Search NASA⌕ Search

SEARCH · Search NASA

Results for “DRT analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo↗

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo↗

Mars Science Laboratory CHIMRA/IC/DRT Flight Software for Sample Acquisition and Processing

The design methodologies of using sequence diagrams, multi-process functional flow diagrams, and hierarchical state machines were successfully applied in designing three MSL (Mars Science Laboratory) flight software modules responsible for handling actuator motions of the CHIMRA (Collection and Handling for In Situ Martian Rock Analysis), IC (Inlet Covers), and DRT (Dust Removal Tool) mechanisms. The methodologies were essential to specify complex interactions with other modules, support concurrent foreground and background motions, and handle various fault protections. Studying task scenarios with multi-process functional flow diagrams yielded great insight to overall design perspectives. Since the three modules require three different levels of background motion support, the methodologies presented in this paper provide an excellent comparison. All three modules are fully operational in flight.

sample processing↗

Space Launch System: SLS Real Time Rollout Monitoring for MPCV

The NASA Space Launch System (SLS) rocket, Orion spacecraft, and Mobile Launcher (ML) are transported to Pad 39B from the Vehicle Assembly Building on a large, tracked vehicle known as the Crawler Transporter (CT). The CT is a holdover from the Apollo and Space Shuttle programs but has been extensively upgraded to accommodate the SLS. The Dynamic Rollout Test (DRT) on March 17, 2022 marked the first full rollout of the SLS and ML. Analysis indicated that loads and vibrations would be well below design limits, but out of an abundance of caution it was decided to monitor the response in real time during the rollout to assure that loads remained within predicted limits. This first rollout was outfitted with extensive test instrumentation such as accelerometers, pressure sensors, and strain gauges. This instrumentation remained in place following the integrated vehicle modal test and was being used for additional Operational Modal Analysis (OMA) during the rollout in addition to the real-time monitoring. This presentation discusses the specific loads and accelerations monitored during the rollout, how and why those responses were chosen, and how the system was implemented. Finally, a post-rollout loads reconstruction is used to assess the process and the analysis tools used for the rollout analysis.

SLS↗

Artemis I Prelaunch Flight Readiness Analysis

The Prelaunch loads analysis traditionally captures the vehicle and Mobile Launcher (ML) loads associated with stacking in the Vehicle Assembly Building (VAB), rollout to the pad, and high-speed winds while out on the pad prior to liftoff. The following paper details the methodology used in this analysis for loads for the Artemis Flight Readiness assessment. This paper focuses on the stacking and assembly loads, the loads induced by fueling, and the load seen during rollout to the pad. Methods for integrating multiple structural models in dynamic simulations using interface forces, constraint modes, and residual vectors is discussed. Both linear and nonlinear responses are addressed. Simulation results are compared to measured data from the Dynamic Rollout Test (DRT) and Wet Dress Rehearsal (WDR).

SLS↗

Performance Analysis and Data Processing for the Mars Sample Recovery Helicopter in the Jet Propulsion Laboratory 25-ft Space Simulator

On April 19, 2021, Ingenuity became the first helicopter to fly on Mars at Jezero Crater, completing a total of 72 flights by the end of its mission. The success of Ingenuity resulted in various research efforts to further explore Mars via vertical flight, including two optimized Ingenuity-sized helicopters proposed to retrieve samples for the 2028 Mars Sample Return mission. To aid in the design process for the two proposed Sample Retrieval Helicopters, both heritage and optimized, increased diameter rotors were tested at the NASA Jet Propulsion Laboratory in the 25-ft Space Simulator. Three test campaigns were performed using the Ingenuity rotors and optimized Sample Retrieval Helicopter (SRH) rotors for several rotor speeds, densities, configurations, and collectives to identify performance limitations. These three test campaigns included the Ingenuity Engineering Design Model 1 (EDM-1) with and without a cruciform box, Transonic Rotor Test (TRT) rig, and SRH Dual Rotor Test (DRT). Experimental setup, test matrix, data processing, data quality, and performance results for EDM-1, TRT, and DRT campaigns are presented and discussed. Experimental results from the test campaigns will aid in future experimental methods and validation efforts for planetary rotorcraft exploration.

Data Processing↗