers to operate as dual fuel or dedicated natural gas – created an additional source of methane emissions. While some gaseous emissions were decreased from implementation of these technologies – methane and CO 2 equivalent emissions tended to increase, especially for non-road engines. The increases were highest for dual fuel engines due to methane slip from the exhaust and engine crankcase. Dedicated natural gas engines tended to have lower exhaust methane emissions but higher CO 2 emissions due to lower efficiency. Therefore, investing in currently available natural gas technologies for prime movers will increase the greenhouse gas footprint of the unconventional well development industry.

03 NATURAL GAS↗

New insights into microbial responses to oil spills from the Deepwater Horizon incident

On April 20, 2010, a catastrophic eruption of methane caused the Deepwater Horizon exploratory drill rig drilling the Macondo Well in Mississippi Canyon Block 252 (MC252) to explode. The Deepwater Horizon oil spill was unprecendeted for several reasons: the volume of oil released; the spill duration; the well depth; the distance from the shore-line (77 km or about 50 miles); the type of oil (light crude); and the injection of dispersant directly at the wellhead. This study clearly demonstrated that there was a profound and significant response by certain members of the in situ microbial community in the deep-sea in the Gulf of Mexico. In particular putative hydrocarbon degrading Bacteria appeared to bloom in response to the Deepwater Horizon oil spill, even though the temperature at these depths is never >5 C. As the plume aged the shifts in the microbial community on a temporal scale suggested that different, yet metabolically important members of the community were able to respond to a myriad of plume constituents, e.g. shifting from propane/ethane to alkanes and finally to methane. Thus, the biodegradation of hydrocarbons in the plume by Bacteria was a highly significant process in the natural attenuation of many compounds released during the Deepwater Horizon oil spill.

02 PETROLEUM↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 5: Utah FORGE Well 16B(78)-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 4: Utah FORGE Well 78B-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 3: Utah FORGE Well 56-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 1: Summary of Utah FORGE Wells 16A(78)-32, 56-32, 78B-32 and 16B(78)-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

Utah FORGE: Drilling Data for Student Competition

Diagnostic drilling data (Pason log files) from Well 58-32 (previously labeled MU-ESW1), which was drilled near Milford Utah during Phase 2B of the FORGE Project to confirm geothermal reservoir characteristics met requirements for the final FORGE site. This dataset includes both raw, unprocessed drilling data recorded at 1Hz and a processed version downscaled to ~0.3m (1 ft) intervals. Diagnostic drilling data were collected to obtain useful information regarding the nature of the subsurface materials and performance of the drilling rig and drilling bits, including rate of penetration (ROP), weight on bit, temperature, pump pressure, etc.

15 GEOTHERMAL ENERGY↗

Mitigation for Removal of Building 01-202681 in the Main Storage Yard of the Area 1 Subdock, Nevada National Security Site, Nye County, Nevada

The Main Storage Yard was originally recorded as SHPO Resource No. S2772 in 2020 during an architectural survey of the Area 1 Subdock (Collins et al. 2022). It was recommended individually eligible for listing in the NRHP under Criteria A and C and as contributing to the significance of the potential Area 1 Subdock Historic District. The SHPO concurred with these determinations in a letter dated April 29, 2022 (Reed). The Main Storage Yard retains all seven aspects of integrity. The location, design, materials, workmanship, feeling, and association have not changed since the original construction. Since the purpose of the yard is to maintain storage equipment that is actively being used, the design and feeling will change each time equipment is moved. Such actions reinforce the integrity of design and feeling. Buildings 01-101 and 01-102 were removed (Collins and Menocal 2020), but the other buildings and storage yard remain. Therefore, the setting has been changed, but not to the degree that the Main Storage Yard no longer conveys its significance (see Figures 4 and 5 for comparison). The Main Storage Yard was designed to facilitate the relocation of the Area 3 Subdock to Area 1 in 1985. The design for the overall Subdock provided a centralized cluster of buildings surrounded by two large storage yards. While the North Storage Yard largely serves as overflow storage, the Main Storage Yard holds the majority of drill rigs and drilling equipment needed to support big hole drilling. The Main Storage Yard and its contents were essential elements of the nuclear testing drilling program on the NNSS thus making it eligible for the NRHP under Criterion A for its contribution to broad patterns of history by storing specially designed equipment for underground nuclear testing at the NNSS. It is also eligible under Criterion C as it is an engineered landscape that now serves as an open-air repository of drilling technology and nuclear testing. In addition to its individual significance, the Main Storage Yard also contributes to the significance of the Area 1 Subdock Historic District as it showcases a variety of big-hole drilling equipment, support facilities, and warehouses that were specially designed for nuclear testing at the NNSS. Despite the demolition of two contributing elements to date, the district still contains numerous examples of other facilities with the purpose of supporting big-hole drilling; therefore, the district still remains eligible under Criteria A and C.

54 ENVIRONMENTAL SCIENCES↗

Use of Rig Parameter Data in Bit Constraint Models for Improved Drilling Performance at The Geysers

Surface parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. However, these measurements are of reduced value without a standard to aid in evaluation and decision making. A method is demonstrated whereby drill bit constraint models are used to interpret drilling response parameters. Drill rig parameter data for well GDC-36 at the Geysers Geothermal Field Power were acquired by Geysers Power Company and drilling contractor Kenai Drilling using Pason US DataHub and evaluated. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) along with other model constraints in computational algorithms. The method is used to evaluate overall bit performance, monitor bit integrity, and detect the presence of drillstring vibrations and other conditions contributing to bit failure; comparisons are made to observations of bit wear and damage. The method will be applied in real-time to improve decision-making on subsequent wells and has applicability to development of advanced analytics on future geothermal wells using real-time electronic drilling recorder (EDR) data for improved performance and reduced drilling costs.

15 GEOTHERMAL ENERGY↗

Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description Addendum

This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) facility for fiscal year 2010. The addendum adds work scope to the previously developed program plan (DOE/WIPP 08-3376). Over the years a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico well drilling contractor holding a valid and current well driller license. The term "Contractor" refers to the licensed well driller and /or registered drill rig supervisor assigned by the well drilling contractor, who will be directed by the WIPP Subcontract Technical Representative (STR) or designee at the drilling site. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Requirements for Geothermal Resource Confirmation

In 2017-2018, the Bureau of Land Management's Renewable Energy Coordination Office, through its Geothermal Program, funded the National Renewable Energy Laboratory (NREL) to analyze technical and environmental considerations related to geothermal resource confirmation drilling. NREL solicited input from a group of technical and environmental experts in the geothermal industry, along with analyzing National Environmental Policy Act of 1969 (NEPA) documentation for previously approved projects. The collected data and analysis will be used by the Bureau of Land Management to examine the possibility of developing a new classification of wells and/or expediting the NEPA compliance process, which could potentially reduce permitting and regulatory compliance timelines when compared to the current process for obtaining a geothermal drilling permit for resource confirmation drilling activities. This paper provides a summary of the technical requirements for confirming a geothermal resource. The analysis showed that confirming a geothermal resource requires confirming reservoir temperature, chemistry, permeability, and flow rate. Obtaining these data requires drilling at least two-preferably three-successful wells into the resource to conduct the necessary tests, including an interference test. Bottom-hole well diameters of at least 6'' to 8'' (0.15 to 0.2 m) are needed to limit the wellbore frictional pressure drop to effectively perform well flow and interference tests. Drilling these wells requires a drill rig with a mud pump and derrick capable of holding three drill pipes. This type of rig requires a minimum well-pad size of 2.5 acres (104 m2) including surface area for a 1 million-gallon (3.8 million-liter) pit. Up to 15 acres (5x104 m2) of total surface disturbance are needed for developing access roads and well pads to drill a total of three to five wells.

15 GEOTHERMAL ENERGY↗

On the possible long-term fate of oil released in the deepwater horizon incident: estimated by ensembles of dye release simulations

We have conducted an ensemble of 20 simulations using a high-resolution global ocean model in which dye was continuously injected at the site of the Deepwater Horizon drilling rig for two months. We then extended these simulations for another four months to track the dispersal of the dye in the model. We have also performed five simulations in which dye was continuously injected at the site of the spill for four months and then run out to one year from the initial spill date. The experiments can elucidate the time and space scales of dispersal of polluted waters and also give a quantitative estimate of dilution rate, ignoring any sink terms such as chemical or biological degradation.

02 PETROLEUM↗

Field Testing of Environmentally Friendly Drilling System

The Environmentally Friendly Drilling (EFD) program addresses new low-impact technology that reduces the footprint of drilling activities, integrates light weight drilling rigs with reduced emission engine packages, addresses on-site waste management, optimizes the systems to fit the needs of a specific development sites and provides stewardship of the environment. In addition, the program includes industry, the public, environmental organizations, and elected officials in a collaboration that addresses concerns on development of unconventional natural gas resources in environmentally sensitive areas. The EFD program provides the fundamentals to result in greater access, reasonable regulatory controls, lower development cost and reduction of the environmental footprint associated with operations for unconventional natural gas. Industry Sponsors have supported the program with significant financial and technical support. This final report compendium is organized into segments corresponding directly with the DOE approved scope of work for the term 2005-2009 (10 Sections). Each specific project is defined by (a) its goals, (b) its deliverable, and (c) its future direction. A web site has been established that contains all of these detailed engineering reports produced with their efforts. The goals of the project are to (1) identify critical enabling technologies for a prototype low-impact drilling system, (2) test the prototype systems in field laboratories, and (3) demonstrate the advanced technology to show how these practices would benefit the environment.

03 NATURAL GAS↗

Characterization and Remediation of the Hanford 618-10 Burial Ground Vertical Pipe Units - 17121

The 618-10 Burial Ground is approximately 148 m by 143 m (485 feet by 470 feet) and consists of 12 trenches and 94 Vertical Pipe Units (VPU's). It is located approximately 8.1 km (5 miles) north of Richland, Washington in the 600 Area of the Hanford Site. The 618-10 Burial Ground received low- to high-activity waste (e.g., fission products and some plutonium-contaminated waste). Most of the waste originated at the 300 Area laboratory facilities. Lower activity radioactive material and shielded drums were disposed in trenches, while laboratory wastes with higher levels of radiation were disposed in Vertical Pipe Units (VPUs). There are different variants of VPUs. Some VPUs are simply corrugated culverts or standard pipes, 36 cm (14 in.) diameter and 3.1 m to 4.6 m (10- to 15-ft) long, buried vertically. Some VPUs are carbon steel pipes 25 to 61 cm (10 to 24 in.) in diameter and up to 4.6 m (15 ft) in length. The final design of the VPUs is 56 cm (22-in) diameter, 4.4 m (14.4 ft) long waste receptacles constructed by welding five 208 L (55-gallon) bottomless drums together end-to-end and burying them vertically, separated by approximately 3.1 m (10 feet) on center in rows approximately 7.6 m (25 feet) apart. The 618-10 Burial Ground contains approximately 94 VPUs. Historical documents indicate that shielding materials (e.g., concrete or soil) may have been added to the VPUs to reduce dose rates over the openings, and that each VPU was backfilled with sand and capped with concrete at the end of its service life. Historical documents also indicate that the VPUs were covered with approximately 0.6 m (2-ft) of soil when they were closed, and an additional 0.6 m (2-ft) of topsoil was later added for surface stabilization. In general, the process for VPU remediation was as follows: - Installed four cone penetrometers (CPTs) around the exterior of each individual VPU and sent radiation detection probes down the interior of the CPTs to get initial radiation data in order to calculate the overall curie content and create maps showing the dose rate distribution throughout the VPU. - Removed the CPTs and installed a 122 cm (48-in) diameter, 1.3 cm (0.5-in) thick steel over-casing using a vibrating hammer suspended from a crane that encompassed the VPU with some surrounding soil. - Using a Bauer BG-30 drill rig with a specifically designed augur bit and a specially designed confinement system the auger process was used to stabilize and size reduce the contents. - Once the auger reached a depth of 8.5 m (28 feet) the BG-30 drill stem was separated and additional characterization was completed by sending a radiation probe down the center of the drill stem to gather radiological data. - Once auguring and characterization was completed the waste was removed using a specially designed extended clamshell retrieval bucket and placed into individual 2.7 m x 1.5 m x 1.2 m (9-ft x 5-ft x 4-ft) metal boxes. - After the waste was placed into the metal waste boxes a low strength grout was added and the grout and waste material was mixed using a large rake device attached to an excavator. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Air quality impacts from the development of unconventional oil and gas well pads: Air toxics and other volatile organic compounds

Unconventional oil and natural gas development (UOGD) has expanded rapidly across the United States in recent decades and raised concerns about associated air quality impacts. While significant effort has been made to quantify methane emissions, relatively few observations have been made of Volatile Organic Compounds (VOCs), especially during drilling and completion of new wells. Extensive air monitoring during development of several large, multi-well pads in Broomfield, Colorado, in the Denver-Julesburg Basin, provides a novel opportunity to examine changes in local air toxics and other VOC concentrations during well drilling and completions and production. These operations offer an especially useful case to study as several management practices were implemented to reduce emissions (e.g., electrified, grid-powered drill rigs and closed loop fluid handling systems to reduce truck traffic and limit fluid handling on the pad). With simultaneous measurements of methane and 50 VOCs from October 2018 to December 2022 at as many as 19 sites near well pads, in adjacent neighborhoods, and at a more distant reference location, we identify impacts from each phase of well development and production. Use of weekly, time-integrated canisters, a Proton Transfer Reaction Mass Spectrometer (PTR-MS), continuous photoionization detectors (PID) to trigger canister collection upon detection of VOC-rich plumes, and an instrumented vehicle, provided a powerful suite of measurements to characterize both transient plumes and longer-term changes in air quality. Prior to the start of well development, VOC gradients were small across Broomfield. Once drilling commenced, concentrations of oil and gas (O&G) related VOCs, including alkanes and aromatics, increased around active well pads. Concentration increases were clearly apparent during certain operations, including drilling, coil tubing/millout operations, and production tubing installation. Emissions of C 8 –C 10 n-alkanes during drilling operations highlighted the importance of VOC emissions from synthetic drilling mud chosen to reduce odor impacts. More than 90 samples were collected of transient plumes. Using composition measurements, meteorological data, and information about well pad activities, these plumes were connected with specific UOGD operations including drilling, flowback, and production equipment maintenance. The chemical signatures of these plumes differed by operation type (e.g., C 8 –C 10 n-alkanes constituted a larger fraction of measured VOCs in drilling-related plumes). Concentrations of individual, oil and gas-related VOCs in these plumes were often several orders of magnitude higher than in background air, with maximum ethane and benzene concentrations of 79,600 and 819 ppbv, respectively. Because these plumes typically impact a monitoring site for just several minutes, they are easily missed by slower-responding instruments. Study measurements highlight future emission mitigation opportunities during UOGD operations, including better control of emissions from shakers that separate drill cuttings from drilling mud, production separator maintenance operations, and periodic emptying of sand cans during flowback operations.

54 ENVIRONMENTAL SCIENCES↗

Deep Borehole Field Test Specifications

This report documents conceptual design development for the Deep Borehole Field Test (DBFT), mainly the test packages (not containing waste) and the system for demonstrating emplacement and retrieval of those packages in the Field Test Borehole (FTB). For the DBFT to have demonstration value, it must be based on conceptualization of a deep borehole disposal (DBD) system for specific waste forms. This document therefore describes a current reference DBD concept, and analyzes key design options for disposal, to guide selection of options for the DBFT. The most important of these options is the emplacement mode, i.e. whether packages are emplaced using a wireline or a string of drill pipe (with a drill rig). This choice is analyzed using cost and risk models, in Sections 5 and 6. Other emplacement mode options are also identified and discussed. The reference DBD concept and the analysis of waste packaging and emplacement options, are used to develop requirements and assumptions for the DBFT and to recommend DBFT specifications. Design issues are identified, and priorities are developed for further conceptual design development and additional engineering analysis, anticipating future design activities. Conceptual design development is part of a process that proceeds in three stages: 1) conceptual design including feasibility studies; 2) preliminary design that includes technical and cost information necessary for final design; and 3) final design sufficient for fabrication or construction. The DBFT engineering demonstration will follow such an evolution. Whereas design evolution typically begins with bench-scale and pilot-scale investigations proceeding to conceptual, preliminary, and final designs, the DBFT can proceed directly to design because of extensive previous work and published literature on scientific drilling, characterization methods, waste packaging and handling, industrial deep-hole drilling and construction, and downhole operations. Hence it is anticipated that this report will lead to completion of conceptual design, then preliminary and final design, fabrication and testing, and demonstration of waste emplacement in a deep borehole.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Floodplain Assessment for the Middle Los Alamos Canyon Aggregate Area Investigations in Technical Area 02 at Los Alamos National Laboratory

The proposed action being assessed in this document occurs in TA-02 in the bottom of Los Alamos Canyon. The DOE proposes to conduct soil sampling at AOC 02-011 (d), AOC 02- 011(a)(ii), and SWMU 02-005, and excavate soils in AOC 02-011(a)(ii) as part of a corrective actions effort. Additional shallow surface soil samples (soil grab samples) will be collected throughout the TA-02 area, including within the floodplain, to perform ecotoxicology studies (Figures 1 and 2). The excavation boundaries in AOC 02-011(a)(ii) are slightly within the delineated 100-year floodplain. The project will use a variety of techniques for soil sampling and remediation efforts to include hand/digging, standard hand auger/sampling, excavation using machinery such as backhoe and front end loader and small drill rig. Heavy equipment will traverse the floodplain and spoils piles will be staged in the floodplain within developed or previously disturbed areas (e.g., existing paved roads and parking areas). The project will utilize and maintain appropriate best management practices (BMPs) to contain excavated materials, and all pollutants, including oil from machinery/vehicles. The project will stabilize disturbed areas as appropriate at the end of the project.

54 ENVIRONMENTAL SCIENCES↗

Benchmarking of Wellhead Safety Zone Criteria for Underground Gas Storage Facilities

Underground natural gas storage facilities are a vital part of the U. S. national infrastructure. However, the concept of hazard zones from fires and explosions at these facilities is not nearly as well defined as it is for natural gas transmission pipelines. This report will take a safety area predicted for underground gas storage facilities called the Wellhead Safety Zone or WSZ and benchmark it against the observed damage zone from the drill rig accident near Rama, Louisiana on November 15, 2007. When combined with earlier accidents, this new benchmark indicates the WSZ formula gives an accurate indication of the hazard radius from underground gas storage facility accidents over a wide range of casing sizes and pressures.